HMA Pavement Construction Issues HMA Pavement Construction Issues Presented by: Robert Sauber Supervising Engineer Engineer Bureau of Materials

HMA Pavement Construction Issues.ppt

Embed Size (px)

Citation preview

Page 1: HMA Pavement Construction Issues.ppt

HMA Pavement Construction IssuesHMA Pavement Construction Issues

• Presented by:

Robert Sauber

Supervising EngineerEngineer

Bureau of Materials

Page 2: HMA Pavement Construction Issues.ppt

Develop a Strategy

4 0

5 0

6 0

7 0

8 0

fici

ent

Sm

oo

thn

4 0

5 0

6 0

7 0

8 0

fici

ent

Sm

oo

thn

0

1 0

2 0

3 0

1 9 9 6 1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 1 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5

F i s c a l Y e a r%

Wit

h D

ef

R e d u c e F u n d in g b y 3 3 %C o n tin u e C u r re n t F u n d in gIn c re a s e F u n d in g b y $ 1 0 0 M /Y rR e d u c e H a lf D e fic ie n t B a c k lo g U s in g $ 2 9 0 M /Y rH is to ry

0

1 0

2 0

3 0

1 9 9 6 1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 1 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5

F i s c a l Y e a r%

Wit

h D

ef

R e d u c e F u n d in g b y 3 3 %C o n tin u e C u r re n t F u n d in gIn c re a s e F u n d in g b y $ 1 0 0 M /Y rR e d u c e H a lf D e fic ie n t B a c k lo g U s in g $ 2 9 0 M /Y rH is to ry

Page 3: HMA Pavement Construction Issues.ppt

Construction requirementsConstruction requirements

• Lane closure hours and environmentalLane closure hours and environmental regulations often limit treatment selection

• Select a buildable treatment that provides• Select a buildable treatment that provides the largest agency and user benefitC t ti t d i i htti• Constructing pavements during nighttime lane closures reduces quality

• Poor working conditions resulting in loss of talented workers

Page 4: HMA Pavement Construction Issues.ppt

Considerations with Full Road Closure

• Not amendable to all construction situationssituations– The availability of adequate alternate routes

• A solid management plan• A solid management plan– Done on an accelerated schedule

Scheduled on a 24 hr work basis potential for• Scheduled on a 24-hr. work basis, potential for impacts to local residents are concerned.

• Ensure all the needs to be met throughout project g p jduration

– Balance the increased load on the network • Increased traffic densities on alternate routes must

be assessed, planned for, and managed.

Page 5: HMA Pavement Construction Issues.ppt

Benefits of Full ClosureBenefits of Full Closure• Reduced project duration • Increased worker productivity• Increased worker productivity • Improved safety

I d d t lit• Improved product quality • Positive public sentiment • Increased workspace and flexibility • Reduced impact on construction p

travelers • Cost savingsg

Page 6: HMA Pavement Construction Issues.ppt

Full Road Closure Time Savings

Page 7: HMA Pavement Construction Issues.ppt

Milling and Profile MillingMilling and Profile Milling

• Milling is used to remove worn out surfaceMilling is used to remove worn out surface material and fix cross slope and profile– 2007 Specs eliminates 20+ milling itemsp g– Ranges now specified; 0-3”, >3”-6”, >6”– Plans should indicate grade control pointsg p

• Profile milling is used to remove ruts and corrugation and/or improve smoothnessg– Normally included for bridge undercuts where

lane closure time is limited, thick lifts placed

Page 8: HMA Pavement Construction Issues.ppt

Paver Production Rates (approx )Paver Production Rates (approx.)

• Microsurfacing- up to 7 lane miles/shiftMicrosurfacing up to 7 lane miles/shift• Novachip- up to 5 lane miles/shift

HMA t 3 l il / hift• HMA- up to 3 lane miles/shift• Plant production outpaces paver placement• Number of haul trucks is critical• MTV helps to reduce the number of trucksMTV helps to reduce the number of trucks

Page 9: HMA Pavement Construction Issues.ppt

Material Transfer VehicleMaterial Transfer Vehicle

• Helps to maintain consistent paver speedHelps to maintain consistent paver speed• Helps mixture and temperature

segregation by remixing the materialsegregation by remixing the material• Prevents haul trucks from bumping paver• Stores 1½ loads of material on site

But…

• Extremely heavy when loaded• Material loses 20oF in the processMaterial loses 20 F in the process

Page 10: HMA Pavement Construction Issues.ppt

Weather LimitationsWeather Limitations

• Microsurfacing the most sensitive to coldMicrosurfacing the most sensitive to cold temperatures or heavy rain

• Open Graded Friction Course and• Open Graded Friction Course and Novachip sensitive to cold weather T k C t 64 22 ill t dh h• Tack Coat 64-22 will not adhere when surface is damp from rain or milling

• Thicker lifts of HMA should be placed in cool weather

Page 11: HMA Pavement Construction Issues.ppt

Milling Machineg

Page 12: HMA Pavement Construction Issues.ppt

Cutting DrumCutting Drum

Page 13: HMA Pavement Construction Issues.ppt

Scabs after milling

Page 14: HMA Pavement Construction Issues.ppt

Proper Tack Coat Coveragep g

Page 15: HMA Pavement Construction Issues.ppt

Poor Tack Coat Coverage

Page 16: HMA Pavement Construction Issues.ppt

Good/Bad Tack Coat Coverageg

Page 17: HMA Pavement Construction Issues.ppt

Paver Augerg

Page 18: HMA Pavement Construction Issues.ppt

Screed Extension

Page 19: HMA Pavement Construction Issues.ppt

Paver HopperPaver Hopper

Page 20: HMA Pavement Construction Issues.ppt

Hopper Insert for MTVHopper Insert for MTV

Page 21: HMA Pavement Construction Issues.ppt

Paver Push Roller & Hitch

Page 22: HMA Pavement Construction Issues.ppt

Paver Gearbox

Page 23: HMA Pavement Construction Issues.ppt

Gear Box StreakGear Box Streak

Page 24: HMA Pavement Construction Issues.ppt

Gearbox Streak

Page 25: HMA Pavement Construction Issues.ppt

Echelon PavingEchelon Paving

Page 26: HMA Pavement Construction Issues.ppt

Bad Longitudinal Joint

Page 27: HMA Pavement Construction Issues.ppt

Notch Wedge Apparatus

Page 28: HMA Pavement Construction Issues.ppt

Notch Wedge Joint

Page 29: HMA Pavement Construction Issues.ppt

Ski used for grade controlg

Page 30: HMA Pavement Construction Issues.ppt

MTV: Blaw Knox MC 30

Page 31: HMA Pavement Construction Issues.ppt

MTV- Shuttlebuggyggy

Page 32: HMA Pavement Construction Issues.ppt

Shuttlebuggy Auger

Page 33: HMA Pavement Construction Issues.ppt

Steel Wheel Roller- Vibratoryy

Page 34: HMA Pavement Construction Issues.ppt

Pneumatic tire roller

Page 35: HMA Pavement Construction Issues.ppt

Pneumatic tires

Page 36: HMA Pavement Construction Issues.ppt

Nuclear Density Gauge: QCy g

Page 37: HMA Pavement Construction Issues.ppt

Fat Spots- Bleeding or FlushingFat Spots Bleeding or Flushing

Page 38: HMA Pavement Construction Issues.ppt

Roller Marks

Page 39: HMA Pavement Construction Issues.ppt

Poor Longitudinal JointPoor Longitudinal Joint

Page 40: HMA Pavement Construction Issues.ppt

Patched Longitudinal Jointg

Page 41: HMA Pavement Construction Issues.ppt

Poor Texture

Page 42: HMA Pavement Construction Issues.ppt

Ravelingg

Page 43: HMA Pavement Construction Issues.ppt

Freshly Placed HMAFreshly Placed HMA

Page 44: HMA Pavement Construction Issues.ppt

Mat Temp at Transverse JointMat Temp. at Transverse Joint

Page 45: HMA Pavement Construction Issues.ppt

Nuclear Density TestingNuclear Density Testing

Page 46: HMA Pavement Construction Issues.ppt

Temperature SegregationTemperature Segregation

Page 47: HMA Pavement Construction Issues.ppt

Temperature SegregationTemperature Segregation

Page 48: HMA Pavement Construction Issues.ppt

MTV Dumping into PaverMTV Dumping into Paver