COAL CONCESSION DUE DILLIGENCE

PROJECT EAGLE

28TH APRIL 2010

Page 2: Gmt Coal Presentation 2010

SITUATION MAP

Eagle Project Location : PT. Kencana Wilsa (KW) situated in

Kecamatan Barong Tongkok, PT. Bonboi Central Prima Coal (BCPC)

situated in Kecamatan Muara Lawa, PT. Central Coalindo Utama (CCU)

situated in Kecamatan Damai and Muara Lawa,

PT. Karya Pertama Prima (KPP) situated in Kecamatan Muara Lawa and Kecamatan Bantian Besar,

Kabupaten Kutai Barat, East Kalimantan

Situated 170 km west of Samarinda and 160 km northwest of Balikpapan.

Page 3: Gmt Coal Presentation 2010

FORESTRY MAP

Forestry zonation area:

Most of the concession situated in Other Land Use forestry zonation,

Approximately 60% of PT. Karya Permata Prima situated within Production Forest zonation in the southern and southeastern part.

For Other Land Use areas, no forestry permit required.

Page 4: Gmt Coal Presentation 2010

TOPOGRAPHIC & 3D MAP

Page 5: Gmt Coal Presentation 2010

GEOLOGICAL MAP

PT. KW

- Maragoh Formation

- Alluvial PT. CCU

- Pamaluan Formation

- Pulaubalang Formation

- Kampungbaru Formation PT. BCPC

- Pamaluan Formation

- Pulaubalang Formation

- Kampungbaru Formation PT. KPP

- Pamaluan Formation

- Pulaubalang Formation

Page 6: Gmt Coal Presentation 2010

OUTCROP MAPPING PT. KW

27 outcrops mapped, mainly in central southern area,

Orientation average strike 140/32 and 282/17,

Thickness 20 cm up to > 4 metres, Coal quality:

- TM : 9.10 – 49.28 %

- IM : 6.36 – 19.98 %

- Ash : 2.04 – 4.48 %

- VM : 38.74 – 41.11 %

- FC : 36.80 – 50.49 %

- TS : 0.25 – 1.93 %

- CV : 4,900 – 5,187 kcal/kg adb.

with one sample 7,100 kcal/kg.

- HG : 45 - 63

Page 7: Gmt Coal Presentation 2010

PROPOSED RELINQUISHMENT AREA FOR PT. KW

Page 8: Gmt Coal Presentation 2010

OUTCROP MAPPINGPT. BCPC

47 outcrop mapped, mainly in the southern area,

Orientation average strike 317/25 and 27/32,

Thickness 10 cm up to > 1 metre, Coal quality:

- TM : 6.70 – 29.71 %

- IM : 3.72 – 15.69 %

- Ash : 1.91 – 12.32 %

- VM : 35.04 – 43.22 %

- FC : 40.30 – 50.48 %

- TS : 0.34 – 2.47 %

- CV : 5,084 – 7,512 kcal/kg adb.

- HG : 49 - 71

Page 9: Gmt Coal Presentation 2010

OUTCROP MAPPING PT. CCU

13 outcrops mapped mainly in the southwest and northeast areas close to the concession boundary, Orientation average strike 279/43 and 48/31, Thickness 10 cm up to 78 cm, Coal quality:

- TM : 8.02 – 16.92 % - Ash : 1.69 – 8.74 % - VM : 34.19 – 41.52 %

- IM : 5.18 – 10.59 % - FC : 45.33 – 51.58 % - TS : 0.98 – 4.10 %

- CV : 5,887 – 7,273 kcal/kg adb. - HG : 51 - 69

Page 10: Gmt Coal Presentation 2010

OUTCROP MAPPING PT. KPP

17 outcrops mapped mainly in the western area, some near to the concession boundary, Orientation average strike 356/26 and 11/34, Thickness 10 cm up to 76 cm, No Coal quality data

Page 11: Gmt Coal Presentation 2010

COAL OUTCROP DESCRIPTION

Page 12: Gmt Coal Presentation 2010

COAL OUTCROP DESCRIPTION

Page 13: Gmt Coal Presentation 2010

COAL OUTCROP DESCRIPTION

Page 14: Gmt Coal Presentation 2010

COAL OUTCROP DESCRIPTION

Page 15: Gmt Coal Presentation 2010

COAL OUTCROP DESCRIPTION

Page 16: Gmt Coal Presentation 2010

ORIGINAL DRILL PLAN OF PT. BCPC

Page 17: Gmt Coal Presentation 2010

ACTUAL DRILL PROGRAMME OF PT. BCPC

Page 18: Gmt Coal Presentation 2010

BORE HOLE COMPILATION

Page 19: Gmt Coal Presentation 2010

BORE HOLE COMPILATION

Page 20: Gmt Coal Presentation 2010

BORE HOLE COMPILATION

Page 21: Gmt Coal Presentation 2010

BORE HOLE COMPILATION

Drill hole summary Total hole : 40 holes Maximum depth each hole : 65 meters Total open hole : 2,528.20 meters Total coring : 96.50 meters Total depth : 2,624.70 meters

Page 22: Gmt Coal Presentation 2010

LINES & CROSS SECTION INTERPRETATION