 INITI AL ENVIRONMENTAL EXAMINATION (IEE) CHECKLIST REPORT for PROPOSED VILLA STA. MARIA ACP LINE REPLACEMENT PROJECT Project name or Title This Generic IEE Checklist Report shall be used as the interim pro-forma EIA Report requirement for projects to be located within Environmenta! Criti"a Area# (ECA) where a customied IEE Checklist Report !orm has not "et been de#eloped but are required IEE Checklist Report !orm or IEE Report per e$istin% %uidelines  $or ECC a%%i"ation#& t'i# IEE C'e"i#t Re%ort #'a e #*mitte+ ,it'- Proof of Compatibilit" with the e$istin% &and 'se Plan Proof of Authorit" o#er the Project (ite  Accountabilit" (tatements of Proponent )s ee attached form* a nd the Preparer )i f an"+ followin% Anne$es ,-,, of Re#ised Procedural anual for .A/ ,001-10* Photo%raphs or plates2#icinit" map of the project site showin% impact areas and affected areas and communitie s  .ul" Accomplished Project En#ironmental onitorin% 3 Audit Prioritiation (cheme )PEAP(* 4uestionnaire )see Anne$ ,-5d of Re#ised Procedural anual for .A/ ,001-10* (No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14) Read the questions carefull" and write the required information on the blank spaces pro#ided or otherwise check ) * the appropriate bo$es  or parenthesis ) *6 7o$es with check marks )* are automaticall" required6 'se additional sheets if necessar" and indicate this in the appropriate space6 Project proponents are stron%l" +i#"o*rae+ to en%a%e the ser#ices of consultants2facilitators2prepa rers to accomplish 2fill-up the IEE Checklist Repor t !orm6 The Report !orms ha#e be en desi%ned to be user-friendl"6 !urthermore+ E7 Re%ional /ffice is required to complete the processin% of an ECC application usin% the IEE Checklist Report within twent" ),0* workin% da"s upon receipt for completed2du l"- accomplished form6 Misleading or erroneous answers are basis for legal actions and/or denial of ECC issuance. PROJECT $ACT SHEET Pro/e"t Name- Proposed 8illa (ta6 aria ACP &ine Replacement Project Pro/e"t Lo"ation- Go#6 &im A#enue+ 9amboan%a Cit" Tota Pro/e"t Lan+ Area- ,+:;0600 linear meters Tota Pro/e"t01*i+in ,+:;0600 linear meters EE Chec!list "or PROPOSED GOV. LIM V E!"E PIPELI!E REPLCEME!# PRO$EC#  Page1  o f 1 8

IEE Checklist for Water System Project (distribution only)

Embed Size (px)

Citation preview

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 1/18

  INITIAL ENVIRONMENTAL EXAMINATION (IEE) CHECKLIST REPORTfor 

PROPOSED VILLA STA. MARIA ACP LINE REPLACEMENT PROJECT

Project name or Title

This Generic IEE Checklist Report shall be used as the interim pro-forma EIAReport requirement for projects to be located within Environmenta! Criti"aArea# (ECA) where a customied IEE Checklist Report !orm has not "et beende#eloped but are required IEE Checklist Report !orm or IEE Report per e$istin%%uidelines

 

$or ECC a%%i"ation#& t'i# IEE C'e"i#t Re%ort #'a e #*mitte+ ,it'-

• Proof of Compatibilit" with the e$istin% &and 'se Plan

• Proof of Authorit" o#er the Project (ite

•  Accountabilit" (tatements of Proponent )see attached form* and the Preparer )if

an"+ followin% Anne$es ,-,, of Re#ised Procedural anual for .A/ ,001-10*

• Photo%raphs or plates2#icinit" map of the project site showin% impact areas and

affected areas and communities

 

.ul" Accomplished Project En#ironmental onitorin% 3 Audit Prioritiation

(cheme )PEAP(* 4uestionnaire )see Anne$ ,-5d of Re#ised Proceduralanual for .A/ ,001-10*

(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)

Read the questions carefull" and write the required information on the blank spacespro#ided or otherwise check )* the appropriate bo$es or parenthesis ) *6 7o$eswith check marks )* are automaticall" required6 'se additional sheets if necessar"and indicate this in the appropriate space6

Project proponents are stron%l" +i#"o*rae+ to en%a%e the ser#icesof consultants2facilitators2preparers to accomplish2fill-up the IEEChecklist Report !orm6 The Report !orms ha#e been desi%ned to beuser-friendl"6

!urthermore+ E7 Re%ional /ffice is required to complete theprocessin% of an ECC application usin% the IEE Checklist Reportwithin twent" ),0* workin% da"s upon receipt for completed2dul"-accomplished form6

Misleading or erroneous answers are basis for legal actions and/or denial of ECC issuance.

PROJECT $ACT SHEET

Pro/e"t Name- Proposed 8illa (ta6 aria ACP &ine Replacement ProjectPro/e"t Lo"ation- Go#6 &im A#enue+ 9amboan%a Cit"

Tota Pro/e"t Lan+ Area- ,+:;0600 linear metersTota Pro/e"t01*i+in ,+:;0600 linear meters

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page1 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 2/18

$oot%rint Area

 )Area actuall" utilied*

Pro/e"t Pro%onent- 9A7/A<GA CIT= >ATER .I(TRICTO22i"e A++re##- Pilar (treet+ 9amboan%a Cit"Conta"t Per#on-  Anne Aubre" R6 .e Guman-7u%ton%

De#ination- En#ironmental (pecialistConta"t N*mer0#

  Lan+ine -

$a3 N*mer-

  E4mai A++re##-

 

;??-@,1? )9C>. !IE&. /!!ICE*

;??-@,1? )9C>.*

aubre"boo%s1B;,B"ahoo6com

I. PROJECT DESCRIPTION

5.5  PROJECT LOCATION AND AREA-  (treet <ame+ 7aran%a"+ and unicipalit"2Cit"+Pro#ince

This ACP line replacement project will commence at junction Pasonanca Road and8illa (ta6 aria (treet

(ee attached #icinit" map2s and photo%raphs of the project site and site de#elopment2la"outplan6

Geo%raphic coordinates of the project area )Preferabl" use >G( :@ datum+ otherwisespecif" datum used*6

Perimeter01o*n+ar! %oint# Lonit*+e Latit*+e

(tart of Project )junctionCali$to (treet and Go#6 &im A#enue*

E B,,D@,F6B1 < 0FD?@B:6;0

End of Project )junction8eterans A#enue and Go#6&im A#enue*

E B,,D@@:65: < 0FD?@,56B:

H - note data %enerated throu%h Goo%le Earth*

5.6 PROJECT COMPONENTS

$a"iitie#No. o2 7nit#

Area (#8. m.) 0Ca%a"it! 0

Lent'

S%e"i2i"ation0 De#"ri%tion 0Remar#

!inal (takin%2&a" outin%and Potholin%J AsphaltCuttin% and ConcreteCuttin% )includes remo#alof e$istin% asphaltpa#ement and concretepa#ement*

:1B600 linear meters lon% b"B600 meter wide

Pipela"in% of B?0 mm Ø P8C pipe

B1;pieces of 

F600meterseach

:1B600 linear meters

Class B?0

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page2 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 3/18

$a"iitie#No. o2 7nit#

Area (#8. m.) 0Ca%a"it! 0

Lent'

S%e"i2i"ation0 De#"ri%tion 0Remar#

Installation of 8al#es and!ittin%s+ fire h"drants+

blow off assembl"

B@ units - The pipeline will be encased inconcrete to secure it from

pilfera%e+ outside force anddama%e6

5.9 7TILITIES0RE:7IREMENTS )/peration Phase*-

7tiitie# So*r"e E#timate+ Deman+0Con#*m%tion

Power2Electricit"(Tota)

n2a <2A

Power2Electricit"($rom Rene,ae Ener!So*r"e#)

n2a <2A

>ater 

(Tota))!ill-up table below if wateris not obtained from thelocal water utilit"*

n2a Cubic meters2da"

>ater (Rain,ater Coe"tionS!#tem)

n2a <2A

>ater (ource

K L %round water K L well K L sprin% K L others  

K L (urface water K L ri#er K L lake K L others  

&ocation of water source Tuma%a Ri#er+ Pasonanca+ 9amboan%a Cit"+ Re%ion IM

Ener!0;ater E22i"ien"!

7tiitie# E#timate+Savin#

Pro%o#e+ E22i"ien"!0Con#ervation Mea#*re#

Power2Electricit" N>h2d n2a

>ater BB0 cubicmeters

To be used for h"drotestin% and disinfection ofthe pipeline6

5.< MANPO;ER

a. Con#tr*"tion P'a#e

Man%o,er Re8*irement

E3%erti#e0Si# Tota

Construction!oreman

(uper#ise dail" constructionacti#it" and pro%ress of project

B

(afet" /fficer Responsible in ensurin% that theproject complies with the safet"

standards

B

Carpenters Responsible in undertakin% ,

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page3 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 4/18

carpentr" works in the project

ason Responsible in undertakin%masonr" works in the project

,

Pipefitter Responsible for undertakin%interconnection works in the

project

,

&i%ht Equipment/perator 

Responsible for the operation ofli%ht equipment in the project

,

Plumber Assists pipefitters in undertakin%interconnection works in theproject

,

(teelman Responsible for undertakin% steelworks in the project

B

Painter Performs the paintin% works in theproject

B

>elder Performs the weldin% works in theproject

B

&aborers Assists skilled workers inperformin% their tasks andperforms such other tasks as ma"be dele%ated b" the constructionforeman

,1

. O%eration P'a#e

Man%o,er Re8*irement

E3%erti#e0Si# Tota

>ater aintenanceGeneral !oreman

Responsible for o#erseein% the carr"in% outOob /rders for pipeline maintenance works

B

>ater aintenancean 7

Responsible for carr"in% out the Oob /rdersfor pipeline maintenance works

@

5.= INDICATIVE PROJECT COST

  Project Cost )PhP* P'% =&>?@&B>.B=

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page4 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 5/18

II. ENVIRONMENTAL IMPACTS AND MANAEMENT PLAN

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

&A<.

þ Consistenc" with

land use

Current land use w2in Bkmradius )as per onin%ordinance* Residential

þ Commercial2 Institutional

Industrial

 A%ricultural2 Recreational

Protected Areas /thers+ specif"

 Actual land uses w2in Bkmradius Residential

þ Commercial2 Institutional

Industrial

 A%ricultural2 Recreational

Protected Areas

/thers+ specif"

  

þ (ee attached proof of compatibilit" with

land use

.isturbance to

wildlife due to#e%etation clearin%

E$istin% #e%etation in the area !orestland

arshland

Grassland an%ro#e

>etland

/thers+ specif"

Compliance with conditions of

.E<R2&G' (&'P+ Tree Cuttin% Permit+R/>+ PCA Permit

&imit land clearin% as much as possible Pro#ide temporar" fencin% for

#e%etation that will be retained Promote restoration of dama%ed or

destro"ed #e%etation where possible)e6%6+ tree plantin%*J

 Annual inspection of area

replanted2 re#e%etated

Cost inte%rated in the

construction 2operationcost

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page5 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 6/18

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

Chan%e in surface

landform2topo%raph"2terrain2slope

(oil Erosion

(lopeþ flat )0-1*

%entl" slopin% to rollin% )1-

B:* steep )QB:*

Is the project site located in anarea identified b"G72PAGA(A2PI8/&C( ashaard proneS

=es

þ <o

Pro#ide erosion control and slope

protection measures .esi%nate a (poils (tora%e Area+ with

topsoil set aside for later use andallow ma$imum re-use of spoils

Construction durin% dr" season

(tabiliation of embankment with

%rasses or other soil co#er  /thers+ specif"

  

þ Compliance with the .E<R

 Administrati#e /rder <o. ,001-10 and.E<R Administrati#e /rder <o6 ,000-,:+ Implementin% Guidelines onEn%ineerin% Geolo%ical and Geo-haard Assessment )EGGA*6

Re%ular inspection of

slope protection measuresin erosion-prone areas

Re%ular inspection for new

eroded areas near the site /thers+ specif"

  

(lope2 Erosion Control

Cost   /thers+ specif"

(oil2&and

contamination due toimproper solid wastedisposal

E$istin% soil t"pe in the area (and"

cla"

sand"-loam

/thers+ specif" pa#ed area

þ Implementation of the Ecolo%ical (olid

>aste ana%ement Plan )E(>P*þ (et-up temporar" fence around the

construction areaþ Implement re-use and rec"clin% of

waste materialsþ Implement proper se%re%ation+

collection and disposal of domestic

wastes in desi%nated areasþ Pro#ide receptacles 2 bins for solid

wastesþ Coordinate with the municipal 2 cit"

waste collectors

þ .ail" inspection of

waste2rec"clin% bins forse%re%ation

þ .ail" inspection for

presence of mi$ed%arba%e in the facilit"

þ >eekl" inspection of waste

accumulated

/thers+ specif"  

þ Cost inte%rated in the

construction 2operationcost

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page6 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 7/18

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

En%a%e third part" compan" for waste

collection /thers+ specif" Transport solid waste

back to 9C>. otor pool forappropriate disposal6

Impairment of #isual

aesthetics

.e#aluation of land#alues

Presence of #isuall" si%nificantlandforms2landscape2structuresS

=esþ <o

Implement landscapin% and other

beautification measures

Pro#ide adequate buffer Compensate adjacent propert" owners

/thers+ specif"

   

Re%ular inspection of

landscapin% and other

beautification acti#ities Re%ular monitorin% of

buffer ones Re%ularl" monitor

presence2absence ofcomplaints from adjacentpropert" owners

Cost inte%rated in the

construction2

operation cost

>ATER

Increased siltation

due to projectacti#ities

>ater qualit"

de%radation /thers+ specif"

  

(pecif" nearest2recei#in% waterbod"   

.istance to nearest2recei#in%water bod"þ 0 to less than 06? km

06? to B km

ore than B km

If nearest2recei#in% water bod"is fresh water+ specif"classification

 AA

 A

7

þ (et-up proper and adequate sanitar"

facilitiesþ (trictl" require the contractor and its

workers to obser#e proper wastedisposal and proper sanitation

(trictl" obser#e proper waste handlin%

and disposal Pro#ision of wastewater treatment

facilit" )e6%6 septic tank+ oil and water

separator+ etc6* (et up silt trap2stillin% ponds to

minimie downstream siltation Pro#ision of three-chambered septic

tank for domestic sewa%e Pro#ide rin% canals around fuellin%

Re%ular )ocular* inspection of .raina%e 2 canal s"stems

>ater treatment facilit"

)i6e6+ %rease trap+ septictank+ etc6*

4uarterl" monitorin% of thefollowin% p

T(( concentration 7/.

Total Coliform

Color 

/il and Grease

þ Cost inte%rated in the

construction2 operationcost

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page7 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 8/18

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

C

.

þ unclassified

If nearest2recei#in% water bod"is coastal or marine water+specif" classification

(A

(7

(C

(.

Current >ater 'se !isher"

Tourist 9one 2 Park

Recreational

Industrial

 A%ricultural

.omestic 'se

.istance of project area to the

nearest well used 0 to less than 06? km

06? to B km

ore than B km

'se of the nearest well

tanks2 motorpool2 maintenance areas /thers+ specif"

  

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page8 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 9/18

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

.rinkin%2.omestic

Industrial

 A%ricultural

 Abandoned

Competition in water

use .epletion of water

resources

(ie of population usin%recei#in% surface water

B+000 persons QB+000 and ?+000persons

Q?+000person

 A#ailable2nearest water source6 .eepwell

þ >ater district2&G'

(urface water 

/thers+ specif"

  

Implement rainwater har#estin% and

similar measures as an alternati#esource of water

/bser#e water conser#ation measuresJ

Careful selection of project site to

a#oid disruption of traditional wateruses

/btain >ater Permit from <>R7

þ Impro#e efficienc" of water suppl" and

distribution s"stem /thers+ specif"

  

þ Re%ularl" monitor

presence2absence ofcomplaints

þ Re%ular coordination with

concerned a%enciesþ Re%ularl" monitor

occurrences of watershorta%es

/thers+ specif"

  

þ Cost inte%rated in the

construction2 operationcost

Increased

occurrence offloodin%

Is the project site located in anarea identified b" G72PAGA(Aas flood proneS

þ =es

<o

þ 'se appropriate desi%n for project

facilities Implement appropriate draina%e

s"stemþ Re%ularl" remo#e debris and other

materials that ma" obstruct water flow

'se appropriate technolo%" )e6%6raised hand-pumps* to protect drinkin%water from flood contamination

/thers+ specif"

  

þ Re%ularl" monitor

presence2absence ofcomplaints

þ Re%ular coordination with

concerned a%enciesþ Re%ularl" monitor

increased frequenc" offloodin%

/thers+ specif"

  

þ Cost inte%rated in the

construction2 operationcost

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page9 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 10/18

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

 AIR 2 </I(E

 Air qualit"

de%radation

.istance to nearest communit"þ 0 to less than 06? km

06? to B km

ore than B km

þ Properl" operate and maintain all

emission sources )e6%6 #ehicles+pumps+ %enerator+ etc*

Install when applicable+ the appropriate

air pollution control de#ice2s (trictl" enforce %ood housekeepin%

practicesþ Control #ehicle speed to lessen

suspension of road dustþ Conduct water spra"in% to suppress

dust sources and minimie discomfortto nearb" residents

þ 'se co#ered #ehicles to deli#er

materials that ma" %enerate dust /ther+ specif"

  

þ Re%ularl" monitor

presence2absence ofcomplaints

Re%ular )ocular* inspection ofþ  Absence of white or

black smoke from#ehicles+ hea#"equipment and%enerator 

þ Presence of truck

co#er durin% deli#eries

þ Cost inte%rated in the

construction2 operationcost

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page10 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 11/18

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

þ <uisance due to

noise %eneration

.istance to nearest communit"þ 0 to less than 06? km

06? to B km

ore than B km

þ Properl" operate and maintain all noise

sources )e6%6 #ehicles+ pumps+%enerator+ etc*

þ Install when applicable+ the appropriate

noise control de#ice2s )e6%6+ mufflers+silencer+ sound barriers+ etc6*

þ Implement appropriate operatin% hours

Pro#ide adequate buffer and2or

plantin% of trees

/thers+ specif"  

þ Re%ularl" monitor

presence2absence ofcomplaints

Re%ular monitorin% of

buffer ones

þ Cost inte%rated in the

construction2 operationcost

PE/P&E

.isplacement of

residents in theproject site and withinits #icinit"

.isplacement of

Indi%enous Peopleþ Enhanced

emplo"ment and2orli#elihoodopportunities

Reduced

emplo"ment and2or

li#elihoodopportunities

þ Increased re#enues

for &G' .isruption2Competitio

n in deli#er" of public

(ie of population of hostbaran%a" B+000 persons

þ QB+000 and ?+000persons

Q?+000person

Classification of host baran%a" 'rban

þ Rural

 A#ailable ser#ices within2nearthe host baran%a"

þ (chools )e6%6 elementar"+hi%h school+ colle%e*

ealth facilities )e6%6+ clinics+

hospitals+ etc6*þ Peace and order )e6%6+ police

outpost+ br%"6 Tanod+ etc6*

Pro#ide relocation2disturbance

compensation packa%esþ Prioritie local residents for

emplo"ment Promptl" pa" local ta$es and other

financial obli%ationsþ Re%ular coordination with &G'

þ Prior consultation 3 coordination to

minimie disruption on dail" domesticacti#ities 3 respect for IP ri%hts andcultural practices

þ Ensure participation of IPs in

consultations and dialo%ues Pro#ide appropriate traffic2warnin%

si%ns+ li%htin%+ etc /thers+ specif"

  

þ Re%ularl" monitor

presence2absence ofcomplaints

þ Re%ular coordination with

&G' /thers+ specif"

  

þ Cost inte%rated in the

construction2 operationcost

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page11 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 12/18

Po##ieEnvironmenta0 So"iaIm%a"t#

1a#eine Environment Preventive0 Mitiatin Mea#*re# Monitorin Parameter#0Im%ementation

Co#t o2 Mitiation0Monitorin

ser#ices )e6%6+education+ peace andorder+ etc6*

þ Enhanced deli#er" of

public ser#ices )e6%6+education+ peace andorder+ etc6*

þ Increase in traffic

#olume and

worsenin% of trafficflow

Recreation and sports

facilities /thers+ specif"

  

Impacts on

communit" healthand safet"

/thers+ specif"

  

þ Re%ular coordination with &G'

  Pro#ide appropriate warnin% si%ns+

li%htin% and barricades+ whene#erpracticableþ /bser#e proper housekeepin%

Pro#ide on-site medical ser#ices for

an" emer%enc"6 Participate in public awareness

pro%rams on health and safet" Implement appropriate safet"

pro%rams for both communit" andworkers

(trictl" compl" with fire+ safet" and

similar re%ulator" requirements (trictl" compl" with requirements of RA

F;F; /thers+ specif"

  

þ Presence2Absence of

complaintsþ Re%ular coordination with

&G' Re%ular submission of

reports to concerneda%enc"

/thers+ specif"

  

þ Cost inte%rated in the

construction2 operationcost

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page12 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 13/18

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page13 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 14/18

III. A1ANDONMENT 0DECOMMISSIONIN0REHA1ILITATION POLICIES AND ENERIC7IDELINES )if Applicable*

Project &ife or (er#ice for P8C pipelines ?0 "ears

 

Pro#ide description of the Abandonment acti#ities+ such as+ dismantlin% and waste disposal6

>ater s"stem projects undertaken b" the 9amboan%a Cit" >ater .istrict are desi%ned toser#e the water suppl" demands of the public for the ma$imum period of time+ takin% intoconsideration the capital and operational e$penses6 owe#er+ for pipelines+ their replacement will be made upon the e$piration of their e$pected lifespan6 'pon such time+ theold pipelines will be replaced and decommissioned6 7" practice+ old pipelines aredecommissioned and the new lines are used in their place6 The pipelines are leftunder%round for to actuall" remo#e the same would entail %reater cost6 owe#er+ thee$posed pipelines )G6I6* that will be replaced in the future would ha#e to be returned to the

9C>. otor pool >arehouse for appropriate disposal6 Concrete structures on the other hand+ would be rehabilitated as the need arises to ensure the inte%rit" of the structures6

IV. INSTIT7TIONAL PLAN $OR EMP IMPLEMENTATION

The 9amboan%a Cit" >ater .istrict is a d"namic or%aniation whose %rowth throu%h the"ears has been dri#en b" the challen%es facin% it6

It is led b" a ?-member 7oard of .irectors )representin% women+ business+ ci#ic ser#iceclubs+ professionals+ education* appointed b" the local chief e$ecuti#e6 7oard members electthe Chairman+ 8ice Chairman and 7oard (ecretar"6

 A General ana%er appointed b" the 7oard Chairman and confirmed b" the Ci#il (er#iceCommission handles the operations of the or%aniation6 e is supported b" a &e%al 3ana%ement (er#ices .epartment6

!our )@* Groups carr" out the administrati#e and operational acti#ities of the 9amboan%aCit" >ater .istrict+ super#isin% #arious departments under their areas of concern6 Theseinclude the Administrati#e Group+ !inance Group+ /perations Group and Technical (er#icesGroup6

The heads of the departments+ the Assistant General ana%ers who head the four %roups+ and the General ana%er make up the E$ecuti#e Committee6 This E$ecom is themana%ement %roup supportin% the 7oard of .irectors in e$ecution of policies+ pro%rams+ andprojects )(ource 9C>. A &i#in% Tradition of (er#ice #$ua es %ida& brochure*6

Policies pertainin% to the implementation of En#ironmental ana%ement Plan+ after ha#in% been prepared b" the En#ironmental ana%ement (ection of the En#ironment and>ater Resources .epartment+ will ha#e to be appro#ed b" hi%her mana%ement and the7oard of .irectors+ especiall" if it entails bud%et appropriation6 owe#er+ if the costs ha#ealread" been inte%rated in the construction2operation and maintenance costs+ the appro#alfor the implementation of the EP ma" be raised to the Assistant General ana%er for Technical (er#ices6 These will be implemented b" the ainline E$pansion and Rehabilitation.i#ision )ER.*+ if the project is undertaken b" administration+ or if the project is undertakenb" contract+ b" the contractor under the super#ision of ER.6 .urin% operations+ the

mana%ement plan and monitorin% will be undertaken b" the /perations Group6

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page14 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 15/18

/r%aniation Chart

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page15 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 16/18

 Administration Group

!inance Group

Technical (er#ices Group

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page16 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 17/18

/perations Group

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page17 of18

7/24/2019 IEE Checklist for Water System Project (distribution only)

http://slidepdf.com/reader/full/iee-checklist-for-water-system-project-distribution-only 18/18

S;ORN STATEMENT O$ ACCO7NTA1ILIT O$ THE PROPONENT

This is to certif" that all the information and commitments in this Initial En#ironmentalE$amination )IEE* Checklist Report are accurate and complete to the best of m" knowled%e6

7" the authorit" #ested in me b" the AM1OANA CIT ;ATER DISTRICT  asGeneral Manager % I hereb" commit to ensure implementation of all commitments+ miti%atin%measures and monitorin% requirements indicated in this IEE Checklist Report as well as thefollowin%

• Conform with pertinent pro#isions of applicable en#ironmental laws e6%6+ R6A6

<o6 F;F; )'oic ubstances and *a+ardous and Nuclear ,astes Control #ct o" 10 *+ R6A6 <o6 ;001 )Ecolo$ical olid ,aste Mana$ement #ct o" 2000 *+R6A6 <o6 ;,5? ).hilippine Clean ,ater #ct o" 2004*+ and R6A6 <o6 :5@;).hilippine Clean #ir #ct o" 1*6

•  Abide and conform to &G' de#elopment plans and %uidelines6

• Promptl" pa" local ta$es and other financial obli%ations6

• Re%ularl" submit reports to concerned a%encies6

I hereb" bind m"self to answer an" penalt" that ma" be imposed arisin% from an"misrepresentation or failure to state material information in this IEE Checklist6

In witness whereof+ I hereb" set m" hand this da" of at 6

 &E/<AR./ RE= .6 8A(4'E9General ana%er 

9amboan%a Cit" >ater .istrict

('7(CRI7E. A<. (>/R< T/ before me this da" of ,0B+ affiante$hibitin% his2her Communit" Ta$ Certificate <o6 issued at  on 6

.oc6 <o6  Pa%e <o6  7ook <o6  (eries of  

EE Chec!list "or PROPOSED GOV. LIM VE!"E PIPELI!E REPLCEME!# PRO$EC# 

  Page18 of18