15
FULLER AND D’ANGELO, P.C. ARCHITECTS AND PLANNERS BID ADDENDUM #2 May 29, 2018 Page No.1 GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER ROOM RENOVATIONS AND RELATED WORK BID ADDENDUM NO. 2 BID ADDENDUM NO. 2 OWNER: GREENWICH PUBLIC SCHOOLS HAVEMEYER BUILDING 290 GREENWICH AVENUE GREENWICH, CT 06830 PROJECT: GREENWICH HIGH SCHOOL LOCKER ROOM RENOVATIONS AND RELATED WORK F&D PROJECT NO. 17301.00 BID NO. 2207-18 The attention of Bidders submitting proposals for work on the GREENWICH HIGH SCHOOL, LOCKER ROOM RENOVATIONS AND RELATED WORK is called to the following Addendum to the Contract Forms and Specifications. The items set forth herein, whether of omission, addition, substitution or clarification are to be included in and form a part of the proposal submitted. This Addendum is hereby included in and made a part of the Contract Documents, dated MAY 17, 2018, whether or not attached thereto. All requirements of the original project specifications and drawings shall remain in force except as amended by this addendum. This Addendum contains changes to the requirements of the Contract Documents. Such changes shall be incorporated into the contract Documents and shall apply to the work with the same meaning and force as if they had been included in the original documents. Wherever or any portion of a drawing, the remainder of the paragraph or drawing affected shall remain in force. The conditions of the Specifications shall govern all work described in this Addendum. Wherever the conditions of work and the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work, etc., described by the Specifications or drawings for similar items of work shall apply to the work described in this Addendum. DATE: May 29, 2018 This Addendum consists of three (3) pages and twelve (12) attachments. THE FOLLOWING ARE MODIFICATIONS, CLARIFICATIONS, AND AN ADDITION TO THE DRAWINGS: MODIFY “GENERAL NOTES:” ON ARCHITECTURAL DRAWINGS; A150, A151, A160 ALT-1, A161 ALT-2 and A162 ALT-3 ADD: 4. 5% OF NEW LOCKERS SHALL BE HANDICAP ACCESSIBLE. MODIFY “WORKSCOPE NOTES (KEYED):” ON ARCHITECTURAL DRAWINGS; A150, A151, A160 ALT-1, A161 ALT-2 and A162 ALT-3 ADD: WS13 REMOVE FLOOR TILE. MAKE 12" HIGH CONCRETE BASE, TO MATCH EXISTING FOR RELOCATED SALVAGED LOCKERS. REINSTALL LOCKERS AND SLOPPED TOP AS INDICATED. REFER TO DETAIL 3/A800, SIMILAR. INSTALL TWO (2) SALVAGED BENCHES AS INDICATED.

GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

FULLER AND D’ANGELO, P.C. ARCHITECTS AND PLANNERS

BID ADDENDUM #2 May 29, 2018

Page No.1

GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL

LOCKER ROOM RENOVATIONS AND RELATED WORK BID ADDENDUM NO. 2

BID ADDENDUM NO. 2 OWNER: GREENWICH PUBLIC SCHOOLS HAVEMEYER BUILDING 290 GREENWICH AVENUE GREENWICH, CT 06830

PROJECT: GREENWICH HIGH SCHOOL LOCKER ROOM RENOVATIONS AND RELATED WORK

F&D PROJECT NO. 17301.00 BID NO. 2207-18

The attention of Bidders submitting proposals for work on the GREENWICH HIGH SCHOOL, LOCKER ROOM RENOVATIONS AND RELATED WORK is called to the following Addendum to the Contract Forms and Specifications.

The items set forth herein, whether of omission, addition, substitution or clarification are to be included in and form a part of the proposal submitted. This Addendum is hereby included in and made a part of the Contract Documents, dated MAY 17, 2018, whether or not attached thereto. All requirements of the original project specifications and drawings shall remain in force except as amended by this addendum.

This Addendum contains changes to the requirements of the Contract Documents. Such changes shall be incorporated into the contract Documents and shall apply to the work with the same meaning and force as if they had been included in the original documents. Wherever or any portion of a drawing, the remainder of the paragraph or drawing affected shall remain in force.

The conditions of the Specifications shall govern all work described in this Addendum. Wherever the conditions of work and the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work, etc., described by the Specifications or drawings for similar items of work shall apply to the work described in this Addendum.

DATE: May 29, 2018 This Addendum consists of three (3) pages and twelve (12) attachments.

THE FOLLOWING ARE MODIFICATIONS, CLARIFICATIONS, AND AN ADDITION TO THE DRAWINGS: MODIFY “GENERAL NOTES:” ON ARCHITECTURAL DRAWINGS; A150, A151, A160 ALT-1, A161 ALT-2 and A162 ALT-3

ADD: 4. 5% OF NEW LOCKERS SHALL BE HANDICAP ACCESSIBLE. MODIFY “WORKSCOPE NOTES (KEYED):” ON ARCHITECTURAL DRAWINGS; A150, A151, A160 ALT-1, A161 ALT-2 and A162 ALT-3

ADD: WS13 REMOVE FLOOR TILE. MAKE 12" HIGH CONCRETE BASE, TO MATCH EXISTING FOR RELOCATED SALVAGED LOCKERS. REINSTALL LOCKERS AND SLOPPED TOP AS INDICATED. REFER TO DETAIL 3/A800, SIMILAR. INSTALL TWO (2) SALVAGED BENCHES AS INDICATED.

Page 2: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

FULLER AND D’ANGELO, P.C. ARCHITECTS AND PLANNERS

BID ADDENDUM #2 May 29, 2018

Page No.2

MODIFY “REMOVAL LEGEND” ON ARCHITECTURAL DRAWINGS; A150, A151, A160 ALT-1, A161 ALT-2 and A162 ALT-3

DELETE: APPROXIMATE AREA OF FLOOR TO BE SAW CUT AND REMOVED. PATCH REMOVED SLAB, REFER TO DETAIL 2/A200.

ADD: APPROXIMATE AREA OF FLOOR TO BE SAW CUT AND REMOVED. PATCH REMOVED SLAB,

REFER TO DETAIL 2/A800. MODIFY DRAWING A150 BASE BID – PROPOSED FLOOR PLANS MEN’S AND WOMEN’S TOILETS, SHOWER ROOMS AND MEN’S POOL TEAM ROOM

REVISE DETAIL 1 – UNISEX TEAM ROOM 3, #706D ADD note - BENCH(S) IS TO BE SALVAGED, AS REQUIRED TO REMOVE EXISTING HOUSE TRAP. ALL

OTHER BENCHES AND LOCKERS ARE TO REMAIN. REVISE DETAIL 2. As indicated on sketch SK-1 and SK-2 dated 5-29-2018, attached to this addendum. Revisions are bubbled.

MODIFY DRAWING A160 ALT-1, ALTERNATE 1 WOMEN’S TEAM ROOM PLANS & ELEVATIONS

REVISE DETAIL 2 As indicated on sketch SK-3 dated 05-29-2018, attached to this addendum. Revisions are bubbled. REVISE DETAIL 3 As indicated on sketch SK-4 dated 05-29-2018, attached to this addendum. Revisions are bubbled.

MODIFY DRAWING A161 ALT-2, ALTERNATE 2 WOMEN’S TEAM ROOM PLANS & ELEVATIONS

REVISE DETAIL 2 As indicated on sketch SK-5 dated 05-29-2018, attached to this addendum. Revisions are bubbled. REVISE DETAIL 3 As indicated on sketch SK-6 dated 05-29-2018, attached to this addendum. Revisions are bubbled.

REPLACE DRAWING M-300, MECHANICAL ROOM PARTIAL FLOOR PLAN REMOVE drawing M-300 dated 05/17/2018 ADD drawing M-300 dated 05-29-2018, attached to this addendum. Revisions are bubbled.

REPLACE DRAWING M-400, MECHANICAL SECTIONS REMOVE drawing M-400 dated 05/17/2018 ADD drawing M-400 dated 05-29-2018, attached to this addendum. Revisions are bubbled.

REPLACE DRAWING M-500, MECHANICAL DETAILS REMOVE drawing M-500 dated 05/17/2018 ADD drawing M-500 dated 05-29-2018, attached to this addendum. Revisions are bubbled.

Page 3: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

FULLER AND D’ANGELO, P.C. ARCHITECTS AND PLANNERS

BID ADDENDUM #2 May 29, 2018

Page No.3

MODIFY DRAWING E-200, ELECTRICAL FLOOR PLAN - LIGHTING REVISE “LIGHTING FIXTURE SCHEDULE:” TYPE ‘A’, under DESCRIPTION

ADD: FOR CHAIN HUNG OPTION PROVIDE KWIKWIRE HANGING SYSTEM. CONTRACTOR IS TO VERIFY CHAIN HUNG FIXTURE QUANTITIES.

THE FOLLOWING ARE PROVIDED FOR CLARIFICATION PURPOSES: BIDDER RFI RESPONSES: In the event of a discrepancy between these responses and the contract documents, the contract documents shall prevail unless modified by Addendum. Bid RFI Response 01 (Sal Sabia Electric) Bid RFI Response 02 (Sal Sabia Electric) Bid RFI Response 03 (Sal Sabia Electric)

END OF ADDENDUM NO. 2

Page 4: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:
Page 5: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:
Page 6: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:
Page 7: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:
Page 8: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:
Page 9: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:
Page 10: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

P:\_P

rojects\180000\180115-000\D

-D

esign M

gm

t\C

AD

\M

ech\180115-000_M

-300.dw

gK

o, A

lexander

5/25/2018 3:38 P

M5/2

5/2

018

3:38 P

MP

LO

T D

AT

E:

SA

VE

D

AT

E:

LO

GIN

:

T: (2

03) 3

23-4

333

F: (2

03) 3

23-2

999

Lead

ersh

ip in

Eng

inee

ring

& In

tegr

ated

Ser

vice

s

PR

OJE

CT

T

IT

LE

DR

AW

IN

G T

IT

LE

SCALE

DRAWN BY

DATE ISSUED TO

DRAWING NO.

CHECKED BY FILE NO.

05/17/2018 BID

GR

EE

NW

IC

H, C

T

AK

F P

RO

JE

CT

N

UM

BE

R

180115-000

AK

JJM

AS NOTED

ME

CH

AN

IC

AL R

OO

M P

AR

TIA

L F

LO

OR

P

LA

N

05/29/2018 ADDENDUM 2

Page 11: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

P:\_P

rojects\180000\180115-000\D

-D

esign M

gm

t\C

AD

\M

ech\180115-000_M

-400.dw

gK

o, A

lexander

5/25/2018 3:38 P

M5/2

5/2

018

3:38 P

MP

LO

T D

AT

E:

SA

VE

D

AT

E:

LO

GIN

:

T: (2

03) 3

23-4

333

F: (2

03) 3

23-2

999

Lead

ersh

ip in

Eng

inee

ring

& In

tegr

ated

Ser

vice

s

PR

OJE

CT

T

IT

LE

DR

AW

IN

G T

IT

LE

SCALE

DRAWN BY

DATE ISSUED TO

DRAWING NO.

CHECKED BY FILE NO.

05/17/2018 BID

GR

EE

NW

IC

H, C

T

AK

F P

RO

JE

CT

N

UM

BE

R

180115-000

AK

JJM

1/4" = 1'-0"

ME

CH

AN

IC

AL S

EC

TIO

NS

05/29/2018 ADDENDUM 2

Page 12: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

P:\_P

rojects\180000\180115-000\D

-D

esign M

gm

t\C

AD

\M

ech\180115-000_M

-500.dw

gK

o, A

lexander

5/25/2018 3:38 P

M5/2

5/2

018

3:38 P

MP

LO

T D

AT

E:

SA

VE

D

AT

E:

LO

GIN

:

T: (2

03) 3

23-4

333

F: (2

03) 3

23-2

999

Lead

ersh

ip in

Eng

inee

ring

& In

tegr

ated

Ser

vice

s

PR

OJE

CT

T

IT

LE

DR

AW

IN

G T

IT

LE

SCALE

DRAWN BY

DATE ISSUED TO

DRAWING NO.

CHECKED BY FILE NO.

05/17/2018 BID

GR

EE

NW

IC

H, C

T

AK

F P

RO

JE

CT

N

UM

BE

R

180115-000

AK

JJM

NTS

ME

CH

AN

IC

AL D

ET

AILS

05/29/2018 ADDENDUM 2

Page 13: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

1

5/24/18

Frank Sabia 203-496-0138 203-323-1234

Ceiling plan Ceiling / Electrical A-100 E-100

Please clarify the school of work for the ceilings in the women's room for base and alternate #1. The A-100/A-200 and the E-100/E-200 drawings have different scopes base vs. alternate

The scope of work for the Base Bid and Alternates shall be as delineated on the Architectural plans.

5/25/18

Also refer to drawing A151 for Base Bid - Partial Reflected Ceiling Plans.

Page 14: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

2

5/25/18

Frank Sabia 203-496-0138 203-323-1234

Floor demo Demo A-150

Plans call for removal of existing sections of floor slab (Note R15 on A-150) How thick is the existing slab? and how far below the slab do the plumbing lines sit? Is this section of the building a slab on grade or are their tunnels under the lockerroom?

According to existing drawings provided by the District, the concrete slab in the locker rooms should be 4" thick with #3 rebar @ 18" O.C. each way. We are not aware of documentation stating the depth of the plumbing below the slab. We are not aware of any tunnels under the locker rooms slab.

5/29/2018

Page 15: GREENWICH PUBLIC SCHOOLS GREENWICH HIGH SCHOOL LOCKER … · 2018-05-29 · greenwich high school locker room renovations and related work bid addendum no. 2 bid addendum no. 2 owner:

3

5/25/18

Frank Sabia 203-496-0138 203-323-1234

Temporary partitions September work A-150

Will a drawing be issued detailing the where temporary partitions will be required if work extends into September? Will the board of education consider allowing a block wall opening in the womans shower room 704.1 to provide access to both the womans and mens room if works has to be finished in September?

The temporary partition shall be a combination of District, Contractor and Architect discussion, also based on the Contractors progress of work by late August 2018. Yes, leaving a toothed block wall opening seems reasonable to allow access. Later closure of same to match adjacent surfaces will be required.

5/29/2018