12

GCF Site Analysis

Embed Size (px)

Citation preview

Page 1: GCF Site Analysis
Page 2: GCF Site Analysis
Page 3: GCF Site Analysis

View south towards Ping Tom park. The area through which lanterns will proceed to this point does not articulate strongly with the water.. The Fire started a few blocks to screen right. Incineration point?

Page 4: GCF Site Analysis

View north from the same point. The scene once the lanterns move north of the Congress Drive bridge becomes dramatically more urban and “downtown”

Page 5: GCF Site Analysis

View East from Wolf Point.

Page 6: GCF Site Analysis

Wolf Point (Overhead)

Page 7: GCF Site Analysis

View down South Branch from Wolf Point

Page 8: GCF Site Analysis

Riverwalk SystemsSomewhat underutilized, wide (usually 30 ft., sometimes smaller)causeways

Page 9: GCF Site Analysis

• Vietnam Veteran’s Park (Main Branch)

Page 10: GCF Site Analysis

North Riverside Park (North Branch – Kinzie and Ontario)

Page 11: GCF Site Analysis
Page 12: GCF Site Analysis

Boat/Flotilla Access

River bank draft usually between 6 – 10 ft.River Width ~ 170 ft. (turning basin wider)