Dams and Hydropower development in Italy

Giovanni Ruggeri

Page 2: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Hydro

Thermal

Import-Export

Electricity production in Italy

Year

Page 4: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Hydro

Thermal

Import-Export

Page 5: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Hydro

Thermal

Import-Export

• Most favorable sites already exploited

• Vulnerability of the hydroelectricity (dry years)

• Easier access to fossil fuels

• No “American funds” for the hydro equipment

• Increased manpower cost

• Vajont disaster

Page 6: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

12 GW

22 GW

Page 7: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

12 GW

22 GW

Continuous increase of the installed capacity by:

• Updating and Repowering of existing plants (larger generation units, automation)

• New large pumped storage plants (related to nuclear energy plans …):

o Entracque (1200 MW) Edolo (1000); Presenzano (1000); Anapo (600); Taloro (260)

Page 8: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Carefull preservation of historical-architectural values

Page 9: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Hydro-electricity in Italy, today:

• Installed Capacity : ~ 22 GW (~ 6 GW pumped storage plants)

• No. of Plants : ~ 2700 (capacity > 10 MW: ~ 300)

• Production : ~ 50.000 GWh/year (20% of the total)

• Hydroelectric prevailing purpose: ~ 60%of the large dams

Page 10: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Hydro-electricity in Italy, today:

• Installed Capacity : ~ 22 GW (~ 6 GW pumped storage plants)

• No. of Plants : ~ 2700 (capacity > 10 MW: ~ 300)

• Production : ~ 54.000 GWh/year (20% of the total)

• Hydroelectric prevailing purpose: ~ 60%of the large dams

“Minor” contribution, but of paramount importance

-supply-demand gaps,

-sudden fluctuations,

-spinning and non-spinning reserve

- regulation and frequency response

- black start capability

Page 11: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

An outlook to the next future: Needs and Opportunities

• Managing new requirements, minimizing the negative impact :

– flood protection, irrigation, water supply, minimum vital flow, recreational purposes, tourism development, wet land habitat

• Optimizing existing infrastructure:

– Upgrading schemes, extending operational life, mini-hydro to generate the minimum flow, hydropower capabilities at non-power dams, etc.

• GHG, global warming, climate change : interest for renewables, positive attitude also for hydro (also for “large-hydro” …??)

• Increasing contribution from renewable non-programmable sources

Page 12: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Increasing contribution from wind and solar source:

Increasing importance of balancing capacity

.... of hydropower (pumped storage, in particular)

Page 13: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Increasing contribution from wind and solar source:

Increasing importance of balancing capacity

.... of hydropower (pumped storage, in particular)

Pumped Storage

Construction in

Europe, by decades

Page 14: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Future perspectives:

COUPLING OF THE EUROPEAN MARKETS

- Rules

- Networks

Page 15: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Large Dams: ~ 540

(France: ~ 560)

ALPEGERA dam (H=160 m)

Dam Owners:

• Enel Group : 40% of the dams

• Other Hydroelectric Owners: 20% of the dams

Dams in Italy:

Page 16: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Dam Purpose

Page 17: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Dam Purpose

Italy

France

60%

40% 10%

35%

15% 10% 20%

Irrigation Hydropower

Navigation Water supply

Recreational

Page 18: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Dam Type

France

Italy

Concrete Embankment

Page 19: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100% 1

88

0

18

90

19

00

19

10

19

20

19

30

19

40

19

50

19

60

19

70

19

80

19

90

20

00

20

10

Pe

rce

nta

ge o

f d

ams

in o

pe

rati

on

Years

Year of completion

Italy

France

80 80%

80 80 60%

80

Mean Age:

- Italy : 60 years - France : 55 years

Page 20: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0

10

20

30

40

50

60

70

80

90

10

0

11

0

12

0

13

0

14

0

15

0

16

0

17

0

18

0

19

0

20

0

Pe

rce

nta

ge o

f d

ams

in o

pe

rati

on

m

Height

Italy

France

80 80%

80

80 60%

80

Page 21: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100% 0

,01

0,1

1

10

10

0

10

00

Pe

rce

nta

ge o

f d

ams

in o

pe

rati

on

Million m³

Storage Capacity

Italy

France

Page 22: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

Main current need: Maintenance – Rehabilitation

No. of dams subjected to restoration/rehabilitation

- Ageing and degradation

- Obsolete dam design criteria

- Increased or additional loads

- Silting of reservoirs

Page 23: Giovanni Ruggeri - barrages-cfbr.eu · • Vajont disaster . 22 GW 12 GW . 12 GW 22 GW Continuous increase of the installed capacity by: • Updating and Repowering of existing plants

“Obsolete typologies” :

• stone and mortar (61)

• dry stone

• multiple arches/slabs

• hollow gravity dams

In total: more than one hundred (20%)

hollow gravity stone and mortar

multiple arches