217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 237 80 119 27 252 174 .59 “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.” Colonel Timothy R. Vail District Engineer Galveston District U.S. Army Corps of Engineers 6 AUG 2020 GULF INTRACOASTAL CANAL ASSOCIATION GALVESTON DISTRICT U.S. ARMY CORPS OF ENGINEERS 1

GULF INTRACOASTAL CANAL ASSOCIATION ......Galveston District U.S. Army Corps of Engineers 6 AUG 2020 GULF INTRACOASTAL CANAL ASSOCIATION GALVESTON DISTRICT U.S. ARMY CORPS OF ENGINEERS

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • 217217217

    200200200

    255255255

    000

    163163163

    131132122

    2396553

    110135120

    1129256

    62102130

    1025648

    130120111

    237237237

    8011927

    252174.59

    “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

    Colonel Timothy R. VailDistrict EngineerGalveston DistrictU.S. Army Corps of Engineers6 AUG 2020

    GULF INTRACOASTAL CANAL ASSOCIATION

    GALVESTON DISTRICTU.S. ARMY CORPS OF ENGINEERS

    1

  • GALVESTON DISTRICT O&M NAVIGATION PROGRAM

  • VESSEL TRAFFIC ON THE TEXAS COAST

    Density of Vessel Traffic on the Texas Coast, 2017

  • Gulf Intracoastal Waterway, Texas5-Year Funding Summary

  • Fiscal Year 2020 President’s Budget: $35,275,000 Total Allocation: $39,997,000 Total Capability: $59,350,000

    Hurricane Hanna Recovery- MM603.3, MM421

    4 Dredging Contracts: 4.5 MCY 1 Placement Area / BU Site Improvement Mooring Buoy Installation/Re-spacing Maintain Hydrographic Survey Website Continue TCOON Partnership GIWW – Resilience Study

    Fiscal Year 2021 President’s Budget: $24,200,000 Allocation: TBD Total Capability: $58,200,000

    4 Dredging Contracts: 6.0 MCY 2 Placement Area Improvement Mooring Buoy Installation/Re-spacing Maintain Hydrographic Survey Website Continue TCOON Partnership

    Capability Additional Maintenance Dredging Placement Areas Improvements Construct Beneficial Use Sites

    Gulf Intracoastal Waterway, TX & TributariesInitiatives – Galveston District

  • CESWG Operations Navigation Dashboard

    https://www.swg.usace.army.mil/Missions/Navigation/Navigation-Projects-Contracts/

    https://www.swg.usace.army.mil/Missions/Navigation/Navigation-Projects-Contracts/

  • Gulf Intracoastal Waterway, TXMooring Basins – Respacing Completed

    Re-spacing Completed- Bolivar Peninsula - Pelican Island- Brazos River (East / West)- Colorado River (East / West)- Port ArthurRe-Spacing Upcoming- Chocolate Bayou- Oyster Lake- Channel to Victoria- Aransas National Wildlife Refuge- Channel to Harlingen

    Completed FY17-2020

  • Installing & Re-spacing Mooring Buoys atColorado River Locks

  • 9

    Colorado River Locks Brazos River Floodgates

    CURRENT SYSTEM COMPONENTS

    75’ WIDE

    AVG TOWS/DAY = 38

    FUNCTION: SEDIMENT CONTROL &

    NAVIGATION

  • RECOMMENDED PLAN (BRFG COMPONENT) 125’ Gates/Open West, New 125’ Sector Gate on East setback ~1,200’ from Existing

    10

  • RECOMMENDED PLAN (CRL COMPONENT) Convert both locks to 125’ flood Riverside floodgates on both sides of Crossing, Setback

    ~ 1,000 feet from River Crossing

    11

  • MILESTONE SCHEDULE12

    Major Milestones

    November 2019: Signed Chief ’s Report

    FY2020: Earliest Possible Authorization (WRDA)

    FY2022: Earliest Possible Start of Construction

  • GIWW COASTAL RESILIENCE STUDY 13

  • GIWW COASTAL RESILIENCE STUDY MAJOR MILESTONES

    14

    July 2020: Alternative MilestoneMeeting held July 24th.

    May 2021: Tentatively Selected Plan (TSP) Milestone

    July 2021: Draft Report out for public review

    Nov 2021: Agency Decision Milestone (ADM)

    April 2023: Signed Chief ’s Report

    FY2024: Earliest Possible Authorization (WRDA)

    FY2026: Earliest Possible Start of Construction

  • http://www.facebook.com/GalvestonDistricthttp://www.twitter.com/USACEgalvestonhttp://www.swg.usace.army.mil/http://www.dvidshub.net/units/USACE-GDhttp://www.dvidshub.net/http://www.youtube.com/GalvestonDistrict

    GULF INTRACOASTAL CANAL ASSOCIATION��GALVESTON DISTRICT�U.S. ARMY CORPS OF ENGINEERS�� Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8������������CURRENT System Components��75’ wide��Avg tows/day = 38��Function: �Sediment control & Navigation ������������ Recommended Plan (brfg Component) �125’ Gates/Open West, New 125’ Sector Gate on East setback ~1,200’ from ExistingRecommended Plan (CRL Component) Convert both locks to 125’ flood Riverside floodgates on both sides of Crossing, Setback ~ 1,000 feet from River Crossingmilestone scheduleGIWW Coastal resilience Study GIWW Coastal Resilience study �MAJOR MILESTONESSlide Number 15