Page 1: HCL’s Oracle Database Upgrade & Migration Capabilities

HCL’s Oracle Database Upgrade &

Migration Capabilities

Page 2: HCL’s Oracle Database Upgrade & Migration Capabilities

2

Agenda

Oracle Database CoE – Methodologies

Oracle Database Experience Snapshot – Case Studies

Client testimonies for Database Upgrades & Migrations3

2

1

Page 3: HCL’s Oracle Database Upgrade & Migration Capabilities

3

DBA Center of Excellence

DB Architecture Group

Data Architecture & Design Logical & Physical Model – ErWin Forward & Reverse engineering DB models –

Release Management Database migration Star and Snow Flake schema design for

DWH application design

Performance Engineering Group

Dedicated DBA Team to optimize the application and DB performance criteria

High Availability (RAC) & DR Performance management Closely Interact with application developers in designing

for optimal performance

Security, Standards & Best Practices Support Group

Industry standard security best practices adherence SOX Compliance Industry & Customer specific standards compliance Advanced Security & Audit

Research & Innovation group

Beta testing and assessment Advanced (Multi-Master) replication, High availability (RAC)

& DR (Data Guard) RCA, Incident & Problem management R & D for DBA Innovation Platform support research

DBA CoE Highlights

Streamlined Knowledge Transition Methodology and DBA Cross Training on Database Products Advanced Certified Partner with Oracle Long Term Support (Onsite-Offshore Model) Quick Turnaround time for Issues 85% of HCL DBAs are certified on Oracle 10g 50% of HCL DBAs are hands-on with Oracle11g

Page 4: HCL’s Oracle Database Upgrade & Migration Capabilities

4

Database Services

Service Level Management

Consistent end-user satisfactionProcess based service delivery

Reduced costs of operationsContinuous improvement

Domain expertise on top SLM

Technical

GroupsDatabase

COE

Oracle SQL Server SybaseDB/2

Services

Monitoring

Administration

Problem Management

Patch Management

Performance Tuning & Optimization

Consolidation/ Roll Out/ Migration

Page 5: HCL’s Oracle Database Upgrade & Migration Capabilities

5

DBA Activities

Change the business (Implementations/ Upgrades)

Installation, Configuration & Upgrade Upgrade/ Migration Analysis Preparing Installation/ Upgrade/ Migration Check-list Capturing the issues faced during Installation, Configuration, Upgrade, Migration etc., Documenting the resolutions Special configurations {Hardware Load balancing, Heterogeneous installation etc.,}

Database Design and Configuration Analyse short and long term database growth trends Logical & Physical Design Reverse & Forward Engineering Redesign/ Consolidation Capacity planning

Maximum Availability Architecture Implementation Analysis of current architecture Set up and manage different levels of Oracle database HA based on client's requirements including

Standby Databases Oracle Data Guard Oracle Replication Oracle Advanced Queuing Oracle RAC

Page 6: HCL’s Oracle Database Upgrade & Migration Capabilities

6

DBA Activities

Run the business (Support)

Regular Database & Application Management Regular DBA Procedures Backup and Recovery (RMAN, hot backup, cold backup – Scheduled/on-demand etc.,) Application development Support Patch Application Cloning support instances Minor upgrades Change Control Management

Pro-active Monitoring Resource utilization {Memory, CPU, Space etc.,} Collect statistics to pinpoint resource bottlenecks, monitor database and Application matrices Analyse short and long term database growth trends User access Creating and maintaining alerts for database and application monitoring attributes

Troubleshooting & Tuning Incident Management Problem Management – Root Cause Analysis Periodic performance analysis & identification of tuning activities Database reorganizations and row re-sequencing for performance

User Administration and Security Implementation Oracle advanced security options Application security management

Page 7: HCL’s Oracle Database Upgrade & Migration Capabilities

7

Database Implementation Methodology

Page 8: HCL’s Oracle Database Upgrade & Migration Capabilities

8

Assess

Plan

Develop

Upgrade

Optimize

Maintain

Evaluate the value available in target release

Plan and prepare Roadmaps for Upgrade

Pre-upgrade tasks and steps

Upgrade & Post-Upg tasks

Tune the Upgrade

Support

HCL’s Upgrade Methodology

Page 9: HCL’s Oracle Database Upgrade & Migration Capabilities

9

Typical Upgrade Process Flow

Evaluate new release

Install new release

Perform initial upgrade pass

Test/ make adjustments

Perform test move to Prod.

Test

Final TestingSchedule cut

over date

Make adjustments

Make final adjustments

Start the process

Go Live

Upgrade?

Ready?

Acceptable

Stay put

Yes

No

Yes

No

Yes

No

Page 10: HCL’s Oracle Database Upgrade & Migration Capabilities

10

HCL RoleProject Background

Case Study 1 – Tier One Automotive Supplier in North America and Europe

Benefits

Client will benefit from the advanced data compression features of the Oracle 11g and Increased performance in Daily ETL Loads

Upgrade of Oracle Datawarehouse Database & ETL tool informatica

Oracle Database and informatica runs on Solaris 5.9

As part of IT road map of client the upgrade was performed to increase the performance of daily ETL loads at the same time to utilize the new features like advance data compression in the new 11g version

HCL is providing L1 and L2 support from Offshore

HCL is responsible for maintaining mission critical Application databases for the customer

Oracle Database upgrade from release 9i (9.2.0.8) to 11g Release 1 (11.1.0.7)

Upgrade the entire application (Informatica + Database) for Datawarehouse Management system

Page 11: HCL’s Oracle Database Upgrade & Migration Capabilities

11

Case Study 2 – Leading Publishing Company based out of UK

HCL RoleProject Background Benefits

Client will benefit the new features of the Application and more robust Integration with their sub-systems

Upgrade of Oracle Content Management Applications & sub system

Oracle CMS and Sub-Systems runs on Solaris and Windows

As part of IT road map of client the upgrade was performed as Designer repository was one of the integrated sub system

HCL is providing L1 and L2 support for Customer from Onsite and Offshore

HCL is responsible for maintaining mission critical Application databases for the customer

Oracle Database upgrade from release 9i (9.2.0.4) to 11g Release 1 (11.1.0.7)

Upgrade the entire application (Application stack + Database) for Content Management system and their sub-system

Page 12: HCL’s Oracle Database Upgrade & Migration Capabilities

12

Case Study 3 – A Live Events Company based in California

HCL RoleProject Background Benefits

This helped the Client move to High Availability Architecture to cater to the growing business and the increasing number of users

18 months old implementation of E-Business Suite 11i

Oracle Applications 11.5.10.2 running on 9.2.0.6 database

Two node architecture with database on one node and all the application services on another node

Intended to be 9i RAC on OCFS but 2nd RAC Node never worked due to OCFS issues hence being used as a single instance

Upgrading from 9.2.0.6 to 10.2.0.4 in a High Availability RAC Architecture on RHAS 5.1

Oracle Database migration from 32-bit Linux server to new 64-bit Linux server with 64-bit O/S

Oracle Database upgrade from release 9i (9.2.0.6) to 10g Release 2 (10.2.0.4)

Converted 10g database (10.2.0.4) from single-instance to RAC (Real Application Clusters)

Configured ASM on RAW devices on EMC SAN

Page 13: HCL’s Oracle Database Upgrade & Migration Capabilities

13

Case Study 4 – Largest Provider of Conferencing Services in Europe

ChallengesDatabase Upgrade Benefits

Implemented a system with a centralized repository, hardware, and a common interface for the client’s business across the globe, which resulted in further reduction of their TCO and maintenance

The new enhanced features of 10g like Merge & Schedulers were used to restructure the application, which helped in reducing the time of Data Warehouse loads by 50% and helped manage it more efficiently

Building the RAC Database

TAF Configuration

Deploying the Application to the RAC environment

TAF Testing, and

Structured Testing & Tuning

Migrated terabytes of data from the 9i database to the new 10g database RAC

Added 6 Node Cluster for performance

Platforms migrated from AIX 4.3.3 to Linux 3.0 ES

Platforms migrated from UK DWHS 9i RAC to US Global DWHS 10g RAC Rel 2

The company’s globalization project demanded a common Business Intelligence system across the globe which would provide them a single storage location of all their business data with maximum performance benefits and high availability

The existing 9i RAC nodes were serving only users based in UK and was fast becoming outdated as the business demanded more advanced features

Page 14: HCL’s Oracle Database Upgrade & Migration Capabilities

14

Case Study 5 – Leading Manufacturer of Software & Storage for Info. Management

ChallengesInfrastructure Benefits

New Technology components are configured like Hardware Load Balancing, 48 Application Nodes, Mobile Applications Servers and Automatic memory tuning

Oracle Enterprise Manager has been integrated with OEBS sign on, through which client can see all the patches applied on the system and can monitor Concurrent Manager Activities etc.

Shared Appltop Load Balance – new Technology introduced where it reduces drastically the down time of Applications and Improve the Performance

Oracle 11i Applications with 48 Applications Server and DB Server maintain by HCL Onsite & Offshore team

DR server maintain in different location and data synchronized online by every 15 minutes

Upgrade of Application as well as database

24*7 Production Support and Minimum production down time for maintenance

SUN OS

Configuring 48 Application Nodes with single Database

AchievementsDBA Support

Maintain common instance for application and other tools

HCL DBA team spread with 6 Onsite DBA’s and 4 offshore DBA

65 databases are maintained by DBA team

Completed the Database Upgrade activity with in a scheduled period

Patches applied on Heterogeneous Network

Hardware Load Balancer with 48 nodes were maintained

Page 15: HCL’s Oracle Database Upgrade & Migration Capabilities

15

Case Study 6 – Leading Provider of Simulation Software & Services

ChallengesInfrastructure Benefits

Shared Appl_top along with Distributed Admin reduced the down time of Applications

Shared APPL_TOP also reduced the over-all disk requirements

Distributed AD enabled better resource utilization

Oracle’s recommended and supported Level of RDBMS, Java Plug-in with Oracle EBS

Recommend patch-set level for Critical Patch Updates

Oracle 11i Applications on Solaris Servers. Application Support being done HCL team

Several Application Technology Stack need to be upgraded

Version of EBS to be maintained @ 11.5.1.0.2

Upgrade of following technology stacks in single downtime window Developer 6i Patch

set Upgrade Application Technology Group

Patch level change { 5 to 6} 9.2.0.7 to 11.1.0.7 upgrade JInitiator to SUN JRE Migration JDK upgrade Shared Appl_top migration Critical patches update HR Family Pack upgrade Vertex Tax Engine Upgrade

AchievementsDBA Support

Regular Support and Maintenance of Oracle EBS environments

Technical Upgrades

Regular Patching and Cloning

Support for Enhancements and Customizations

Completed the Database Upgrade activity with in a scheduled period

Reduced patching window because of shared Appl_top and distributed processing

Adherence to Oracle’s recommended patch set level

Page 16: HCL’s Oracle Database Upgrade & Migration Capabilities

16

Case Study 7 – A Lifestyle Merchandising Company Operating Specialty Retail Stores

ChallengesInfrastructure Benefits

Scalable and high available environment for Production instance because of RAC Implementation

Greater business productivity

Costs reduction as Oracle Databases are created on Linux Platform

Customer is better placed to plan and leverage the new features of 11g. Recommendations have been given to the customer on same

Client is currently using db2 and mssql to maintain their enterprise information

The requirement was to migrate data from db2 and mssql to Oracle 11g database

The requirement was also to implement 2-node RAC for new Oracle 11g database

Testing of the upgrade required lot of coordination effort

Setting up RAC cluster environment with Red Hat Linux and porting database into RAC environment

Performance tuning of new Oracle Database when benchmarking from db2 could not be used directly

Defining new administration procedure for RAC Database

AchievementsDBA Support

RAC Implementation

Database Migration to 11g

Performance tuning

Post Production Support

Completed the Database Upgrade activity with in a scheduled period

Page 17: HCL’s Oracle Database Upgrade & Migration Capabilities

17

Case Study 8 – Leading Automated Test Equipment Manufacturer in Semi-Conductor

ChallengesInfrastructure Benefits

Datawarehouse Applications and Database are compatible and in Supported Platform

Customer is better placed to plan and leverage the new features of upgraded DB Versions

Enabled Customer to save on 3rd Party utility licenses

Enabled better customer satisfaction

Client is currently using 150+ Oracle Databases and 50+ MSSql Databases to maintain their enterprise information

HCL is collaboratively running the clients IT Division and DBA services are part of thisMulti-Service Delivery Engagement

One of the requirement was to upgrade their Enterprise Datawarehouse Oracle Databases from 8.1.6 to 9.2.0.8

Another requirement was to upgrade their Parts and Drawing Application (SMARTEAM) database from 9.x to 10.2.x with Advanced 8 Site Multi-Master Replication

Datawarehouse Upgrade Complex Upstream and

Downstream applications. New DB Version integration

incompatibility in certain old Legacy Upstream System

Cannot afford longer downtime No Direct Upgrade Path to

8.1.x to 9.x

SMARTEAM All sites have to be

upgraded simultaneously Ensuring Multi-Master

Replication is intact after Upgrade

Achievements

DB Upgrade with Planned minimum downtime, Multiple DBA’s were engaged for multi Database Upgrade

Page 18: HCL’s Oracle Database Upgrade & Migration Capabilities

18

Client Appreciations…

Thank you for your hard work during the upgrade. Overall, the process went extremely well and is a result of your dedication in both preparation and execution of this highly visible project…persistence and teamwork prevailed! I am especially pleased with the success of working with a 'remote' team. We were able to coordinate a smooth continuous schedule that contributed to achieving our goal without any major incident and ahead of schedule! Congratulations on a job well done!

– Paula Hockster, IT Director {A leading provider of Simulation Software and related services.}

On Technical upgrade of EBS Environment…On Technical upgrade of EBS Environment…

The migration of our Conferencing Oracle Applications E-Business suite from a UK AIX/RS6000 infrastructure to a US LINUX/Intel based infrastructure posed a significant number of managerial, technical and logistical challenges. The three-man (HCL) Database Administration Team ably resolved all the challenges this major application migration posed them. The team utilized their technical skills, experience and applied their own original approach to resolve each of the challenges successfully and delivered the migration on time and on budget.

– Andrew Gray, Globalization Programme/ Project Manager, RLT Member

On Migration of EBS Environment…On Migration of EBS Environment…

I wanted to send you a quick email to say a big THANK YOU for all the work that you have been doing not just this past weekend, but throughout the globalization process. I really do appreciate the level of commitment and calibre that you bring to the team.

– Global CIO

“”

On RAC Implementation…On RAC Implementation…

Page 19: HCL’s Oracle Database Upgrade & Migration Capabilities

19

HCL’s Value Proposition

Point out overlooked issues deep within your database environments that may be causing poor performance/ slowing down your operations.

Database administration is not restricted to Core Database infrastructure alone, but spans across the application landscape as well, giving you a robust support framework.

Take advantage of our DBA maintenance services and decrease the chance of sudden failure. Our team pro-actively monitors problem areas and fixes them before they can cause havoc due to instance down times/ systems crash.

Regular MIS reports and Dashboard generated tracks; evaluation of application and database performance and growth, with pro-active steps taken to mitigate risk and improve system up-time.

With requirements on DB management increasing by the day, HCL’s strong skill-base of experts give you the flexibility to find the right resource with the right knowledge to augment your team during project crunches.

Checklist based assessment

Application Practice

Increased Availability

Improved Performance &

Risk Mgmt.

Flexibility

Page 20: HCL’s Oracle Database Upgrade & Migration Capabilities

20

Next Steps…