Headworks Facilities Evaluation: Operator-Driven Decision Making Greg Gunderson, P.E., ENV SP Wisconsin Wastewater Operators Association 53 rd Annual Conference October 9, 2019

Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks Facilities Evaluation: Operator-Driven Decision Making

Greg Gunderson, P.E., ENV SP Wisconsin Wastewater Operators Association 53rd Annual Conference October 9, 2019

Page 2: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Presentation Outline

• Project Background • Equipment 101 • Evaluation Process

• Planning Approach • Selection Criteria • Visualization

• Take Home Messages

Page 3: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Project Background

Page 4: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Project Background Village of Grafton WWTF

WWTF

Page 5: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Project Background Village of Grafton WWTF

Page 6: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Project Background Unit Process Overview

Presenter
Presentation Notes
Originally constructed in the 1950’s. Major expansion in 1983. Single stage nitrification activated sludge (primary clarification, anaerobic digestion, GBT thickening, 14-30d storage. Chemical addition for phosphorus removal)
Page 7: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Project Background Facilities Planning

Parameter Historical Design (2038)

Avg. Flow (MGD) 1.47 2.15

Peak Flow (MGD) 10.89 11.54

BOD (lb/d) 2,789 4,149

TSS (lb/d) 2,726 4,067

TKN (lb/d) 436 647

TP (lb/d) 64 95

Approximately 46% Growth Planned

Page 8: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Project Background Need for Project

• Equipment failure (Capacity, Condition, Performance)

• Screening • Grit • Pumping

• Age/Condition of Building • Original to Plant (1950’s) • Lack of adequate space

Page 9: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Need for Project

Fine Screening Influent Pumping Grit Removal

Page 10: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks Equipment 101 Definitions & Overview

Page 11: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Mechanical Screening

• Collection • Fine Screening (1/4” Opening) • Not coarse or micro

• Compaction • Washing – removal of organics • Compaction – water/volume

reduction • Conveyance

• Auger & Chute

Page 12: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Mechanical Screening

Perforated Plate Screen (Band Screen)

Presenter
Presentation Notes
Generally considered the best capture device
Page 13: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Mechanical Screening

Perforated Plate Screen (Band Screen)

Presenter
Presentation Notes
Generally considered the best capture device
Page 14: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Mechanical Screening

Step Screen (Stair Screen)

Page 15: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Mechanical Screening

Spiral Screen

Page 16: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Mechanical Screening

Bar Screen (Chain/Rake)

Page 17: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Grit Removal

• Phases • Collection • Classification/Washing • Conveyance

• Types (Collection) • Forced Vortex • Multiple-Tray Vortex

• Types (Washing) • Classifier • Washer

Page 18: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Grit Removal

Forced Vortex Multiple-Tray Vortex

Page 19: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Headworks 101 Grit Removal

Classifier Washer

Page 20: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Approach & Criteria

Page 21: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Planning Approach

• Communication & Collaboration • Whose project is this? • Engineer is the guide • Meaningful meetings • Input from all stakeholders

• Administration • Lead Foreman • Experienced Staff • Mechanic

• Visualization

Page 22: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Criteria

1. Application • New vs. Retrofit, Temporary Operations, capacity

2. Quality of Equipment • Performance, Robustness, References, etc.

3. O&M Requirements • Regular maintenance, wear parts, power/water use

4. Quality of Provider • MFR/Rep

5. Ancillary Equipment • Controls/SCADA

Presenter
Presentation Notes
Application New or retrofit Temporary operations Price Quality of Equipment Peformance
Page 23: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Criteria

• Application • New or Retrofit – May limit your

options (hydraulics) • Flow Range – what type is best

for my design flow?

• Temporary Operations • New vs. Retrofit • Staffing

• Price

Page 24: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Criteria

Quality of Equipment • Performance • UK Water Industry Research Testing

(UKWIR) Reports • Materials of Construction

• Robustness • 304/316SS, HDPE, carbon steel

• References/Experience • What do other operators think? • How does it hold up? • Comparable installations?

• Moving Parts (quality of bearings, chains, etc.)

Page 25: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Criteria

• Operation & Maintenance • How often does it need to be

greased? Are they below water?

• What are the wear parts? • How much power does it use?

• Ancillary Equipment • Do I need to upgrade my water

reuse system? • How extensive of a SCADA

system is needed?

Page 26: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Criteria

Page 27: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Criteria

• Quality of Providers • Is the local representative knowledgeable? • Do they claim to be the ‘best’? • How knowledgeable are the application

engineers? • Who is going to service the equipment? • Warranty – will they stand behind it? • Did you check their references? • Do they have single point of responsibility? • What is their delivery time?

Page 28: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Process

• Reference Check • Installation List • Hit the Road

• New & Old installations • Talk to the operators

• Trade Shows • WEFTEC • WWOA • WRWA

Page 29: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Process

• Evaluation Matrix • Selection Options

• Pre-Procurement • Base Bid Equipment w/

Alternates • Open Bid (required multiple

designs • Funding requirements

Page 30: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Process

• What did the Village select? • Perforated Plate Screen &

Washing Press • Huber

• Mechanical Vortex Grit Collection

• Smith & Loveless • Vortex Grit Washer

• Huber • Dry-Pit Submersible Pumps

• Flygt

• Base Bid Procurement Method

Page 31: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Visualization What will it look like?

Page 32: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Visualization Design Model

Presenter
Presentation Notes
https://api2.enscape3d.com/v1/view/287828e1-ee6a-4bed-8e14-dee5ad16a960
Page 33: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Visualization Design Model

Presenter
Presentation Notes
https://api2.enscape3d.com/v1/view/287828e1-ee6a-4bed-8e14-dee5ad16a960
Page 34: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Visualization Design Model

Page 35: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Visualization Virtual Reality

Page 36: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Take Home Message What should I remember?

Page 37: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀

Evaluation Process Selection Process

• Own the Project

• Take Site Visits

• Be confident in manufacturer & supplier

• Utilize visualization tools

Page 38: Headworks Facilities Evaluation - WWOA · 10/9/2019  · Originally constructed in the 1950’s. Major expansion in 1983.\爀屲Single stage nitrification activated sludge \⠀瀀爀椀洀愀爀礀