Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation Natasa Gospic 1 , Milan Jankovic 2 , Dragan Bogojević 3 1 Univesity of Belgrade, Traffic and Transport Engineering Faculty, Belgrade, 2 Univesity of Belgrade, School of Electrical Engineering, Belgrade, 3 ICT-INFO, Belgrade, Serbia

Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Embed Size (px)

Citation preview

Page 1: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Gospiic, Jankovic & Bogojevic, November 2012 11 | Industry Analyst Network | June 2009

Public Private Partnership: aspects of national model implementation

Natasa Gospic1, Milan Jankovic2, Dragan Bogojević3

1Univesity of Belgrade, Traffic and Transport Engineering Faculty, Belgrade, 2Univesity of Belgrade, School of Electrical Engineering,

Belgrade,3ICT-INFO, Belgrade, Serbia

Page 2: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Agenda

• Introduction: Public Private Partnership (PPP): Academia approach

• Gap model and role of the PPP (Author’s WB & ITU)• Proposal for National model of the NGN and BB

deployment and its decomposition• Aspects of national model implementations• National Broadband Network: Multi-layer open

access model• Serbian PPP Delphi Survey• Proposals and Conclusions

2

Page 3: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

REGULATOR’S METODOLOGY -PROPOSAL FOR US POLICY-

• CREATION OF US PROJECT – Preparation of detailed overview of the situation of telecom

infrastructure and telecom service provisioning within the whole territory of the country

– Proposal for scope and content of US– Financial options– Recommendations for US implementation

• Public discussion• US implementation

• Project development is done by University Belgrade, TTEF

Page 4: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

PROJECT • Data base

– Development of Main Data Base (all settlements in country – 4.715 in Serbia)– Locations (Settlements) without fixed telecom services (0% penetration)– Locations with low penetration (less then 4% and less then 10%)– Identification of areas lacking mobile signal – DEVELOPMENT OF THE LIST OF CRITICAL SETTLEMENTS– Elements for techno-economic analysis

• Criteria for definition of critical settlements for US– Basic :

• + 20 households and/or • + 50 inhabitants

– Additional:• no mobile signal – critical• inhabitant’s index (2002/1991)• school, post office, ambulance, on the border to EU....

• Structuring the settlements in the list of critical settlements for US

– Number of inhabitants– Potential tourist locations– Natural resources

– Requirements for NB and BB access

Gospiic, Jankovic & Bogojevic, November 2012 4

Page 5: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Academia Proposal for NB US and BB US per region Academia Proposal for NB US and BB US per region

Scenario A NB US

1. Pčinjski2. Jablanički3. Raški4. Pirotski5. Zlatiborski6. Nišavski7. Toplički8. Rasinski

Scenario B BB US1. Zapadno-bački2. Sremski3. Podunavski4. Braničevski5. Srednje-banatski6. Severno-banatski7. Moravički8. Severno-bački9. Južno-banatski10. Južno-bački11. Kolubarski12. Borski13. Grad Beograd14. Pomoravski15. Zaječarski16. Mačvanski i17. Šumadijski

5Gospiic, Jankovic & Bogojevic, November 2012

Serbian regional organization 2008: 24 regions and city of Belgrade

This proposal is not endorsed!

Page 6: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Word Bank: Gap model, theoretical framework for UAS*

• Over last few years operators have bridged the market efficiency gap for voice

• The smart subsidy zone has narrowed

• The true access gap is typically last 5% of total population, but 20% in rural areas

6Gospiic, Jankovic & Bogojevic, November

2012

*Source: Telecom Regulation Handbook, Universal Service: Distinctions Within the Access Gap, WB 2011

Page 7: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Authors’ proposal for a national model of the NGN and BB deployment*

*Sources: Gospic & Bogojevic, NGN Deployment in Developing Countries, ITU-D Forum for Arab Region, Dec. 2010 Bogojevic & Gospic, Modeling of NGN deployment, African Journal of Business Management, July, 2011

7Gospiic, Jankovic & Bogojevic, November 2012

P w

S

N

PWSN- People with special needs

Page 8: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Gospiic, Jankovic & Bogojevic, November 2012 8

ANALYTICAL AND STRUCTURAL FRAMEWORK

• To transform the proposed framework into a model for the particular devC, it is necessary:– To determine the existing level of access, – To determine frontiers of market efficiency, – To determine affordability frontiers in relation with household income– To determine sustainability frontiers in relation to the potential investment

cost

• Also in order to define structural components of the model it is necessary to determine the following:– Detailed input data related to market-specific features; – Costs for implementation of possible technologies – Algorithms that represent the process of building the infrastructure, based on

geography, population, and penetration; – Revenue (per customer and total) and – Calculation of the net profit and ROI

Page 9: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Model decomposition*

*Source: N. Gospic & D. Bogojevic, ITU Cross Regional Seminar, Chisinau Moldova, Sep. 2011

9Gospiic, Jankovic & Bogojevic, November 2012

Page 10: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Application of the proposed Analytical Framework for Serbia

• The frontier for the existing level of acceptance is set to 600 € and the affordability frontier at 300 €. (The average monthly income of households in Serbia in September 2012 is amounted to around 500 €; for illustration, the average net salary amounted to 352€).

• Research into the Serbian territory covered by ADSL and 3G services indicated that market oriented methods lead to good coverage in urban areas and poor coverage in rural areas.

Page 11: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Frontiers for the Serbian national model (the end of 2010)

Source: Bogojevic & Gospic, Modeling of NGN deployment, African Journal of Business Management, July, 2011

11Gospiic, Jankovic & Bogojevic, November 2012

RECOMMENDATION:•Develop the project to define frontiers and data

•Pilot project to test this framework

Page 12: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

GOVERNMENT’S ROLE• The government responsibilities frontiers are indicated

(100% of population)

• The Government financial resources have to be directed towards the development of services provided to citizens (e-Government, e-Health, e-Education, e-Procurement) in partnership with private sector.

• Development of National Broadband Network –NBN (Strategy for e-communication development in RS 2010-2020)

• National Commission for Broadband (high level officials)

Gospiic, Jankovic & Bogojevic, November 2012 12

Page 13: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

• First layer: open access passive network • Second layer: open access passive network• Interconnection points• Level playing field

• First layer: open access passive network • Second layer: open access passive network• Interconnection points• Level playing field

• Coverage• Bitrate• Social and economic advantages

• Coverage• Bitrate• Social and economic advantages

Establish a new company to build NBN?

Establish a new company to build NBN?

• Reasonable profit and return on investment (ROI)• Affordable prices• Efficient investments

• Reasonable profit and return on investment (ROI)• Affordable prices• Efficient investments

How to build the NATIONAL BROADBAND NETWORK (NBN)?

•Transparent work• Fair competition• Guaranteed coverage

•Transparent work• Fair competition• Guaranteed coverage

• Government budget • Bank loans• Supplier credit• Public/private partnership

• Government budget • Bank loans• Supplier credit• Public/private partnership

FTTx, Wireless/satellite technology selection based on technical and economic analysis

FTTx, Wireless/satellite technology selection based on technical and economic analysis

Technology

NBN project

Regulation Financing

Operation model

Open access

Business plan

Goals

13

Source: M. Jankovic ITU Regional Forum for Europe on Broadband, September 2012, Tirana, Republic of Albania

Page 14: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Innovations in NBN designMulti-layer open access model

Local governments offering a network will sell bandwidth to communication operators wholesale and service providers retail, instead of doing business with private persons.

o Infrastructure operators offering passive network (dark fiber)

o Operators offering active network (wholesale access)

o Service operators offering innovative services such as IPTV, with end-users

ServiceService

BitrateBitrate

Access rightAccess right

Underground infrastructureUnderground infrastructure

Optical fiberOptical fiber

Infrastructure operator(mainly local governments)

RSP

Vertical service

operator

RSP RSP

The main role of the state:

By applying this model, the NBN developers can further be divided as follows:

• Create– Universal coverage– Open access– Fair competition

• Stimulate cooperation through partnerships (private/public sector...)

14

Source: M. Jankovic ITU Regional Forum for Europe on Broadband, September 2012, Tirana, Republic of Albania

Page 15: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Serbia BB4All situation• Serbia adopted basic package of documents: Strategy of IS Development

until 2020, Strategy of e-communication in Serbia from 2010 to 2020, Law on Electronic Communications and Strategy of broadband development up to 2012.

• Strategy of IS Development has set objective to provide all citizens of the Serbia with high speed Internet up to 100 Mbps.

• Strategy of e- communications, among others, has promoted model of national network based on passive optical infrastructure

• The appropriate action plans, resources and government activities in order to achieve objectives are still not officially prepared.

• Documents do not recognize PPP models and state subsidies.• Examples and the proposed model indicate that development of PPP

policy is important. • Regulatory activities in this sense are very crucial.

Gospiic, Jankovic & Bogojevic, November 2012 15

Page 16: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

APPLICATION OF THE PPP – WHAT ARE EXPERTS OPINIONS?

Gospiic, Jankovic & Bogojevic, November 2012 16

Page 17: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

PPP Delphi Survey for application of the PPP and Analytical Framework

• Questionnaire on the position of public-private partnerships in the development of broadband Internet access and role of PPP in Serbia is in progress (I phase of Delphi method)

• Questionnaire sent to 30 Serbian experts (Academia, Regulator, Government, Private sector) first week of November 2012

• For the moment answers received from 18 experts.

Gospiic, Jankovic & Bogojevic, November 2012 17

Page 18: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

ANSWERS ON QUESTIONNAIRE• Consensus on questions

– “Who is the key player in the implementation of BB to all citizens of Serbia?”. • “Both the government and the market should be included”

– “Private operators will not invest in between sustainability and government frontiers”

• All experts are agreed (Average 9.13, Median 10)– “Political support is enough for implementation of Digital Agenda for Serbia

• Majority did not agreed (Average 3.00, Median 2)– Is financing using PPP for BB applicable?

• All experts agreed (87%)– Is it necessary to define methods of Government intervention?

• All experts agreed (87%). However, some comments refer that Government has no capacity for that, what could delay implementation

• Different expert’s opinions on questions – Implementation of National Strategy for Information Society – Realization of National Broadband Network– Government investment for BB

• Additional comments– Lack of e-services in local language will slow down BB– Low level of ICT skills will slow down BB– Domestic industry does not exist any more

Page 19: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Top ten proposals 1. Definition and Scope of UAS have to be changed within time according

to the country’s situation (Scope: US + UA => BB_UAS). 2. Broadband UAS policies should to migrate to Broadband policies (rural)

to ensure “Broadband for all”.3. Highlight of needs for innovation and creativity in identification of new

services within UAS, like digital Broadcasting (BB_UAS + Digital Broadcasting => BB_UASB).

4. Commence with promotion of new services from e-Government package and their impact (eGov + eEDU + eHelth => BB_UASBG).

5. Identification of the broadband infrastructure serving for all purposes, including Critical Telecommunications Infrastructure (CTI).

Gospiic, Jankovic & Bogojevic, November 2012 19

Page 20: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

Top ten proposals 6. Definition and implementation of National model for BB deployment,

with identification of non-sustainable areas, which should be served with broadband Universal Service/Access, and be the scope of government support and/or PPP.

7. Recognition that multi stakeholder approach is only financial solution, with clear role of government’s state intervention.

8. Monitoring mechanism and benchmarking are critical factor. 9. Starting as soon as possible with pilot projects based on the proposed

analytical model for investigating the limits of market efficiency, availability and sustainability.

10. Starting with activities on public-private partnerships (PPP) on local government level.

Gospiic, Jankovic & Bogojevic, November 2012 20

Page 21: Gospiic, Jankovic & Bogojevic, November 2012 1 1 | Industry Analyst Network | June 2009 Public Private Partnership: aspects of national model implementation

THANK YOU FOR YOUR ATTENTION!

[email protected]@ratel.rs

[email protected]

Gospiic, Jankovic & Bogojevic, November 2012 21