Icarus detector ‘’ dismantling ’’. JL Grenard, C. Bertone. ICARUS detector feet. There are 10 bolted and pinned supports between the structure and the cryostat. All are underneath. Pins impossible to remove There are 2 fixed supports in the middle of the structure, one per each side - PowerPoint PPT Presentation

Citation preview

Page 1: Icarus detector ‘’ dismantling ’’

Icarus detector ‘’dismantling’’

21 November 2011

JL Grenard, C. Bertone

Page 2: Icarus detector ‘’ dismantling ’’

ICARUS detector feet

• There are 10 bolted and pinned supports between the structure and the cryostat. All are underneath. Pins impossible to remove

• There are 2 fixed supports in the middle of the structure, one per each side

• There are 4+4 ‘sliding’ supports (2+2 per each side) • The 2+2 sliding supports that are on the extremity are

accessible by the outside by the ‘trou d’homme’• The 6 remaining supports (2 fix and 4 sliding) needs to

enter the detector and dismantle a part of the race track to unbolt them

2

Page 3: Icarus detector ‘’ dismantling ’’

Disconnection of the sliding feet

• Unscrewing the supporting points

• This permits to lift the detector by extracting the sphere 4 screws to

be removed

3

Page 4: Icarus detector ‘’ dismantling ’’

Disconnection of the fix point

• Removal of the 2 small screw to free the big bolt

• Unscrewing of the two bolts to increase the gap for the lifting

• This permits to lift the structure out of this support

4

Page 5: Icarus detector ‘’ dismantling ’’

• Need to dismount 0.5m of ‘’pipes’’ on the sides and on the floor to access at the support points on each side.

To be done on the ‘’bolted’’ side of the cryostat. For the other side, access by the trou d’homme on the cryostat is enought

Opening of the cryostat

04/19/23 5

Page 6: Icarus detector ‘’ dismantling ’’

Extraction• Lifting with 8 hydraulics jacks (close to the

supporting points)• The main part of the feet will stay in place.

need to lift ~50mm to pass over those• Installation of some sliding block on the

structure and some rails between the cryostat

Fix part remaining in the cryostat

6

Page 7: Icarus detector ‘’ dismantling ’’

Extraction• Pulling out of the detector to the ‘’transport

frame’’

-The frame will be completely enclosed for a clean transport-Total weight for handling <40t

7

Page 8: Icarus detector ‘’ dismantling ’’

What next?

• Design of transport feet• Design and dimensioning of transport box:– Drawings of interface with transport structures is

missing– Information about maximum sagitta admissible

for the integrity of the wires is missing