STAMP I-94 Bridge Rehabilitation Washtenaw & Jackson Counties Construction and Motorist Information 2004 Michigan Department of Transportation Michigan Department of Transportation I-94 Bridge Rehabilitation Washtenaw & Jackson Counties I-94 Bridge Rehabilitation Washtenaw & Jackson Counties I-94 over Ann Arbor RR I-94 under State St. I-94 under Ann Arbor- Saline Rd. I-94 over I-94 BL (Jackson Ave.) I-94 under Wagner Rd. I-94 over Pierce Rd. I-94 at the Norfolk Southern RR I-94 under Kalmbach Rd. I-94 under Notten Rd. I-94 under Clear Lake Rd. I-94 under Mt. Hope Rd. I-94 under Parker Rd. I-94 over Mill Creek I-94 under Old US-12/ Fletcher Rd. I-94 under Freer Rd. I-94 over Dancer Rd. Phase 3 Phase 2 Phase 1 The bridge groups and the impact to local and I-94 traffic (moving east to west) include (see detail inside): I-94 under M-52 What is being done? Starting in the spring of 2004, the Michigan Department of Transportation will rehabilitate 21 bridges along the I-94 corridor. The project stretches from just west of US-23 in Washtenaw County to Mt. Hope Rd. in Jackson County. Improvements include bridge deck replacement, structural steel repair and bridge painting. How will traffic be affected? To reduce the inconvenience to motorists and residents, traffic will be maintained using construction staging in three separate groups. Construction will take place and be completed within Group 1 and 3 before work begins in Group 2.

I-94 Bridge Rehabilitation Washtenaw & Jackson Counties€¦ · I-94 under Kalmbach Rd. Kalmbach Rd. Bridge closed; detour in place. I-94 under Notten Rd. F One lane maintained with

Embed Size (px)

Citation preview

STAM

P

I-94 Bridge Rehabilitation

Washtenaw & Jackson

Counties

Construction and Motorist

Information

2004

Michigan Department of TransportationMichigan Department of TransportationI-94 Bridge Rehabilitation Washtenaw & Jackson Counties I-94 Bridge Rehabilitation Washtenaw & Jackson Counties

I-94 over Ann Arbor RR

I-94 under State St.

I-94 under Ann Arbor-Saline Rd.

I-94 over I-94 BL

(Jackson Ave.)

I-94 under Wagner Rd.

I-94 over Pierce Rd.

I-94 at the Norfolk Southern RR

I-94 under Kalmbach Rd.

I-94 under Notten Rd.

I-94 under Clear Lake Rd.

I-94 under Mt. Hope Rd.

I-94 under Parker Rd.

I-94 over Mill Creek

I-94 under Old US-12/

Fletcher Rd.

I-94 under Freer Rd.

I-94 over Dancer Rd.

Phase 3 Phase 2 Phase 1

The bridge groups and the impact to local and I-94 traffic (moving east to west) include (see detail inside):

I-94 under M-52

What is being done?

Starting in the spring of 2004, the Michigan Department of Transportation

will rehabilitate 21 bridges along the I-94 corridor. The project stretches from

just west of US-23 in Washtenaw County to Mt. Hope Rd. in Jackson County.

Improvements include bridge deck replacement, structural steel repair

and bridge painting.

How will traffic be affected?

To reduce the inconvenience to motorists and residents, traffic will be maintained using construction

staging in three separate groups. Construction will take place and be completed within Group 1 and 3

before work begins in Group 2.

Embedded EPS
There is embedded EPS on this page. Adobe Acrobat does not support the display of this type of object but it will print intact to a PostScript device.

Construction will take place and be completed within Group 1 and 3 before work begins in Group 2.

I-94 Bridge Rehabilitation Washtenaw & Jackson Counties

Ph

as

e 1

I-94 over Ann Arbor RR

I-94 under State St. Two lanes maintained in each direction on State St. The eastbound I-94 on-ramp to northbound State St. closed for two-weeks to accommodate work at the Ann Arbor RR.

I-94 under Ann Arbor-Saline Rd. Maintain minimum one lane in direction on Ann Arbor-Saline Rd.

each

I-94 over I-94 BL (Jackson Ave.) Nighttime lane closureson I-94 BL

I-94 under Wagner Rd. Wagner Rd.Bridge closed; detour in place

Construction will take place at the Ann Arbor RR, State St. and I-94 BL starting in March and is expected to be completed by Memorial Day. After Memorial Day, construction will occur at Ann Arbor-Saline Rd. and Wagner Rd. with all work completed by mid-July.

On I-94, 24-hour-seven-day-a-week, single closures will take place in each direction along I-94 near the Ann Arbor RR and I-94 BL for several months. Shoulder and nighttime closures will occur on I-94 at the other locations during construction.

A

B

C D

E

Construction will take place at Pierce Rd., Norfolk Southern RR and Clear Lake Rd. starting in the spring. Work at these locations will be completed before work begins at Kalmbach Rd., Notten Rd. and Mt. Hope Rd.

On I-94, 24-hour-seven-day-a-week, single lane closures will take place in each direction along I-94 between Pierce Rd. and Norfolk Southern RR. Shoulder and nighttime closures will occur on I-94 at the other locations during construction

I-94 over Pierce Rd. One lane maintained with a temporary signal on Pierce Rd.

I-94 at the Norfolk Southern RR

I-94 under Kalmbach Rd. Kalmbach Rd. Bridge closed; detour in place

I-94 under Notten Rd. One lane maintained with a temporary signal on Notten Rd.

I-94 under Clear Lake Rd. Clear Lake Rd. Bridge closed; detour in place

I-94 under Mt. Hope Rd. Mt. Hope Rd. Bridge closed; detour in place

Ph

as

e 3

F

A

B

C

D

E

Construction will take place at Mill Creek, Dancer Rd., Old US-12/Fletcher Rd. and Freer Rd. starting in approximately mid-July. Once work is complete at these locations in early fall, work at Parker Rd. and M-52 will begin.

On I-94, 24-hour-seven-day-a-week, single closures will take place in each direction along I-94 between Mill Creek and Dancer Rd. Shoulder and nighttime closures will occur on I-94 at the other locations during construction

I-94 under Parker Rd. Parker Rd. Bridge closed; detour in place

I-94 over Mill Creek I-94 under Old US-12/Fletcher Rd. Old US-12 Bridge closed; detour in place

I-94 under Freer Rd. One lane maintained with a temporary signal on Freer Rd.

I-94 over Dancer Rd. Shoulder closures on Dancer Rd; one lane maintained with flag control

I-94 under M-52 One lane in each direction on M-52.

Ph

as

e 2

A

B

C

D

E

F

Packard

Ellsworth Rd.Ellsworth Rd.

Sci Church d.o R

State St.

Ann A

bor S

line R

d.

r

a

n or

..

AnArb

RR.

Stone School Rd.

ganMor Rd.

Plattl Rd.

Miller Rd.

Liberty d.R

Craig Rd. Maple Rd.

gneW

ar Rd.

I-94 BL

Phase 1

Contact information:For more information, visit MDOT's web site at

www.michigan.gov/mdot or the Brighton Transportation Service Center (TSC) at

810-227-4681.

Michigan Department of Transportation

A

B

C

D

E

M r la shal Rd.

Baker Rd.

Parker Rd.a k d.

J c son R

Easton Rd.

ri kl RT n e d.

Gross Rd.

Steinback Rd.

Dancer Rd.

North Fork.

rRFree

d.

CHELSEA

l US 12

Rd.

Od

Fletcher Rd.

Phase 2

ABCD

EF

ai Conr l Rd.

Cavanaugh Lake Rd.

Glazer Rd.

Old U

S 12

Rd.

Old US 12 Rd.

Kalmback Rd.

Mt.

Hope

Rd.

WAS

HTEN

AW

C

O.

JACK

SON

CO.

ir

d.

Pe

ceR

ac dLe h R .

Sager Rd.

Bohne Rd.

M s yorris e Rd.

u

dM

ate

R.

Fran

sisco

Rd.

Reiman Rd.

ra vH d.R ey

dNotten

R.

Hoppe Rd.

Kilmer Rd.Notten Rd.

Conrail Rd.

Winters Rd.

Clear Lake Rd.

Kl

achd

am

b R

.

Phase 3

AB

CDE

F

23

52

94

14

94

94

94

94N

N

N

MDOT is improving Michigan’s total transportation system by efficiently delivering transportation

products, services and information.

Prepared by: MDOT Graphics\OfficeOfCommunications\brochures\Brian’s Construction map... copies printed @ $ each for a total cost of $

RECYCLEDPAPER