www.goldwind.com.cn Goldwind Smart Microgrid and Industrial Park Smart Energy Internet Reporter: Dehua Zheng October 2016

Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Embed Size (px)

Citation preview

Page 1: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

www.goldwind.com.cn

Goldwind Smart Microgrid and Industrial Park Smart Energy Internet Reporter: Dehua Zheng October 2016

Page 2: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Contents

The development and planning of Goldwind smart energy internet

The introduction of Goldwind microgrid and products

The core technologies and achievements of Goldwind microgrid

The smart energy internet of Goldwid industrial park

The typical cases of Goldwind microgrid project

Page 3: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The introduction of Goldwind microgrid and products

3

What is the energy internet and the relationship between energy internet and microgrid?

The energy internet is the internetwork consisted of multiple energy recourses with the electrical power system and microgrid at the core. It is a new ecological energy system with high integration of energy and information, achieving horizontal multiple energy compensation and vertical coordination with DERs, utility grid, loads and energy storage, based on internet thinking and energy technology reform.

Page 4: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The introduction of Goldwind microgrid and products

4

Reformed part of Grid A--the connection of lithium battery and diesel To be reformed part of Grid C--communication control access of Grid A and Grid C To be built part of Grid B--600kW micro turbine CCHP system and comprehensive control and

management platform of energy efficiency

Page 5: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Smart load forecasting

control system

Dynamic Stable Control System

Transient control

Protection system

Reliable power

Lower cost Higher

compatibility

Broad adaptability

Isolated microgrid Optimum design System

Our products

The introduction of Goldwind microgrid and products

5

Page 6: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

--金风智能微电网示范项目 鸟瞰图

6

500kWp Capacity: 500 kWp

Polysilicon/490 kW

Monocrystal silicon/5 kW

Cadmium telluride/5 kW

Model number:GW 106/2500kW

Tower height:80m

BDA

Floor space : 91271.6 m2

Load capacity:200kW – 2200kW

Goldwind Beijing

PV generation

Wind turbine

VRB: 200kW*4h

Lithium battery : 125kW*2h

Supercapacitor: 200kW*10s

Lead carbon battery 100kw*1.5h

Energy storage system

Diesel: 300kW * 1,200kW * 1

Micro turbine:

65kW*2+600kw*1

Reserve power supply

Reach fractional energy saving of 14.3

5.8% Lighting system energy saving counts 5.8% of the total

energy consumption.

8.5% Air conditioning system energy saving counts 8.5% of the

total energy consumption.

Energy conservation

Smart energy building (under construction)

The aerial view of Beijing Goldwind microgrid

Page 7: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Contents

The development and planning of Goldwind smart energy internet

The introduction of Goldwind microgrid and products

The core technologies and achievements of Goldwind microgrid

The smart energy internet of Goldwid industrial park

The typical cases of Goldwind microgrid project

Page 8: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The classic cases of Goldwind microgrid project

8

Microgrid project case 1

20kV north line(State grid)

20kV6300kVA

Transformer

10kVReservation

2.0MWWind turbine

2500kVATransformer

690V

Inlet wire of wind turbine

Jiangsu CRRC

loop

Switch station

Jiangsu CRRC

Note: The dashed parts is the newly-built.

Loads

ACDC

100kWPV

200kW*3hLead carbon battery

ACDC

500kVATransformer

100kWWind turbine

690V400V

Reform 1: metering reform

Reform 2: connection reform

10kV

Microgrid project in Dafeng Jiangsu

Jiangsu Goldwind

loop

Industry park loop

Page 9: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

9

The features of Dafeng microgrid

It connected to the utility grid on

26 March 2015. The gross

generation is

2, 120 kWh up to 17 December 20

15.

It saves electricity cost, improves

the power quality and capacity

cost. Above advantages produce

direct economic benefit near RMB

1 million.

It is the first commercial

grid-connected microgrid

project of industrial park

Microgrid project case 1

Page 10: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

55.00%

60.00%

65.00%

70.00%

75.00%

80.00%

2015-04-06 00:002015-05-26 00:002015-07-15 00:002015-09-03 00:002015-10-23 00:002015-12-12 00:00

Energy efficiency of energy storage(%)

10

Microgrid project case 1

Page 11: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

11

Microgrid project case 2

Page 12: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

12

Capacity:375kWp

Roof-mounted PV 315kWp

Concentrating PV 30kWp

30kWp

VRB: 125kW * 5h

Micro turbine 65 kW*1

Charging stations

Mode number: 2.0 MW Goldwind

wind turbine

Tower height:85m

Wind turbine

PV generation

Micro turbine/energy storage/Charging station

EMS

Transient and dynamic stable control system

Power smart dispatching system

All-Around monitoring system for microgrid

generation and load

Energy management system

The aerial view of Jiaze microgrid

Page 13: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

• The microgrid transient stable control system and isolated combined control system of

micro turbine and energy storage, the self-developed products, have been applied in

Jiaze microgrid project, both of which have passed the technical evaluation of the first

major technical equipment by National Innovation Model Zhongguancun Area.

The features of Jiaze microgrid project in Ningxia automatic operation

13

Page 14: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Contents

The development and planning of Goldwind smart energy internet

The introduction of Goldwind microgrid and products

The core technologies and achievements of Goldwind microgrid

The smart energy internet of Goldwid industrial park

The typical cases of Goldwind microgrid project

Page 15: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Combine the generation units and customers via the reasonable application strategy, to achieve stable smart power supply

The core technology and achievements

Interconnection

of microgrid A/B/C

Cloud computing

Big data

Load monitoring

system

Production plan

operating and maintenance

Generation unit System strategy customers

Generation forecasting

control

Core control strategy

Goldwind industrial park smart energy internet/local smart grid

Grid connection Grid connection

15

Page 16: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Baseline loads:The loads with coerciveness and randomness, are not regulated, occurs naturally according to the demand of the life and work; Schedulable loads:The loads with fixed schedule of operation, are not very convenient to regulate, of which the running time can be flexible; Adjustable loads:the loads with long time running, affected by temperature and other factors, of which the power can be adjustable or interrupted intermittently.

The classification

and influencing factors of

loads

16

The core technology and achievements - data structure

Page 17: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Forecasting model of Wind and PV Power forecasting model of DER

Loads forecasting model Effective forecasting algorithm

Low-cost net power

Energy conservation Comprehensive forecasting

The optimization algorithm of generating capacity

statistical data for customers

Multi-power generation combined control

optimization model

Industrial microgrid and central controller of smart energy internet can meet to the requirements of State active distribution network project. Smart bi-directional metering, monitoring, EMS and integrated dispatching terminals

17

The core technology and achievements - data model

Page 18: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Wind power forecasting: The wind power is estimated efficiently and the corresponding dynamic mathematical model is established.

The curve of wind speed forecasting at hub The diagram of actual output power

18

The core technology and achievements - wind power forecasting model

Page 19: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

PV power forecasting: The PV power is estimated efficiently and the appropriate mathematical model is established based on effective information from mass data.

The curve of irradiation intensity forecasting The curves of PV output power

19

The core technology and achievements - PV power forecasting model

Page 20: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Load prediction in realistic condition

Accurate forecasting of wind power and PV power can increase absorption ration of new energy in utility grid.

20

The core technology and achievements - load forecasting model

Page 21: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Analysis method of energy consumption

The energy consumption models of baseline loads, scheduled loads and adjustable loads are established respectively based on the classification and characteristics of loads, to compute and analyze the energy consumption of equipment.

Loads monitoring

21

The core technology and achievements – mathematical model

The energy

consumption analysis of Goldwind

industrial smart energy internet

Page 22: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Objective functions of economic operation

• Objective function significance

Microgrid optimized economic operation must be taken into account from the point of the

lowest operation costs and the most generation profit.

The basic question is the microgrid stability which should be always the priority.

•Objective functions design input

The cost, profit and maintenance of wind turbine and PV The cost and maintenance of energy storage, release and receive power of Grid. In addition, the objective function requires micro-grid running in the best State and the minimum cost

22

The core technology and achievements – mathematical model

Page 23: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Objective functions 1 of economic operation—Lowest operation cost

24

124

124

1

[ ( ) ( )+ ( ) ( )]

[ ( ) ( )+ ( ) ( )]

( )

MT BA

MT MT BA BA

MT

ope wt OM wt i pv OM pv i OM MT i OM BA ii

wt wt wtdep i pv pv pvdep i MTdep i BAdep ii

bulwtdep bulpvdep bulMTdep bulbatdepi

minM C P C P C P C P

P P P P

P P P P

ο ο ο ο

η ο η ο η ο η ο

ο

− − − −=

− − − −=

=

= + +

+ + +

+ + + +

+

∑24 24 24

loadloss1 1 1

+ + ii i ilifetime i rt

WF PQ

ξη −

= = =−

∑ ∑ ∑

- Minimum value of operation cost opeminM

( )OM wt iC P − -maintenance cost of wind power per KWH

pv wtdep iPη − -Depreciation cost of wind power per KWH

bulwtdepP -Construction depreciation cost of wing turbine cover area F- Labor cost

24

1i lifetime i rt

WQ η= −

∑ -Energy storage efficiency

loadloss iP −-Load loss for power off

wtο -Operation state

23

The core technology and achievements – mathematical model

Page 24: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

7

010

715

10

( ) [ + ]

[ + ]

[ +

BA i

BA i

low wt i wt i pv i pv i mt i MT i Bat BA ii

normal wt i wt i pv i pv i mt i MT i Bat BA ii

high wt i wt i pv i pv i mt i MT i Bati

max Profit p P P P Model P

p P P P Model P

p P P P Model

ηο ο ο ο

ηο ο ο ο

ηο ο ο ο

− − − − − − −=

− − − − − − −=

− − − − − −=

= + +

+ + +

+ + +

∑18

1521

1823

21

]

[ + ]

[ + ]

[ +

BA i

BA i

BA i

BA i

normal wt i wt i pv i pv i mt i MT i Bat BA ii

high wt i wt i pv i pv i mt i MT i Bat BA ii

normal wt i wt i pv i pv i mt i MT ii

P

p P P P Model P

p P P P Model P

p P P P Mode

ηο ο ο ο

ηο ο ο ο

ηο ο ο

− − − − − − −=

− − − − − − −=

− − − − − −=

+ + +

+ + +

+ + +

∑ ]BA iBat BA il Pο

− −

max(Profit)- Maximum generation

η -Failure rate BatModel - Storage running mode

wt iP − - Wind turbine output power -Time section power price wt iο − - Equipment is running or not

24

Objective functions 2 of economic operation—most generation profit

The core technology and achievements – mathematical model

Page 25: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Objective functions 3 of economic operation

24

21

) [ ( ) ( )

+ ( ) ( )]MT BA

wt wt i coal wt i pv pv i coal pv ii

MT i coal MT i BA i coal BA i

CO (emission P C C P C C

P C C P C C

ο ο

ο ο

− − − −=

− − − −

= − + −

− + −

min maxwt wt i wtP P P− − −≤ ≤

min maxpv pv i pvP P P− − −≤ ≤

min maxMT MT i MTP P P− − −≤ ≤

min maxBA BA i BAP P P− − −≤ ≤

Constraints of wind power

Constraints of PV power

Constraints of micro turbine power

Constraints of energy storage power

Function of reducing carbon emission/ Objective function 3

Energy Saving constraints of load

Constraint condition of generated power

min maxnormal normal normalLoad Load Load⋅ ⋅≤ ≤

min maxhigh high highLoad Load Load⋅ ⋅≤ ≤

Constraints of load energy conservation at the trough price

Constraints of load energy conservation at the fair price

Constraints of load energy conservation at the peak price

-Carbon dioxide emissions per 1 KW of coal burn -Carbon dioxide emissions per 1 KW of wind power

25

The core technology and achievements – mathematical model

min maxlow low highLoad Load Load⋅ ⋅≤ ≤

coalC

wt iC −

Page 26: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

26

Identification: Mater station and slave station device have been passed the type test of Cape LABS,including EMC, electrical properties and safety test. It also has been certified as the first major technical equipment by National Innovation Model Zhongguancun Area.

Microgrid transient stable control system

The core technology and achievements – microgrid transient stable control system

Page 27: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

27

Microgrid transient stable control system

The core technology and achievements – microgrid transient stable control system

It has been certified as the first major technical equipment by National Innovation Model Zhongguancun Area.

Page 28: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The core technology and achievements – the core achievements Better power quality

our products promote power quality meet IEC microgrid

standards

With our products Without our products

0 100 200 300 400 500 600 700 800-400

-300

-200

-100

0

100

200

300

400

200 300 400 500 600 700 800 900 1000 1100-400

-200

0

200

400

Through IEC standards the advantage of our product can be verified

10ms

300ms

100ms 20ms

160ms

120ms

Voltage response

Current response

28

Curves of voltage and current at load fluctuation

Page 29: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

What our products can solve

0

0.05

0.1

0.15

4%

7%

15%

29

The core technology and achievements – core achievements

Grid-connected Island Isolated

Reduce the capacity ratio of energy storage

Page 30: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

9%

15%

31%

30

What our products can solve

The core technology and achievements – core achievements

Grid-connected Island Isolated

Page 31: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The new proposal of IEC/TS 62898

was voted for.

31

2013.10@ Rome

2014.6@ Xi An

2014.11@ Tokyo

2015.9@ Milan

2016.6@ Denmark

2016.10@ Frankfurt

The core technology and achievements – international standard IEC TS 62898-1 and 62898-2

Page 32: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The new proposal of IEC/TS 62898

was voted for.

Working group draft

32

2013.10@ Rome

2014.6@ Xi’an

2014.11@ Tokyo

2015.9@ Milan

2016.6@ Denmark

2016.10@ Frankfurt

The core technology and achievements – international standard IEC TS 62898-1 and 62898-2

Page 33: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The new proposal of IEC/TS 62898 was voted for

Working group draft

33

2013.10@ Rome

2014.6@ Xi’an

2014.11@ Tokyo

2015.9@ Milan

2016.6@ Denmark

2016.10@ Frankfurt

Committee Draft 1

The core technology and achievements – international standard IEC TS 62898-1 and 62898-2

Page 34: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The new proposal of IEC/TS 62898

was voted for.

Working group draft

34

2013.10@ Rome

2014.6@ Xi’an

2014.11@ Tokyo

2015.9@ Milan

2016.6@ Denmark

2016.10@ Frankfurt

Committee Draft 1

Committee Draft 2

The core technology and achievements – international standard IEC TS 62898-1 and 62898-2

Page 35: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The new proposal of IEC/TS 62898

was voted for.

Working group draft

35

2013.10@ Rome

2014.6@ Xi’an

2014.11@ Tokyo

2015.9@ Milan

2016.6@ Denmark

2016.10@ Frankfurt

Committee Draft 1

Committee Draft 2

Committee Draft 3

The core technology and achievements – international standard IEC TS 62898-1 and 62898-2

Page 36: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The new proposal of IEC/TS 62898

was voted for.

Working group draft

36

2013.10@ Rome

2014.6@ Xi An

2014.11@ Tokyo

2015.09@ Italy

2016.10@ Frankfurt

2016.06@ Denmark

Committee Draft 1

Committee Draft 2

Committee Draft 4 and

vote Committee Draft 3

The core technology and achievements – international standard IEC TS 62898-1 and 62898-2

Page 37: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The core technology and achievements – international standard IEC TS 62898-3-1

37

Page 38: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

The core technology and achievements – international standard IEC TS 62898-3-1 8/1438/RVN

38

Page 39: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Contents

The development and planning of Goldwind smart energy internet

The introduction of Goldwind microgrid and products

The core technologies and achievements of Goldwind microgrid

The smart energy internet of Goldwid industrial park

The typical cases of Goldwind microgrid project

Page 40: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Grid A existing buildings

Grid A: Etechwin (1# building), Goldwind (2# building), Goldwind university (3# building), above part of power are supplied by grid A.

Power generation: wind turbine 2.5 MW*1+PV 500 kW+ micro turbine 65 kW*2 +diesel 500 kW*1 Energy storage: VRB 200kW*4h+ supercapacitor 200kW*10s+ lithium battery 100kW*1.5h (to be accessed microgrid)

Wind and PV generate power stably sell the redundant electricity to On/Off grid switch if microgrid Transient support of supercapacitor Profit of energy storage between peak price and trough price

The buildings having put into

use PV smart greenhouse

The PV can generates stably.

Grid C exsting buildings

Realized functions

40

The smart energy internet of Goldwind industry park

System configuration

Thin-film PV 71.28kW (to be accessed microgrid)

Page 41: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

Contents

The development and planning of Goldwind smart energy internet

The introduction of Goldwind microgrid and products

The core technologies and achievements of Goldwind microgrid

The smart energy internet of Goldwid industrial park

The typical cases of Goldwind microgrid project

Page 42: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

1

• Active distribution network: to realize the friendly interaction between 1000 kW major support power source and utility grid, including the previous 500 kW diesel, 65kW*2 micro turbine and the new 600 kW micro turbine, forming the CCHP system.

2

• Interconnect grid B (the new big data building) with grid A (microgrid in Etechwin building)

and grid C (PV smart greenhouse), to develop the relevant business on smart energy internet

through smart industrial loads management and efficient power supply.

3

• Establish the integrative energy control management platform (to achieve the intelligent

energy consumption management of industrial electricity, heat, cooling, gas and water , 10%

energy conservation), to provide future commercial project a series of competitive products

and service. 42

The development and planning of Goldwind smart energy internet

Page 43: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

4

• IEC/TS 62898-3-1 Ed.1 Microgrids-Technical Requirements-Protection Requirements in Microgrid

• IEC/TS 62898-2 Ed.1 Technical Requirements for Operation and Control of Microgrids

• IEC/TS 62898-1 Ed.1 Guidelines for general planning and design of microgrids

5 • It replicates business at the base of Dafeng, Jiaze and Beijingaccording to the Goldwind

industrial park, meanwhile radiating its influence across the whole country , Southeast Asia

and Africa.

6 • Include flexible voltage and frequency control system of high permeability new energy within

power distribution network / microgrid dynamic stable control system

43

The development and planning of Goldwind smart energy internet

Page 44: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

44

7

• Isolated combined control technology of micro turbine and energy storage

8 • Transient and dynamic simulation system of microgrid hardware and software

9

• Microgrid + CCHP of micro turbine and diesels + energy conservation + loads monitoring +

integrative energy control management platform of energy internet • integrative loads monitoring system, smart loads and energy conservation analysis system,

new energy generation monitoring system, smart wind power forecasting system, smart PV power forecasting system, integrative energy optimization system

The development and planning of Goldwind smart energy internet

Page 45: Goldwind Smart Microgrid and Industrial Park Smart …microgrid-symposiums.org/wp-content/uploads/2016/asia/12 Asia1... · Goldwind Smart Microgrid and Industrial Park Smart Energy

www.goldwind.com.cn

Thanks 新疆金风科技股份有限公司 XINJIANG GOLDWIND SCIENCE & TECHNOLOGY CO., LTD. 北京金风科创风电设备有限公司 BEIJING GOLDWIND SCIENCE & CREATION WINDPOWER EQUIPMENT CO., LTD.