Headlamps Assembly Loop for Ford Aero Headlights. Valverde-Ventura Rene Vouravis Veerakachen. Current Situation. 7.2 hours of production shifts The current production of 2892 pieces per shifts can’t meet the required production of 3002 pieces per shifts - PowerPoint PPT Presentation
Citation preview
Headlamps Assembly Loop for Ford Aero Headlights
Valverde-Ventura ReneVouravis Veerakachen
Current Situation
• 7.2 hours of production shifts• The current production of 2892 pieces per
shifts can’t meet the required production of 3002 pieces per shifts
• Need changes in designs to improve the performance of the loop
Current Layout
Requirement
• 3002 pieces of good parts during 7.2 hour shifts.
• Minimum cost
Design Changes
• Number of pallets• Operating procedure for Leak Test Stations• Additional Aimer
Number of Pallets
• Find the Optimum number of Pallets
• Minimum number of pallet is 44
• The Optimum number of pallet is 52
• Delivers the production of 2902 parts per shift
Average 90% Lower C.I. 90% Higher C.I.44 2892.75 2888.03 2897.4746 2897.50 2892.61 2902.3948 2899.67 2895.39 2903.9450 2895.92 2888.26 2903.5852 2902.17 2896.73 2907.6154 2895.25 2891.53 2898.9756 2897.67 2890.21 2905.12
Number of PalletsProduction in 7.2 Hour Shift
Production
2875
2880
2885
2890
2895
2900
2905
2910
44 46 48 50 52 54 56
Number of Pallets
Par
ts
Production in 7.2 Hour ShiftAverage
Production in 7.2 Hour Shift90% Lower C.I.
Production in 7.2 Hour Shift90% Higher C.I.
Change Operating Procedure of Leak Test Station
• Originally, 3 machines in the station operate simultaneously
• We modified the operating procedure that each machine in the stations works independently
Average 90% Lower C.I. 90% Higher C.I.Before 2902.17 2896.73 2907.61After 3192.75 3187.25 3198.25
Change Operating Procedure
Production in 7.2 Hour Shift
Additional Aimer
• Reduce the Blocking rate of previous station
• Improve the loop performance
Average 90% Lower C.I. 90% Higher C.I.Before 3192.75 3187.25 3198.25After 3225.83 3220.46 3231.2
Put One More AimerProduction in 7.2 Hour Shift
Recommendation
• Changing operating procedure of the Leak Test Stations should be done first
• Next, change the number of pallets to the optimum
• Add the Aimer, depending on the management’s cost justification
Modified Layout