I-94 Bridge Rehabilitation
Washtenaw & Jackson
Counties
Construction and Motorist
Information
2004
Michigan Department of TransportationMichigan Department of TransportationI-94 Bridge Rehabilitation Washtenaw & Jackson Counties I-94 Bridge Rehabilitation Washtenaw & Jackson Counties
I-94 over Ann Arbor RR
I-94 under State St.
I-94 under Ann Arbor-Saline Rd.
I-94 over I-94 BL
(Jackson Ave.)
I-94 under Wagner Rd.
I-94 over Pierce Rd.
I-94 at the Norfolk Southern RR
I-94 under Kalmbach Rd.
I-94 under Notten Rd.
I-94 under Clear Lake Rd.
I-94 under Mt. Hope Rd.
I-94 under Parker Rd.
I-94 over Mill Creek
I-94 under Old US-12/
Fletcher Rd.
I-94 under Freer Rd.
I-94 over Dancer Rd.
Phase 3 Phase 2 Phase 1
The bridge groups and the impact to local and I-94 traffic (moving east to west) include (see detail inside):
I-94 under M-52
What is being done?
Starting in the spring of 2004, the Michigan Department of Transportation
will rehabilitate 21 bridges along the I-94 corridor. The project stretches from
just west of US-23 in Washtenaw County to Mt. Hope Rd. in Jackson County.
Improvements include bridge deck replacement, structural steel repair
and bridge painting.
How will traffic be affected?
To reduce the inconvenience to motorists and residents, traffic will be maintained using construction
staging in three separate groups. Construction will take place and be completed within Group 1 and 3
before work begins in Group 2.
Construction will take place and be completed within Group 1 and 3 before work begins in Group 2.
I-94 Bridge Rehabilitation Washtenaw & Jackson Counties
Ph
as
e 1
I-94 over Ann Arbor RR
I-94 under State St. Two lanes maintained in each direction on State St. The eastbound I-94 on-ramp to northbound State St. closed for two-weeks to accommodate work at the Ann Arbor RR.
I-94 under Ann Arbor-Saline Rd. Maintain minimum one lane in direction on Ann Arbor-Saline Rd.
each
I-94 over I-94 BL (Jackson Ave.) Nighttime lane closureson I-94 BL
I-94 under Wagner Rd. Wagner Rd.Bridge closed; detour in place
Construction will take place at the Ann Arbor RR, State St. and I-94 BL starting in March and is expected to be completed by Memorial Day. After Memorial Day, construction will occur at Ann Arbor-Saline Rd. and Wagner Rd. with all work completed by mid-July.
On I-94, 24-hour-seven-day-a-week, single closures will take place in each direction along I-94 near the Ann Arbor RR and I-94 BL for several months. Shoulder and nighttime closures will occur on I-94 at the other locations during construction.
A
B
C D
E
Construction will take place at Pierce Rd., Norfolk Southern RR and Clear Lake Rd. starting in the spring. Work at these locations will be completed before work begins at Kalmbach Rd., Notten Rd. and Mt. Hope Rd.
On I-94, 24-hour-seven-day-a-week, single lane closures will take place in each direction along I-94 between Pierce Rd. and Norfolk Southern RR. Shoulder and nighttime closures will occur on I-94 at the other locations during construction
I-94 over Pierce Rd. One lane maintained with a temporary signal on Pierce Rd.
I-94 at the Norfolk Southern RR
I-94 under Kalmbach Rd. Kalmbach Rd. Bridge closed; detour in place
I-94 under Notten Rd. One lane maintained with a temporary signal on Notten Rd.
I-94 under Clear Lake Rd. Clear Lake Rd. Bridge closed; detour in place
I-94 under Mt. Hope Rd. Mt. Hope Rd. Bridge closed; detour in place
Ph
as
e 3
F
A
B
C
D
E
Construction will take place at Mill Creek, Dancer Rd., Old US-12/Fletcher Rd. and Freer Rd. starting in approximately mid-July. Once work is complete at these locations in early fall, work at Parker Rd. and M-52 will begin.
On I-94, 24-hour-seven-day-a-week, single closures will take place in each direction along I-94 between Mill Creek and Dancer Rd. Shoulder and nighttime closures will occur on I-94 at the other locations during construction
I-94 under Parker Rd. Parker Rd. Bridge closed; detour in place
I-94 over Mill Creek I-94 under Old US-12/Fletcher Rd. Old US-12 Bridge closed; detour in place
I-94 under Freer Rd. One lane maintained with a temporary signal on Freer Rd.
I-94 over Dancer Rd. Shoulder closures on Dancer Rd; one lane maintained with flag control
I-94 under M-52 One lane in each direction on M-52.
Ph
as
e 2
A
B
C
D
E
F
Packard
Ellsworth Rd.Ellsworth Rd.
Sci Church d.o R
State St.
Ann A
bor S
line R
d.
r
a
n or
..
AnArb
RR.
Stone School Rd.
ganMor Rd.
Plattl Rd.
Miller Rd.
Liberty d.R
Craig Rd. Maple Rd.
gneW
ar Rd.
I-94 BL
Phase 1
Contact information:For more information, visit MDOT's web site at
www.michigan.gov/mdot or the Brighton Transportation Service Center (TSC) at
810-227-4681.
Michigan Department of Transportation
A
B
C
D
E
M r la shal Rd.
Baker Rd.
Parker Rd.a k d.
J c son R
Easton Rd.
ri kl RT n e d.
Gross Rd.
Steinback Rd.
Dancer Rd.
North Fork.
rRFree
d.
CHELSEA
l US 12
Rd.
Od
Fletcher Rd.
Phase 2
ABCD
EF
ai Conr l Rd.
Cavanaugh Lake Rd.
Glazer Rd.
Old U
S 12
Rd.
Old US 12 Rd.
Kalmback Rd.
Mt.
Hope
Rd.
WAS
HTEN
AW
C
O.
JACK
SON
CO.
ir
d.
Pe
ceR
ac dLe h R .
Sager Rd.
Bohne Rd.
M s yorris e Rd.
u
dM
ate
R.
Fran
sisco
Rd.
Reiman Rd.
ra vH d.R ey
dNotten
R.
Hoppe Rd.
Kilmer Rd.Notten Rd.
Conrail Rd.
Winters Rd.
Clear Lake Rd.
Kl
achd
am
b R
.
Phase 3
AB
CDE
F
23
52
94
14
94
94
94
94N
N
N
MDOT is improving Michigan’s total transportation system by efficiently delivering transportation
products, services and information.
Prepared by: MDOT Graphics\OfficeOfCommunications\brochures\Brian’s Construction map... copies printed @ $ each for a total cost of $
RECYCLEDPAPER