    HINDUSTAN PETROLEUM CORPORATION LIMITED MUMBAI REFINERY

    DHT PROJECT

    PART : III

    SECTION : A

    TITLE : ENGINEERING DESIGN BASIS

    PIPING

    DOCUMENT NO: 44LK-5100-00/L.02/002/A4

    1 06.04.09 50 Revised as marked & Issued as Amendment

    no.1

    DRP RMP RMP/PVS

    0 03.12.08 50 Issued for FEED DRP RMP RMP/PVS

    Rev No. Issue Date Pages Description Prepared By Checked

    By Approved

    By

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 2 of 50

    TABLE OF CONTENTS

    1.0 PURPOSE

    2.0 SCOPE

    3.0 GENERAL CRITERIA

    3.1 EQUIPMENT LAYOUT

    3.2 PIPING MODELING & GENERAL ARRANGEMENT

    3.3 OFFSITES AND YARD PIPING

    3.4 TANK FARM PIPING

    3.5 UNDERGROUND PIPING

    3.6 VENTS AND DRAINS

    3.7 FLEXIBILITY ANALYSIS & SUPPORTING

    3.8 FLARE PIPING

    3.9 MATERIALS AND SELECTION OF PIPES AND FITTINGS

    3.10 NDT REQUIREMENTS 3.11 STRAINERS

    3.12 WELDING

    4.0 REFERENCED PUBLICATION

    ANNEXURES

    ANNEXURE A ACCESSIBILITY FOR VALVES & INSTRUMENTS

    ANNEXURE B CLEARANCES

    ANNEXURE C VERTICAL AND HORIZONTAL GUIDES SPACING

    ANNEXURE D TABLE OF BASIC SPAN

    ANNEXURE E TECHNICAL REQUIREMENTS OF PIPING MATERIAL

    ANNEXURE F GENERAL REQUIREMENT ANNEXURE G STANDARD DRAWINGS

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 3 of 50

    1.0 PURPOSE

    The purpose of this document is to establish a common understanding between PMC & LSTK Contractor on Piping Design Philosophies for DHT Project at HPCL, Mumbai Refinery.

    2.0 SCOPE

    This Design Basis defines briefly the general guidelines for piping viz: preparation of equipment layout, piping arrangement, piping material specifications and local statutory / safety requirements. In case of any discrepancy or contradiction either in this Design Basis, or in Standard Drawings / Standard specifications, It is deemed mandatory to follow the requirements of the national / International design codes / standards, local statutory rules or OISD guide lines as applicable. The standard drawings provided in the BID are for reference and for conceptual understanding only and thus not exhaustive. Where ever necessary, either for the lack of information or non availability, LSTK shall prepare or develop the required specifications/standard drawings and use the same with prior approval of PMC

    2.1 DEFINITION :

    OWNER - Hindustan Petroleum Corporation Limited, Mumbai Refinery.

    PMC - Jacobs Engineering India Pvt. Ltd.

    LSTK - Successful Bidder

    3.0 GENERAL CRITERIA

    3.1 EQUIPMENT LAYOUT

    3.1.1 BASIS OF EQUIPMENT LAYOUT Equipment Layout shall be developed based on the following data:

    P&IDs

    Typical Equipment Layout Diesel Hydro treating Unit, by Process Licensor

    Indicative Equipment Layout by PMC

    Equipment Process Data Sheets.

    Wind direction.

    Overall Plot Plan

    Tie-in-Points for process & utilities with existing Plant.

    3.1.2 DEVELOPMENT OF EQUIPMENT LAYOUT

    The following aspects shall be considered during development of Equipment Layout:

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 4 of 50

    1. Process requirement i.e. proper interconnection between equipment as per P& IDs to achieve the intended process parameters. The indicative Equipment Layout by PMC only provides a suggested equipment layout that conforms to accepted good practice and incorporates the critical relationships between major equipment that affect process performance.

    2. Economy of Piping material - Minimize the quantity of costly piping.

    3. Erection & Construction requirement: -

    Erection scheme and schedule of all equipment must be considered during equipment layout to have smooth erection mainly in case of tall columns, heavy equipments like thick walled reactors, approach road for cranes/ derrick for lifting the column or reactors and requirement of special foundation/pile etc.

    4. Safety Requirements including fire fighting, and hazardous area classification, Access stairways in the platform/Technological structures.

    5. Petroleum Rules, OISD Standard guidelines shall be followed. Fire fighting facility shall be as per TAC and OISD norms. Safety shower location shall be marked in equipment layout. The relevant standards are to be followed for preparation of hazardous area drawings.

    6. Operation and Maintenance requirement as mentioned below:

    Overhead and side clearances for exchangers and pumps

    Provision of exchangers - tube bundle pulling area

    Horizontal and overhead clearances for easy movement of working personnel

    Crane approaches for air coolers / fired heaters

    Provision for catalyst loading / unloading facilities

    Provision for monorail for pumps and exchangers

    Provision for EOT / HOT crane for compressors

    Provision for operators cabin

    7. Similar equipment grouping All columns, exchangers, pumps etc. shall be grouped together for convenience of maintenance and safety wherever feasible.

    8. The technological structures should be interconnected for easy movement of operational personnel.

    9. All areas requiring crane access in erection/maintenance of equipments, catalyst loading etc. shall be marked on the equipment layout.

    10. U/G piping corridors for main headers should be marked in equipment layout for all underground piping.

    11. Fire proofing requirements in pipe racks, structures & supporting equipments.

    12. Eye wash & shower locations, Utilities stations.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 5 of 50

    3.1.3 PIPE RACK

    In general, equipment layout shall be prepared considering straight pipe rack, however other shapes like L/T/U/H/Z etc can also be considered based on area available.

    The total width of pipe rack shall include 30% extra space or 1.5m (min) for future modifications in unit at later stage at all levels/tiers.

    The width of the rack shall be 6m, 8m or 10m for single bay and 12M, 16M or 20M for double bay having 4 tiers maximum. For interconnecting pipes to different units, existing pipe racks to be expanded wherever possible considering foundation and column design. The spacing between pipe rack portals shall be taken as 6m in general. However it can be changed to suit intra units distances.

    Each bay between two passing columns shall have secondary structural members at a span of 3m to enable supporting of small bore lines.

    Pipe racks shall be fireproofed, as per OISD Codes with provision of insert plates in supporting auxiliaries.

    - Clearance beneath pipe rack shall be 4.5m minimum

    - Road Clearance shall be 9m minimum for main road. Secondary road clearance shall be 5m.

    - Dia. 20 rod above Sleeper/Pipe rack to be made of CS.

    - Deleted.

    - Corrosion wear pads shall be provided for all the lines at support locations.

    3.1.4 REACTORS

    The reactor superstructure structural steel columns shall be placed in line and symmetrically so that piping routing is shorter, easier, and economical and the whole area looks aesthetically laid out.

    Maintenance access required near the reactor structure is mainly for catalyst loading and unloading.

    Stairway is provided for the reactor structure since the structure goes high and is frequently used by operators. Emergency escape ladder shall also be provided.

    Depending on the type of catalyst loading system i.e. fixed or mobile or as indicated in Process Licensors Package; make space allocation in the layout as required. The paved areas at grade will extend around catalyst unloading / loading areas

    Since reactors are heavily insulated, insulation to be shown on equipment layout drawing. Reactor shall have davits to handle top man way covers and its piping.

    1

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 6 of 50

    3.1.5 REBOILER

    Reboiler shall be located next to the tower they serve. The elevation of Reboiler shall be as given in the P&IDs. Horizontal thermo-siphon exchangers are located at a minimum elevation. Vertical thermo-siphon types are usually supported by the tower and are located on the backside to be accessible for maintenance. Large vertical types, which cannot be supported from the tower/ column, may require a separate supporting structure. As far as possible they shall not be mounted on springs to take care of differential expansion. No platform/ piping to obstruct removal of vertical Reboiler with the help of crane. Vertical Reboiler will require guides, where length/ diameter exceed 6.0 m. Reboiler piping shall be checked for pressure drop before finalization of the same. Clear crane access shall be provided for maintenance of unfired type re-boilers including piping elements like 3-way valve etc.

    3.1.6 HORIZONTAL VESSELS

    The Horizontal vessels shall be laid perpendicular to pipe rack and dished end shall be placed minimum 4 m away from the pipe rack. The clearance between horizontal vessel shells shall be minimum 2m or 900 mm clear aisle whichever is higher. The aisle minimum 900mm/OISD as specified should be clear of any piping or instrument element (like LS, LG etc.) All the inter equipment distances shall be as per OISD std.

    High-pressure vessels shall be aligned with their dished ends facing away from the plant.

    The chemical vessels to be located close to the dosing pumps to the extend possible.

    3.1.7 TOWERS AND VERTICAL VESSELS

    Towers and vertical vessels shall be arranged in a row with common centerline, decided by largest vessel, placing O.D of the equipment minimum 4m away from pipe rack. A minimum clearance of 3m shall be maintained between tower shells, but in any case, minimum 100mm horizontal gap shall be provided between platforms of adjacent towers. A minimum of 900mm clearance shall be provided between tower plinths.

    A davit is required to be provided to handle the heavy items (like relief valves, blinds, covers etc.) The davit shall be on the side of column/vessel away from pipe rack. The area at grade level to be kept clear for dropout.

    Efforts shall be made to provide interconnecting platforms at suitable levels for adjacent towers, considering thermal expansions of towers. All level switches, LG etc. including their isolation valves, shall be accessible from ladders / platforms.

    Chemical vessels shall be located close to the dosing point to the extent possible.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 7 of 50

    PUMPS Clearance between two adjacent pumps shall be such that clear 1000mm aisle is available. Wherever practicable, pumps shall be arranged in rows with the centerline of the discharge on a common line; in general pumps shall be kept outside the pipe rack only with motor facing opposite to equipment.

    3.1.8

    All pumps not open to sky, with motor rating 75 KW and above, shall be provided with monorail under pipe rack / shed. Clearance between two adjacent pumps shall be such that clear 1000mm aisle is available.

    Pumps shall not be located within bunded (dyked) tank areas. Hydrocarbons process pumps shall not be installed beneath equipment containing flammable or combustible liquids other than unit pipe racks, unless special fireproofing and fire fighting precautions are taken, like water spray system.

    All process pumps handling class A fluid shall be provided with water sprinkle/spray system

    3.1.9 EXCHANGERS

    In most of the cases floating head of exchangers shall be placed on a line 4 m away from pipe rack. Shell and tube type exchangers may have a removable shell cover with flanged head. Tube pulling or rod cleaning area must be allowed at the channel end. This shall be minimum tube bundle length + 1.5 m from the channel head.

    One number of tube bundle puller (common) to be considered in all the exchangers.

    Minimum clearance in between two horizontal exchangers shall be 2.0 m or 900 mm clear aisle whichever is higher. The minimum clear aisle specified between the exchangers i.e., 900mm, shall be clear from any piping element and instrument including probes of thermocouples.

    Likewise Heat Exchanger train should be suitably spaced such that shell / tube inlet/outlet piping do not foul with floating head covers.

    Monorails to be provided for tube bundle removal for all exchangers except for those, which are open sky. Davits to be provided for floating head cover for all exchanger.

    Elevation of exchangers shall be kept to minimum but shall be of sufficient height to allow drainage from low points of exchanger piping. Clear access shall be provided for the OWS and CBD valves of the exchangers. No piping element like CBD / OWS valves shall be located on grade directly below the channel cover and shell cover.

    The roof height of the technological structure shall be sufficient to allow erection of exchangers (including stack type) by crane. On technological structure- monorail with chain pulley block will be provided for exchanger bundle removal.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 8 of 50

    3.1.10 FIN FAN EXCHANGERS/ AIR FIN COOLERS

    Fin Fan Exchangers / Air Fin Coolers shall preferably be located over the main unit pipe rack. Suitable access for maintenance shall be provided. For air coolers located on technological structure/rack, pipe concrete blind floor shall be provided below the air coolers. Blind floor is generally not required if pumps handling hydrocarbons or equipment are not placed below them. Pumps handling hydrocarbon, shall not be placed below the air fin coolers.

    The width of the structure from where Air Fin Exchanger assembly is supported shall be about 2m more than the Air Fin Exchanger tube length so that supporting of piping manifold (inlet / outlet) can be done from the main member of pipe rack / technological structure, thus transferring the load to main structural members. Monorail shall be provided at one end of air cooler platform area for lowering the gearboxes.

    Following access shall be provided for air coolers mounted on pipe racks :

    - Service platform to access the flanged inlet/outlet nozzles

    - Plat forms to servicing the Fan, Drives, Gears etc. below to Air coolers.

    - All platforms /walkways shall be supported from air cooler structure

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 9 of 50

    3.1.11 FURNACES/FIRE HEATERS

    When the hydrocarbon being handled is above its auto-ignition temperature in process, equipment may be located close to the heater and adequate access for maintenance and adequate fire protection to be provided. This is done to reduce high hazard spreading within the plant

    Furnaces/Fire Heaters shall be located upwind or side wind of process units to blow any combustible leaks away from the open flame. They shall be located minimum 90 m away from tanks and 30m away from control room. Distances for equipments handling hydrocarbon from the heaters shall be strictly as per OISD norms. Vessels/ reactors/ columns directly connected to heater (if required as per P&ID) are exception. Heaters shall be arranged with centerline of the stacks on a common line in case of circular heater and wherever a common stack is furnished to cater more than one heater the stacks shall be located at the end or side, which is away from the unit. In case of individual box heater, the edge of the heaters on the rack side shall be matched.

    The stack height governed by the clearances from statutory authorities like Director General of Civil Aviation and Pollution Control Board or any other safety norms whichever is stringent. For maintenance, vertical tube heater must have access to permit a crane to remove and replace tubing. Horizontal tube heater must have horizontal free space equal to tube length plus crane parking space for tube pulling /maintenance/cleaning. In case of bottom floor fired heaters, there shall be adequate headroom clearance underneath furnace for removal of burners. In case of wall fired heater min 2m wide platform with escape route at each end is necessary.

    Pits and trenches are not permitted under heater or any fired equipment. Underground drain points and manhole covers shall be sealed within heater vicinity.

    Furnaces shall be provided with platforms for operation and for access as follows

    - For maintenance of soot blowers

    - For burner operation when inaccessible from grade.

    - For observation door, except that when the doors are located less than 3600mm,

    Above grade. Access shall be by ladder only

    - When temporary platforms for header boxes containing removable plug fittings

    Are required, only the platform supports are to be provided.

    - For analyzer and sample points etc

    3.1.12 COMPRESSORS AND THEIR PRIME MOVERS

    Two major types of compressors are used in process plants. Centrifugal Compressors

    Reciprocating Compressors

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 10 of 50

    Compressors shall be located to keep suction lines as short as possible. Drivers for compressor may be electric motor or steam turbines as per P&ID. The gas Compressors shall be located downwind side of furnace so that leaks are not blown towards the furnace.

    In general Compressors are kept under shed. When Compressors are kept under shed, sides are fully open for the low shed or partially closed from top for high shed to avoid accumulation of heavier gases in the shed. Layout of the compressor shall facilitate maintenance space for removal of motor, piston etc.

    In case of a turbine driven compressor, if exhaust steam is condensed, turbine and compressor are located at an elevated level and condenser is located below turbine. A major consideration in centrifugal compressor location is the lube and seal oil console. It must be accessible from a road, must be lower than the compressor to allow gravity drain of oil to the consoles oil tank.

    Intercoolers are placed near the compressor and are kept within the shed. Knockout pots and after coolers may be kept outside the shed but near compressor house.

    For compressors, one electrically operated traveling (EOT) crane to handle heaviest removable piece shall be provided for each compressor house. Maintenance bay for compressors shall be provided. Maintenance bay shall be accessible from road to facilitate unloading of load on to truck etc. For removal of exchangers located within building monorail arrangement shall be provided.

    The layout of compressor house shall take into consideration process licensors requirement as well as compressor manufacturers

    3.1.13 CLEARANCE AND ACCESSIBILITY

    3.1.13.1 Crane Access & tube bundle pulling

    Equipment, structures shall be arranged to permit crane access to service air coolers, Compressors and exchangers.

    All exchanger tube bundles shall be "jacked out" against shell. A clear space for tube bundle removal shall be provided. Dropout bay/area may be considered for exchangers located at elevated structure. Provision for pulling and inserting of tube bundle to be provided. Monorail with chain-pulley shall be provided for all heat exchangers except on grade & open to sky

    For high-pressure exchangers, shell pulling on rails may be considered with prior approval of PMC / OWNER.

    3.1.13.2 Access to Pumps

    Clear access of 3.8 m vertically and 4 m horizontally shall be provided centrally under main pipe ways for small mobile equipment to service pumps, wherever these are located under pipe rack. Pumps outside the rack shall be approachable by small cranes from under the pipe rack.

    3.1.13.3 Access to lowering items to grade level (Lowering Area) Clear access shall be provided at grade on the access side for lowering external and internal

    fittings from tall elevated equipment by providing pipe davits.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 11 of 50

    3.1.13.4 Layout & access requirements for Platforms Ladders and Stairs

    3.1.13.4.1 For providing platform ladder & staircase following guidelines shall be followed:

    Two means of access shall be provided (i.e., two ladders or one ladder and one stair case) at any elevated platform, which serves three or more vessels and for battery limit valves / operating platform.

    Platforms, Ladders and stairways shall be the minimum, consistent with access and safety requirements.

    Stairways for tanks to be provided on upstream of predominant wind direction

    3.1.13.4.2 Platform at elevated structure:

    Unless otherwise mentioned dual access (i.e. one staircase and one ladder) shall be provided for structure having length up to 22.65 m (75ft). For large elevated structure, if any part of platform has more than 22.65 m (75 ft) of travel, it shall have staircases on both sides. Also, based on height and levels of operating platform/technological structures, stairways shall be provided on both sides.

    Fire heaters located adjacent to one another shall have inter-connecting platform at various elevations. Fire heaters shall have minimum two stairways- access from grade level and will extend up to highest level of operating platform of the heaters.

    Air coolers shall have platforms with interconnected walkways provided to service valves ,Fan motors ,Instruments etc.

    Location at which normal monitoring (once a day or more) is required or where samples are taken shall be provided with stair access.

    Items that require occasional operating access including valves, spectacle blind and motor operated valves; heater stack sampling points shall be provided with ladder access.

    Columns and technological structure shall be interconnected by walkway.

    All nozzles of columns to be provided with ladder access.

    No ladder shall be more than 6m in one flight

    (Refer Annexure A for accessibility guidelines.)

    3.1.13.5 Clearances

    Minimum clearances shall be as indicated in Annexure B.

    3.2 PIPING MODELING AND GENERAL ARRANGEMENT

    3.2.1 BASIS OF 3D MODELING (ISBL)

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 12 of 50

    Piping and Instrument Diagram, Inter connecting P&ID.

    Equipment layout

    Piping Specification and cats & specs

    Line list

    Instrument data sheet & vendor drgs

    The following objective shall be ascertained during piping modeling Proper access to all operating points including valves and instruments.

    (Refer Annexure A) Proper access to inter-related operating points for specific purpose.

    Economic routing with minimum bends and flanges

    Aesthetics

    3.2.2 UNIT PIPING

    3.2.2.1 Basis of Piping

    Piping and Instrument Diagram

    Equipment Layout

    Equipment Data sheet and Setting plan

    Line list

    Instrument Data sheet

    Structural and Building drawings

    Topography of the plant

    Piping material specification

    Overall plot plan

    Proper access to all operating points including valves /instruments and for maintenance purpose shall be considered during piping layout.

    3.2.2.2 Pipe ways/Rack piping

    Racks shall be designed to give the piping shortest possible run and to provide clear head rooms over main walkways, secondary walkways and platforms. The entire Tie in points are to be clearly studied and identified so as to avoid any unnecessary crossing and jump over of pipes.

    Predominantly process lines are to be kept at lower tier and utility & hot process lines on upper tier.

    Generally the top tier is to be kept for Electrical and Instrument cable trays.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 13 of 50

    Generally the hot lines and cold lines shall be kept apart in different groups on a tier.

    Generally the bigger and heavier size lines shall be kept nearer to the column.

    Spacing between adjacent lines shall be decided based on O.D. of bigger size flange (min 300# flange), O.D. of the smaller pipe, individual insulation thickness and additional 25 mm clearance, preferably. Wherever even if the flange is not appearing the min. spacing shall be based on above basis.

    Anchors on the racks are to be provided on the anchor bay if the concept of anchor bay is adopted. Otherwise anchors shall be distributed over two to three consecutive bays.

    Anchors shall be provided within unit on all hot lines leaving the unit.

    Process lines crossing units (within units or from unit to main pipe way) are normally provided with a block valve, spectacle blind and drain valve. Block valves are to be grouped and locations of block valves in vertical run of pipe are preferred. If the block valves have to be located in an overhead pipe way, staircase access to a platform above the lines shall have to be provided. Provision of block valves, blinds etc. shall be as per Process Design Basis & P&IDs.

    3.2.3 PIPING

    3.2.3.1 Design Pressure :

    The design pressure of each line is the maximum non-shock internal service pressure. This pressure corresponds with maximum of: 1.1 times the maximum operating pressure.

    Design pressure of equipment to which it is connected.

    The pressure setting of the relief valve that protects piping system. For liquid lines, static head between lowest point and safety valve also to be added.

    The pump shut-off pressure or a compressors maximum discharge pressure for system with no relief valves or 1.2 times differential pressure plus suction pressure for discharge lines.

    The static plus pressure head for system on the suction side of pumps.

    In cases where a pump discharge line includes a control valve, but no relief valve that portion of line from the pump through the control valve, including all valves in the control valve manifold; shall have the same design pressure as the pump shut-off pressure.

    All lines operating below atmospheric pressure shall be designed for full vacuum. Lines which normally do not operate in vacuum but vacuum can develop in abnormal condition shall also be designed for vacuum.

    All piping leaving Battery limit shall be designed for a closed valve outside the Battery Limit.

    Higher design pressure shall apply from the source to the last valve before entering equipment rated at a lower pressure.

    Process shall decide design pressure of pipe line.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 14 of 50

    3.2.3.2 Design Temperature

    The design temperature shall be maximum sustained fluid temperature in line.

    All the lines subjected to steam-out conditions shall be designed at 120C (process line data) or as per process Design temperature of the line whichever is higher.

    The design temperature of piping may be the same as the design temperature of connecting upstream equipment if the difference between the operating temperature and design temperature is less than or equal to 20C.

    If there is large difference between design and operating temperature, duration and frequency of process fluid attaining higher temperature shall be considered.

    For steam traced piping, design temperature shall be fluid temperature plus 20C or 10C below steam saturation temperature whichever is higher.

    For low temperature (operating temperature is either lower than 0C or lower than minimum ambient temperature) design temperature shall be minimum operating temperature of the fluid. Metal temperature resulting from emergency conditions like depressurization, operation errors etc. need to be taken care of.

    Process will decide all the design temperatures of pipeline.

    3.2.3.3 Loads & Supports

    The piping system shall be designed to resist the efforts of loads imposed by the weight of the pipe, valves, fittings, insulation and fluid in the lines. When this fluid is air, gas or vapour, and the line is to be Hydrostatically tested, temporary support may be required.

    The additional loads imposed by wind shall be considered for large lines (18" and above). The wind pressure is spelled out elsewhere in bid document. The discharge of reciprocating compressors, pumps, HP safety valves and let down valves and other lines which are likely to pulsate and vibrate shall be properly designed and supported to avoid undue vibrations and forces/moments on piping, supports and connected equipment/machinery.

    Downstream of control valves, safety valves blowing to atmosphere which can attain some velocities shall be so designed to take care of the same and noise shall not exceed 88 dba at operating levels, by using diffusers, silencers etc.

    The stresses created by the imposed loads shall not exceed the allowable stress prescribed by the ANSI B 31.3 Code for pressure piping where applicable or the ASME boiler code and should also meet the requirements of IBR wherever applicable.

    3.2.3.4 Corrosion Allowance

    The minimum corrosion allowance in general shall be as given below:

    Carbon Steel 1.5 mm (1/16") Alloy Steel 1.5 mm (1/16") Austenitic Steels 0.0 mm

    Non-Ferrous Alloys 0.0 mm

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 15 of 50

    For corrosive services corrosion allowance for material shall be adequately designed to give a life of at least 20 years.

    Exception to these shall be only with PMC/owners approval.

    3.2.4 COLUMN / VESSEL PIPING

    Piping from column shall drop or rise immediately upon leaving the nozzle and run parallel and close as practicable to vessel. Reboiler outlet piping shall be as short as possible with minimum bends.

    Piping shall be grouped as far as possible for the ease of supports and shall run on the rack side of the column.

    Manholes shall be kept on the road side of the column and approachable from the platform. Projection of platform shall be 1.0m up to 1.0m diameter column and 1.2m for column diameter > 1m from column insulation surface

    Piping shall be supported from cleats welded on the vessel as far as possible.

    Proper guides at intervals shall be provided for long vertical lines.

    For ease of operation and maintenance, column and vessels, which are grouped together, shall have their platforms at the same elevation should be interconnected by walkways. However each Column/ Vessel shall have independent access also. Column/ Vessel platform should be designed in such a way so that all nozzles should be approachable from platforms.

    Piping support cleats shall be designed for safety valves considering impact loading during popping off.

    Complete platform all around shall be provided in case of columns, at all manhole locations.

    Maximum height of platform ladders shall be restricted to 6 meters.

    Davit shall be provided on top of all columns for handling safety valves, Top curves etc.

    3.2.5.1 EXCHANGER PIPING

    Exchanger Piping shall not run in the way of built in or mobile handling facilities.

    Wrench clearance shall have to be provided at exchanger flanges.

    Piping shall be arranged so that they do not hinder removal of shell end and channel cover and withdrawal of tube bundle.

    3.2.5.2 HEATER/FURNACE PIPING

    Arrange piping to permit burner removal by providing break up flanges in the piping. Burner valves shall be located close to peepholes for operation. Piping to Burners shall be arranged in such a way so as to give equal and sufficient quantity

    of oil/gas to all burners. Only flexible metallic SS (SS316/SS321) hoses shall be used for burner piping

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 16 of 50

    Block valves for emergency, snuffing steam valve shall be located minimum 15 m away from the heater, preferably on the upwind side of the heater.

    Piping from various passes of heater outlet nozzles should preferably be symmetrical. Transfer line from heater to column shall be as short as possible, without pockets, free draining towards column and with minimum bends.

    No piping shall be routed in the tube withdrawal area. If unavoidable, break up flanges shall be provided in the piping for removal.

    Nozzle forces and moments to be as per API 560 All furnaces if they are located in the same area should be inter connected with each other at

    different elevations.

    3.2.6 PUMP PIPING

    Pump drives shall have clear access.

    Pump suction piping shall be as short as possible and shall be arranged with particular care to avoid vapor pockets.

    Reducers immediately connected to the pump suction shall be eccentric type flat side up to avoid the accumulation of gas pocket.

    For end suction pumps elbows shall not be directly connected to the suction flange. A straight piece minimum 3 times the line size shall have to be provided at the suction nozzle.

    Pump discharge check valve if installed in vertical lines shall be fitted with a drain connection as close as possible downstream of the valve.

    When a suction vessel operates under vacuum, the vent connection of the pump has to be permanently connected to vapor space of the suction vessel to allow possible filling of the pump with liquid before it is started.

    T-type strainers are to be used for permanent as well as temporary to avoid disassembly of suction piping for strainer cleaning for sizes 2" and above.

    Y-type strainers are to be used for all sizes in steam services and for pump suction lines 1" and below

    All small-bore piping connected to pump (drain to OWS & CBD, seat and gland leak drain) shall have provision for break up flanges for removal of pumps.

    Piping shall be so arranged that forces and moments imposed on the pump nozzle do not exceed the allowable values.

    Pump discharge should preferably be routed away from pump rather than towards the motor side.

    For top suction, pump elbow shall not be directly connected to suction flange. A straight piece of minimum 5 times the nozzle size shall have to be provided at the suction nozzle.

    Pump cooling water connection shall be taken from the top of the circulating cooling water header.

    PI (pressure gauge) connections shall be provided on upstream and downstream of valves in suction and discharge lines for all process pumps.

    3.2.7 COMPRESSOR PIPING

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 17 of 50

    Suction lines shall be as short as possible

    Suction piping shall have adequate flanged joints for ease of erection and maintenance. All operating valves on main suction and discharge piping shall be lined on one side as far

    as possible.

    A minimum straight length of suction pipe is to be provided as per manufacturers recommendation.

    Piping shall be designed so that forces and moments imposed on the compressor do not exceed the manufactures recommendation.

    Compressor suction lines between the knockout drum and the compressor shall be as short as practicable & shall be without pockets.

    Where the line between knockout drum and the compressor cannot be routed without pocket, low point in compressor line shall be provided with drains to remove any possible accumulation of liquid, but after taking clearance from process licensor.

    Low points in the discharge line from an air compressor shall be avoided because it is possible for lube oil to be trapped and subsequently ignited. If low points are unavoidable, they shall be provided with drains.

    Compressor suction and discharge shall have untied bellows. The bellows are to be supplied by compressor manufacturer as per design calculations and bellows selection done as per stress analysis.

    All the valves and spectacle blind in suction and discharge piping shall have operating and maintenance access.

    3.2.7.1 Piping arrangement for Centrifugal Compressors

    Suction and discharge piping should preferably be routed at grade level to have a proper supporting of these lines.

    Check valve for the compressor shall be located as close as possible to the compressor to reduce surges.

    It would be preferable to bunch valves in one area wherever possible with their hand wheels facing one direction for ease of operation.

    Suction pipes which are too small for manual cleaning, shall be provided with a removable spool piece to permit installation of a strainer at a convenient, accessible location. Piping from strainer to equipment nozzle shall have a special note for clearing procedures.

    3.2.7.2 Piping arrangement for Reciprocating Compressors

    Trenches, pits and similar gas traps be avoided within compressor house.

    Compressor suction piping from K.O. Drum shall be independently supported. It is important to see that this support is not provided from the compressor house steel work. Pulsation analysis should be carried out to decide the routing of the line.

    Suction piping will subject to chemical cleaning as per the procedure specified in JEs standard specifications. Also process licensors specifications/requirements shall be fulfilled.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 18 of 50

    It is very important to route all suction and discharge piping of the compressor as close to grade level (min 500mm above grade) as practical to provide proper supports for the system. Concrete sleepers are preferred to steel supports. Sleepers shall be spaced at varying distances (3000 mm max.) with no adjacent spans being equal, enabling to dampen the vibration of the piping.

    3.2.8 PIPING ARRANGEMENT FOR REACTORS

    All reactor piping shall be clear of the access areas of loading / unloading of catalyst

    Platforms provided around reactors and for access to piping and valves shall generally be supported from separate structure. However the platform can be connected to vessel shell if welding is allowed and cleats are provided. Generally reactor shell clips / cleats are to be avoided.

    Reactor with top man way nozzle for catalyst charging is provided with a flanged elbow Nozzle on this man way to connect outlet piping. This flanged elbow nozzle is to facilitate spool removal during catalyst charging.

    Piping connected to reactor top outlet nozzle needs to be additionally supported from structure. (This support acts temporarily) since this connection to man way is dismantled during catalyst charging.

    Swing elbows type arrangement is preferred on the regeneration piping from reactor bottom as against valves and bypasses. This eliminates stress problems to some extent since the used hot line and unused cold line are not permanently interconnected.

    All valves provided on reactor hydrogen service lines be it inline, vent, drain and instrument valves shall always be double blocked type. Also snuffing steam rings shall be provided around hydrogen service flanges size over 12".

    For reactor process piping where spec. calls for ring joint flanges the piping shall be arranged so as to allow for valve removal.

    The catalyst unloading / dump nozzle elevation of reactor bottom is to be decided based on the provision of a catalyst shaker / vibrator equipment to be bolted onto this unloading nozzle.

    3.2.9 RELIEF SYSTEM/ BLOW DOWN SYSTEM PIPING

    Relief of liquid and easily condensable hydrocarbons is to be discharged to closed blow down system.

    Wherever the inlet line size is higher than the safety valve inlet size, reducer shall be installed adjacent to inlet of safety valve.

    Relief valve discharging steam, air or other non-flammable vapor or gas directly to atmosphere shall be equipped with drain or suitably piped to prevent accumulation of liquid at valve point.

    Relief valve discharge piping to atmosphere shall be taken to safe location as per following.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 19 of 50

    3 m - Above top platform of column or structure within 6m radius for steam and 8m for hydrocarbon/ toxic discharge.

    25 m - Horizontally away from Reformer Or any fired equipment.

    50 m - Horizontally away from furnace, if more than one relief system of different set pressures is discharging into one common riser of vent stack.

    Inlet and outlet piping of pressure relief valve shall be adequately supported to take care of the thrust induced by the relief valve during popping.

    Reaction forces due to safety valve popping shall be ascertained in the connected piping. The effect of these forces on the piping supports and the anchors of the piping system shall be calculated to ascertain that the allowable limits at these locations are not exceeded. The supporting structure also shall be adequately designed so that when subjected to these System stresses in the inlet and outlet piping portions

    At safety valves also shall be kept within the allowable limits, inclusive of the distribution branching points in the inlet portion. These reactive forces shall not lead to any leakage at the flanged joints present in the system. To ascertain these necessary calculations at the flanged joints shall be performed.

    3.2.10 STEAM PIPING

    Steam lines with conditions listed below fall in the scope of Indian Boiler Regulations (IBR). All lines falling under IBR purview must comply with IBR requirements.

    Lines having design pressure (maximum working pressure) 3.5 Kg/cm2 (g) & above Line sizes 10" inside diameter & above having design pressure 1.0 Kg/cm2 (g) & above Lines with pressure less than 1.0 Kg/cm2 (g) are exclusion. User of steam like steam tracing lines, jacket of the steam jacketed lines, steam heating coil

    within the equipment are excluded from IBR scope.

    All steam users where downstream piping is connected to IBR i.e. condensate flushed to generate IBR stream are covered under IBR

    Boiler feed water lines to steam generator, condensate lines to steam generator and flash drum as marked in P&ID shall be under purview of IBR.

    IBR Requirements (in brief) All materials used on lines falling under IBR must be accompanied with IBR Inspection

    Certificate, Leading Inspection authority viz. Lloyds or others are authorized inspection authorities for IBR outside India. Whereas for Indian supply only IBR is the inspection authority.

    IBR authority of state in which the system is being installed must also approve drawings like General Arrangement Drawings (GAD) and isometrics of lines falling under IBR.

    All welders used on fabrication of IBR system must possess IBR welding qualification certificate.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 20 of 50

    IBR system must be designed according to IBR regulations. IBR authority must approve all design calculations towards the same.

    3.2.11 STEAM HEADER & SUPPLY LINES

    Steam header shall be located generally on the upper tier and at one end of the rack adjacent to columns.

    Branch lines from horizontal steam header, except condensate collection points, shall be connected to the top of the pipe header.

    Isolation valves if provided on the branch line shall preferably be provided on the horizontal run and outside the pipe rack.

    All branch lines shall be drainable.

    The Tapings on the headers shall have Gusset supports.

    Drip legs & steam traps shall be provided at all low points and dead ends of steam header. Drip legs at low points shall be close to down stream riser and shall be provided to suit bi-directional flows, if applicable.

    The first isolation valve on Drip leg (Boot leg) outlet shall be piston type glandless and butt welded type.

    All turbines on automatic control for start up shall be provided with a steam trap in the steam inlet line.

    All traps shall be provided with strainers if integral strainers are not provided.

    Steam traps discharging to atmosphere shall be connected to storm water drain/storm sewer.

    Expansion loops are to be provided to take care of the expansions within units.

    Line traps shall be thermodynamic type up to Class 600# & bimetallic for piping Class 900# & above.

    Double block Vents and drain valves shall be provided on high-pressure steam piping.

    Small size steam valves upto 1 inch NB to be piston type glandless valves.

    Wherever condensate is to be drained, proper condensate draining facility shall be provided.

    Discharge of steam traps should not be near the vicinity of any Process / utility lines. Proper drainage facility must be envisaged for the condensate drain.

    3.2.12 Steam Tracing/Steam Jacketing

    3.2.12.1 Steam tracing system (If applicable)

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 21 of 50

    Tracers for the individual lines shall be supplied from manifolds when there are two or more connections. Standard module for steam distribution and condensate collection manifolds with integral glandless piston valve and thermostatic steam trap shall be used. Balanced Pressure thermostatic steam trap with 40 mesh strainer to be used. Number of Mech. Mant. Point tracers shall be 4/8/12 and tracer size or depending upon the detail engg-requirement. 20% or minimum 2 nos tracer connections shall be kept spare for future use for both steam supply and condensate collection manifolds. All manifolds shall be installed in vertical position and manifold size shall be 1.5.

    For Steam tracing balanced pressure thermostatic steam trap with 40 mesh strainer to be used.

    Manifolds shall be provided with two spare blanked off connections.

    Maximum number of connections taken from a manifold is 12 including spares.

    Manifolds shall be accessible from grade or from a platform.

    Pockets in steam tracers shall be avoided as far as possible.

    Tracers shall be limited to the following run length upstream of traps.

    Size of tracer (inch)

    Length of tracer pipe (Meters)

    Steam operating pressure

    20psig 50psig 100psig 150psig 200psig & above

    " 23 38 46 53 61

    Tracers shall generally be of . Tracers shall be of CS steel seamless pipe and valves on the steam tracing circuit including steam station block valve shall be glandless piston valve.

    Size of the lead line to manifold shall be as follows:

    Number of connections Size of Lead Line

    2

    3 1

    4-6 1

    7-12 2

    The lead line to manifold, manifold up to the block valves of individual tracer shall be carbon steel of IBR quality.

    Tracer lines shall be provided with break up flanges for main line flange joints and valves. All tracers shall have individual steam traps before condensate manifolds. Condensate

    manifold including the last valve on individual tracer shall be of carbon steel.

    All steam traps discharging to a closed system shall have a block valves upstream and downstream of the trap. A bypass globe valve shall be installed around the trap. Check valve

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 22 of 50

    shall be installed on the downstream of the steam trap near the condensate header in case discharging to a closed system.

    All steam tracer lines shall be welded as per approved Welding Specification followed by hydro test.

    All steam tracer lines up to 1-1/2 size shall be welded using GTAW welding process followed by hydro-test.

    Number of tracers required on a line shall be as follows:

    Size of Line Number of Tracers

    Up to 4 1

    6 to 16 2

    18 to 24 3

    26 & above To calculate

    3.2.12.2 Steam Jacketing System (If applicable) A Steam Jacketed pipe consists of a product line, which passes through the center of a larger

    diameter steam line.

    The normal size of the inner pipe (CORE) and outer pipe (JACKET) in inches shall be as per table below unless otherwise mentioned in project piping material specification (PMS) or P&ID. Core pipe will be of SS material only.

    Core pipe Jacket pipe

    1

    1 2

    1 3

    2 3

    3 4

    4" 6"

    6" 8"

    8" 10"

    10" 12"

    Distance between steam inlet and condensate outlet shall be similar to steam tracing system. Baffle plates, flanged joints or end caps shall be used to discontinue one feed length from the next. The size of steam feeder to jacket shall be generally " or as specified in job specification.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 23 of 50

    Flanged jumpovers shall be used in case of Flanged joint. In case of discontinuous jacketing simple jumpovers shall be employed. The length of jacket shall be 4 to 5 meters or as mentioned in job specification.

    Intermediate partial baffles shall be provided if a separate branch portion is to be heated from the main line stream.

    Steam inlet to jacket shall generally be provided from top of the pipe in case of horizontal lines. The jumpovers and condensate outlets shall be from the bottom.

    In case of vertical lines steam inlet shall be done at the topmost points and condensate outlet shall be done from the lowest possible points. Two consecutive jumpovers shall be 180 deg apart.

    Each feed length shall be provided with individual trap before connecting to condensate recovery headers.

    Balanced pressure / bi-metallic type thermostatic steam traps shall be used in jacketing as well as steam tracing.

    To keep proper concentricity between core and jacket pipe internal guides (rods or flat bars) shall be provided at intervals depending on the size of the pipe.

    Wherever anchors are provided on jacket lines proper interconnection of jacket pipe and core pipe shall have to be provided with proper Jumpovers for steam.

    3.2.13 UTILITY STATIONS

    Requisite number of Utility Stations shall be provided throughout the unit to cater for the utility requirement. Utility Stations shall have two connections (one for Plant Air, one for Service Water and one Low Pressure Steam each of 1") unless otherwise specified in P&ID. All connections shall be directed downward. All connections shall have globe valve for isolation purpose. All connections shall have ends flanged with threaded nipple for hose connections. Air and water lines shall have quick type hose connection and steam line shall have flanged type hose connection.

    Number of Utility Stations shall be such that all equipment shall be approachable from at least one Utility Station. The approach of Utility Station shall be considered 15m all around the station location.

    The Utility Stations shall generally be located adjacent to pipe-rack column. The Utility Stations shall also be provided on elevated structures, operating platforms of vertical equipments etc. Operating platforms having manholes must have a Utility Station.

    Spares required for utility stations are generally as described in mandatory spare list .

    3.2.14 FIRE FIGHTING

    All Fire fighting facility shall be as per OISD / TAC- fire protection manual and shall conform to the scope of work, enclosed in the BID.

    3.2.15 INSULATION AND PAINTING

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 24 of 50

    For Insulation, Painting and Colour coding, Engineering Design Basis provided else where in the BID, shall be followed.

    3.3 OFFSITE & YARD PIPING (If applicable) Battery limit integration to the main process block shall be through multi tier pipe rack and

    sleepers (either existing or new). Battery limits and tie-in points to be clearly marked and shall be routed economically and as to satisfy process requirements.

    In general, the pipes shall be laid at grade level on sleepers of concrete 450 mm high from grade level. Pipe sleepers shall have hard surfacing. Hard surfacing should be completed before start of pipe laying. Width of hard surfacing shall be about 1m more than the piping corridor. This extra hard surfacing shall be for the movement of operating personnel along the pipe corridor. At every 500 m approach to be provided from the road for hard surfacing area. Pipe rack/portals may be used depending upon requirement, if adequate space is not available for sleepers. Modification of existing sleepers shall be done if required. The exact level shall be decided during detail engineering depending on requirements.

    However, existing/modified pipe rack around Unit block shall be suitably used.

    Pipes at road crossing shall be under culverts in general. All process lines & steam lines if required to be routed below the road, the same shall be routed through culvert at the road crossing.

    Overhead pipe bridges may be used for areas where pipe racks are provided with minimum clearance as per Annexure B.

    Clearances between lines shall be minimum "C" as given below.

    C = (d0 + Df)/2 + 25 mm + Insulation thickness Where. d0 = outside diameter of smaller pipe (mm)

    Df = outside diameter of flange of bigger pipe (mm) Adequate clearances shall be provided for very long & high temperature lines to avoid clashing

    at the bends.

    Expansion loops for all lines shall generally be kept at the same location.

    Vents shall be provided on all high points and drains shall be provided at all low points.

    Drain valve shall be suitably located for ease of operation. Drain valves at sleeper piping shall be kept outside the sleeper way. If the same is not accessible and valves shall be put in horizontal only. At all such places where piping is extended to make drain valves accessible, 2 no. of stiffeners, irrespective of pipe rating shall be provided.

    Spacing of guides on each line on a pipe bay shall not exceed the value given in Annexure C.

    3.4 TANK FARM PIPING ( If applicable)

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 25 of 50

    The number of pipelines in the tank dyke shall be kept at minimum and shall be routed in the shortest practicable way to main pipe track outside the tank dyke, with adequate allowance for expansion. Within one tank dyke the piping connected to that tank shall only be routed.

    Manifolds shall be located outside the tank dyke and by the sides of the road, easily accessible by the walkway.

    Analysis shall be carried out to prevent damage to lines and tank connection caused by tank settlement.

    If exceptionally high settlement is expected "dressers coupling" or "flexible ball joint" may be provided.

    For flexibility analysis and supporting refer clause 3.8

    Special consideration shall be given as regards to spacing of nozzles while installing special item like hammer blind, Motor Operated Valves etc.

    Tank connections to be done after tank hydro testing.

    3.5 UNDERGROUND PIPING

    Services for underground piping.

    OWS

    CRW

    Sanitary sewer system.

    All underground C.S .Pipes shall be painted/ coated as per painting/coating specification provided else where in the BID.

    All underground C.S pipes shall be provided with corrosion resistance protection as per the specification for coating & wrapping.

    1. Surface preparation: Abrasive blast cleaning SA 2 followed by Tape primer (supplied by Tape manufacturer).

    2. Poly Ethylene Tape (M/s.Denso) / PVC Tape (M//s. Rustech ) 3 mm thick tape coating

    3. Holiday testing after tape coating

    Corrosion resistance protection given to underground C.S. pipes shall extend up to 500mm above/beyond grade on both sides

    To the extent possible, fire water header shall be laid above ground except around process area where it shall be laid underground .In case it is to be laid U/G, it shall be laid in RCC trenches covered with pre-cast RCC slabs in RCC paved area, whereas in unpaved area it shall be laid directly buried.

    All underground-buried firewater piping shall be externally protected from corrosion by wrapping & coating as per the specifications provided else where in the BID.

    3.6 VENTS AND DRAINS

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 26 of 50

    Process Licensors requirements are to be followed for the size and type of vents and drains and all shall be as per PIDs approved by PMC. All hydrocarbon drain & vents shall have valves with blind flanges at other end.

    Identification marks for location /visibility of drain points of off-site piping should be provided. All drain points should be approachable and clearly visible.

    3.7 FLEXIBILITY ANALYSIS AND SUPPORTING

    Stress Design Basis provide else where in the BID, shall be referred.

    3.8 FLARE PIPING

    Flare header shall be sloped towards flare knockout drum. Only horizontal loop shall be provided as per requirement to accommodate thermal expansion. The desired slope shall be ensured throughout including flat loop. Flare header shall be supported on shoe of height ranging from 100 mm to 300 mm.

    Proper thermal analysis temperature shall be established including the possibility of temperature gradient along the line before providing expansion loops.

    Flare piping to offsite shall be provided with guide support on all around the pipe to prevent it falling off from the flare trestles.

    Flare header valve stems shall be in vertical downward position. Valves in Flare Header shall be of Gate Type only.

    3.9 MATERIALS AND SELECTION OF PIPES AND FITTINGS

    The PMS (Piping material specifications) provided by PMC are only for reference and indicative and thus may not be exhaustive. LSTK shall update PMS given in the BID and develop detailed piping material specifications (PMS) and Valve Data sheets (VMS), based on process Licensors piping specifications, basic material depending upon service conditions (temperature, pressure and corrosively etc.) as spelt in process package.

    3.9.1 Pipe Wall thickness Calculation of pipe thickness and branch reinforcement shall be based on requirements of

    ASME B 31.3. /IBR as applicable. Proper corrosion allowance and mill tolerance shall be considered while selecting thickness.

    For carbon steel and low alloy steel pipes (expect for steam tracing piping) minimum pipe thickness shall be as follows:

    'S160' up to 0.75"NB,

    'XS' for 1 to 2 NB

    'STD' for above 2NB.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 27 of 50

    For Stainless Pipes minimum pipe thickness shall be: -

    80S up to 0.75 NB

    40S for 1 to 2 NB

    10S for above 2 NB

    The philosophy of minimum thickness/schedule is applicable for both seamless and welded pipes.

    The above-mentioned minimum thickness/schedule criterion is not applicable to category -D fluid where IS pipes or welded API 5L pipes are being used.

    All pipes (seamless & welded) shall have uniform negative wall thickness tolerance of 12.5% for wall thickness calculations purpose, except for pipes made out of plate material, where relevant ASTM code shall govern.

    For thickness exceeding minimum thickness/schedule criteria, schedule XS shall be selected for CS & AS classes (for 2" & above). Intermediate schedules between STD & XS shall be ignored. Similarly for SS classes (2" & above) S10, S20, S30 & 40S may be selected beyond minimum thickness/schedule criteria.

    If, the thickness exceeds XS in CS & AS classes and 40S in SS classes, only then, the thickness shall be calculated based on actual service conditions subject to a minimum of 80% class rating. Maximum 10% of corrosion allowance may be reduced in special cases, to optimize the pipe schedules.

    In general the pressure-temperature combination to calculate wall thickness shall be as follows:

    Material Class Pipe Size Design condition 150 Up to 24" Class condition Above 24" Line condition (//) 300 Up to 14" Class condition Above 14" Line condition (//) 600 Up to 8" Class condition Above 8" Line condition (//) 900 Up to 8" Class condition Above 8" Line condition 1500&2500 Up to 4" Class condition

    C.S.

    (A 106 GR.B, API 5L GR.B, A672) LTCS

    (A333 GR 6) Low alloys

    1.25%Cr-05%Mo

    2.25%Cr-1.0%Mo

    5%Cr.-0.5%Mo. Above 4" Line condition

    150 Up to 24" Class condition Above 24" Line condition $ 300 Up to 14" Class condition Above 14" Line condition $ 600 Up to 6" Class condition Above 6" Line condition $ 900,1500 Up to 4" Class condition

    S.S. (A312 TP304, TP304L, 316L, 347) OR

    (A358 TP304, 304L 316,316L, 321,347)

    Above 4" Line condition

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 28 of 50

    2500 Up to 2" Class condition Above 2" Line condition 150 Up to 6 Class condition Above 6" Line condition

    Higher Alloys

    300 -2500 All sizes Line condition // Only if the thickness/schedule as per class condition exceeds XS. $ Only if the thickness/schedule as per class condition exceeds 40S. For other than Category D classes D/t ratio shall be restricted to generally 100(Max), up to size

    of 48,D is nominal dia. andt is nominal thickness. For sizes 50and aboveD/t ratio shall be decided by job engineer. For Cat-D Classes, for above ground applications D/t ratio shall be taken, as 150, t is min. calculated thickness excluding corrosion and manufacturing tolerance.

    Pipe size

    Pipe size shall normally be ", ", 1", 1", 2", 3", 4", 6", 8", 10", 12", 14", 16", 18", 20", 24", 26", 30", 36", 40", 44", 48", 52", 56", 60", 64", 72", 78", 80".

    Pipe type Material Size Type Up to 14 Seamless

    CS & LTCS, AS (except for Category D fluids)

    10 and Above EFW

    SS (Process Lines)

    Up to 1" Seamless

    SS (Non Process Lines) 2" & Above Welded

    CS (Category D fluids) * Except for fire water and cooling water services, for which following shall apply:-

    1. Up to 6 NB - Seamless

    2. 8 NB and above - Welded

    3. Less than 3 NB - Carbon steel ( Higher schedule )

    4. 3 inch NB and above - Carbon Steel (Cement Lined)

    ALL

    Welded *

    3.9.2 Fittings

    Type of fittings shall be equivalent to pipe type.

    1

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 29 of 50

    Thickness of fittings at ends to match pipe thickness for BW fittings

    SW fittings shall be 3000#, 6000#, and 9000# depending on the pipe thickness S80, S160 and above S160 respectively.

    Up to 600# all branch connections shall be as follows, unless specifically mentioned otherwise in PMS.

    Up to 1" NB Half Coupling / Tee

    2" and above Tee/ Pipe to pipe with / without reinforcement pad

    For branch connection above 600# rating equal tee/unequal tee shall be used for all sizes. Unequal tee may be replaced by weld-o-let up to branch size of 8".

    Miters shall be used in Category D service above 6"NB. For other than category D fluids in 150#, 300# classes miters may be able to be permitted for sizes above 48" only. Miters to be designed as per ASME B 31.3.However use of miters shall be minimum.

    3.9.3 Flanges:

    Flanges: Flanges shall be as follows: Class Size Type Remarks

    Up to 1" SW RF If non-metallic gasket used.

    Up to 1" WN RF If metallic gasket used. 2" & above WN RF/LJ FF For SS LJ FF + Stub ends

    150#

    2" & above SO RF If used in Category D service 300#, 600# Up to 1" SW RF 2" & above WN RF 900#, 1500#, 2500# All WN RTJ All flange joints on piping system including flanges on equipment, manhole, etc shall be tightened using torque wrench/ hydraulic bolt tensioner depending upon service criticality.

    3.9.4 Gaskets. Gaskets to be provided as per service condition as mentioned in PMS. 3.9.5 Valves

    SW valves up to 1 inch up to 600# ANSI Class except ball and plug valves which shall be flanged for all sizes.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 30 of 50

    Flanged cast valve above 1" 150#, 300#, 600# ANSI Class

    BW valves all sizes-900# ANSI Class & above

    No CI valves to be used.

    Over and above requirements, other technical requirement prescribed in Annexure E shall also be adhered to.

    3.10 NON DESTRUCTIVE TESTING REQUIREMENTS

    Depending on the severity of application, extent of NDT shall be decided. As a rule, all hydrogen, oxygen, NACE and any other lethal service shall have 100% radiography on weld joints. Castings used in these services shall have 100% radiography. For high-pressure applications i.e. 600# upward 100% radiography on weld joints shall be employed. In 100% radiography classes any fillet welds employed shall have 100% MP in CS/AS classes and 100% DP in SS classes. Category D service shall have 2% radiography. Classes in 150# for normal hydrocarbon service shall be subjected to 10% radiography and SW/Fillet weld/attachment weld where radiography is not possible shall be 10% DP/MP tested. Classes in 300# for normal hydrocarbon service shall be subjected to 20% radiography and SW/ Fillet weld/attachment weld where radiography is not possible shall be 20% DP/MP tested.

    All AS pipes, fittings, flanges, valves & bolts shall undergo Positive Material Identification (100%) at site. All the PMI test at construction site shall be done as per standard.

    3.11 STRAINERS

    3.11.1 Temporary Strainers:

    1" & below for all services shall by Y-type 2" & above for steam service shall by Y-type 2" & above for other than steam services shall by T-type 3.11.2 Permanent strainers

    Compressor suction, cold box inlet strainers shall be cone type with reinforced perforated sheet cage design

    1" & above permanent strainer shall be as per process data sheet

    3.12 WELDING

    3.12.1 Applicable codes and standards

    All welding work, equipment for welding, heat treatment, other auxiliary functions and the welding personnel shall meet the following requirements of the latest edition of following accepted standards and procedures.

    Process piping ASME B 31.3

    In addition, the following codes and specification referred in the code of fabrication shall be followed for the welding specifications, consumables, qualifications and non-destructive test procedures.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 31 of 50

    Welding and Brazing qualifications ASME BPV Sec IX Non Destructive Test - ASME BPV Sec V Material specification: welding rods, electrodes, and filler metals ASME BPV Sec II part

    C The additional requirements mentioned in this specification, over and above those obligatory

    as per codes, shall be followed wherever specified.

    3.12.2 Welding processes

    3.12.2.1 Welding of various materials shall be carried out using one or more of the following

    Shielded Metal Arc Welding process (SMAW) Gas Tungsten Arc Welding (GTAW)

    3.12.2.2 Automatic and semi-automatic welding shall be employed only with the approval of the Owner. The welding procedure adopted and consumables used shall be specifically approved.

    3.12.2.3 All steam tracing line to be welded with TIG welding process and subjected to hydro test prior to commissioning.

    3.12.2.4 A combination of different welding processes could be employed for a particular joint only after duly qualifying the welding procedure to be adopted and obtaining the approval of Owner.

    3.12.2.5 For additional details "welding specification for fabrication of piping / welding charts shall be referred.

    4.0 REFERENCED PUBLICATIONS

    The following latest codes and standards shall be followed unless otherwise specified.

    ASME SEC. I - Rules for Construction of Power Boilers.

    ASME SEC. VIII

    - Rules for Construction of Pressure Vessels.

    ASME B31.1 - Power piping.

    ASME B31.3 - Process piping.

    ASME B 31.8 - Guide for Gas Transmission and Piping distribution system

    ANSI/NEMA SM 23

    - Steam turbines for mechanical drive service.

    API RP 520 - Sizing, selection and installation of Pressure relieving devices in Refineries.

    API Std. 560 - Fired heaters.

    API Std. 610 - Centrifugal pumps for Petroleum, Heavy-duty chemical and gas industry service.

    API Std. 617 - Centrifugal compressors for petroleum, chemical and gas industry service.

    API Std. 618 - Reciprocating Compressors

    API Std. 661 - Air cooled heat exchangers

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 32 of 50

    EJMA - Expansion joints Manufacturers Association. NACE

    MR-0175 - Sulphide Stress cracking resistant metallic materials for oilfield

    equipment.

    NACE TM-0177

    - Laboratory testing of metals for resistance to Sulphide Stress cracking in H2S Environments.

    NACE MR-0284

    - Evaluation of pipeline and pressure vessel steel for resistance to Hydrogen Induced Cracking.

    IBR - Indian Boiler Regulations

    TAC - Tariff Advisory Committee.

    OISD - Oil Industry Safety Directorate.

    OISD 118 - Layouts for oil and gas installation.

    OISD 116 - Fire protection facilities for petroleum refineries and oil/gas processing plants.

    OISD 113 - Classification of area for electrical installation at hydrocarbon and handling facilities.

    OISD 164 - Fire proofing in Oil & Gas industry

    IS 5572 - Classification of Hazardous area (other than mines) for electrical installation.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 33 of 50

    ANNEXURE A

    Accessibility for valves and instruments

    Valves, instrument, equipment to be operated

    Centerline of item to be operated, located less than 3.6 m above grade, 2.75m above floor or platform or 1.8m above wing platform.

    Centerline of item to be operated, located more than 3.6 m above grade, 2.75m above floor or platform or 1.8m above wing platform.

    Exchanger heads Nil Platform

    Oper. Valves 2" & smaller Fixed ladder Fixed ladder

    Oper. Valves 3" above Platform Platform

    Motor operated valves Platform Platform

    Control valves Platform Platform

    Relief valves 2" & smaller Fixed ladder Fixed ladder

    Relief valves 3" & above Platform Platform

    Block valves 2" & smaller Portable ladder Platform

    Block valves 3" & above Platform note 1 Platform

    Battery limit valves Platform Platform

    Pressure instrument Fixed ladder if above 2.2 m Fixed ladder

    Temperature instrument Fixed ladder if above 2.2 m Fixed ladder

    Sample points Platform Platform

    Gauge glasses Fixed ladder Platform

    Level controllers Platform Platform

    Process blinds and spades 2" & above

    Portable ladder/platform Platform

    Process blinds and spades 3" & above

    Platform Platform

    Man ways / manholes Platform Platform

    Manholes / inspection holes Platform Platform

    Nozzles Access required Platform

    Vessel vents Portable ladder Fixed ladder

    Line drains & vents Portable ladder Portable ladder

    Orifice flanges Portable ladder Portable ladder

    Note: - 1. Centerline or block valves located above 2.0 meter from the operating floor, which are required for normal operation, shall be provided with portable platform or chain for operation of valves.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 34 of 50

    ANNEXURE B

    CLEARANCES

    Equipment, Structure, Platforms, Piping & its supports shall be arranged so as to provide the following clearances.

    A OVERHEAD CLERANCES

    1. Over rail roads, top of rail to bottom of any obstruction. 9 m

    2. Over plant roads for major mobile equipment 9 m 3. Over grade & bottom of pipe (inside battery limit) 4.5 m 4. Over walk-ways, pass-ways & platforms to nearest

    obstruction and inside building 2.2m

    5. Over Exchangers at Grade, shell cover channel end. 1.5 m

    B. HORIZONTAL CLEARANCES

    1. Between Exchangers (Aisles between Piping). 0.9 m or 2m centre to centre whichever is higher

    2. Around Pumps (Aisles between piping) 0.9 m 3. Fired heaters to pumps handling flammable stock 15 m

    4. Fired heaters to other flammable containing equipment and closely associated with heaters.

    15 m

    5. At driver end of pumps where truck/fork lifter access is required.

    4 m

    6. At driver end of pumps where truck access is not required. 1.8 m

    7 At shell cover end of exchangers at grade, for access way 1.3 m

    8 Between shells of adjacent horizontal vessels 2.0 m or 0.9m clear aisle whichever is higher

    C EQUIPMENT SPACING

    1. Small size pumps

    (13.7 KW & Less) Mount on common foundations suitable centre to centre distance.

    2. Middle size pumps

    (22.5 KW & Less) 0.9m clears Aisle between associated piping.

    3. Large size pumps

    (Above 22.5 KW) 0.9m clears Aisle between associated piping.

    4. Exchangers and other equipment on structures 0.9m clears Aisle between associated piping.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 35 of 50

    D PLATFORMS

    1. TOWERS, VERTICAL & HORIZONTAL VESSELS

    i. Distance of platform below centerline of manhole flange-side platform.

    0.9-1.05 m

    ii. Width of manhole platform from manhole cover to outside edge of platform

    1.0 m

    Iii Platform extension beyond centre line of manhole side platform.

    1.0 m

    iv. Distance of platform below under side of flange Head platform

    1.75 m

    v. Width of Platform from three sides of manhole Head platform

    0.75 m

    2. HORIZONTAL EXCHANGER

    i. Clearance in front channel or Bonnet flange.

    1.3 m

    Ii Heat exchanger tube bundle removal space.

    Bundle length + 1.5 m

    Iii Min. clearance from edge of flanges. 0.1 m

    3. VERTICAL EXCHANGER

    i. Distance of platform below top flange of channel on bonnet.

    1.5 m

    4. FURNACES

    i. Width of the platform at side of horizontal and vertical tube furnace.

    2.0 m Min.

    Ii Width of the platform at ends of horizontal tube furnace.

    2.0 m Min.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 36 of 50

    ANNEXURE C

    Vertical and Horizontal Guide Spacing

    Pipe Size (Inch) Guide Spacing in meters Vertical Horizontal

    1 6 6

    1 6 6

    2 6 6

    3 8 12

    4 8 12

    6 8 12

    8 8 12

    10 12 18

    12 12 18

    14 12 18

    16,18 12 18

    20 16 18

    24 16 18

    26 and above 16 18

    Notes:

    These spacing may be varied to suit column spacing of rack. The above spacing is for straight runs of pipe and does not include guides, which are used for control of thermal movements, as decided by stress group.

    The guide spacing given in the above table is indicative only.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 37 of 50

    ANNEXURE D Table of Basic Span

    PIPE-VAPOR INSULATION

    PIPE-LIQUID-INSULATION

    BARE PIPE EMPTY

    BARE PIPE WATER FILLED

    BASIC SPAN (L) m

    BASIC SPAN (L) m

    Pipe Size Inch

    SCH. THK mm

    Up to 175C

    176 to 345C

    446C to 400C

    Up to 175C

    176C to 445C

    346C to 400C

    SPAN (L) m

    Weight Kg/m

    SPAN (L) m

    Weight Kg/m

    Pipe Size Inch

    SCH 40 3.5 3.5 2.5 3.5 3.0 2.0 4.5 1.68 4.0 2.04 1 SCH 40 4.5 4.0 3.0 4.5 3.5 3.0 5.0 2.52 4.5 3.07 1 1 SCH 40 5.0 5.0 4.5 5.0 4.5 3.5 6.0 4.0-8 5.0 5.4 1 2 SCH 40 5.5 5.0 4.5 5.0 4.5 3.5 6.5 5.47 5.5 7.65 2 2 SCH 40 6.5 6.0 5.0 6.0 5.5 4.5 7.5 8.7 6.5 11.79 2 3 SCH 40 7.5 6.5 5.5 6.5 6.0 5.0 8.0 11.35 6.5 16.15 3 4 SCH 40 8.0 7.5 6.5 7.5 7.0 6.0 9.0 16.2 7.5 24.45 4 6 SCH 40 10.0 9.5 8.5 9.0 8.0 7.5 10.5 28.3 9.0 46.7 6 8 SCH 40 12.0 11. 10.0 10.0 10.0 9.0 12.0 42.84 10.0 75.22 8 10 SCH 40 13.5 13. 12.0 11.5 10.5 10.5 14.0 60.74 11.5 111.9 10 12 3/8" w 14.5 13. 13.0 12.0 11.5 11.0 15.0 74.40 12.0 147.5 12 14 3/8" w 15.0 14. 13.5 12.0 12.0 11.5 16.0 82.5 12.5 172.05 14 16 3/8" w 16.0 15. 14.5 13.0 12.5 12.0 17.0 94.5 13.0 213.15 16 18 3/8" w 17.0 16. 15.0 13.5 13.0 12.0 18.0 106.5 13.5 258.3 18 20 3/8" w 18.0 17. 16.0 14.0 13.5 12.5 19.0 118.5 14.0 307.5 20 24 3/8" w 20.0 19. 17.5 14.5 14.5 13.0 21.0 142.5 15.0 418.2 24 SCH 80 3.5 3.5 2.5 3.5 3.0 2.0 4.5 2.20 4.0 2.49 1 SCH 80 4.5 4.0 3.0 4.5 3.5 3.0 5.0 3.25 4.5 3.72 1 1 SCH 80 5.0 5.0 4.5 5.0 4.5 4.0 6.0 5.45 5.0 6.60 1 2 SCH 80 6.0 5.0 4.5 5.5 5.0 4.0 6.0 7.53 6.0 9.45 2 2 SCH 80 6.5 6.0 5.5 6.0 6.0 5.0 7.5 11.49 6.5 14.25 2 3 SCH 80 7.5 6.5 6.0 6.5 6.5 6.0 8.0 15.37 7.0 19.66 3 4 SCH 80 8.0 8.0 7.0 7.5 7.5 6.5 9.0 22.47 8.0 29.94 4 6 SCH 80 10.5 10. 9.0 9.5 9.0 8.5 10.5 42.90 9.5 59.85 6 8 " w 12.0 11. 10.5 10.5 10.0 10.0 12.0 65.10 11.0 94.8 8 10 " w 13.5 13. 12.0 11.5 11.5 10.5 14.0 82.20 12.0 130.69 10 12 "w 14.5 13. 13.0 12.5 12.0 11.5 15.0 98.13 13.0 168.64 12 14 "w 15.0 14. 13.5 13.0 12.5 12.0 16.0 108.1 13.5 194.4 14 16 "w 16.0 15. 15.0 13.5 13.0 13.0 17.0 124.2 14.0 240.0 16 18 "w 17.5 17. 16.0 14.5 14.0 13.5 18.0 140.2 14.5 286.64 18 20 " w 18.0 17. 17.0 15.0 14.5 14.0 19.0 157.0 15.0 341.8 20 24 " w 20.0 19. 18.5 16.0 15.0 15.0 21.0 188.2 16.0 458.44 24 1 10S 4.0 3.5 3.0 4.0 3.0 2.5 4.5 2.08 4.0 2.7 1 1 10S 5.0 4.5 3.5 4.5 4.0 3.0 5.5 3.12 5.0 4.57 1 2 10S 5.0 4.5 3.5 4.5 4.0 3.0 6.0 3.94 5.5 6.63 2 2 10S 6.5 5.5 4.5 5.5 5.0 4.5 7.0 5.26 6.0 8.85 2 3 10S 7.0 6.0 5.0 6.0 5.5 5.0 7.5 6.45 6.0 11.91 3 4 10S 7.5 7.0 6.0 6.5 6.0 6.0 8.0 8.34 7.0 17.67 4 6 10S 9.5 9.0 8.0 8.0 7.5 7.5 10.0 13.82 8.5 34.54 6 8 10S 11.0 10. 10.0 9.5 9.5 8.5 11.5 19.94 10.0 55.5 8 10 10S 12.5 12. 11.0 10.5 10.0 9.5 13.0 27.83 11.0 83.4 10 12 10S 14.0 13. 12.0 11.0 11.0 10.0 14.5 36.00 11.5 114.6 12 14 10S 14.5 14. 13.0 11.5 11.0 11.0 15.5 41.18 11.5 132.6 14 16 10S 16.5 14. 14.0 12.0 11.5 11.5 16.5 47.33 12.5 172.2 16 18 10S 16.5 15. 14.5 12.5 12.5 11.5 17.5 53.18 13.0 212.1 18 20 10S 17.5 16. 15.5 13.0 13.0 12.0 18.5 68.50 13.0 264.5 20 24 10S 19.0 18. 17.0 14.0 13.5 12.5 20.5 94.37 14.0 376.8 24

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 38 of 50

    ANNEXURE E

    TECHNICAL REQUIREMENTS OF PIPING MATERIAL

    1.0 Ends

    Unless otherwise specified the ends shall be to the following standard:

    SW/SCRD ASME B16.11

    BW ASME B16.25 / B16.9

    FLANGED ASME B16.5 and ASME B16.47 SERIES B/API-605

    THREADING ASME/ANSI B1.20.1 (NPT, Taper threads)

    2.0 Face Finish

    This shall be to MSS-SP-6/ASME B46.1/ ASME B16.5. The interpretation shall be :

    Stock Finish 250-1000 in AARH

    Serrated Finish 250-500 in AARH

    Smooth Finish/125 AARH 125-250 in AARH

    Extra Smooth Finish /63 AARH 32-63 in AARH

    3.0 Austenitic Stainless Steel

    All items/ parts shall be supplied in solution-annealed condition.

    Intergranular Corrosion (IGC) Test shall be conducted as per following: ASTM A262 Practice B with acceptance criteria of 60-mils/ year (max.) for casting. ASTM A262 Practice E with acceptance criteria of No cracks as observed from 20X

    magnification & microscopic structure to be observed from 250X magnification" for other than casting.

    For IGC test, two sets shall be drawn from each solution annealing lot: one set corresponding to highest carbon content and other set corresponding to the highest rating/ thickness.

    IGC test is a must for all stainless steel classes.

    For all items of stabilized SS grades, stabilizing heat treatment shall also be done. It shall be carried out subsequent to normal solution annealing. Soaking temperature and holding time shall be 900 Deg. C and 4 hours respectively.

    4.0 Item specific notes:

    4.1 Pipes

    Double seam is allowed for sizes 36" and larger.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 39 of 50

    Galvanized pipes shall be only Hot Dip galvanized To ASTM A53.

    Pipes greater than 10" spiral welded/ pipe shall be used weld seams to be kept in upper quadrant only.

    4.2 Fittings

    All fittings shall be seamless in construction unless otherwise specified.

    For reducing BW fittings having different wall thickness at each end, the greater one shall be employed and the ends shall be matched to suit respective thickness.

    All welded fittings shall be double welded. Inside weld projection shall not exceed 1.6 mm, and the welds shall be ground smooth at least 25mm from the ends.

    For fittings made out of welded pipe, the pipe itself shall be of double welded type, manufactured with the addition or filler material and made employing automatic welding only.

    All welded fittings shall be normalized for CS, normalized & tempered for AS: and 100 % radiographed by X-ray for all welds made by fitting manufacturer as well as for welds on the parent material.

    Bevel ends of all BW fittings shall undergo 100 % MP/DP test. Those used in fire fighting facility should be marked

    Tell-tale hole to be tapped in all reinforcement pads.

    4.3 Flanges

    For Ring Joint Flanges, Blinds and Spacers, the hardness shall be as follow:

    Flange Material Min. hardness of Groove

    (BHN) Carbon Steel 120

    1 % Cr. To 5% Cr. Mo 150

    Type 304,316, 347, 321 180

    Type 304 L, 316 L 140

    For RTJ flanges, blinds & spacers, the hardness of the groove shall be specified on the test report.

    Bore of weld neck flange shall correspond to the inside diameter of pipe for specified schedule/ thickness. Ends shall be beveled to suit the specified schedule/ thickness.

    All flange joints to be tightened with proper gaskets, bolts & nuts with skilled technician and box-up of flange joints to be documented.

  • Jacobs HPCL, Mumbai Piping Design Basis Part- III LSTK Doc NO : 44LK-5100-0/L.02/0002/A4 Section - A 44LK 5100

    Sheet 40 of 50

    4.4 Valves

    Valves of Class 900# & above shall be pressure-seal type. Threaded and seal welded or welded bonnet may be employed up to sizes 1-1/2".

    All flanged valves (except forged) shall have flanges integral with the valve body. Yoke material shall be at least equal to body material.

    Forgings are acceptable in place of Castings but not vice-versa.

    No cast iron valves to be used in fire fighting or any other service except in drinking water service

    Valve castings/ forgings purchased from India or Indian Vendors shall be from Owner approved foundries/ forging shop.

    4.5 Dimensions

    Face-to-Face/End-to-End dimension shall be as per ANSI B16.10. In case the same is not covered under B16.10, the dimension shall be as per BS 2080/Manufacturers Std. Valve under cryogenic service (temp.below-45C) shall be as per BS-6364 and shall be procured from pre-qualified vendor.

    4.6 Operation

    Generally the valves are hand wheel or lever operated. However, suitable gear operator in enclosed gear box shall be provided for valves as follows;

    TYPE OF VALVE ANSI CLASS SIZES

    Gate 150 300 600 900

    1500 2500

    14" and larger 12" and larger 8" and larger 6" and larger 4" and larger 2" and larger

    Ball 150 and 300 600 and over

    6" and larger Manufacturer's Std.

    Plug 150 300

    8" and larger 6" and larger

    Butterfly all 8" and larger

    Globe 150 and 300 600 900

    1500 and 2500

    8" and larger 6" and larger 4" and larger 3" and larger

    Hand wheel diameter shall not exceed 750 mm and lever length shall not exceed 500 mm on each side. Effort to operate shall not exceed 35 kgf at hand wheel periphery. Howeve