GSFIC Photo Report page 1

GSFIC Photo Report Report

Number: 4

Project No. GAE-015 Project Name: Horse Arena & Practice Ring EXPANSION

Date: 1-29-09 Contract Compliance

Specialist (Reported by): Billy Carr Project

Manager: Joe Riley

Photo # 61 started erecting steel 1-26-09 #62 form and rebar E end ring wall

#63 rebar radius section ring wall E end #64 SS and tee to N side bldg

#65 roof steel set to line 3 #66 columns line 4 & 5 set both sides

Page 2: GNF ProgressPhotosJan09

GSFIC Photo Report page 2

#67 roof steel to line 3 #68 concrete placed E ring wall radius

#69 SS rough in S. side restrooms

#70 forms wrecked E end ring wall

#71 cable bracing being installed, below tracking #72 roof steel erected to line 6, below tracking fix

Page 3: GNF ProgressPhotosJan09

GSFIC Photo Report page 3

#75 form spread trying to brace moor #76 form for column base cover

#77 wall conduit stub-up

#78 cold joint and honey combs at E side ring wall

blow out

#79 blow-out area wall 3 to 4 inches wider than

existing wall

#80 electrical room conduit stub-up

Page 4: GNF ProgressPhotosJan09

GSFIC Photo Report page 4

#81 grading S side bleacher area

#82 fine grading S. side restrooms