21
High Speed Inertial Profiler

High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

  • Upload
    trannga

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

High Speed Inertial Profiler bull

Caltrans Test Method 387 - METHOD OF TEST FOR OPERATION CALIBRATION AND OPERATOR CERTIFICATION OF INERTIAL PROFILERS References AASHTO R 56 ndash Certification of Inertial Profiling Systems AASHTO R 57 ndash Operating Inertial Profiling Systems AASHTO E2560 ndash Standard Specification for Data Format for Pavement Profile

Accelerometer Calibration Laser Height Verification

Bounce Test Verification Distance MeasuringInstrument Calibration

Verify the tire air pressure on the wheels of the host vehicle daily and maintain according to the vehicle manufacturerrsquos recommendations

Maintain a log with the inertial profiler in accordance with AASHTO R 56

Repeatability Testing required once Per Project

~ Re peat Prova l - PCM - Results pd (SECURED) - Adobe Reader =(ii

File Edit View Window Help

Analys is Profi ler Cert ifi cation

Inputs Maximum Offset (ft ) 300 Minimum Repeatability () 92 Minimum Accuracy() 90 Basis R iter IR (with 250mm Filt er) Comparison Filter IR (with 250mm Riter)

Selections File

20150924shy 10STA1 20shy WB_ l _ B_4 10_ 0 00_EXIST_ HMA_repeat Ol Tl t o T2

20150924shy 105TA1 20shy WB_ l _ B_ 4 10_ 0 00_EXIST_ HMA_ re peat 04 Tl t o T2

20150924shy 10STA120shy WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_repeat 05 Tl t o T2

20150924shy 10STA1 20- WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_ re peat06 Tl t o T2

20150924 10STA1 20 WB l B 4 10 0 00 EXIST HMA re peat 02 Tl t o T2

Summary Results

St atistics Stat istic Repeatability shy Left

Comparison Count 10

Pass ing

Mean

Minim um

Maxim um

standard Deviation

Grade

10000

9661

9485

9915

13

Passed

Repeatability shy Right

10

10000

9786

96 54

9899

07

Passed

I [Kl Tools

Repeat Prova l

Pr o fil es Ba si s Ru n Sam p le I n terv a l

Left + Right No l 1000000

Left + Righ t INo 4 I 1000000

Left + Righ t No 5 1000000

Left + Righ t INo 6 I 1000000

Left + Right No 2 1000000

be needed Contractors that can help prepare the profiler operator with these items will often times enhance the amount of information we can provide on the collection report

It is important to have the project plans and specifications available The project plans offer start and end location for the project It also identifies bridges intersections and additional information that may

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 2: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Caltrans Test Method 387 - METHOD OF TEST FOR OPERATION CALIBRATION AND OPERATOR CERTIFICATION OF INERTIAL PROFILERS References AASHTO R 56 ndash Certification of Inertial Profiling Systems AASHTO R 57 ndash Operating Inertial Profiling Systems AASHTO E2560 ndash Standard Specification for Data Format for Pavement Profile

Accelerometer Calibration Laser Height Verification

Bounce Test Verification Distance MeasuringInstrument Calibration

Verify the tire air pressure on the wheels of the host vehicle daily and maintain according to the vehicle manufacturerrsquos recommendations

Maintain a log with the inertial profiler in accordance with AASHTO R 56

Repeatability Testing required once Per Project

~ Re peat Prova l - PCM - Results pd (SECURED) - Adobe Reader =(ii

File Edit View Window Help

Analys is Profi ler Cert ifi cation

Inputs Maximum Offset (ft ) 300 Minimum Repeatability () 92 Minimum Accuracy() 90 Basis R iter IR (with 250mm Filt er) Comparison Filter IR (with 250mm Riter)

Selections File

20150924shy 10STA1 20shy WB_ l _ B_4 10_ 0 00_EXIST_ HMA_repeat Ol Tl t o T2

20150924shy 105TA1 20shy WB_ l _ B_ 4 10_ 0 00_EXIST_ HMA_ re peat 04 Tl t o T2

20150924shy 10STA120shy WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_repeat 05 Tl t o T2

20150924shy 10STA1 20- WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_ re peat06 Tl t o T2

20150924 10STA1 20 WB l B 4 10 0 00 EXIST HMA re peat 02 Tl t o T2

Summary Results

St atistics Stat istic Repeatability shy Left

Comparison Count 10

Pass ing

Mean

Minim um

Maxim um

standard Deviation

Grade

10000

9661

9485

9915

13

Passed

Repeatability shy Right

10

10000

9786

96 54

9899

07

Passed

I [Kl Tools

Repeat Prova l

Pr o fil es Ba si s Ru n Sam p le I n terv a l

Left + Right No l 1000000

Left + Righ t INo 4 I 1000000

Left + Righ t No 5 1000000

Left + Righ t INo 6 I 1000000

Left + Right No 2 1000000

be needed Contractors that can help prepare the profiler operator with these items will often times enhance the amount of information we can provide on the collection report

It is important to have the project plans and specifications available The project plans offer start and end location for the project It also identifies bridges intersections and additional information that may

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 3: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Accelerometer Calibration Laser Height Verification

Bounce Test Verification Distance MeasuringInstrument Calibration

Verify the tire air pressure on the wheels of the host vehicle daily and maintain according to the vehicle manufacturerrsquos recommendations

Maintain a log with the inertial profiler in accordance with AASHTO R 56

Repeatability Testing required once Per Project

~ Re peat Prova l - PCM - Results pd (SECURED) - Adobe Reader =(ii

File Edit View Window Help

Analys is Profi ler Cert ifi cation

Inputs Maximum Offset (ft ) 300 Minimum Repeatability () 92 Minimum Accuracy() 90 Basis R iter IR (with 250mm Filt er) Comparison Filter IR (with 250mm Riter)

Selections File

20150924shy 10STA1 20shy WB_ l _ B_4 10_ 0 00_EXIST_ HMA_repeat Ol Tl t o T2

20150924shy 105TA1 20shy WB_ l _ B_ 4 10_ 0 00_EXIST_ HMA_ re peat 04 Tl t o T2

20150924shy 10STA120shy WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_repeat 05 Tl t o T2

20150924shy 10STA1 20- WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_ re peat06 Tl t o T2

20150924 10STA1 20 WB l B 4 10 0 00 EXIST HMA re peat 02 Tl t o T2

Summary Results

St atistics Stat istic Repeatability shy Left

Comparison Count 10

Pass ing

Mean

Minim um

Maxim um

standard Deviation

Grade

10000

9661

9485

9915

13

Passed

Repeatability shy Right

10

10000

9786

96 54

9899

07

Passed

I [Kl Tools

Repeat Prova l

Pr o fil es Ba si s Ru n Sam p le I n terv a l

Left + Right No l 1000000

Left + Righ t INo 4 I 1000000

Left + Righ t No 5 1000000

Left + Righ t INo 6 I 1000000

Left + Right No 2 1000000

be needed Contractors that can help prepare the profiler operator with these items will often times enhance the amount of information we can provide on the collection report

It is important to have the project plans and specifications available The project plans offer start and end location for the project It also identifies bridges intersections and additional information that may

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 4: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Bounce Test Verification Distance MeasuringInstrument Calibration

Verify the tire air pressure on the wheels of the host vehicle daily and maintain according to the vehicle manufacturerrsquos recommendations

Maintain a log with the inertial profiler in accordance with AASHTO R 56

Repeatability Testing required once Per Project

~ Re peat Prova l - PCM - Results pd (SECURED) - Adobe Reader =(ii

File Edit View Window Help

Analys is Profi ler Cert ifi cation

Inputs Maximum Offset (ft ) 300 Minimum Repeatability () 92 Minimum Accuracy() 90 Basis R iter IR (with 250mm Filt er) Comparison Filter IR (with 250mm Riter)

Selections File

20150924shy 10STA1 20shy WB_ l _ B_4 10_ 0 00_EXIST_ HMA_repeat Ol Tl t o T2

20150924shy 105TA1 20shy WB_ l _ B_ 4 10_ 0 00_EXIST_ HMA_ re peat 04 Tl t o T2

20150924shy 10STA120shy WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_repeat 05 Tl t o T2

20150924shy 10STA1 20- WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_ re peat06 Tl t o T2

20150924 10STA1 20 WB l B 4 10 0 00 EXIST HMA re peat 02 Tl t o T2

Summary Results

St atistics Stat istic Repeatability shy Left

Comparison Count 10

Pass ing

Mean

Minim um

Maxim um

standard Deviation

Grade

10000

9661

9485

9915

13

Passed

Repeatability shy Right

10

10000

9786

96 54

9899

07

Passed

I [Kl Tools

Repeat Prova l

Pr o fil es Ba si s Ru n Sam p le I n terv a l

Left + Right No l 1000000

Left + Righ t INo 4 I 1000000

Left + Righ t No 5 1000000

Left + Righ t INo 6 I 1000000

Left + Right No 2 1000000

be needed Contractors that can help prepare the profiler operator with these items will often times enhance the amount of information we can provide on the collection report

It is important to have the project plans and specifications available The project plans offer start and end location for the project It also identifies bridges intersections and additional information that may

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 5: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Verify the tire air pressure on the wheels of the host vehicle daily and maintain according to the vehicle manufacturerrsquos recommendations

Maintain a log with the inertial profiler in accordance with AASHTO R 56

Repeatability Testing required once Per Project

~ Re peat Prova l - PCM - Results pd (SECURED) - Adobe Reader =(ii

File Edit View Window Help

Analys is Profi ler Cert ifi cation

Inputs Maximum Offset (ft ) 300 Minimum Repeatability () 92 Minimum Accuracy() 90 Basis R iter IR (with 250mm Filt er) Comparison Filter IR (with 250mm Riter)

Selections File

20150924shy 10STA1 20shy WB_ l _ B_4 10_ 0 00_EXIST_ HMA_repeat Ol Tl t o T2

20150924shy 105TA1 20shy WB_ l _ B_ 4 10_ 0 00_EXIST_ HMA_ re peat 04 Tl t o T2

20150924shy 10STA120shy WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_repeat 05 Tl t o T2

20150924shy 10STA1 20- WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_ re peat06 Tl t o T2

20150924 10STA1 20 WB l B 4 10 0 00 EXIST HMA re peat 02 Tl t o T2

Summary Results

St atistics Stat istic Repeatability shy Left

Comparison Count 10

Pass ing

Mean

Minim um

Maxim um

standard Deviation

Grade

10000

9661

9485

9915

13

Passed

Repeatability shy Right

10

10000

9786

96 54

9899

07

Passed

I [Kl Tools

Repeat Prova l

Pr o fil es Ba si s Ru n Sam p le I n terv a l

Left + Right No l 1000000

Left + Righ t INo 4 I 1000000

Left + Righ t No 5 1000000

Left + Righ t INo 6 I 1000000

Left + Right No 2 1000000

be needed Contractors that can help prepare the profiler operator with these items will often times enhance the amount of information we can provide on the collection report

It is important to have the project plans and specifications available The project plans offer start and end location for the project It also identifies bridges intersections and additional information that may

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 6: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Repeatability Testing required once Per Project

~ Re peat Prova l - PCM - Results pd (SECURED) - Adobe Reader =(ii

File Edit View Window Help

Analys is Profi ler Cert ifi cation

Inputs Maximum Offset (ft ) 300 Minimum Repeatability () 92 Minimum Accuracy() 90 Basis R iter IR (with 250mm Filt er) Comparison Filter IR (with 250mm Riter)

Selections File

20150924shy 10STA1 20shy WB_ l _ B_4 10_ 0 00_EXIST_ HMA_repeat Ol Tl t o T2

20150924shy 105TA1 20shy WB_ l _ B_ 4 10_ 0 00_EXIST_ HMA_ re peat 04 Tl t o T2

20150924shy 10STA120shy WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_repeat 05 Tl t o T2

20150924shy 10STA1 20- WB_ l _ B_ 4 10_ 0 00_ EXIST_ HMA_ re peat06 Tl t o T2

20150924 10STA1 20 WB l B 4 10 0 00 EXIST HMA re peat 02 Tl t o T2

Summary Results

St atistics Stat istic Repeatability shy Left

Comparison Count 10

Pass ing

Mean

Minim um

Maxim um

standard Deviation

Grade

10000

9661

9485

9915

13

Passed

Repeatability shy Right

10

10000

9786

96 54

9899

07

Passed

I [Kl Tools

Repeat Prova l

Pr o fil es Ba si s Ru n Sam p le I n terv a l

Left + Right No l 1000000

Left + Righ t INo 4 I 1000000

Left + Righ t No 5 1000000

Left + Righ t INo 6 I 1000000

Left + Right No 2 1000000

be needed Contractors that can help prepare the profiler operator with these items will often times enhance the amount of information we can provide on the collection report

It is important to have the project plans and specifications available The project plans offer start and end location for the project It also identifies bridges intersections and additional information that may

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 7: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

be needed Contractors that can help prepare the profiler operator with these items will often times enhance the amount of information we can provide on the collection report

It is important to have the project plans and specifications available The project plans offer start and end location for the project It also identifies bridges intersections and additional information that may

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 8: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

IP Start Location IP End Location

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 9: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Bridge Approach amp Departures Intersection

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 10: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Electric Eye reads 3M Traffic Cone with 3M

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 11: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

On Ramp andAccelerator Lane Passing Lanes

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 12: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Issues not having traffic control Some highways are difficult to work on due to extreme volume of traffic small shoulders or even blind corners not allowing the operator to identify the start and end location of the project SSls system provides additional tools to work with scenarios like this and also any discrepancies with distance using the high accuracy GPS system The data collected can be viewed on a map application to determine start end and event locations The data can then be cropped to correct start and end sections of the project

COC110 ElfU

bull surch

bull rtn~

l (~ ~rnmy1notibull

t S~ 1 tZ Hrnmiddot t~ RnMb j

- Fl~ (-dt-o) bull

Pilll~

r bull ~---- --Ullllh~ishyn e~middotmiddoti~ itth- 0 llcfbull 0 a1tmmiddot~-shyc p--1-11t

t_ tJ--INMill~nmiddot bull MP

h l1 11~ bull tz f PNOraquo

Cbull Rci)js - F7 1 oamp--hlu~ ~ F7 V Oun ~ C O Vliuthv c 6Wy bull CS Oatul_ bull

L L r

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 13: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Google Earth File Edit View Tools

bull Search

ex COOlputer repair near Boston

bull Places

El ~ My Places IE lJ EJ Sightseeing Tour

Make sure 30 Buildings layer is checked

El ll 6 Tempora ry Places El 0EJ 2015Q61B 105J12 WB 1 B

Collection of ProFiler data files

lplusmnl lJ EJ Reference

IE lJEJ Track1 ~ lJEJ Track2

lplusmnl ll EJ Station Notes

ll EJ Grind Sections

ll~ Surface System and

bull Layers Earth Gallery raquo El 1J ~ Primary Database

$ 1J ~ Voyager New

lJ f Happy 10th Birthday G

El 116 Edition l ll cl Highlight tour

D bull Street v~ highli

D bull Earth View lan dsc D 3Dcities

D + Satellite imagery D Download

lplusmnl J f Borders and Labels ll ~ Plac es

lplusmnl ll ~ Photos

Da Roads

0lJ JD Buildings

ll Oc ean

DQ WeatherD Gollery D(tl Globa l Awareness

DQ Mo re

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 14: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Identifying areas of localized roughness (ALR) for grinding SSls raw data is processed through ProVals Smoothness Assurance

Grind Simulator [Untitled] bull - ProVAL 35

Add Files Save Viewer Editor Analysis Analysis SAM

Options

I ~ Screenshot Close Template Strategy Locations iJ

bull ~ HelpProject

NavigateSmoothness Assurance Grinding

Enabled Start Direction Head Height Warning length (in) (ft)Copy table to Clipboard

Grinder Type 118-foot Wheelbase middotI -

000 n a 1392 Copy table without column names bull l ard Maximum Grinding Depth (in) 0301 l--=-=middot t--gtoorrio-Jard 000 Deep Grinding 3775

l5lJ -5013867 -4995016 Forward 000 Deep Grinding 18850 Head Position asol

l5lJ -4993508 -4992525 Forward 000 na 983

Wheelbase (ft) 18ool l5lJ -4985892 -4985341 Forward 000 na 550

l5lJ -4969308 -4966475 Forward 000 n a 2833Tandem Spread (ft) ll fL llC 111 r - bullbull i

Short Cutoff Wavelength (ft) Total Ground (ft) 127261

150

100

sect 50

-2c

0

~ w -50

-100

-150

-200+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---1

-55000 -50000 -45000 -40000 -35000 -30000 -25000 -20000 Distance (ft) tsect Screenshot Added

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 15: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

SSI Profiler with High Accuracy GPS

Distance MeasuringInstrument

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 16: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Interstate IRI specification vs Remote State Highways

Design build method Paving over existing roadway conditions Dig-outs Mill and Fill overlays

Different methods of build design with the same IRI Specification

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 17: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Present Highways

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 18: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

Partnership Collaboration A unified approach with all involved parties

Equals

The best final product for ALL

End of Presentation

Page 19: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

The best final product for ALL

End of Presentation

Page 20: High Speed Inertial Profiler - California Department of ... · PDF fileFile Edit View Window Help Analysis: Profiler Certification Inputs ... Microsoft PowerPoint - 150928 HMA IP Forum

End of Presentation