GMR Highways - nhai.org. Status Report... · GMR Highways GMR Kishangarh Udaipur Ahmedabad Expressways

  • View
    224

  • Download
    3

Embed Size (px)

Text of GMR Highways - nhai.org. Status Report... · GMR Highways GMR Kishangarh Udaipur Ahmedabad...

  • GMR Highways project Office:GMR Kishangarh Udaipur Ahmedabad Expressways Limited Rajasthan Regional Chapter. Udaipur Centre. ITP. Opposite Oevendra Oham. Bhuvana. Udaipur 313 001. Rajasthan T +91294 2440185 F +91 294 2440195 Wwww.gmrgroup.in

    Ref: GKUAEL/UDR-SPV /PIU/079 Dated: 09th July 2012

    To The Team Leader MIs Euroestudios, S.L. 13, Machla Magra Scheme, Patel Circle to Kishnapole road Udaipur, Rajasthan

    Subject: Six Laning of Kishangarh-Udaipur-Ahmadabad Section of NH-79A, NH-79, NH-76 and NH-8 including New Udaipur Bypass in the States of Rajasthan and Gujarat (approx. Length 555.500 kms) on DBFOT (Toll) under NHDP Phase V Project- Reg. - Project Status Report Jun 2012

    Ref.: Your letter no. Theme-Euro/UDR/6-lane/GMR/2012-13/58 dated 19.06.12

    Dear Sir,

    With reference to the above stated letter, the status report of the project for the month of

    June' 2012 is herewith enclosed.

    This..is for your information & record please.

    Thanking you and assuring best of cooperation at all times.

    For GMR Kishangarh Udaipur Ahmedabad Expressways Ltd.

    ~ Chandrapal Mehta (General Manager)

    Cc: po, NHAI, lO-A, Panchavati, Udaipur, Rajasthan (For information)

    Regd. Office:

    4th Floor. Birla Tower. 25.

    Barakhamba Road. New OelhHlOOOl

    Corporate Office:

    IBC Knowledge Park. Phase 2.

    "0" Block. 10th Floor. 4/1.

    Airports I Energy I Highways I Urban Infrastructure I Foundation Bannerghatta Road. Bangalore 560 029

    http:19.06.12http:www.gmrgroup.in

  • , ~ ~ GMR Kishangarh - Udaipur - Ahmedabad Expressways Limited Institute of Town Planners, Rajasthan Regional Chapter - Udaipur Center. Opposite Devendra Dham,

    Bhuwana, Udaipur, Rajasthan 313001, Web Site: www.gmr9!.9_llil.Jll

    Appcndix - 'A'

    Progress Report for the Month of June 2012

    1. Condition Precedent Status The details pertaining to Financial Closure have been submitted to your office vide our letter

    21stNo. GKUAEl/UDR-SPV/PIU/074, dated June 2012. Further, the acceptance of NHAI confirming financial closure has also been submitted vide this letter.

    2. Applicable Permits The details pertaining to Applicable Permits have been submitted to your office vide our letter No. GKUAEl/UDR-SPV/PIU/078, dated 04th July 2012. In addition to the details submitted vide our letter, permission from mining department for Samodi mining area & Consent to establish crusher at village- Baran, Tehsil- Banera, Dist. - Bhilwara is herewith enclosed.

    3. Utility Shifting - LT Lines a) Rajasthan State (Ajmer, Bhilwara, Chittorgarh, Udaipur & Dungarpud - Estimates have

    been returned to AVVN l for necessary compliance as per observations of NHAL b) Gujarat State (Sabarkantha & Gandhinagar) - Presently estimates are with IE for

    verification.

    - HT Lines a) Rajasthan State (RVPNL) -NHAI has deposited the processing fees of Rs. 8.5 lacs to RVPNl

    on 30th Apr'12. Survey & Estimates preparation for HT lines by RVPNl is in progress. 20t h b) Gujarat State (GETCO) - NHAI has deposited the processing fee Rs. 2.40 l.acs on

    Feb'2012 to GETCO. After completion of survey by GETCO for all HT lines; GETCO has further requested NHAI to inform about acquisition of land required for shifting of pylons beyond ROW so that estimate can be submitted. NHAI has forwarded the ROW details to GETCO.

    - Water Pipe Line a) Ajmer & Bhilwara - Estimates have been submitted to PIU, Udaipur to forward the same

    to HQ after verification by IE. b) Chittorgarh - Estimate prepared by concerned department and forwarded to NHAI. c) Udaipur - Estimate prepared by concerned department and forwarded to NHAI. d) Dungarpur - Estimate prepared by concerned department and forwarded to NHAI. e) Sabarkantha & Gandhinagar - Estimates have been submitted to PIU, Udaipur to forward

    the same to HQ after verification by IE.

    - Gas Pipe Line

    a) Ajmer - 04 crossing have been identified, NHAI has written letters to GAil, Bharat Gas,

    HPCl & IOCl on 02 nd May'12 to take protective measures. b) Bhilwara, Chittorgarh, Udaipur & Dungarpur - . No gas lines have been identiifed. c) Sabarkantha & Gandhinagar - 05 locations have been identified. Protection '.;'lork fo: on'

    crossing of Gas line at Ch . 507+755 has been completed by GSPl., balance 4 numbers to be shifted/ protected as and when required.

    --- - --.. - -

    www.gmr9!.9_llil.Jll

  • @ ~R GMR Kishangarh - Udaipur - Ahmedabad Expressways Limited Institute of Town Planners, Rajasthan Regional Chapter - Udaipur Center. Opposite Devendra Dham,

    Bhuwana, Udaipur, Rajasthan 313001, Web Site: www.gmr9.l:Q!!Il.,Lo.

    ---- - --- - - ----- ._- -_ .. . .. . . .

    4. Design Status: Attached as Appendix 'B' (Status of Survey & Investigation) & Appendix 'C' (Status of Design & Drawing)

    5. Information Gathered Regarding Status of Land Acquisition: a) Ajmer - Amended 3(a) submitted to CALA for verification. b) Bhilwara - Verified 3(D) from CALA has been submitted to PIU, Udaipur for further action. c) Chittorgarh - 3(D) of Mangalwar Re-alignment has been processed by NHAI, HQ for

    Gazette Publication. d) Udaipur - 3(D) of Udaipur Bypass is under process by NHAI, HQ and shall be forwarded to

    Ministry for Gazette Publication by next week. Verified 3(A) for Additional Land requirement has been forwarded to PIU, Udaipur by CALA.

    e) Dungarpur Verified 3(A) for Additional Land requirement has been forwarded to PIU, Udaipur by CALA.

    f) Sabarkantha - JMS verification for 3(D) for 42 villages out of 45 is completed, balance are in progress.

    g) Gandhinagar - Verified 3(D) for Project Highway land has been forwarded to PIU, Udaipur by CALA for further action.

    h) Additional Land requirement/ assessment for the project highway and faciliti es are in

    progress.

    6. Information Gathered Regarding Status of Forest: a) Ajmer - Case is now reached to the office of PCCF, Jaipur. b) Bhilwara Case is now reached to the office of PCCF, Jaipur. c) Chittorgarh - Case is now reached to the office of PCeF, Jaipur. d) Udaipur (North) - Case is still in the office of DFO, Udaipur North awaiting for the NOC

    from District Collector, Udaipur. e) Udaipur (South) - Case is still in the office of DFO, Udaipur North awaiting for the NOC

    from District Collector, Udaipur. f) Dungarpur - Case is now reached to the office of PCCF, Jaipur. g) Sabarkantha - DFO forwarded the case to CCF, Mehsana for further submission. h) Gandhinagar - DFO forwarded the case to CCF, Gandhinagar for further submission .

    www.gmr9.l:Q!!Il.,Lo

  • Sections I Chainage

    Km. 0 to Km. 555

    Km. 0 to Km. 90

    Km. 90 to Km. 185

    Km. 185 to Km. 309

    Km. 309 to Km. 363

    Km. 363 to Km. 434

    Km. 434 to Km. 555.480

    -------.--.---.----~

    Appendix - ' 8 '

    Status of Survey & Investigation Topogarphic Geo-Tech Pavement

    Design Consultant Survey Investigation Investigation

    CEG-GDC General Design Consultant

    GMR Infrastructure Ltd. 100% Completed . 100% Completed 100% Completed

    Sheladia Associates INC. 100% Completed 100% Completed 100% Completed

    Sheladia Associates INC. 100% Completed 74% Completed 100% Completed

    Feedback Infra 100% Completed 72% Completed 100% Completed

    AECOM 100% Completed 85% Completed 100% Completed

    L&T Ramboll 100% Com pleted 65% Completed 100% Completed

  • Appendix - I C I

    Status of Designs & Drawings Sections I Minor

    TCS Plan & Profile Major Bridge PUP VUP Flyover Interchange CulvertChainage Bridges

    *Submitted/ **Review/ Total **Review/ Total **Review/ Total **Review/ Total **Review/ Total **Review/ Total **Review/ Total **Review/ Total

    **Review

    Km. 0 to Km. 90 Review 59 Kms./ 90 Kms. 1/1 13/16 22/22 4/4 3/3 - 63/105

    Km. 90 to Km. 185 Review 95 Kms.l 95 Kms. - 0/30 27/27 6/6 1/2 - 0/182

    Km. 185 to Km. 309 Review 124 Kms.l 124 Kms. - 12/21 24/25 9/9 2/2 - 53/179

    23 Kms.(UdaipurKm. 309 to Km. 363 Review 1/2 4/14 17/17 4/4 1/1 0/2 28/170Bypass)/54 Kms.

    Km. 363 to Km. 434 Review 31 Kms.l71 Kms. 1/1 1/7 13/13 3/3 7/7 - 1/196

    Km. 434 to Km. Review 121 Kms.l121 Kms. 2/3 0/34 10/10 12/12 8/13 - 16/170

    555.480

    Overall Progress - 453/555.480 5/7 30/122 113/114 38/38 22/28 0/2 161/1002

    * Submitted:- To Independent Engineer ** Review:- Under review by Concessionaire