INTRODUCTION

GASCO intends to build four new

LPG Filling Plants in the areas of� Jizan

٢

� Jizan

� Hail

� Al- Ahsa and

� Tabuk

Page 3: Gasco Lpg Refuelling Plant

About the Owner

� Gasco was founded in 1974 by merging 4 LPG filling and distribution

companies under the name of National Gas & Industrialization

company (GASCO).

� It is the only LPG filling and distributor company in Saudi Arabia. It

does not have a direct collaboration in LPG business.

٣

� It sells over 2 million cubic meters of LPG with a turnover of about

1.5 billion Saudi Riyals a year.

� Operate 7 filling plants, two operation departments, one cylinder

maintenance workshop over the Kingdom of Saudi Arabia, a fleet of

400 semi trailers in addition to 100 bobtails for LPG tanks refilling

supported by about 2000 employees of which 85% are Saudi.

Page 4: Gasco Lpg Refuelling Plant

About the Consultant

• INGAS is an engineering company based

in France. It provides the consultation and

the engineering work in LPG field

٤

• Today Mr. Xavier Fontova is representing

INGAS

Page 5: Gasco Lpg Refuelling Plant

About the Contractor

?????

٥

Page 6: Gasco Lpg Refuelling Plant

Locations

•TABUK

•Hail

Existing plants

٦

•Jizan

•Al-Ahsa

New plants

Page 7: Gasco Lpg Refuelling Plant

Locations

٧

Area in possession of GASCO in each site is:114,000 m² approximately (380 x 300 m).

Concrete buildings 3000m2Concrete buildings 3000m2

Steel structures 3500m2

Asphalt area 50000m2

Page 8: Gasco Lpg Refuelling Plant

Plant Lay Out

٨

Page 9: Gasco Lpg Refuelling Plant

Components of

Main AreaMain components of each plant will mainly consist of

the following:

� LPG mounded storage tanks area

� LPG loading and unloading area

٩

� LPG loading and unloading area

� LPG pumps, compressors, pneumatic, firefighting, water

� LPG cylinder filling hall

� Stock yard for handling (Empty and filled LPG cylinders)

� Stock yard (cylinders for maintenance & scrapping)

Page 10: Gasco Lpg Refuelling Plant

Scope of Work

Scope of work, including, but not limited to the following:

� Detailed Designing & Engineering

� Manufacturing

� Transportation

١٠

� Transportation

� Installation, Testing and Commissioning

� Training

� Safety & Security

� Documentation

Page 11: Gasco Lpg Refuelling Plant

Scope of Work(contd..)

Complete project design as follows:

� Process and Plant Design

� Final P&I and P&F diagrams

� Civil, Mechanical & Electrical works

١١

� Storage tanks

� Piping for LPG, pressurized air, industrial and potable

water

� Electrical works

� Instrument and Machinery

� safety installation & fire fighting

Page 12: Gasco Lpg Refuelling Plant

Scope of Work(contd..)

Complete detailed engineering design is required i.e. it should

include, but not limited to the following :

� Plot plans and locations

١٢

� LPG tanks & Water tanks

� All civil works inclusive of structural steel works

� Piping inclusive of all supports and ancillaries

Page 13: Gasco Lpg Refuelling Plant

Scope of Work(contd..)

Complete detailed engineering design is required i.e. it should include,

but not limited to the following :

� Electrical inclusive of grounding and protection systems

� PA/GA system

١٣

PA/GA system

� Fire fighting system & CCTV

� Instruments & Machinery

� Painting, coating and protecting of all surfaces

� Adequate air conditioning for Class A & B buildings

Page 14: Gasco Lpg Refuelling Plant

Scope of Work(contd..)

Utilities:

� Infrastructure for communication

� Power, control and lighting distribution

� Industrial and potable water system

١٤

� Industrial and potable water system

� Sewers with septic tank and water

treatment

� Plant for black water and dispersing pit for

rainfall and domestic use

Page 15: Gasco Lpg Refuelling Plant

Main Entrance

١٥

Page 16: Gasco Lpg Refuelling Plant

Main Entrance

١٦

Page 17: Gasco Lpg Refuelling Plant

Admin Building

١٧

Page 18: Gasco Lpg Refuelling Plant

Cylinder Stock Yard

١٨

Page 19: Gasco Lpg Refuelling Plant

Cylinder Stock Yard

١٩

Page 20: Gasco Lpg Refuelling Plant

Filling Hall Carousel

٢٠

Page 21: Gasco Lpg Refuelling Plant

Filling Hall Carousel

٢١

Page 22: Gasco Lpg Refuelling Plant

Loading/Unloading Area

٢٢

Page 23: Gasco Lpg Refuelling Plant

Loading/Unloading Area

٢٣

Page 24: Gasco Lpg Refuelling Plant

Mounded Tanks

٢٤

Page 25: Gasco Lpg Refuelling Plant

Mounded Tanks

٢٥

Page 26: Gasco Lpg Refuelling Plant

LPG Pump & Compressor Area

٢٦

Page 27: Gasco Lpg Refuelling Plant

Date of Call of

Tenders

• Expected time for call of tenders

• March 2011

٢٧

• March 2011

Page 28: Gasco Lpg Refuelling Plant

Thank you for your time and good luck