C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 1
of 22
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
400Kv Substation, Transmission Division
Dhareshwar –Jetpur PHONE: (02823) 221278
E-mail : [email protected]
FAX :(02823) 221733
Tender documents for Tender No. TJ/10-11/04
Work of Cloth Cleaning & Jumper Checking / Tightening work on EHV lines
String disc insulators under Jetpur Tr. Jurisdiction, Contains following
� Tender Notice
� Special Instruction to Bidder.
� Instructions to the Bidders.
A. Scope of work:
B. Procedure of Silicone Compound application
C. Payment of Earnest money Deposit and Security Deposits
D. Commercial Conditions
E. Additional Terms and Condition
F. Technical Conditions
� Notes for qualification
� Appendix I - Work Experience
� Appendix II - Works Tendered/In Hand
� Appendix III - Details of Personnel
� Schedule B (to be submitted in a separate sealed cover)
� Annexure IV General Condition.
EXECUTIVE ENGINEER (TRANS) GETCO, TRANS DIVISION, JETPUR
Signature of the Contractor (With rubber stamp & Date)
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
400Kv Substation, Transmission Division
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 2
of 22
Dhareshwar –Jetpur PHONE: (02823) 221278 E-mail : [email protected]
FAX :(02823) 221733
Tender No: TJ/10-11/04
Sealed percentage rate tenders are invited in two separate sealed covers Super scribed technical bid and
price bid for “Work of Cloth Cleaning & Jumper Checking / Tightening work on EHV lines String disc
insulators under Jetpur Tr. Jurisdiction” from Registered Contractors in appropriate class with
GETCO/Central/State Government / Railway/Semi. Govt. and who has executed similar nature of work
and magnitude successfully.
Tenderer should down load the tender documents from this Website and submit the same as per
instructions therein only by RPAD/Speed post
Sr. No.
Name of Work Estimated Cost Rs.
Time Limit
Tender Fee Rs.
E.M.D. Rs.
1 Work of Cloth Cleaning &
Jumper Checking /
Tightening work on EHV
lines String disc insulators
under Jetpur Tr.
Jurisdiction
Rs. 3,44,410.00
Two Year 350(Non
refund-able)
3500.00
1) Last date of submission of tender: __03__/__09__/__10_____ ( During Working Hrs : Upto 14.00 Hrs)
2) Due date of opening of Technical Bid: __03__/__09__/__10_____ ( At 15.00 Hrs if possible)
3) Validity of Tender: 180 Days from the date of opening of Technical Bid.
No tender shall be accepted / opened in case of receipt after due date and time of tender, irrespective of
delay due to postal services or any other reasons and the Corporation shall not assume any responsibility
for late receipt of tender.
The Earnest Money Deposit and tender fee will be accepted by Demand Draft on any Nationalized Bank
only situated at “JETPUR”, drawn in favor of “GUJARAT ENERGY TRANSMISSION
CORPORATION LTD”. Tender without EMD and tender fee shall be rejected. Two separate demand
drafts for Tender fee and EMD should be submitted along with Technical Bid.
The GETCO reserves the rights to reject any or all tenders or accept any tender without assigning any
reason thereof.
The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason
thereof.
EXECUTIVE ENGINEER (TRANS) GETCO,TRANS DIVISION
JETPUR
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 3
of 22
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
400Kv Substation, Transmission Division
Dhareshwar –Jetpur PHONE: (02823) 221278
E-mail : [email protected]
FAX :(02823) 221733
� SPECIAL INSTRUCTIONS TO BIDDERS
The tender should be submitted in one sealed main envelop with clearly marked on the main
envelop for the work of “Work of Cloth Cleaning & Jumper Checking / Tightening work on EHV
lines String disc insulators under Jetpur Tr. Jurisdiction.”. The main envelope will contain two
separate sealed covers as under:-
(A) Cover No.1:
This cover shall be clearly marked “Qualification documents” and contain all qualifications
documents as under:
(i) Demand Draft for Tender Fee.
(ii) Demand Draft for EMD in separate envelope.
(iii) Attested copy of Registration Certificate.
(iv) Attested copy of work experience certificate for the similar works executed.
(v) List of works in progress duly certified by concerned department.
(vi) Attested copy of document showing P.F. Number obtained by the bidder.
(vii) Attested copy of Company registration or Partnership deed.
(viii) Attested copy of Power of Attorney, if any for signing the bid documents.
(ix) Attested copy of balance sheet or profit and loss account of last 3 financial years duly
audited by Chartered Accountant.
(x) Attested copy of latest solvency certificate issued by Schedule Bank.
(xi) Attested copy of service tax registration certificate.
(xii) Web Tender documents other than schedule B dully signed and stamped.
(xiii) Income Tax Certificate along with Pan Card.
(B) Cover No.2:
1) This cover shall be clearly marked “Percentage Rate Offer” and shall contain Schedule –
B & condition of contract with dully-filled in percentage rate offer.
2) The bidder must clearly quote percentage above or below the tender rates in figure as
well as in words. The bidder must work out the total price of their tender offer
accordingly and the total amount should be clearly written in words & figure. In case of
any discrepancy whatever written in words shall prevail. GETCO shall at liberty to
decide the matter as it deems fit.
3) No deviation in terms, conditions Schedule-B and technical specifications will be
entertained. All the documents related to this tender shall be final and binding to all the
bidders. Any ignorance for this shall not relieve the contractor from their contractual
liability arising as per tender documents
4) An earnest money deposit shall have to be remitted by the bidder by way of Demand
Draft payable to “Gujarat Energy Transmission Corporation Ltd.” Drawn on a schedule
bank in JETPUR with the tender only. Cheques or in any other from towards payment of
earnest money deposit will not be accepted and the bid will be disqualified.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 4
of 22
5) The bidders are required to quote only firm percentage prices. No variation on price
statutory or otherwise on raw materials or finished products on any cause will be
accepted.
6) The bidders should note that the completion of above mentioned work in all respect in
accordance with the time limit is very important and should be strictly adhered to.
“Completion within time limit from the date of issue of letter for commencement of the
work” by the field office.
7) The bidders should furnish a list of orders for similar works executed by them and
clearly mention the name of the party for whom the works have been completed. The
reference of order number and date performance report of such works be furnished in
attached bidding at Schedule-B.
8) The bids should be valid for a minimum period of 6 months from the date of opening.
On which there are due for submission and during this period no tenderer shall be
allowed to withdraw his tender. Any such withdrawal during the said period will entail
for forfeiture of the Earnest Money Deposit submitted with the tender.
9) The works covered under these specification shall be carried out and governed by
“Tender and contract for works” booklet appended herewith except where conditions
specified in this specifications.
10) The contractor shall have a separate provident fund code of RPFC and the contractors
who do not possess separate P.F. code shall not be considered for acceptance of tender.
Contractor has to submit such certificate showing separate P.F. code along with tender.
11) COORDINATION WITH OTHERS :
The contractor shall have to execute the above mentioned work with the concerned
agencies who are Engineers for the GETCO, wherever required. The contractor shall
cooperate in all aspects and exchange the necessary technical data/drawings with the
Engineers under intimation to E.I.C. to ensure proper co-ordination and satisfactory
completion of the work in time.
12) Any more information of the proposed above mentioned work may be referred from the
office of the EXECUTIVE ENGINEER (TRANS), JETPUR during office hours.
13) The successful contractor shall have to sign an agreement as per GETCO’s rules on a
stamp paper and necessary stamp duty charge shall be borne by the contractor. Before
signing agreement, contractor has to pay security deposit as per GETCO’s rule within
fifteen days on receipt of L.O.I. from GETCO.
14) The work shall commence after the due intimation by EIC for commencement is issued.
15) The complete specification comprises of the following. Bill of quantities (Schedule : B)
& condition of contract. Tender and contract for works booklet, general conditions and
instructions to bidder. Technical specification. All these sections are complimentary to
each other and the particulars and requirements contained here in shall cover the
execution of the works covered under these specification.
16) GETCO will not issue any materials; all materials required for completion of work shall
be arranged by the contractor at his own cost.
17) No collection of material shall be made before it is got approved from the E.I.C.
18) Approval to any of the executed item for the work does not in any way relieve the
contractor as per the drawing and specification.
19) Any information, dossier or revised offer during or after the date of submission of tender
shall not be accepted.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 5
of 22
20) The tender must reach to the office of EXECUITVE ENGINEER (TRANS),400KV
S/s, Transmission Division, Dhareshwar- Jetpur on or before due date & time of
submission mentioned in tender notice. No tender shall be accepted/opened in any case
after due date and time of receipt of tender irrespective of delay due to postal services or
any other reasons and the GETCO shall not assume any responsibility for late receipt of
tender. Any tender received after the due date & time of submission shall not be
considered.
EXECUTIVE ENGINEER (TRANS)
GETCO, TRANS DIVISION, JETPUR
SIGNATURE OF THE CONTRACTOR
(WITH RUBBER STAMP & DATE)
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 6
of 22
� INSTRUCTIONS TO BIDDERS
A. Scope of Work of Tender / Contract: - Work is to be carried out as per instruction of EIC,
The jurisdiction of Jetpur Tr. Dn. is as under,
400 KV Lines
1. 400 KV Jetpur – Hadala Line (25 Tension)
2. 400 KV Jetpur Amreli Line (17 Tension)
220 KV Lines
1. 220 KV Jetpur – Jamnagar – 1 Line (20 Tension)
2. 220 KV Jetpur – Jamnagar – 2 Line (20 Tension)
3. 220 KV Jetpur – Sardargadh Line (20 Tension)
4. 220 Kv Jetpur – Keshod Line (20 Tension)
5. 220 Kv Jetpur- Visavadar Line (23 Tension)
- each 400 / 220 Kv Line must be completed in maximum 2 Nos. of outages of 10
Hours each.
Remarks:
Qty Estimated for one round of Cloth cleaning of 220 Kv lines suspension Insulator disc string,
400 KV Jetpur - Hadala line suspension insulator disc string and 400 KV Jetpur - Amreli line
Suspension / Tension disc string under Jetpur Tr. Dn. Jurisdiction.
Qty. Estimated for one round of jumper checking / tightening in all 220 Kv and 400 Kv Lines
Tension Loc. jumpers.
Contractor have to provided sufficient men power to complete the work as per above time slot.
No Transportation Charges will be provided by GETCO.
Also when required the contractor has to provide his service at the same rate for the work to be
carried out in the other jurisdiction other than mentioned above.
B. Procedure of Cloth Cleaning of Insulator String.
- Cleaning of Each Disc insulators with clean cotton cloth in Suspension and Tension
Loc. string insulator.
Procedure of Jumper checking in Tension Loc.
- Each Jumper of Tension String to be checked for its tightness with proper spanners,
and to be tight with proper spanners, to be brought by the Contractor.
Both the above work is to be simultaneous completed in outages provided.
C. Payment of Earnest money Deposit and Security Deposits:
i. Earnest money Deposit:
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 7
of 22
1. Bidders are requested to pay an earnest money deposit (1 % of estimated cost) by demand
draft only on any Nationalized Bank at Jetpur for the amount as specified in the tender
notice. Payment of EMD in form of Cheque or any other form shall not be accepted.
2. The EMD shall be submitted along with submission of Technical bid only. In no case it shall
be submitted with sealed cover of Price Bid.
3. Tenders not accompanied by EMD shall be rejected as non- responsive.
4. If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the
EMD shall be forfeited and the tenderer may be disqualified from tendering for further
works.
5. The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned
to the successful tenderer after he furnishes the Security Deposit for performance and duly
enters in to the contract. If he fails to furnish the SD or to execute the contract for the work
offered to him, his EMD shall be forfeited and the tenderer may be disqualified from
tendering for further work.
ii. SECURITY DEPOSIT:
As per prevailing rules of the Corporation, 5% of the contract value shall be paid as ‘Security
Deposit’. Out of this, 50 % of S. D. shall be paid at Transmission Division- Jetpur within 10
days from receipt of letter of intent either
a) In form of FDR in favor of "Gujarat Energy Transmission Corporation Ltd. " of any
Nationalized Bank OR
b) In form of Bank Guarantee of any Nationalized Bank as per the approved format of the
Corporation.
The balance 50 % Security Deposit shall be recovered from first two R.A. Bills in equal
installments.
Alternatively 100 % S. D. in form of FDR or B. G. may be submitted on receipt of LOI.
The security deposit will be refunded only after the completion of guarantee period of 1 year of
work completed or finalization of final bill whichever is later.
If Security Deposit is not paid within 10 days of issue of LOI, EMD paid will be forfeited and
Corporation will not deal with party for the period of two years.
D. Commercial Conditions :
1 Sealed Percentage rate tender invited for work of “Work of Cloth Cleaning & Jumper
Checking / Tightening work on EHV lines String disc insulators under Jetpur Tr. Jurisdiction” for Gujarat Energy Transmission Corporation Limited- Vadodara (herein referred to as
Corporation).
2 The scope of work is explained in this tender in Para – A & B. The work shall be carried
out according to the enclosed General Conditions, Technical Specifications.
3 Tenders must be submitted in the enclosed schedule of work & quantities. Those
received in any other form will not be accepted. They should be accompanied by a
covering letter in which the bidder should give all information as called for in the
specifications & any other point which he would like to be considered along with the
tender.
4 The Schedule-B shall be filled up with the quoted % above or below & shall be
submitted in sealed envelope superscripted– PRICE BID for “Work of Cloth Cleaning &
Jumper Checking / Tightening work on EHV lines String disc insulators under Jetpur Tr.
Jurisdiction”. The Quoted % above or below shall be written both in words, & figures &
the units in words. If any discrepancy occurs between words & figures, then words shall
prevail. The tender documents shall be written legibly & free from erasure, overwriting
or conversions of figures, crossing out, initializing, dating & rewriting, shall be avoided.
In case of any deviation in figure and words the rates quoted in words will prevail.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 8
of 22
5 The bidders shall note that no deviations from the technical specifications or commercial
conditions with this bid are acceptable & it will be presumed that the bidder agrees
entirely with the specifications & general terms &conditions of the contract.
6 The Corporation reserves the right to accept any tender irrespective of whether it is
lowest or not or to reject all the tenders without assigning any reasons there of. Tenders
departing from the technical Specification or the method of bidding in a radical manner
may also be rejected.
7 On acceptance of the tender the name(s) of the accredited representative(s) of the
tenderer who would be responsible for taking instructions from the Engineers of the
Corporation shall be communicated to the Executive Engineer (Trans), Gujarat Energy
Transmission Corporation, Transmission Division, Jetpur.
8 All royalties, sales tax, toll tax, local tax, development charges, service tax, Works
Contract taxes & any other taxes etc. in respect of this contract shall be payable by the
contractor & Gujarat Energy Transmission Corporation will not entertain any claims
whatsoever in this aspect. Any statutory variation in future towards the above mentioned
taxes and imposing any new tax that shall also be payable by the contractor & Gujarat
Energy Transmission Corporation shall not entertain any claim of whatsoever nature,
during or after the completion of this tendered work. Proof of such payments made by
the Contractor to the appropriate departments shall be produced to Gujarat Energy
Transmission Corporation failing which appropriate amount shall be withheld on getting
information / instruction from the concerned departments.
9. The successful contractor will have to sign an agreement as per the Gujarat Energy
Transmission Corporation rules on stamped paper & the necessary stamp duty charges
shall be borne by the contractor.
10. Bidders must submit the schedule of quantities & rates by quoting the % above or below
the total estimated cost & other schedules duly signed & seal of the company. Any
tender not bearing signature of the bidder & seal of the company on all the documents
accompanying the tender is liable to rejection. Further it is specifically instructed that
conditional tenders shall summarily be rejected.
11. The bidder shall carefully study the work to be carried. The Corporation will not pay any
extra or rate for any reason in case the contractor claims, after acceptance of contract, to
have misjudged the site condition.
12. The percentage quoted shall include cost towards of all materials, & machinery including
equipments, fixtures, labour, constructional equipments, fuel, scaffolding, staging,
ramps, walkways, approach and haul road, temporary works, etc. bearing permanent or
temporary nature necessary for the completion of the work in all respects, except for
those items specifically mentioned to be furnished by the Corporation. The contractor
must also arrange for the transport of materials & include all such costs in the rates
quoted by him for finished work.
13. During the execution of the work if it is found that the work is not progressing as per the
Scheduled Progress Program, approved by the Corporation & planned by the Contractor,
due to the reasons attributable to the Contractor; suitable action shall be taken as per
Clause No.3 & 4 appearing in the Corporation’s prescribed Booklet for ``Tender &
Contractor for Works’’ and Corporation may take such action as it may deem fit to
ensure that the work is completed in time at risk & cost of the contractor.
14. The contract or any part thereof shall not be subject to change without the written permission
of the Executive Engineer (Trans), Gujarat Energy Transmission Corporation,
Transmission Division, Jetpur or his authorized representatives.
15. Tender shall remain open for acceptance for a period of 180 days from the date of Technical
bid opening & during this period no bidder shall be allowed to withdraw his tender. Any
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 9
of 22
such withdrawals, during the said period will entail forfeiture of the earnest money
deposited with the tender.
16. Further information required, if any, can be had from the office of the Executive Engineer (Trans), Gujarat Energy Transmission Corporation, Transmission Division, Jetpur. But
it must be clearly understood that the tenders must be received complete in every
respects by the due date & time.
17. The notice inviting tender, general instructions to the contractors & all documents of this
tender shall form part of the contract.
18. Work under this contract shall be completed in all respects within stipulated period from the
date of commencement order issued by field office. However, interim mile stones to be
jointly fixed after issue of LOI.
19. Bidders must quote firm price only, till completion of work under contract, & this is to be
confirmed by bidder while submitting his offer. No escalation towards labor and material
/ fuel shall be paid in this execution of contract.
20. Contractor shall pay minimum wages to his laborers as per the Minimum Wages Act, 1948
& rules there under as applicable from time to time in pursuant to the State Government
notification. The concerned contractor shall submit the details of the payment with due
certificate of LWO/IRO of the Corporation
21. Once the offer submitted will not be returned back for any reason thereof in any case.
22. The Bidders shall note:
I. Percentage rates quoted shall cater for the cost of all materials & labor including all
leads & lifts, tools, plants, consumables such as but not limited to fuels, lubricants,
etc.
II. Percentage rates quoted shall include for which are obviously & fairly intended &
which may not have been specifically referred to in these documents but are essential
for the satisfactory completion of the work.
III. Percentage rates shall be firm for variations up to any extent for individual items.
IV. No price escalation on any account, will be payable.
23. Each tender shall contain the name, residence & place of business of person or persons
making the tender & shall be signed by the tenderer with his usual signature with seal of
the company.
24. Tender by partnerships shall furnish the full names of all partners. It shall be signed with the
partnership name by one of the members of the partnership or by an authorized
representative followed by the name &designation of the person signing.
25. An attested copy of the constitution of the firm with the name of partners shall be furnished.
Whenever, whether in submission of the tender or later in other matters, the signatures
are made by one person on behalf of Directors or a firm or a corporation, an attested
copy of the resolution of the partners or of law shall be supplied by the tenderer
authorizing Witnesses & sureties shall be persons of status & probity, &their names,
occupation & address shall be stated below their signatures. All signatures shall be dated.
26. Tenders by corporation shall be signed with the legal name of the corporation followed by
the name of the state of incorporation & by the signature & designation of the president,
secretary or other person authorized to bind it in the matter with rubber seal of the
company.
27. Corporation reserves the right to delete any item of Schedule-B for which contractor shall
not have any right to claim on this account.
28. The Bidders shall study the Conditions of site & shall resort to dewatering, where necessary,
by appropriate methods & maintain reasonably dry areas to work at and no extra claim
will be entertain on this account.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 10
of 22
29. The Contractor shall prepare all required way to execute various items of this Contract &
arrange all transport of materials & all such costs shall be taken care of while quoting
the rates. No extra payments shall be admissible towards such costs. On completion, this
shall be cleared if asked by GETCO at no extra cost.
30. Gujarat Energy Transmission Corporation shall entertain no idle charges for any site
conditions or any circumstances.
31. The Contractor shall take all requisite & necessary care to observe that no damage is
occurred to the Existing structures, if any. For any damage to the Existing Structures of
Gujarat Energy Transmission Corporation the Contractor shall be held responsible.
32. Tenders that do not fulfill all the above conditions & those specified in the documents
attached with this contract document or incomplete in any respect are liable to rejection.
33. The submission of any bid connected with these document and specification shall constitute
on agreement that bidder shall have no cause of action or claim against the GETCO for
rejection of his bid. The owner shall always be at liberty to reject or accept split any bid
or bids at his sole discretion and any action will not be called into question and the
bidder shall have no claim in that regards against the owner.
34. Site visit: The bidder is advised to visit the site and examine the site condition. Where in the
work is proposed to be carried out and to get himself fully acquainted at his own
responsibility for all information that may be necessary for quoting the tender bid and
entering in to contract. All cost and liabilities arising out of the site visit shall be at
bidder account.
35. Recoveries:
(I) In case of any damage to equipment/machinery/ structure/building/ hardware/
conductor/ insulators etc. of GETCO or any public property due to negligence’s of
contractor or any other reasons attributed to contractor the decision of E.I.C.
regarding the amount of recovery shall be final and binding.
(II) If the contractor fails to execute the proportionate work as per direction of E.I.C.
within the time frame given for completion of part / whole of the work GETCO
shall get the work done through any other contractor and the cost of execution of
such work along with 15% overhead charges shall be recovered from contractor.
(III) For violation of any rule / regulation described here, the penalty of Rs. 500/- for
each violation per day will be deducted from the payment of Bill.
36. Notwithstanding anything contained to the contrary in the specification or tenders in
subsequent exchange of correspondence, the conditions of contract shall be binding on
the contractor and any change or variations expressed or implied, however made in the
said conditions shall not be valid or operative unless expressly sanctioned by the
Corporation. The contractor shall be deemed to have fully informed himself and to have
special knowledge of the provisions of the conditions of contract herein contained.
37 Tenderer shall be deemed to have full knowledge of relevant documents, site conditions
etc. whether inspected or not by him.
38 Submissions of tender by a contractor implies that he has read the instructions and
condition of contract herein contained and has made himself aware of the scopes and
specifications of the work to be done.
39 These rules and directions shall form part of the contract.
40 In case of any deviation in any terms and conditions between Instruction to the bidders
and Tender and contract for works, the terms and conditions mentioned in Instruction to
the bidders will prevail.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 11
of 22
41 Validity Of Tender: Tender shall remain open for acceptance for a period of 180 days
from the date of Technical bid opening & during this period no bidder shall be allowed
to withdraw his tender. Any such withdrawals, during the said period will entail
forfeiture of the earnest money deposited with the tender, and Corporation will take
further action for “not dealing” with party etc.
42 Water Supply Connection: The contractor has to make his own arrangement of water
for Maintenance and other activity at his own cost.
43 Separate Provident Fund Code: The contractor shall have a separate Provident Fund
Code of RPFC in the name of company. The contractors, who do not posses such
separate P.F. code, shall not be considered for acceptance of tender. The contractor has to
submit such certificate showing P.F. code along with tender.
44 Tenders received after time: The tenders received after time and date specified in the
tender notice, will not be accepted. Once the offer submitted by the contractor before due
date of submission, the contractor will not be allowed to submit revised / additional /
modified / other even before due date. However, if the issue and receipt of tender is
extended by the Corporation due to any reason, the contractor may submit the revised
offer before due date of submission, if he wish to submit.
45 The work shall be completed within the period stipulated in the contract. The contractor
has to organize & coordinate the works to suit these. In the event of any delay to any
other reason not attributable to the contractor, reasonable extension in the completing the
work may be given at the discretion & as decided by the Corporation but no
compensation or idle charges will be paid to the contractor under any circumstances.
46 The price proposals will be opened in the presence of the bidder’s representatives who
choose to attend at the date and time and venue to be notified by the GETCO, after
conclusion of the Technical Evaluation and Post Qualification process.
47 The Schedule-B shall be filled up with the quoted % above or below & shall be returned
& submitted in sealed envelope superscripted Price Bid – “Work of Work of Cloth
Cleaning & Jumper Checking / Tightening work on EHV lines String disc insulators under Jetpur
Tr. Jurisdiction” so as to reach the office of EXECUTIVE ENGINEER (TRANS),
Gujarat Energy Transmission Corporation, Transmission Division, Jetpur.
Schedules for tools & tackles, equipments, personnel details etc., and all other necessary
details shall also be submitted, in Envelop – I, i.e Technical Bid. Tenders will be opened
on the day & time indicated in the tender notice in the presence of such bidders who wish
to remain present.
Any tender not bearing signature of the bidder & seal of the company on all the
documents accompanying the tender is liable to rejection. Further it is specifically
instructed that conditional tenders shall summarily be rejected.
E. ADDITIONAL TERMS AND CONDITIONS: -
1. Contractor have to remain in constant touch with EE [TR] Jetpur for taking up the work.
2. On finalization of outage Contractor will be informed 1 day in advance for taking up the
work.
3. On taking up of the work according to outage schedule, if it will be changed according to
prevailing situation of power supply, Contractor have to carryout the work as per revised
schedule and nothing will be paid extra for the same.
4. For availing outage on the line, Contractor have to depute their authorized representative
approved by EE [TR] Jetpur and line clear will be issued to this authorized representative
only.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 12
of 22
5. The line clear will be issued for particular period and if contractor have fail to return in
time then it will be viewed very seriously and any financial loss will be there, it will be
recovered from contractor.
6. Any safety pre-cautions required before taking up the work on the line has to be arranged
by Contractor i.e. earthing on either side of locations, safety belt etc.
7. All the safety regarding human life and as per I. E. rules is to be observed by Contractor
and regarding any violation of these GETCO will not take any responsibility.
8. For silicone application works all tools and tackles excluding Diesel, Diesel – Silicone
mixture and Cotton cloth is to be arranged by the contractor.
9. After completion of silicone application work Engineer or GETCO’s responsible person
will be inspect the work and if any defect will be found then same is to be attended up to
satisfaction of Engineer in charge / GETCO’s responsible person at contractor’s cost and
risk.
10. During work if any damage is done to the GETCO’s property such as insulator,
conductor hardware, the cost of the same will be recovered from contractor.
11. The GETCO will not be liable for the infringement of the rules described under
workman compensation due to injuries and accident to the workman etc. Contractor have
to observe and comply with various provisions under above Act etc.
12. Contractor has to work as per location and line allotted by EIC in LCP, If any work will
be carried out outside the scope of instruction, the contractor is responsible for the risk
and cost of un-instructed work, and GETCO will not pay any additional charges or take
any responsibility for that work.
13. Contractor shall have to engage qualified and experienced supervisor having necessary
electrical license for supervision and capable in managing the work.
14. The work is to be completed as per the time limit and no extension in time limit will be
granted unless other wise justified and recommended by the competent authorities, the
penalty will be levied as per GETCO’s rules, if the work is not completed in time and
according to our requirement.
15. The time limit for the above work is 24 months from the date of issue of the order.
GETCO reserves right to extend the contract for year or part thereof.
16. The bill will be passed on actual work done bases. IT Will be deducted from each bill as
per prevailing rules. The GETCO will not be held liable for any payment if no work or
partial work executed due to non availability of outages or work is postponed due to
unavailable circumstances.
17. Contractor have to submit bill in triplicate to Division Office.
18. Contractor have to make their own arrangement for transporting of necessary materials
and laborers for this job from GETCO’s yards centers / sub-station entrusted the line at
his cost only.
19. If excess work is required to be carried out it will be paid as per rate accepted by the
GETCO and it will be payable after completion of necessary formalities as per GETCO’s
rules.
20. Contractor will have to take insurance of all persons engaged for this work till
completion of work. GETCO will not be liable for any compensation due to accident
either electrical or mechanical to contractor and persons engaged by contractor for this
work. Contractor have to produce the proof of such insurance to the EE [TR] Jetpur.
21. Contractor has to produced a copy of registration as contractor.
22. Contractor has produced Solvency at least Rs. 50,000.00
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 13
of 22
23. Contractor has to produced a copy of P. F. code registration from P. F. Office.
24. Successful contractor has to submit the monthly copy of P. F. challans of P. F. paid in to
P. F. office of employees who engage for this job. Other wise no any R. A. bill or final
bill will be passed and paid.
25. Successful contractor has to intimate his P. A. N. No. to the undersigned.
26. Contractor has to offer their rates inclusive of all taxes applicable.
27. No any material will be provided by the GETCO to contractor for this job.
28. Contractor has to pay revenue loss as asked by EE [TR] Jetpur if wholly work is carried
out by the contractor beyond permissible time limit of line shut down on a particular
date.
29. No tenders will be accepted other than received by R.P.A.D. at Tr. Dn. Jetpur.
30. If successful contractor who awarded the contract fail to execute the entire work or part
thereof, it will be got done at the risk and cost of successful contractor.
31. Contractor has to produce a copy of Service Tax registration certificate.
F. TECHNICAL CONDITION:
General Conditions of Contract The contractors shall at their own expense make all necessary provisions for housing,
water supply, and sanitary arrangements for their employees as well as for works and shall pay
direct to the authorities concerned, all rates and taxes.
The contractor shall make their own arrangements for the necessary approach, road, for
transport of their materials and be responsible for the compensation on account of damage to
crop etc. & shall till completion of work.
All the royalty charges, Octroi and other duties & all taxes will be paid by the contractor
and no extra be claimed on this account.
It must be distinctly understood that conditions of contract and of claims in respect of
extra work, will not be allowed unless the works to which they relate is clearly without the spirit
and meaning of the specifications or unless such works are ordered in writing by the Engineer-
in-charge and claimed for in specified manner.
On completion of the work, the site shall be cleared by the contractor within the
stipulated period, and ground brought to original state and they shall not be entitled for any extra
claim on this account.
General Specifications of the relevant Indian standard specification shall also apply.
Damage to work clause:
1. Any components or part of the work shall not be given to any sub-contractor without
approval of the competent authority of the Corporation. The whole responsibility of the
execution of the work, as per the terms and conditions of the contract, will entirely rest
of the main contractor. The main contractor shall always keep his responsible
representative, preferably a technical hand, on work site with powers to sign M.R.s. and
take necessary decision and implement the instructions issued in the interest of efficient
execution of the works.
2. The Engineer-in-charge will fix the hours of work, and no work shall be executed
beyond that period.
3. In any work is not executed according to the specifications, and the directions of the
Engineer-in-charge, the same will be rejected, and the contractor has re execute the same
without any financial implication to the Corporation.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 14
of 22
4. Contractor will have to communicate the name of his authorized agent, who shall be
present on the works, and shall be authorized to sign the material requisitions, receive
instruction given verbally or on the order book, on behalf of the contractor.
5. The contractor will have to sign the conditions of contract, and execute the agreements,
send the list of previous works executed, solvency certificate and pay up the security
deposits, falling to that, the tender will be rejected and earnest money deposited will be
forfeited. The value of the stamp paper and stamp duty charges shall be borne by the
contractor.
6. Tenderer must return the form of tender, with the specifications and the schedule of
quantities, and rates and other schedules only signed on each page. Any tender not
bearing signature of the tenderer on all the documents accompanying the tender is liable
to be rejected.
7. Before submitting his tender, unit rates, which shall be for the finished work complete,
the tenderer shall closely examine the specifications and carefully study site conditions
which form a part of the contract, to be entered into by the accepted tenderer.
8. The Tenderer must visit the site of works and see for himself the site conditions
regarding water, labour conditions rates approach road during all seasons and all other
matters affecting the works before submitting the tender.
9. The submission of tender by a contractor implies that, he has read these instructions, the
conditions of contract etc. and has made himself aware of the scope and specifications of
the work to be done, and of conditions and rates at which stores will be issued to him,
and local conditions and other factors bearing on the executions of the work. The
Corporation will not therefore, after acceptance contractor’s rate, pay any extra charge
for lead or for any other reason. In case the contractor is found later on, to have
misjudged the site conditions.
10. The tender document shall be written legibly and free from erasure, over writing or
conversions of figures. Correction where unavoidable, shall be made by crossing out,
initialing, dating and rewriting.
11. The Corporation or its officers, who accept tender, shall have the right of rejecting all or
any of the tenders, and will not be found to accept the lowest offer not to assign any
reasons whatever, for the rejection of any tender or all tenders
12. The tender notice to tenderers shall form a part of the contract.
13. The entire work is to be completed, within the stipulated time limit from the date of issue
of letter for commencement of the work by field office. The contractor will not be
eligible for any extra for the idle period of works, or waiting period that may be required
to suit other consideration, and no claims for compensations on account of such, will be
considered. However in case of delay due to circumstances beyond the control of
contractors, either in date of commencement or due to, waiting during construction,
extension in time may be considered for completion of works, without any penalty to the
Corporation.
14. The contractor shall keep full time qualified person at the site, who shall be fully
authorized to receive and comply with such instructions, as given by the Executive
engineer or Engineer in Charge. The name of such Engineer with his qualifications and
experience shall be intimated by the contractor. The Executive Engineer shall have the
right to demand the removal of any technical personnel, skilled or unskilled workmen,
who in his opinion are considered to cause bad workmanship in the execution of works
or to cause indiscipline.
15. Bills shall be submitted by the contractor monthly on or before the date fixed by the
Executive Engineer, for all works executed in the previous months.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 15
of 22
16. Should this tender be accepted I /We hereby agree to abide by and fulfill all the terms
and provisions of the “Tender & contract for works” as applicable, and in default thereof
to forfeit and pay to the Corporation the sums of money due.
17. The contractor shall keep instruction book on site, for taking site instruction from time to
time. This book shall be made available on site whenever asked for.
18. The contractor shall pay wage to the workers, as per minimum wages act as declared by
the Government time to time.
19. The contractor shall follow all labour laws of Govt.
20. The full value of the “Earnest Money Deposit” paid herewith, shall be forfeited to the
Corporation, if the contractor fails to deposit the full amount of specified security
deposit, within stipulated time.
EXECUTIVE ENGINEER [TR]
GETCO - JETPUR
SIGN. OF CONTRACTOR
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 16
of 22
� NOTES FOR QUALIFICATION
The tender documents are for two separate bids i.e. technical bid (i.e. qualifying
bid) and price bids (i.e. commercial bid). Following credentials shall be submitted
with the technical bid for qualification.
1. Experience: Contractor should produce evidence of having experience in
executing similar nature & magnitude of jobs preferably photo copy of
orders secured from GETCO / Central / State Government / Railway / Semi-
Government and satisfactory completion certificate from respective
department.
2. Latest bank solvency certificate from any nationalized bank of a sum of
minimum 20 % of the estimated cost shown in the tender.
3. Separate provident fund code number towards your firm registered with
Regional P. F. Commissioner.
4. The Earnest Money Deposit and tender fee will be accepted by Demand
Draft on any Nationalized Bank only situated at “JETPUR”, drawn in favor
of “Gujarat Energy Transmission Corporation Ltd.”. Tender without
EMD and tender fee shall be rejected. Two separate demand draft for
Tender fee and EMD should be submitted with technical bid. Any tender
submitted without tender fee and E. M. D. will be disqualified.
5. The details of tools and tackles, owned and available for using in this work.
6. Contractor should produce audited copy of the Balance sheet with profit and
loss account of last three Years.
7. Attested copy of Power of Attorney, if any, for signing the bid documents.
The commercial bid (i.e. Price bid) shown in tender documents comprising
schedule B shall be submitted in separate self-addressed envelope provided with
tender documents.
The technical bid shall be opened at 3.00 pm, if possible on due date. After
scrutinizing of the technical bid, if party fails to fulfill the above requirement for
qualification, the price bids of such parties will not be opened. The price bid of
qualifying parties thereafter shall be opened on the date and time communicated to
qualified parties afterwards in the presence of parties.
The bid should be clearly subscribe with our reference number due date and
title of work. The offer should be valid for acceptance for a minimum period of 6
months from the date of opening of technical bid.
Sign. Of Contractor EXECUTIVE ENGINEER (TRANS) GETCO, Division Office, JETPUR
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 17
of 22
APPENDIX –I
TENDERER’S EXPERIENCE A List of Similar jobs executed by the Contractor &Name with address of a Person whom
reference can be made, by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr. No
Name & Descript
ion of Work
Value Of Work Executed
Rs.
Time Period as per
Contract
Actual
Time Period for the
Completion of the work
Date Of
Comple
tion
Client
Persons
to whom
Reference
may be made
Principal Features
1 2 3 4 5 6 7 8 9
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place:
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 18
of 22
APPENDIX – II WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand , as on the date of the Submission of
this tender [Tenderers shall submit the information in the Format detailed here under]
Sr. No.
Name of Work
with its
Location &
Address
1 Work in hand 2 Work tendered for Remarks
Tender Cost
Cost of Remaining
work
Anticipated Date of
Completion
Estimated Cost
Date when decision
Is Expected
Stipulated Date or
period Of
Completion
1 2 3 4 5 6 7 8 9
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company Date & place: _______________________________________________
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 19 of
22
GETCO
APPENDIX-III
TENDERER’S DETAILS OF PERSONNEL The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. No.
Description &Details
of position
Name Qualification Professional Experience
& details of
works carried out
Remarks
1 2 3 4 5 6
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: ______________________________________________
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 20 of
22
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
OFFICE OF THE EXECUTIVE ENGINEER, 400KV S/S.
TRANSMISSION DIVISION, JETPUR
E-mail : [email protected] PHONE: (02823) 221278 FAX: (02823) 221733
SCHEDULE - B
Sub: - Work of Cloth Cleaning & Jumper Checking / Tightening work on EHV
lines String disc insulators under Jetpur Tr. Jurisdiction.
Sr.
No. Description of work Qnt. Rate Unit Amount
1 400 KV Line Supension / Tension
Location string disc insulator cloth
cleaning.
850
Strings
140/- Per
Strings
1,19,000/-
2 220 KV Line Supension / Tension
Location string disc insulator cloth
cleaning.
1731
Strings
110/- Per
Strings
1,90,410/-
3 400 KV / 220 Kv Line Tension
Location, Jumper checking /
Tightening work
1000
Jumper
35/- Per
Jumper
35,000/-
Total 3,44,410/-
In words Rs. Three lacs Forty Four Thousand Four Hundred Ten Only.
CIRTIFICATE
I/We am/are willing to carryout to work at ____________________________ %
above/below [should be written in figures & words] the estimated rates mentioned
above amount of my / our tender works outputs as under: -
Total Amount of Rs.___________________________________________________
We agree with all Tender’s terms and conditions of GETCO.
SIGNATURE OF CONTRACTOR. (With rubber stamp/seal of the company
Deputy Engineer [Tech.] EXECUTIVE ENGINEER [TR]
GETCO – JETPUR GETCO – JETPUR
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
OFFICE OF THE EXECUTIVE ENGINEER, 400KV S/S.
TRANSMISSION DIVISION, JETPUR
E-mail : [email protected] PHONE: (02823) 221278 FAX: (02823) 221733
Annexure IV
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 21 of
22
General Conditions
1.0 General Definitions: -
1.1 The “GETCO” means Gujarat Energy Transmission Corporation Limited [GETCO]. The
GETCO is engaged in the business of transmission of electricity for consumer use in the
State of Gujarat through various Electrical sub station and having its registered office at
Sardar Patel Vidyut Bhavan, Race Course, Circle, Vadodara – 390 007.
1.2 The “Contract” means the documents forming the offer letter, the acceptance thereof, the
letter of intent and the acceptance thereof, together with the all documents taken together
shall deemed to form contract and shall be complementary to one another.
1.3 The “Contractor” means the individuals or institutions or the firm or company or partnership
concern undertaking this contract or work and shall include its legal representatives,
successors and assigns.
2.0 Labour Laws: -
2.1 The Contractor shall observe, comply with and abide by the conditions of labour laws
mentioned in the annexure-V attached herewith.
2.2 The Contractor shall have to submit a document showing allotment of PF code No. received
from Regional Provident Fund Commissioner.
3.0 Provision for Penalty: -
3.1 In case of any pilferage, loss, damage, to the GETCO’s properties, due to any negligence or
inaction on the part of the personnel of the contractor, the contractor shall be liable to
compensate the GETCO.
3.2 In case of violation or non-observation of any of the special and detailed terms and
conditions of the contract stipulated in this tender document the GETCO reserves the right to
impose a penalty upto Rs. 500.00 per day per violation / omission and for any continued
violation / omission the decision of the Executive Engineer [TR] of GETCO shall be the final
and binding on the contractor on this issue.
4.0 Security Deposit: -
4.1 You shall submit the Security Deposit of Rs. 35,250.00 [Rupees Thirty Five Thousand Two
Hundred Fifty Only] valid for the contract period either in cash / DD or in form of Bank
Guarantee. This security deposit shall not bear any interest thereon. This security deposit /
Bank Guarantee will be returned to be returned to the Contractor on completion of the
contract period and on his fulfilling all his obligations to the GETCO’s entire satisfaction and
in terms of contract awarded to Contractor in the execution / performance of the awarded
work or non-fulfilling of any obligation towards statutory / legal payment etc. the security
deposit shall be forfeited by the GETCO.
5.0 Cash Retention Money:
5.1 The GETCO shall deduct from your monthly bill 5.0% [Five Percent] of the monthly service
/ charges as cash retention money and the same shall be returned to you at the end of the
Contract period on your fulfilling all the Contract obligations.
6.0 Period and Termination of the Contract:
6.1 The contract shall be awarded initially for a period of two year. The GETCO reserves its
right to extend the said contract for a further period of one year subject to mutually agreed
terms and conditions.
C:\Documents and Settings\MARS\Desktop\15 .TENDER\06Tender Cloth Cleaning.docPage 22 of
22
6.2 The GETCO reserves the right to terminate the contract at any time without assigning any
reason thereof and without giving any prior notice and without payment of any compensation
etc.
7.0 Quotation of Rates
7.1 Your offer rates shall be inclusive of all legal & statutory liabilities and other terms and
conditions mentioned in this tender document.
8.0 Payment:
8.1 The payment shall be made once in a month on certification of successful execution of the
scope of work carried out during the previous month including submission of required
documents / certification as may be necessary, by the GETCO.
9.0 Submission of Tender: -
9.1 The cover containing the tenders should be super-scribed “400 KV / 220 Kv Line Tension
Location, Jumper checking / Tightening work.”
9.2 The sealed tenders shall be sent to Ex. Engineer [Transmission] Gujarat Energy Transmission
Corporation Limited, 400 KV Sub-Station Jetpur. The tenders will be submitted separately
for technical bid & price bid in two sealed covers separately clearly marking the same on top
of the sealed envelope.
9.3 The offer shall be accompanied by Earnest Money Deposit [EMD] for an amount of Rs.
3500.00 by a Demand Draft drawn in favour of Gujarat Energy Transmission Corporation
Limited payable at Jetpur. This EMD will be forfeited in the event of a tenderer not accepting
the workorder if placed. The EMD will be refunded to un-successful tenderer. The EMD
amount will be refunded to successful tenderer on his furnishing security deposit as per
clause No. 11.0 above. This EMD will not bear any interest.
9.4 Tender will be submitted by the Contractor on his own letterhead along with the Earnest
Money Deposit, as well as the copy of the terms and conditions of the tenders enclosed duty
signed by the Contractor.
9.5 Tenders received after the due dates are liable to be rejected.
9.6 The selected tenderer may be invited for confirmations / clarification, if any. He / They shall
at his / their own cost keep himself / themselves available during that period.
9.7 The GETCO reserves the right to reject any / all the tenders without assigning any reason
thereof.
10.0 Jurisdiction: -
10.1 All disputes differences arising out of, or in relation to the contract will be subject to the
exclusive jurisdiction of the Courts of Jetpur only.
11.0 General: -
11.1 In case of any terms and conditions not defined herein, the decision of the GETCO shall be
final and binding upon the tenderer.All other terms and conditions as per works contact
booklet will be applicable.
Name & seal & signature of the Tenderer The Executive Engineer [TR]
Date: GETCO – JETPUR