23
Gemini Observatory Update Gemini Observatory Update Eric Tollestrup – Eric Tollestrup – Associate Director for Developme Associate Director for Developmen Scot Kleinman – Scot Kleinman – Instrument Program Scientis Instrument Program Scientis Chris Packham – Chris Packham – Gemini Science Committee Gemini Science Committee Doug Simons - Doug Simons - Director Director

Gemini Observatory Update

Embed Size (px)

DESCRIPTION

Gemini Observatory Update. Eric Tollestrup – Associate Director for Development. Scot Kleinman – Instrument Program Scientist. Chris Packham – Gemini Science Committee. Doug Simons - Director. Presentation Outline. Recent Science Highlights. Transition Plan Summary. - PowerPoint PPT Presentation

Citation preview

Page 1: Gemini Observatory Update

Gemini Observatory UpdateGemini Observatory Update

Eric Tollestrup – Eric Tollestrup – Associate Director for DevelopmentAssociate Director for Development

Scot Kleinman – Scot Kleinman – Instrument Program ScientistInstrument Program Scientist

Chris Packham – Chris Packham – Gemini Science CommitteeGemini Science Committee

Doug Simons - Doug Simons - DirectorDirector

Page 2: Gemini Observatory Update

Presentation OutlinePresentation Outline Recent Science HighlightsRecent Science Highlights Transition Plan SummaryTransition Plan Summary InstrumentationInstrumentation

Future Collaboration OpportunitiesFuture Collaboration Opportunities

Page 3: Gemini Observatory Update

3

Measuring the Mass of Measuring the Mass of the Black Hole in M87the Black Hole in M87

Result announced last week at the AAS meeting

Gephardt et al. used NIFS at Gemini-N and VIRUS-P at McDonald to evaluate the various mass contributors to M87 AO fed NIFS used to measure

dynamics of stars in BH vicinity

VIRUS-P used to measure dark matter contribution in halo

BH mass: 6.6x109 Msun

Largest BH in our “neighborhood”

Page 4: Gemini Observatory Update

4

Evidence of Multiple Stellar Evidence of Multiple Stellar Populations in a Globular Populations in a Globular ClusterCluster

Dupree et al. (2010) used PHOENIX on Gemini-S to record high-res NIR spectra of many stars in Omega Centauri

Found that helium abundance is correlated with overall metal abundance and especially with enhancement of light elements such as Al & Na

Helium enhancement is interpreted to be a consequence of second-generation stars formed from enriched material processed by an earlier generation of stars

Page 5: Gemini Observatory Update

5

Jupiter’s Southern Jupiter’s Southern Equatorial Belt Equatorial Belt Reemerging?Reemerging?

Jupiter’s SEB disappeared recently and Gemini has been used as a high-res NIR imaging platform to monitor its reemergence

AO images (H & K) along with tip/tilt corrected M-band images used to probe deep into Jupiter’s atmosphere

Jupiter – M-band

Page 6: Gemini Observatory Update

6

A Very Cool, Nearby A Very Cool, Nearby Brown DwarfBrown Dwarf

Image from the UKIRT Infrared Deep Sky Survey

Page 7: Gemini Observatory Update

7

A Very Cool, Nearby A Very Cool, Nearby Brown DwarfBrown Dwarf

Isolated brown dwarf UGPS 0722-05

Compared with T9 -Deeper absorption

troughsExtreme colors → coolest

BDTeff = 520 K

L = 9x10-7 L Closest known isolated

BDLucas et al. 2010

T9new

Ratio to T9

Page 8: Gemini Observatory Update

8

The Most Massive The Most Massive Galaxy?Galaxy?

In Abell 3827cD galaxy mass From gravitational

lens: M~ 1013 M

10 times X-ray massOngoing merger

with 5 nuclei visible

Carrasco et al. 2010

Page 9: Gemini Observatory Update

9

Transition Transition ProposalProposal

Recently released for comment Gemini’s “Transition Proposal” in response to Gemini Board’s Nov. 2009 directive to “compile an executable operations plan that involves a reduction of 7% to 10% per annum in current O&M expenditures, base-lined to the 2009 revised budget …that shall be phased into place during the period 2011 through 2013.”

This was in response to the UK (STFC’s) withdrawal of funding from a number of ground based astronomy facilities

Page 10: Gemini Observatory Update

10

Boundary Boundary ConditionsConditions

Driven byUK Withdraw

Future Partner Contribution Profile Defined May 2010

Gemini Board

Sch

edule C

ost

Priorities

Priorities To deliver and operate high-quality

instruments that represent the priorities of our community

To provide a high fraction of queue operations with appropriate data quality control, data products, and completion fraction

To have the ability to remotely operate the telescopes

To better interface with the partner community

Page 11: Gemini Observatory Update

11

Transition Proposal Transition Proposal PillarsPillars

Essential component in observatory’s future

Blend of workhorse imagers & spectrometers plus leading edge technologies (AO)

Replace aging instruments, keeping pace with science trends and enabling technologies

Coordinate development plans with other facilities

Require long-term affordable and sustainable operations model

Blend of classical and queue operations demonstrated to – Match historic demands

from the community between classical/queue

Segue to ever growing synoptic/ToO programs

Optimally use laser AO

Nurture time swaps with other facilities, linking with “system” to maximize overall access for community

Instr

um

en

tati

on

Op

era

tion

s

Page 12: Gemini Observatory Update

12

Laser AO at Laser AO at GeminiGemini

Laser AO at both sites will be preserved, consistent with Gemini’s design strength of high performance NIR imaging

Page 13: Gemini Observatory Update

13

FLAMINGOS-2FLAMINGOS-2

GMOS-S CCDsGMOS-S CCDsGPI

GeMS/GSAOIGeMS/GSAOI

Instrumentation for Instrumentation for Gemini-SGemini-S

2011 Commissioning

FLAMINGOS-2 NIR Multi-object

spectrometer & imager

Commissioning GeMS/GSAOI

Multi-conjugate laser AO system plus large format AO imager

2012 Commissioning

Gemini Planet Imager

Possible CCD upgade for GMOS

Combined, this ~$60M influx of new instrumentation will transform Gemini-S

Page 14: Gemini Observatory Update

14

GNIRS on Gemini-NGemini-N 2011A

Gemini-N Gemini-N InstrumentationInstrumentation

2010 GNIRS operational

Science Verification interest was strong with 44 proposals submitted

In 2011A, the first semester GNIRS was offered, ~1/3 of the time allocated at Gemini-N is going to GNIRS

2011 GMOS-N CCD

Upgrade All-sky laser AO

mode for NIFS

New GMOS-N CCDs

All-sky laser AO for NIFS

Page 15: Gemini Observatory Update

15

New Instrument New Instrument DevelopmentDevelopment

High Resolution Optical SpectroscopyHDS

Would like to increase demand/access to this instrument but its access to the Gemini community is limited by constraints of the time exchange program and HDS alone will likely not be enough to meet Gemini demand

Evaluating possibility of routing fiber between Gemini and CFHT to feed ESPaDOnS (R~70K)

Driven in large part by prospect for large amounts of access time and expected speed with which this mode could be developed

Red wavelengths only

New instrument (GOES) will be developed, likely for Gemini-S

RFP released in the next couple of months to determine cost and capabilities

Page 16: Gemini Observatory Update

16

New Instrument New Instrument DevelopmentDevelopment

Beyond high-res optical spectroscopy, we are examining options to start other new instruments as part of our new budget Planning start-ups of new instruments through 2015 Anticipate $4-5M/yr for new instruments

Will be discussed during the next Gemini Science Committee meeting in April (Hilo) Would like Japanese involvement in that meeting to help

define Subaru/Gemini community interests and identify development collaboration opportunities

Some possibilities include – Ground Layer AO system (GLAO) New wide field/AO NIR imager High-res NIR spectrometer X-shooter like instrument

Page 17: Gemini Observatory Update

17

MIR MIR ConsolidationConsolidation

As part of reducing our costs Gemini will likely consolidate its MIR capabilities on a single telescope MIR capabilities are fairly complex and expensive to

maintain (chopping) Demand has been historically small compared to other

instruments/modes offered, so hard to justify investment at current levels given our budget constraints

Balancing “4+AO” on each telescope, combined with the superiority of Mauna Kea as a MIR site, leads to Gemini-N being the preferred site of future MIR capabilities at Gemini

Not clear yet if we would use MICHELLE or T-ReCS at Gemini-N

Debated within GSC and aware of implications for MIR science at Gemini-S (ALMA follow-up)

Significant overlap in sky coverage between Gemini-N/S will help mitigate this

Page 18: Gemini Observatory Update

18

Forward Look at Forward Look at Instrument DeploymentInstrument Deployment

Possible Instrument Line Up (~2012)Gemini-N Gemini-S

GNIRS (available 2011A) FLAMINGOS-2 (starting 2011)

GMOS-N (upgraded 2011A) GMOS-S (upgraded 2011?)

NIFS GSAOI (commissioned 2011)

T-ReCS or MICHELLE ? NICI (replaced by GPI in 2012)

ALTAIR (replaced by GeMS-N or GLAO?) GeMS

Yellow = long term future/need, Red = short term (few years) future

• Note that NIRI is not on this list, will decommission in a few years• Will seek GSC endorsement of replacement GN instrument (NIR imager?) at the next GSC meeting

Page 19: Gemini Observatory Update

19

Blend of Operating Blend of Operating Modes Remain in Modes Remain in Gemini’s FutureGemini’s Future

A blend of classical and queue based operations will be provided, recognizing the attributes and historic demands of both approaches

To reduce costs Gemini’s queue will be run primarily with non-research staff Reduced PhD core will

handle queue coordination and classical programs

We will be developing innovative modes in the future as well…

% o

f Tim

e D

em

an

d

Page 20: Gemini Observatory Update

20

A Portal on our A Portal on our Future?Future?

Keck• Waimea remote op’s•California remote Op’s• Staff on mountain

UH 88”• Honolulu/Hilo remote op’s• No staff on mountain

IRTF• Remote op’s via VPN from essentially anywhere• Staff on mountain

CFHT• Remote op’s from Waimea since 1 Jan 2011• No staff on mountain

UKIRT• Remote op’s from Waimea since 1 Jan 2011• No staff on mountain

Page 21: Gemini Observatory Update

21

Nominal Timeline for Nominal Timeline for Developing Base Developing Base Facility Op’sFacility Op’s

2010 2011 2012 2013 2014

Start Design Phase

End Design Phase

End Fabrication Phase

End GN Install & Trial Period

End GS Install & Trial Period

New Sci-Op’s S/W

Ready

SSA & DAS Cross Training

Done

Start New Sci-Op’s

S/W Project

Base FacilityOperations Begins

N S

Page 22: Gemini Observatory Update

22

Eavesdropping, Remote Eavesdropping, Remote Observing, & Building Observing, & Building Community BridgesCommunity Bridges

Page 23: Gemini Observatory Update

Exploring the Universe, Sharing its Wonders