    ATTACHMENT NO. 1 :

    SUMMARY SCOPE OF WORK(SOW)

  • 8/18/2019 Hotwork Checklist TKP-A

    4/96

    SCOPE OF WORK

    DISCIPLINE TKP-A

    Structure 1 Deck Strengthening at Cellar & Sea Deck

    2 Removal of existing beams, bracing, handrails & gratings (CD)

    3Deck Extension - Panel 1, 2 & 3 c/w diagonal bracing, tubular supports, loose beams, gratings, handrails andpipe coaming

    4 Deck Extension - Panel 4 & 5 c/w diagonal bracing, tubular supports, gratings, and handrails

    5 Sump Pump Deck Extension c/w tubular supports, gratings & handrails.

    6 ABV Service Platform c/w tubular supports, ladder, gratings & handrails.

    7 Drip pan (under Panel 1 & 2)

    8 Removal of existing SDV Service Platform

    Mechanical1

    Crude Launcher (L-1350), N2 Bank (A-5910), Chemical Transfer Pumps Skid (A-6811), Eyewash & Safety ShowerStation, Sump Pump Skid (A-6511), Sump Tank Skid (A-6500).

    2 Chemical Injection Skids, A-6810A/B (CI,BI & SI) c/w injection DBB valves (SP-13505 / 13506 / 13507)

    3 H2S Analyzer Skid (XA-1350) c/w sampling (SP-13508) & return line DBB valves (SP-13509)

    4Corrosion Coupon (SP-13504), Scale Corrosion Coupon (SP-13503), Bioprobe (SP-13502) & Sampling DBB Valve(SP-13501)

    5 Removal of existing Crude Launcher (L-008), CI Skid (AQ-4010), Biocide Storage Tank (T-6810), CI Storage Tank(T-6820), Sump Pump (P-700)

  • 8/18/2019 Hotwork Checklist TKP-A

    5/96

    Piping 1 Process, blowdown, vents & drains line for L-1350 c/w valves, bolting sets and pipe supports.

    2 Process, vent, drains & chemical lines of A-6810A/B and A-6811c/w valves, bolting sets and pipe supports.

    3 Vent & drain line of XA-1350 c/w bolting sets

    4 Process, vent & drains lines of A-6510/65611 c/w valves, bolting sets and pipe supports.

    5 Mechanical Installation of MOV-13504/13505 & ABV-1350

    6 Removal of process, vents, & drains lines of L-008 & P-700

    7 Removal of drains, vent & chemical line of AQ-4010/T-6810/T-6820

    Instrument1

    Instrumentation for L-1350 : Pressure Gauges (PI-1350A/1350B/1351/1352),Pig Signallers (XI-1350/1351), Pressure Pilots (PEL-1350/PEH-1350)

    2 Electric Resistance Probe XCP-1350

    3 Signal & air line tubing for LCP-6810 (A-6810)

    4 New SR-1320A (c/w signal & air line tubings) for existing SDV-1320

    5 LCP-1350 / ABV-1350 c/w signal & air line tubings

    6 Air line tubing for H2S Analyzer, XA-1350

    7 Signal line tubings for A-6500/LCP-6510

    8 Injection Line of A-6810A/B (CI,BI & SI)

    9 Fusible plugs for L-1350, A-6810, A-6811, XA-1350, ABV-1350, MOV-13504, MOV-13505, A-6500, A-6511

    10 Removal of instrumentation for L-008

  • 8/18/2019 Hotwork Checklist TKP-A

    6/96

    Electrical 1 Modification at L5-H, Main LV Switchboard (TKQ-A)

    2 Modification at existing LV Switchboard (TKQ-A/TKK-A bridge)

    3 Distribution Board, DB-1000 (TKK-A/TKP-A bridge) c/w cable glanding & termination

    4Power Cable (P-1000-K) run from existing LV Switchboard (TKQ-A/TKK-A bridge) to new DB-100 (TKK-A/TKP-Abridge)

    5Cable run, glanding & termination at MOV-13504, MOV-13505, LCP-6810 & chemical injection pumps, H2SAnalyzer (XA-1350), LCP-6510, water cut meter and sump pump

    6 New lightings c/w JB, cable run, glanding & termination at CD

    7 Grounding (Earth Boss) for L-1350, A-5910, A-6810, MOV-13504/13505, XA-1350, A-6500, A-6511, cage ladder ofABV service platform

    Commissioning 1 Commissioning of Crude Launcher, L-1350 and H2S Analyzer, XA-1350

    and 2 Commissioning of Chemical Injection Skid, A-6810A/6810B & Chemical Transfer Pump, A-6811

    ecommissioning 3 Commissioning of Sump Pump Tank, A-6500 & Sump Pump Skid, A-6511

    4 Commissioning of Eyewash & Safety Shower Station

    5 Commissioning of new lightings (floodlight, pole mounted fluorescent light & beam mounted fluorescent light)

    6Decommissioning of existing Crude Launcher L-008, Chemical Injection Skid AQ-4010, Biocide Storage Tank, T-6810, CI Storage Tank T-6820, Sump Pump, P-700

  • 8/18/2019 Hotwork Checklist TKP-A

    7/96

    ATTACHMENT NO. 2 :

    HAZARDOUS AREA

    CLASSIFICATION DIAGRAM

  • 8/18/2019 Hotwork Checklist TKP-A

    8/96

    MECH/PIPING

  • 8/18/2019 Hotwork Checklist TKP-A

    9/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    10/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    11/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    12/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    13/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    14/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    15/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    16/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    17/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    18/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    19/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    20/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    21/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    22/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    23/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    24/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    25/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    26/96

    Hot Work Location

    Legend :

  • 8/18/2019 Hotwork Checklist TKP-A

    27/96

    STRUCTURAL

  • 8/18/2019 Hotwork Checklist TKP-A

    28/96

    ( ) PETRA RESOURCES

    SDN BHD(172962-D)

    1 1

    ( ) ( ) ( ) ( ) ( )

    ( ) 1. . 2. , & 1 ( ). 3. 2 ( ) 4. 1 5. 1 ( ) 6. '2' ( 2) 7. 2 8. 2 ( )

    . '1' ( 1) 10. 3 11. ' ' ( 2) 12. ( 3) 13. / 14. 1, 2, & 3 15. 2 ( ) 16. 4 17. ( 4) 18. ( 4) 1 . 3 4 20. 5 21. 4 & 5 22. , 2 23. & , 2 24. , 2 25. , 2 26. 1 & 2 27. 28. 2 . (114.3 & 88. ) 30. 31. 32. ( ) 1

  • 8/18/2019 Hotwork Checklist TKP-A

    29/96

  • 8/18/2019 Hotwork Checklist TKP-A

    30/96

  • 8/18/2019 Hotwork Checklist TKP-A

    31/96

  • 8/18/2019 Hotwork Checklist TKP-A

    32/96

  • 8/18/2019 Hotwork Checklist TKP-A

    33/96

  • 8/18/2019 Hotwork Checklist TKP-A

    34/96

  • 8/18/2019 Hotwork Checklist TKP-A

    35/96

  • 8/18/2019 Hotwork Checklist TKP-A

    36/96

  • 8/18/2019 Hotwork Checklist TKP-A

    37/96

  • 8/18/2019 Hotwork Checklist TKP-A

    38/96

  • 8/18/2019 Hotwork Checklist TKP-A

    39/96

  • 8/18/2019 Hotwork Checklist TKP-A

    40/96

  • 8/18/2019 Hotwork Checklist TKP-A

    41/96

  • 8/18/2019 Hotwork Checklist TKP-A

    42/96

  • 8/18/2019 Hotwork Checklist TKP-A

    43/96

    E&I

  • 8/18/2019 Hotwork Checklist TKP-A

    44/96

  • 8/18/2019 Hotwork Checklist TKP-A

    45/96

  • 8/18/2019 Hotwork Checklist TKP-A

    46/96

  • 8/18/2019 Hotwork Checklist TKP-A

    47/96

  • 8/18/2019 Hotwork Checklist TKP-A

    48/96

  • 8/18/2019 Hotwork Checklist TKP-A

    49/96

  • 8/18/2019 Hotwork Checklist TKP-A

    50/96

  • 8/18/2019 Hotwork Checklist TKP-A

    51/96

  • 8/18/2019 Hotwork Checklist TKP-A

    52/96

  • 8/18/2019 Hotwork Checklist TKP-A

    53/96

  • 8/18/2019 Hotwork Checklist TKP-A

    54/96

  • 8/18/2019 Hotwork Checklist TKP-A

    55/96

  • 8/18/2019 Hotwork Checklist TKP-A

    56/96

  • 8/18/2019 Hotwork Checklist TKP-A

    57/96

    ATTACHMENT NO. 3 :

    P&ID OF AFFECTED HOT

    WORK AREA

  • 8/18/2019 Hotwork Checklist TKP-A

    58/96

  • 8/18/2019 Hotwork Checklist TKP-A

    59/96

  • 8/18/2019 Hotwork Checklist TKP-A

    60/96

  • 8/18/2019 Hotwork Checklist TKP-A

    61/96

  • 8/18/2019 Hotwork Checklist TKP-A

    62/96

  • 8/18/2019 Hotwork Checklist TKP-A

    63/96

  • 8/18/2019 Hotwork Checklist TKP-A

    64/96

  • 8/18/2019 Hotwork Checklist TKP-A

    65/96

  • 8/18/2019 Hotwork Checklist TKP-A

    66/96

  • 8/18/2019 Hotwork Checklist TKP-A

    67/96

  • 8/18/2019 Hotwork Checklist TKP-A

    68/96

  • 8/18/2019 Hotwork Checklist TKP-A

    69/96

  • 8/18/2019 Hotwork Checklist TKP-A

    70/96

  • 8/18/2019 Hotwork Checklist TKP-A

    71/96

    ATTACHMENT NO. 4 :

    SPADING PLAN

  • 8/18/2019 Hotwork Checklist TKP-A

    72/96

    AREA

    Contractor EIC

    Mokhtar Ab Manap

    March 26, 2015

    Size (in) Rating Face Date Initial Date Initial Date Initial Size Material Qty

    SP-001A

    Upstream of V-300 (200-PL-011-1101X/11432)

    Inlet Line to V-3001.Insert spade2.Hotwork at TP-012 P-0034 PL

    8 150# RF SP - - -

    SP-002A

    Upstream of V-300 (200-PL-011-1101X/11432)

    Inlet Line to V-3001.Insert spade2.Hotwork at TP-012 P-0034 PL

    8 150# RF SP - - -

    SB-001B

    Vent Line of R-005 to 50-V-002-1101

    Vent Line of R-0051.To ensure the Spectacle Blind is inswing closed position.2.Hotwork at TP-001/002

    P-0036 SH 1/2 V 2 600# RF SB - - -

    CV-001B

    Vent Line of R-005 to 50-V-002-1101

    Vent Line of R-0051.To ensure the 2'' x 600# ball valveis in closed position.2.Hotwork at TP-001/002

    P-0036 SH 1/2 V 2 600# RF CV - - -

    SB-002B

    Vent Line of R-006 to 50-V-002-1101

    Vent Line of R-0061.To ensure the Spectacle Blind is inswing closed position.2.Hotwork at TP-001/002

    P-0036 SH 1/2 V 2 600# RF SB - - -

    CV-002B

    Vent Line of R-006 to 50-V-002-1101

    Vent Line of R-0061.To ensure the 2'' x 600# ball valveis in closed position.2.Hotwork at TP-001/002

    P-0036 SH 1/2 V 2 600# RF CV - - -

    SB-003B

    Vent Line of L-008 to 50-V-002-1101

    Vent Line of L-0081.To ensure the Spectacle Blind is inswing closed position.2.Hotwork at TP-001/002

    P-0036 SH 2/2 V 2 600# RF SB - - -

    CV-003B

    Vent Line of L-008 to 50-V-002-1101

    Vent Line of L-0081.To ensure the 2'' x 600# ball valveis in closed position.2.Hotwork at TP-001/002

    P-0036 SH 2/2 V 2 600# RF CV - - -

    SP-004B

    50-V-002-1101X to Vent Header Vents of Receivers and Launchers to Atmospheric Vent Header.1.Insert Spade2.Hotwork at TP-001/002

    P-0039 V 2 150# RF SP - - -

    SB-001C

    Kicker Line of L-008 to 250-PL-101-6101X

    Kicker Line of L-0081.To ensure the Spectacle Blind is inswing closed position.2.Hotwork at TP-003/004

    P-0036 SH 2/2 PL 6 600# RF SB - - -

    CV-001C

    Kicker Line of L-008 to 250-PL-101-6101X

    Kicker Line of L-0081.To ensure the 6'' x 600# ball valveis in closed position.2.Hotwork at TP-003/004

    P-0036 SH 2/2 PL 6 600# RF CV - - -

    SB-002C

    Balance Line of L-008 to 250-PL-101-6101X

    Balance Line of L-0081.To ensure the Spectacle Blind is inswing closed position.2.Hotwork at TP-003/004

    P-0036 SH 2/2 PL 2 600# RF SB - - -

    CV-002C

    Balance Line of L-008 to 250-PL-101-6101X

    Balance Line of L-0081.To ensure the 2'' x 600# ball valveis in closed position.2.Hotwork at TP-003/004

    P-0036 SH 2/2 PL 2 600# RF CV - - -

    SB-003C

    80-D-007-1101X to 250-PL-101-6101X

    Closed Drain Line of 250-PL-101-6101X1.To ensure the Spectacle Blind is inswing closed position.2.Hotwork at TP-003/004

    P-0036 SH 2/2 D 3 600# RF SB - - -

    CV-003C

    80-D-007-1101X to 250-PL-101-6101X

    Closed Drain Line of 250-PL-101-6101X1.To ensure the 3'' x 600# ball valveis in closed position.2.Hotwork at TP-003/004

    P-0036 SH 2/2 D 3 600# RF CV - - -

    SB-004C

    Bypass Line of L-008 (250-PL-101-6101X)

    Bypass Line of L-0081.Swing Spectacle Blind in swingclosed position.2.Hotwork at TP-003/004

    P-0036 SH 2/2 PL 10 600# RF SB - - -

    CV-004C

    Bypass Line of L-008 (250-PL-101-6101X)

    Outlet of Liquid Metering Skid toBypass Line of L-0081.Close 10'' x 600# ball valve.2.Hotwork at TP-003/004

    P-0036 SH 2/2 PL 10 600# RF CV - - -

    TKP-A Turnaround (August 2015)

    PHYSICAL ISOLATION LIST

    N ID. UNIT NO.

    NT/TAG NO

    RIPTION

    Approved by

    OIM

    Prepared by Reviewed By

    t FOM PS

    Location Function & RemarksBOLT DATA REINSTATEMENT GASKET

    (Gasket Description)Qty

    OPS CONFIRM SPADESREMOVEDMethod of

    IsolationStandard

    RatingScaffold

    TypeInsulation

    CSR CONFIRMCORRECT RATED

    SPADE INSTALLED

    OPS CONFIRM SPADEINSTALLED AT

    CORRECT LOCATIONP&ID NO. L ine ClassFlange dataSOLATION TAG

    NO.

  • 8/18/2019 Hotwork Checklist TKP-A

    73/96

    AREA

    Contractor EIC

    Mokhtar Ab Manap

    March 26, 2015

    Size (in) Rating Face Date Initial Date Initial Date Initial Size Material Qty

    TKP-A Turnaround (August 2015)

    PHYSICAL ISOLATION LIST

    N ID. UNIT NO.

    NT/TAG NO

    RIPTION

    Approved by

    OIM

    Prepared by Reviewed By

    t FOM PS

    Location Function & RemarksBOLT DATA REINSTATEMENT GASKET

    (Gasket Description)Qty

    OPS CONFIRM SPADESREMOVEDMethod of

    IsolationStandard

    RatingScaffold

    TypeInsulation

    CSR CONFIRMCORRECT RATED

    SPADE INSTALLED

    OPS CONFIRM SPADEINSTALLED AT

    CORRECT LOCATIONP&ID NO. L ine ClassFlange dataSOLATION TAG

    NO.

    SP-005C

    Liquid Metering Skid to BypassLine of L-008 (250-PL-101-6101X)

    Outlet of Liquid Metering Skid toBypass Line of L-008.1.Insert spade.2.Hotwork at TP-003/004

    P-0038 PL 10 600# RF SP - - -

    CV-005C

    Liquid Metering Skid to BypassLine of L-008 (250-PL-101-6101X)

    Outlet of Liquid Metering Skid toBypass Line of L-0081.To ensure the 10'' x 600# ball valveis in closed position.2.Hotwork at TP-003/004

    P-0038 PL 10 600# RF CV - - -

    SP-006C

    Liquid Metering Skid to BypassLine of L-008 (250-PL-101-6101X)

    Outlet of Liquid Metering Skid toBypass Line of L-008.1.Insert spade.2.Hotwork at TP-003/004

    P-0038 PL 10 600# RF SP - - -

    CV-006C

    Liquid Metering Skid to BypassLine of L-008 (250-PL-101-6101X)

    Outlet of Liquid Metering Skid toBypass Line of L-008.1.Close 10'' x 600# ball valve.2.Hotwork at TP-003/004

    P-0038 PL 10 600# RF CV - - -

    SB-001D

    Closed Drain Line of R-005 to 80-D-006-1101X

    Closed Drain Line of R-005.1.To ensure the spectacle blind is inswing closed position.2.Hotwork at TP-016/017

    P-0036 SH 1/2 D 3 600# RF SB - - -

    CV-001D

    Closed Drain Line of R-006 to 80-D-006-1101X

    Closed Drain Line of R-005.1.To ensure the 3'' x 600# ball valveis in closed position.2.Hotwork at TP-016/017

    P-0036 SH 1/2 D 3 600# RF CV - - -

    SB-002D

    Closed Drain Line of R-006 to 80-D-006-1101X

    Closed Drain Line of R-006.1.To ensure the spectacle blind is inswing closed position.2.Hotwork at TP-016/017

    P-0036 SH 1/2 D 3 600# RF SB - - -

    CV-002D

    Closed Drain Line of R-006 to 80-D-006-1101X

    Closed Drain Line of R-006.1.To ensure the 3'' x 600# ball valveis in closed position.2.Hotwork at TP-016/017

    P-0036 SH 1/2 D 3 600# RF CV - - -

    SB-003D

    Closed Drain Line of Sump Pump,P-700 to Closed Drain Header

    Closed Drain Line of P-700.1.Swing spectacle blind to closedposition.2.Hotwork at TP-016/017

    P-0040 D 6 600# RF SB - - -

    SP-004D

    Closed Drain Header (150-BD-004-1101X)

    Closed Drain Header.1.Insert spade.2.Hotwork at TP-016/017 P-0040 D 6

    600# RF SP - - -

    RMV-005DClosed Drain Header (150-BD-004-1101X)

    Closed Drain Header.1.Temporary swing open the affectedspool. P-0040 D 6

    600# RF RMV - - -

    RMV-001EOpen Drain Header (150-D-008-1101)

    Open Drain Header.1.Temporary swing open the affectedspool.

    P-0040 D 6 600# RF RMV - - -

    e Blind

    angee Block & Bleedve Spoolalve

  • 8/18/2019 Hotwork Checklist TKP-A

    74/96

    SP-001A

    SP-002A

  • 8/18/2019 Hotwork Checklist TKP-A

    75/96

    SB-001B

    CV-001B

    SB-002B

    CV-002B

    CV-001D

    SB-001D

    CV-002D

    SB-002D

  • 8/18/2019 Hotwork Checklist TKP-A

    76/96

    SB-001BCV-001B

    SB-002B

    SP-004B

    CV-002B

    SB-003B

    CV-003B

    SB-001C

    CV-001C

    SB-002C

    CV-002C

    CV-003C

    SB-003C

    SP-005C

    CV-005C

    SP-006C

    CV-006C

    SB-004C

    CV-004C

  • 8/18/2019 Hotwork Checklist TKP-A

    77/96

    SP-005C

    CV-005C

    CV-006C

    SP-006C

  • 8/18/2019 Hotwork Checklist TKP-A

    78/96

    SP-004B

  • 8/18/2019 Hotwork Checklist TKP-A

    79/96

    RMV-001E

  • 8/18/2019 Hotwork Checklist TKP-A

    80/96

    SB-003D

    SP-004D

    RMV-005D

  • 8/18/2019 Hotwork Checklist TKP-A

    81/96

    ATTACHMENT NO.5 :

    HOT WORK PERMIT FOR THE

    JOB

  • 8/18/2019 Hotwork Checklist TKP-A

    82/96

  • 8/18/2019 Hotwork Checklist TKP-A

    83/96

  • 8/18/2019 Hotwork Checklist TKP-A

    84/96

    ATTACHMENT NO. 6 :

    JOB HAZARD ANALYSIS

  • 8/18/2019 Hotwork Checklist TKP-A

    85/96

  • 8/18/2019 Hotwork Checklist TKP-A

    86/96

  • 8/18/2019 Hotwork Checklist TKP-A

    87/96

  • 8/18/2019 Hotwork Checklist TKP-A

    88/96

  • 8/18/2019 Hotwork Checklist TKP-A

    89/96

  • 8/18/2019 Hotwork Checklist TKP-A

    90/96

  • 8/18/2019 Hotwork Checklist TKP-A

    91/96

    ATTACHEMENT NO. 7 :

    FIREWATCHERCHECKLIST/CERTIFICATE

  • 8/18/2019 Hotwork Checklist TKP-A

    92/96

    No. Action Items Yes No Remarks

    1 Flammable liquids, dust, lint and oil depositsremoved.

    2 Explosive atmosphere in area eliminated.

    3 Floor swept clean of combustibles.

    4Combustibles floor wet down, covered with fireblankets.

    5 All wall & floors opening covered.

    6Fire watch will be provided during and continuouslyfor 30 minutes after work, including during anywork breaks.

    7 Fire watch is supplied with suitable extingushers.

    8Fire watch is trained in use of this equipment and in

    sounding alarm.

    9Hot work area inspected 30 minutes after jobcompleted.

    10 Fire watcher to wear identifiable vest ( Green )

    Firewatcher:

    ________________________

    Name:

    Date:

    FIRE WATCHER CHECKLIST

  • 8/18/2019 Hotwork Checklist TKP-A

    93/96

  • 8/18/2019 Hotwork Checklist TKP-A

    94/96

    37E_?

    .HR sroPrER NG^NG ANIANG 7312rs r3 5ae7)

    For having successfully compleied

  • 8/18/2019 Hotwork Checklist TKP-A

    95/96

    CERTIFICATE 50163

    Awarded toH WEt LIONC (890914-13-5129)

    For having successfully completed

    FiREWATCHER COURSE

    Held On

    25ff lULY 2013

    t\/ @MnlMFriiri6n niNiE iry oate: 24u JU|Y 2016

    ffil

  • 8/18/2019 Hotwork Checklist TKP-A

    96/96

    CERTIFICATE

    Awarded toLEO Il, ItCHEAL ACHA €60102-52-591 7)

    Held On

    l9 JULY 2013

    49875

    For having successfully completed

    FIRE WATCHER COURSE

    G r