GLAST LAT Project March 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area GLAST Large Area Telescope: Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower Status Thomas Borden Stanford Linear Accelerator Center Tracker Subsystem Engineer [email protected] Gamma-ray Large Gamma-ray Large Area Space Area Space Telescope Telescope

GLAST LAT ProjectMarch 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower

Embed Size (px)

Citation preview

Page 1: GLAST LAT ProjectMarch 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower

GLAST LAT Project March 24, 2003

3A Tracker Peer Review, WBS 4.1.4 1

GLAST Large Area Telescope:GLAST Large Area Telescope:

Tracker SubsystemWBS 4.1.4

3A: Engineering Model Tower Status

Thomas BordenStanford Linear Accelerator CenterTracker Subsystem Engineer

[email protected]

Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope

Page 2: GLAST LAT ProjectMarch 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower

GLAST LAT Project March 24, 2003

3A Tracker Peer Review, WBS 4.1.4 2

AgendaAgenda

• Tale of Two Towers• Mini Tower• Structural/Thermal Tower• Schedule

Page 3: GLAST LAT ProjectMarch 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower

GLAST LAT Project March 24, 2003

3A Tracker Peer Review, WBS 4.1.4 3

Tale of Two TowersTale of Two Towers

Carbon-Fiber Wall

• Tracker EM consists of Two Towers– Mini-Tower

• Five trays

• 3 full X-Y detector planes

• Flight like flexure attach

– Structural/Thermal

• Full Form and Fit Tower

• Full thermal dissipation

• Vibration and thermal vacuum tested

• Shipped in double container with data logger

Page 4: GLAST LAT ProjectMarch 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower

GLAST LAT Project March 24, 2003

3A Tracker Peer Review, WBS 4.1.4 4

Mini TowerMini Tower

Page 5: GLAST LAT ProjectMarch 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower

GLAST LAT Project March 24, 2003

3A Tracker Peer Review, WBS 4.1.4 5

Structural/Thermal TowerStructural/Thermal Tower

Page 6: GLAST LAT ProjectMarch 24, 2003 3A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3A: Engineering Model Tower

GLAST LAT Project March 24, 2003

3A Tracker Peer Review, WBS 4.1.4 6

ScheduleSchedule

• Mini-Tower trays arrived March 21– Mini Tower in assembly at SLAC– Projected delivery to I&T March 28

• Structural/Thermal Tower scheduled to be delivered to I&T July 1– Bottom Tray Fabrication starting– All other trays complete– Sidewalls material on order– Assembly complete June 1– Vibration testing complete June 10 (LAT-TD-01841)– Thermal vacuum testing complete June 27 (LAT-TD-01842)– Tower shipped to SLAC

• Structural/Thermal Tower delivered with Shipping case and lifting fixture