90
Agency Name Grantee Appropriation Name FY10 HB0312 and SB1221 SoS Statewide - Grants to public libraries for permanent improvements 50,000,000 Agriculture Agriculture-Statewide-Grants to Soil and Water Conservation Districts 2,612,500 Agriculture Agriculture-Statewide-Grants to Soil and Water Conservation Districts 2,612,500 Agriculture Illinois State Fairgrounds-Springfield-Sangamon County-Various projects 600,000 Agriculture DuQuoin State Fairgrounds-Perry County-Various projects 250,000 CMS Statewide - For Infrastructure Improvement, Hardware and Shared Services 13,500,000 DCEO Argonne National Laboratory - Argonne - Grant for the Advanced Protein Crystallization Facility 13,000,000 DCEO Fermilab - Batavia - Illinois Accelerator Research Center 17,000,000 DCEO University of Illinois - Urbana-Champaign - Petascale Computing Facility 60,000,000 DCEO Statewide - Port Development Revolving Loan Program - For grants and loans pursuant to 30 ILCS 750/9-11 3,000,000 DCEO Statewide- River Edge - Brownfield Redevelopment Program 25,000,000 DNR Grant to Chain O'Lakes-Fox River Waterway Management Agency for operating expenses 150,000 DNR Statewide-Boat Access Area Development Grants - assist. to local government agencies for public boat and canoe access areas; reimbursement up to 100% of construction costs 90% of land acquisition 725,000 DNR Statewide-Snowmobile Trails (Local Government) Grants - up to 50% reimbursement of approved facility development/rehabilitation costs and 90% of approved trail corridor land acquisition costs for public snowmobile trails and areas in the state 120,000 DNR Statewide-Boating Infrastructure Grant Program (Big-P) - federally supported program provides up to 75% funding for approved cost of developing transient boater storm shelters, way stations or fishing and recreational facilities 75,000 DNR Statewide - Grants to parks and recreational units 150,000,000 DNR Statewide-Program for acquisition, development and maintenance of public bike paths on state lands and provide portion of cost share for federal SAFETEA-LU related projects 750,000 DNR Statewide-Recreational Trails Program - Develop and maintain recreational trails and related projects and issue grants for similar projects per the federal Intermodal Surface Transportation Act 2,000,000 DNR Statewide-Attracting waterfowl and improve public migratory waterfowl areas 500,000 DNR Statewide-Bicycle Path Grant Program to local units of government to assist in acquisition, construction, and rehabilitation of public nonmotorized bicycle paths; provides up to 50% funding assistance of approved project costs 3,000,000 DNR Statewide-Maintenance of sites 2,000,000 DNR Statewide-Rural Community Fire Protection Programs 325,000 DNR Statewide-Snowmobile Trails (Nonprofit Clubs/Organizations) - grants to construct, maintain and rehabilitate snowmobile trails and facilities on public lands, road right-of-ways, or private lands open to public use 80,000 DNR Statewide-North American Waterfowl Management Plan 144,000 DNR Statewide-Migratory waterfowl restoration 144,000 DNR Statewide-Federal 50% reimbursement grant-in-aid program for state outdoor recreation planning, acquisition and development initiatives and grants to local units of government for land acquisition projects for public outdoor recreation purposes 6,200,000 DNR Statewide-Grants for Off-Highway Vehicle Trails - Grants to government agencies, not-for-profit organizations, and other eligible groups or individuals to develop, operate, maintain, and acquire land for OHV facilities that are open to the public 600,000 DNR Statewide-Conservation of pheasants per Section 5/1.31 of the Wildlife Code 495,000 DNR Statewide-Preservation and maintenance of High Quality Habitat Lands 1,215,000 DNR Statewide-Preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series License Plates 225,000 DNR Statewide-Conservation of furbearing mammals per Section 5/1.32 of the Wildlife Code 99,000 DNR Statewide-Acquisition, preservation and stewardship of natural areas 3,000,000 FY2010 Capital New Appropriations - HB0312 and SB1221

FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

SoS Statewide - Grants to public libraries for permanent improvements 50,000,000

Agriculture Agriculture-Statewide-Grants to Soil and Water Conservation Districts 2,612,500

Agriculture Agriculture-Statewide-Grants to Soil and Water Conservation Districts 2,612,500

Agriculture Illinois State Fairgrounds-Springfield-Sangamon County-Various projects 600,000

Agriculture DuQuoin State Fairgrounds-Perry County-Various projects 250,000

CMS Statewide - For Infrastructure Improvement, Hardware and Shared Services 13,500,000

DCEOArgonne National Laboratory - Argonne - Grant for the Advanced Protein Crystallization Facility 13,000,000

DCEO Fermilab - Batavia - Illinois Accelerator Research Center 17,000,000

DCEO University of Illinois - Urbana-Champaign - Petascale Computing Facility 60,000,000

DCEOStatewide - Port Development Revolving Loan Program - For grants and loans pursuant to 30 ILCS 750/9-11 3,000,000

DCEO Statewide- River Edge - Brownfield Redevelopment Program 25,000,000

DNRGrant to Chain O'Lakes-Fox River Waterway Management Agency for operating expenses 150,000

DNR

Statewide-Boat Access Area Development Grants - assist. to local government agencies for public boat and canoe access areas; reimbursement up to 100% of construction costs 90% of land acquisition 725,000

DNR

Statewide-Snowmobile Trails (Local Government) Grants - up to 50% reimbursement of approved facility development/rehabilitation costs and 90% of approved trail corridor land acquisition costs for public snowmobile trails and areas in the state 120,000

DNR

Statewide-Boating Infrastructure Grant Program (Big-P) - federally supported program provides up to 75% funding for approved cost of developing transient boater storm shelters, way stations or fishing and recreational facilities 75,000

DNR Statewide - Grants to parks and recreational units 150,000,000

DNR

Statewide-Program for acquisition, development and maintenance of public bike paths on state lands and provide portion of cost share for federal SAFETEA-LU related projects 750,000

DNR

Statewide-Recreational Trails Program - Develop and maintain recreational trails and related projects and issue grants for similar projects per the federal Intermodal Surface Transportation Act 2,000,000

DNR Statewide-Attracting waterfowl and improve public migratory waterfowl areas 500,000

DNR

Statewide-Bicycle Path Grant Program to local units of government to assist in acquisition, construction, and rehabilitation of public nonmotorized bicycle paths; provides up to 50% funding assistance of approved project costs 3,000,000

DNR Statewide-Maintenance of sites 2,000,000

DNR Statewide-Rural Community Fire Protection Programs 325,000

DNR

Statewide-Snowmobile Trails (Nonprofit Clubs/Organizations) - grants to construct, maintain and rehabilitate snowmobile trails and facilities on public lands, road right-of-ways, or private lands open to public use 80,000

DNR Statewide-North American Waterfowl Management Plan 144,000

DNR Statewide-Migratory waterfowl restoration 144,000

DNR

Statewide-Federal 50% reimbursement grant-in-aid program for state outdoor recreation planning, acquisition and development initiatives and grants to local units of government for land acquisition projects for public outdoor recreation purposes 6,200,000

DNR

Statewide-Grants for Off-Highway Vehicle Trails - Grants to government agencies, not-for-profit organizations, and other eligible groups or individuals to develop, operate, maintain, and acquire land for OHV facilities that are open to the public 600,000

DNR Statewide-Conservation of pheasants per Section 5/1.31 of the Wildlife Code 495,000 DNR Statewide-Preservation and maintenance of High Quality Habitat Lands 1,215,000

DNR

Statewide-Preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series License Plates 225,000

DNRStatewide-Conservation of furbearing mammals per Section 5/1.32 of the Wildlife Code 99,000

DNR Statewide-Acquisition, preservation and stewardship of natural areas 3,000,000

FY2010 Capital New Appropriations - HB0312 and SB1221

Page 2: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DNR

Statewide - Open Space Lands Acquisition and Development (OSLAD) grants to local governments for acquisition and/or development of land for public parks and open space; funding assistance up to 50% of approved project 17,000,000

DNRStatewide-Construction and renovation of waste reception facilities for recreational boaters and grants per Clean Vessel Act 100,000

DNRStatewide-US Forest Service Programs - provides pass through payments to counties containing National Forests in lieu of property taxes 500,000

DNR Statewide - Grants to public museums for permanent improvements 50,000,000

DNR

Statewide - Development of Boating Access Facilities on state-owned bodies of water and at state-owned properties along the major rivers; program receives 75% federal reimbursement of costs for projects 1,500,000

DNR

Statewide-North American Waterfowl Management Plan - for the protection and/or development of waterfowl areas in Canada or the United States that provide waterfowl for the Mississippi Flyway 100,000

DNR Statewide-Illinois River Basin Conservation Reserve Enhancement Program 45,000,000

DNR

Statewide-State Match for Corps Projects - Projects under Federal Water Resources Development Act authorities for CORPS ecosystem restoration projects require a 25% to 35% non-federal match 14,950,000

DNR

Statewide-Timber Growers Forestry Management Practices - cost-sharing grants to forest owners for management practices, including reforestation, vegetation control, thinning, pruning, and fencing to exclude livestock 625,000

DNR Statewide-Forest Stewardship Technical Assistance 300,000

DNRStatewide-Multiple Use Facilities (park and trail purposes) - provides state match for federal Recreational Trails Program projects on Department sites 150,000

DNRLake County-Rehabilitation, Reconstruction, Repair, Replace Fixed Assets and Improve Facilities at North Point Marina 375,000

DNRStatewide-Landowner Grant Program authorized under the Illinois Oil and Gas Act, as amended by PA 90-0260 110,000

DNRStatewide-Grants and contract to conduct research, planning and construction to eliminate hazards of abandoned mines 1,500,000

DNRStatewide-Grants and contract to conduct research, planning and construction to eliminate hazards of abandoned mines 6,000,000

DNRWater resource management projects as authorized by subsection (g) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 42,015,000

DNRWater resource management projects as authorized by subsection (g) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 40,500,000

DNR Statewide-Disbursements of federal flood control monies to counties 800,000

DNR Federal Recovery - For the Purpose of Advancing Forestry Resources in Illinois 15,000,000

IDOT Statewide - Permanent Improvements to IDOT facilities 5,400,000

IDOT Statewide - Disposal of Hazardous Materials 1,158,600

IDOT Statewide - Maintenance, Traffic and Physical Research/Formal Contract (A) 30,129,100

IDOT Statewide - Motorist Damage to Highway Structures 5,500,000

IDOT Statewide - Maintenance, Traffic and Physical Research/Formal Contract (B) 13,150,000

IDOT Statewide - Township Bridge 15,000,000

IDOT Statewide - Apportionment to Needy Road Districts And Townships 10,014,300

IDOT Statewide - Apportionment to High Growth Cities 4,000,000

IDOT Statewide - Apportionment to Counties Under One Million in Population 21,800,000

IDOT Statewide - Transportation and Related Construction 2,801,433,698

IDOT

Grants to counties, muni. And road districts for planning, engineering, acquisition, construction, reconstruction devel, improvement, extension and all construction related expenses 500,000,000

IDOT Statewide - Transportation and Related construction 930,000,000

IDOT State Wide Road Improvements- Local Share of Road fund/Road Program 499,185,700

IDOT Statewide - Transportation and Related construction 95,000,000

IDOT Statewide - Transportation and Related Construction 310,000,000

IDOT Statewide - Installation of Grade Crossing Protection or Grade Separations 39,000,000

Page 3: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

IDOT Statewide - Financial Assistance to Airports (Federal and Local share) 137,000,000

IDOT Statewide - Grants for Air Navigation 20,000,000

IDOT Northeastern Illinois - Federal Pass Through Funding for C.R.E.A.T.E Program 20,000,000

IDOT Downstate - Public Transit - Transportation Grants 200,000,000

IDOT Public Transit - Transportation Grants 1,800,000,000

IDOT Northeastern Illinois - Federal Pass through funding for C.R.E.A.T.E program 300,000,000

IDOTStatewide - Grant for the Federal Share of Capital, Operating, Consultant Services, and Technical Assistance 16,000,000

IDOT Statewide - Rail Freight Loan Repayment Program (State) 2,700,000

IDOT Funding for state's share of Intercity Rail passenger Service (Amtrak) 150,000,000

IDOT Statewide - Rail Freight Loan Repayment Program (Federal) 1,045,000

CDB

Statewide - For Misc Capital Improvements Including Construction, Capital Facilities, Cost of Planning, Supplies, Equipment, Materials, and All Other Expenses Required to Complete Work at the Various Private Colleges and Universities 300,000,000

CDB Statewide - School Construction Grants 1,351,481,696 CDB Statewide - For School Maintenance Grants 100,000,000 CDB Statewide - Capital Renewal Funds for Universities 62,677,200 CDB Statewide - For Higher Education Escalation and Emergencies 25,000,000 CDB Statewide - Community Health Center Construction Grants 50,000,000 CDB Statewide - Emergency Repairs and Hazardous Material Abatement 10,000,000 CDB Statewide - Escalation of State Facilities Projects 17,000,000

CDBChicago Medical Center - Cook County - Install Emergency Generator/Upgrade Electrical System 2,000,000

CDBJames R. Thompson Center - Chicago - Cook County - Plan/Begin Electrical System/Life Safety Upgrades 1,000,000

CDBJames R. Thompson Center - Chicago - Cook County - HVAC Renovation and Upgrade 4,150,000

CDB Elgin Regional Office Building - Kane County - Upgrade HVAC System 2,461,000

CDB Collinsville Regional Office Building - Madison County - Replace Roof 1,980,000

CDB Statewide - Renovation of State-Owned Space 2,000,000 CDB Illinois State Fairgrounds - Sangamon County - Electrical System Upgrade 600,000

CDBIllinois State Fairgrounds - Sangamon County - Replace Administration Building Roof 2,220,472

CDB Centralia - Animal Diagnostics Lab - Clinton County - Replace Roof 615,000

CDBIllinois State Fairgrounds - Sangamon County - Replace HVAC in Administration Building 3,212,000

CDB Chicago State University - Cook County - Renovation of Douglas Hall 19,500,000

CDB Chicago State University - Cook County - Early Childhood Development Center 3,000,000

CDB Chicago State University - Cook County - Convocation (Robinson) Center 5,000,000

CDB Eastern Illinois University - Coles County - Equipment for Fine Arts Center 1,650,000

CDB Eastern Illinois University - Coles County - HVAC Life Sciences and Coleman Hall 4,757,100

CDB Governors State University - Will County - Teaching/Learning Complex 8,000,000

CDB Governors State University - Will County - Campus Roadway Improvements 2,028,000

CDB Northeastern Illinois University - Cook County - Construct Education Building 72,977,200 CDB Big River State Forest - Mercer County - ADA Improvements 322,611 CDB Nauvoo State Park - Hancock County - ADA Improvements 328,385

CDB Wayne Fitzgerrell State Recreation Area - Franklin County - Roof replacements 262,004 CDB Lincoln's Tomb - Springfield - Sangamon County - Interior Restoration 700,000

CDBJake Wolf Memorial Hatchery - Mason County - Replace/Upgrade Electrical Service 348,000

CDB Illinois Beach State Park - Lake County - Shoreline Stabilization 1,000,000

CDB Sparta World Shooting Complex - Randolph County - Infrastructure Improvements 450,000 CDB Giant City State Park - Replace Sewer Treatment System 491,040

Page 4: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

CDBPyramid State Park - Perry County - Renovate Galum Building For Mine Rescue Station 848,000

CDB Starved Rock State Park & Lodge - LaSalle County - Replace Roofing Systems 500,000

CDB Rock Cut State Park - Winnebego County - Rehabilitate Water & Sewer Systems 350,000

CDBLincoln-Herndon Law Office Historic Site - Springfield - Sangamon County - Purchase and Restore Tinley Shop 1,000,000

CDB I&M Canal - Channahon - Grundy County - Repair DuPage River Spillway 364,320 CDB Illinois Youth Center - Pere Marquette - Jersey County - Replace Roof 221,000 CDB Illinois Youth Center - St. Charles - Kane County - Upgrade HVAC 606,000 CDB Illinois Youth Center - Joliet - Will County - Replace Roofs 425,874 CDB Illinois Youth Center - Kewanee - Henry County - Replace Sprinkler System 6,500,000

CDB Vandalia Correctional Center - Fayette County - Replace roofing systems 2,343,000

CDBSouthwestern Illinois Correctional Center - St. Clair County - Replace Roofing Systems 825,000

CDBCentralia Correctional Center - Clinton County - Replace Roofing Systems - Facility-Wide 3,333,000

CDB Vienna Correctional Center - Johnson County - Replace Windows 2,118,000

CDB Jacksonville Correctional Center - Morgan County - Upgrade Fire Alarm System 1,596,000

CDB Vandalia Correctional Center - Fayette County - For an Emergency Generator 815,000

CDB Dixon Correctional Center - Lee County - Replace Fire Alarm System 3,300,000

CDB Stateville Correctional Center - Joliet - Will County - Replace X House Locks 1,597,000

CDB Logan Correctional Center - Logan County - Replace Housing Unit Roofs 829,000

CDB Lincoln Correctional Center - Logan County - Upgrade Fire Alarm System 2,147,000

CDBVienna Correctional Center - Johnson County - Replace Roofs on Various Buildings 940,000

CDBWestern Illinois University - Rock Island County - Construct Quad-City Riverfront Campus 15,863,120

CDBWestern Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768

CDB Capitol Complex - Springfield - Capital Upgrades 250,000,000

CDB Illinois State Library - Springfield - Sangamon County - Replace Roofing System 528,000

CDB Capitol Complex - Springfield - Sangamon County - Upgrade Fire Alarm Panels 771,000

CDBCapitol Complex - Springfield - Sangamon County - Plan/Begin Upgrade of High Voltage Distribution System 1,500,000

CDBHowlett Building - Springfield - Sangamon County - Upgrade North Patio for Public Safety 461,000

CDB Howlett Building - Springfield - Sangamon County - Replace Roofing Systems 662,000

CDBDrivers Services Facilities West, North, and South - Chicago - Cook County - HVAC Upgrades 2,074,000

CDB Howlett Building - Springfield - Sangamon County - Install Emergency Generator 791,000

CDB Illinois State University - Mc Clean County - Renovation of the Visual Arts Center 54,250,100

CDBAttorney General Building - Springfield - Sangamon County - Renovate/Waterproof Terrace 190,000

CDB Attorney General Building - Springfield - Sangamon County - Replace Roof 378,000

CDBAttorney General Building - Springfield - Sangamon County - Replace Electronic Balasts 959,000

CDBKiley Development Center - Waugkegan - Lake County - Upgrade Building C Ceiling 444,000

CDB Choate Mental Health Center - Anna - Union County - Life Safety Improvements 7,296,000

CDBMcFarland Mental Health Center - Springfield - Sangamon County - Upgrade Fire Alarm System 2,800,000

CDBIllinois School for the Visually Impaired - Jacksonville - Morgan County - Replace Roofing Systems 392,832

CDBChicago-Read Mental Health Center - Cook County - Replace Emergency Generator 1,391,000

CDBMcFarland Mental Health Center - Sangamon County - Replace Roofs - Kennedy and Administration Buildings 2,226,000

CDB Fox Developmental Center - Dwight - Livingston County - Upgrade Life/Fire Safety 353,000 CDB Jacksonville Developmental Center - Morgan County - Upgrade Life/Fire Safety 581,000 CDB Alton Mental Health Center - Madison County - Life Safety Improvements 932,000

CDB Choate Mental Health Center - Anna - Union County - Upgrade Fire Alarm System 2,085,000

CDBIllinois School for the Deaf - Jacksonville - Morgan County - Install Sprinkler Systems in Dormitories and Elementary Building 3,841,000

Page 5: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

CDBNorthern Illinois University - DeKalb County - Plan Computer Science and Technology Center 2,787,400

CDBNorthern Illinois University - De Kalb County - Renovation and Expansion of Stevens Building 22,517,600

CDBCapitol Building - Springfield - Sangamon County - Renovation of HVAC and ADA Compliance - Phases II and III 43,761,500

CDBCapitol Building - Springfield - Sangamon County - Upgrade Life/Safety Phases II and III 6,000,000

CDB SIU - Edwardsville - Madison County - Construct Science Lab 78,867,300

CDB SIU - Carbondale - Jackson County - Morris Library Equipment 17,564,400

CDB SIU - Carbondale - Jackson County - Communications Building 4,255,400

CDBSIU - Carbondale - Jackson County - Construct Transportation and Education Center 56,718,792

CDBShiloh, Mt. Vernon, and Carbondale Armories - St. Clair, Jefferson, and Jackson Counties - Complete Construction/Purchase Equipment 400,000

CDBIllinois Math and Science Academy - Aurora - Kane County - Main Building Addition and Residence Halls' renovations 6,260,000

CDBIllinois Math and Science Academy - Aurora - Kane County - "A" Wing Laboratories Remodeling 3,600,000

CDBUniversity of Illinois - Chicago - Cook County - Campus Infrastructure (College of Dentistry) 20,800,000

CDBUniversity of Illinois - Urbana/Champaign - Champaign County - Renovate Lincoln Hall 57,304,000

CDBUniversity of Illinois - Urbana/Champaign - Champaign County - Construct Post Harvest Crop Research Facility 20,034,000

CDBUniversity of Illinois - Urbana/Champaign - Champaign County - Construct Computer and Engineering Facility 44,520,000

CDBUniversity of Illinois - Rockford - Winnebago County - Construct National Rural Health Center 14,820,000

CDBTemporary Facilities Replacement - William Rainey Harper College - Hospitality Facility 3,944,800

CDBTemporary Facilities Replacement - Lake Land College - Workforce Relocation Center 9,881,700

CDB Rock Valley College- Arts Instructional Building 26,711,900

CDB College of Lake County- Student Services/Library 35,927,000

CDB Statewide- Illinois Community College Board- Capital Renewal 27,322,800

CDBTemporary Facilities Replacement - College of Lake County - Classroom Building at the Grayslake Campus 17,569,200

CDBTemporary Facilities Replacement - IECC - Lincoln Trail College - AC/Refrigeration and Sheet Metal Technology Building 1,495,500

CDBTemporary Facilities Replacement - Illinois Central College - Dirksen Hall Renovation and Addition 2,633,700

CDB Temporary Facilities Replacement - McHenry County College - Greenhouse 671,600

CDB Temporary Facilities Replacement - McHenry County College - Pumphouse 115,900

CDB Temporary Facilities Replacement - Spoon River College - Multi-Purpose Building 4,027,100

CDBTemporary Facilities Replacement - Illinois Valley Community College - Community Technology Center 6,521,700

CDBTemporary Facilities Replacement - Lincoln Land Community College - Logan Hall and Mason Hall Renovations 2,991,200

CDB Temporary Facilities Replacement - IECC - Wabash Valley - Student Center 4,029,400

CDBTemporary Facilities Replacement - Lewis & Clark Community College - Daycare and Montessori 1,663,000

CDBTemporary Facilities Replacement - Lewis & Clark Community College - Engineering Annex 1,536,600

CDBTemporary Facilities Replacement - Parkland College - Applied Technology Addition 9,180,600

CDB IECC Lincoln Trail College - Crawford County - Center for Technology 7,569,800

CDB

Temporary Facilities Replacement - Olive Harvey College - Construction of a New Building

30,671,600

CDBTemporary Facilities Replacement - Waubonsee Community College - Replace Building "A" 2,615,200

CDBTemporary Facilities Replacement - IECC - Olney Central - Construction of the Collision Repair Technology Center 1,122,800

CDBTemporary Facilities Replacement - College of DuPage - Temporary Facilities Replacement 25,000,000

CDBTemporary Facilities Replacement - Joliet Junior College - Temporary Facilities Replacement 8,815,900

CDB Rend Lake College - Jefferson County - Art Program Addition 451,300

Page 6: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

CDBLakeland College - Mattoon - Coles County - Rural Development Technology Center 7,524,100

CDB College of DuPage - DuPage County - Instructional Center Noise Abatement 1,544,600

CDBWilliam Rainey Harper College - Cook County - One Stop/Admissions and Campus/Student Life Center 40,653,900

CDB Illinois Valley Community College - Community Instructional Center 16,323,100

CDBRichland Community College - Macon County - Student Success Center Renovation and Addition 3,524,000

CDB Lakeland College - Mattoon - Coles County - Student Services Building Addition 2,361,100

CDBTriton College - River Grove - Cook County - Rehabilitating the Technology Building 10,666,100

CDB Joliet Junior College - Will County - Utilities Renovation 4,522,900

CDB Elgin Community College - Kane County - Spartan Drive Extension 2,244,800

CDB Parkland College - Champaign County - Student Services Center Addition 15,442,100

CDBWilliam Rainey Harper College - Cook County - Engineering and Technology Center Renovations 20,336,800

CDBWillard Ice Building - Springfield - Sangamon County - Emergency Generator Repair 120,000

CDB Willard Ice Building - Springfield - Sangamon County - Parking Ramp Completion 2,791,000

CDB ISP - AIG Complex - For Emergency Generator/Mainframe 3,000,000

CDB ISP - St. Clair County - Construct Metro East Forensic Lab 2,500,000

CDBSpringfield Supreme Court Building - Sangamon County - Plan and Begin Renovation of Former 4th Appellate Court Space 14,400,000

CDBQuincy Veterans Home - Adams County - Plan and Begin Renovation of Kent, Schapers B and Elmore Buildings 1,056,000

CDBLaSalle Veterans Home - LaSalle County - For the Replacement of the Galvanized Cold Water Piping 210,000

CDB Quincy Veterans Home - Adam's County - Construct Central Chiller Plant 5,400,000

CDBAnna Veterans Home - Union County - Plan and Begin The Construction of a 40-50 Bed Addition 700,000

CDB Veterans Affairs- For the Construction of a New-200 Bed Facility 15,000,000 IEPA Statewide - IEPA - River Edge Municipal Brownfields Grant Program 5,300,000 IEPA IEPA-Statewide-Leaking Underground Storage Tank (LUST) Program 75,000,000 IEPA Water Revolving Loan Program 110,400,000 IEPA IEPA-Statewide-Wastewater Loan Program 204,000,000 IEPA IEPA-Statewide-Drinking Water Loan Program 152,000,000 IEPA Water Revolving State Match 110,400,000

IFA

Statewide-Loans to Fire Departments, Fire Protection Districts, Township Fire Departments or Non-Profit Ambulance Services Pursant to the Rural Bond Bank Act, Section 3-27 4,000,000

IFAStatewide-Loans to Fire Departments, Fire Protection Districts and Township Fire Departments Pursant to the Rural Bond Bank Act, Section 3-27 6,000,000

ISBE Statewide - FY2002 School Construction Grant Program 148,518,304

IEMAStatewide- For Safety and Security Improvements at Various Public Universities, Private Colleges, or Community Colleges 25,000,000

IDOT Tran D approp for roads 252,309,300 IDOT NA High Speed Rail 400,000,000 IDOT NA South Suburban Airport 100,000,000 IDOT NA Transportation, Community and System Preservation (TCSP) 16,079,000 IDOT NA Local match for Transportation, Community and System Preservation (TCSP) 2,654,125 IDOT NA CREATE 1,900,000 IDOT NA Quad City Track Improvements 475,000 CDB NA Early Childhood 45,000,000 CDB NA Tech Immersion 10,000,000 ISBE NA For grants to school districts for school construction 25,000,000 CDB NA For grants to school districts for energy efficiency projects 50,000,000 CDB NA 200-bed veterans' home facility 48,500,000 CDB NA New forensic lab in Belleville 37,000,000

CDB Chicago Board of EducationCosts associated with school renovation and construction for the purposes of providing vocational education 75,000,000

CDB NA Capital improv. To Linconln's ChalleNGe Academy 38,140,000 CDB For costs associated with capital upgrades and improvements 50,000,000

CDBFor replacing the roof on the main building and renovating the bathrooms in three dormitories at the Illinois School for the Deaf 3,776,000

CDB NA Cole Hall 8,008,000 CDB NA Renovation and Construction of a Riverfront Campus 42,000,000 CDB Renovation and Construction of the Public Safety Building 4,000,000 CDB NA Construction of a westside campus 40,000,000 CDB NA Capital improv. At Prairie State College 5,200,000

CDB NACapital improv. To the Humboldt Park Vocational Education Center at Wilbur Wright College 5,000,000

CDB NA Capital improv. At Morton College 5,000,000

Page 7: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 CDB NA Capital improv. At Truman College 5,000,000

CDB NA Renovations to the facility for the construction of a Latino Cultural Center at NEIU 1,500,000

CDB NAFor a grant to Kaskaskia College for costs associated with infra. improv. at the Vandalia campus 5,600,000

CDB NAFor a grant to Lewis and Clark College for construction and infra. improv. to the National Great Rivers Research and Education Center 16,294,315

DPH NA Grants associated with the Hospital Capital Investment Program 150,000,000 DNR NA Open Land Trust 25,000,000 DNR NA Upgrades to lodges, camps and campsites 5,000,000 DNR NA Dam Safety 10,000,000 IEPA NA Deposit into Water Revolving Fund 50,000,000 IEPA NA Water Revolving Loan Program 50,000,000 CMS NA Illinois Century Network 26,000,000 Revenue NA Affordable housing 100,000,000 Revenue NA Affordable housing-vets and disabled 30,000,000 DCEO NA Civic Centers 25,000,000 DCEO Chicago Zoological Society Grant for capital improvements 15,600,000 DCEO Chicago Housing Authority Grant for LaClaire Courts 11,700,000 DCEO Medical District Commission Grant for capital improvements 17,000,000 DCEO Southwestern Illinois Commu Grant for campus and building improvements 19,100,000 DCEO NA Grants awarded under the Urban Weatherization Initiative Act 425,000,000 DCEO NA Brdband 50,000,000 DCEO NA Transporation Electrification 10,000,000 DCEO NA Economic Development (private sector expansion or retention activities) 25,000,000 DCEO BMI Inc Grant for a biodiesel plant 5,000,000 DCEO Robbins Community Power Grant for a biomass to energy project 5,000,000 DCEO NA Renewable Fuels 15,000,000 DCEO NA Stimulus matches 37,500,000 DCEO Phoenix Foundation of South Hospital renovation and equipment 3,000,000 DCEO NA Brownfield redevelopment 13,000,000 DCEO United Neighborhood Organi Facilities to alleviate school overcrowding 98,000,000 DCEO Rockford District 205 Greentek Carver Academy 500,000 DCEO Rockford District 205 CICS Rockford Charter Patriots Center 500,000 DCEO Rockford District 205 Sigma Beta Leadership School 1,000,000 DCEO Charter school construction grants 48,000,000 DCEO Economic Development (technology) 15,000,000 DCEO Economic Development (economically depressed areas) 15,000,000 DCEO South Shore Hospital Infrastructure Improvements 1,500,000 DCEO Chestnut Mental Health SysteConstruct a mental health center in the Metro East Region 4,800,000 DCEO Chicago Medical Center Provident Hospital 5,000,000 DCEO Children's Memorial Hospital Capital improvements 7,000,000 DCEO Illinois Masonic Hospital Capital improvements 2,500,000 DCEO Rush University Medical Cen Grant 10,000,000 DCEO Sacred Heart Hospital in ChicGrant 3,000,000 DCEO Community Health and Emer Construction of a hospital wing at the Cairo Megaclinic 3,000,000 DCEO Northwestern University Equipment for the Science and Technology Center 5,000,000 DCEO Black Ensemble Theater Capital Grant 5,000,000 DCEO Mercy Home for Boys and Gi Capital Grant 3,000,000 DCEO University of Chicago Center Grant 1,500,000 DCEO The Hope Institute for Childre Capital Grant 2,000,000 DCEO City of Chicago Salvation Army for brownfield remediation and cleanup 5,000,000 DNR Mud to Parks dredging Illinois Rivers and sediment reuse 8,000,000 DCEO City of Aurora Capital Grant for Aurora Early Learning Center 2,000,000 DCEO Ruth M Rothstein CORE CenCapital improvement projects to modify space to increase patient capacity 3,500,000 DCEO Fresh Food 10,000,000 DPH CLEAR-WIN 5,000,000 DCEO Resurrection School Development of off campus housing 5,000,000 DCEO Facility cost reports prepared for not more than one facility 10,000,000

DCEODevelopment costs pursuant to Section 8.1 of the Energy Conservation and Coal Development Act 6,000,000

IDOT Land acquisition for the South Suburban Airport 10,500,000 DCEO City of Rock Island Renovations to the Martin Luther King Community Center 400,000 DCEO City of East Moline Capital improvements to the Northeast Sport Complex 900,000 DCEO City of Rock Island Construction of a Martin Luther King Center Park 600,000

DCEOBoys and Girls Club of Mississippi Valley Construction of a teen center 100,000

DCEOSkip-A-Long Child Development Services Construction of classrooms at the Moline Campus 400,000

DCEO City of Morrison Renovations to the Farmers' Market facility 75,000 DCEO City of Rock Island Capital Improvements To Douglas Park 75,000 DCEO Arc of Rock Island Replacing the HVAC system at the facility 275,000 DCEO County of Rock Island Capital improvements to county facilities 160,000 DCEO City of Rock Island Engineering and design work associated with a new business park 40,000 DCEO Two Rivers YMCA Renovations to the facility 175,000 DCEO Advocate Health Care Expansion of the Adult Down Syndrome Center 450,000 DCEO Advocate Health Care Adult Down Syndrome Center 750,000 DCEO Avenues to Independence Renovations to the facility 25,000

DCEO Chicago Zoological Society Renovations at Brookfield Zoo 25,000 DCEO City of Des Plaines Rehabilitation of the Storm Water Master Plan Area No. 3 425,000

Page 8: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO City of Park Ridge Capital improvements to the sanitary sewer system 475,000 DCEO City of Rolling Meadows Capital improvements to the storm water detention system 75,000 DCEO Elk Grove Township Improvements to street signs 25,000 DCEO Clearbrook Renovations to the facility located at 87 Lancaster Road in Elk Grove village 25,000 DCEO Elk Grove Village Making repairs to the Greenleaf Lift Station 225,000 DCEO H.A.V.E. Dreams Renovations to the facility 25,000 DCEO Village of Norridge Street repairs at Chester Avenue 50,000 DCEO Indo-American Center Construction of a new facility, to be located in Des Plaines 30,000

DCEO Oakton Community College Installation of solar panels 125,000 DCEO Roosevelt University Renovations to classrooms 200,000 DCEO Village of Arlington Heights Modification and installation of traffic signals 450,000 DCEO Village of Mount Prospect Installation of pedestrian crosswalk signals 100,000 DCEO Village of Mount Prospect Renovations to the Neighborhood Resource Center 100,000 DCEO Village of Niles Reconstruction of the alley between Riverside Drive and Days Terrace 25,000

DCEO Village of Niles Capital improvements to Prospect Street from Oakton Street to Greendale Avenue 50,000 DCEO Village of Niles Instreetallation of streetlights 45,000 DCEO Village of Schaumberg Renovations to the Emergency Operational Center 50,000 DCEO Village of Mount Prospect Procurement and installation of a generator 200,000

DCEOOrpheum Children's Science Museum Expansion of the facility 250,000

DCEO Crisis Nursery Expansion of the facility located at 1309 WeStreet Hill Street in Urbana 200,000 DCEO University YMCA Renovations to the facility 250,000 DCEO Urbana Park District Construction of the Meadowbrook Park Interpretive Center 200,000 DCEO Champaign Park District Renovations to the Virginia Theatre 200,000

DCEOMental Health Center of Champaign County, Inc. Renovations to the facilities 25,000

DCEO Harwood Solon House Renovations to the facility 250,000

DCEODisabled Citizens Foundation Construction and renovation of group homes 200,000

DCEO City of Danville Land acquisition for the Southgate Industrial Park 300,000 DCEO Generations of Hope For costs associated with senior group living facility 500,000

DCEOVermilion County Conservation District Construction of an environmental education center at Kennekuk County Park 500,000

DCEO City of Danville Renovations to the fire fighting training tower 225,000 DCEO Village of Ridge Farm Construction of a village hall building 100,000

DCEOChicago Public School District 299 Capital improvements to the Albany Park Multicultural Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Armstrong G Elementary International Studies School 25,000

DCEOChicago Public School District 299 Capital improvements to the Belding Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Boone Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Carl Schurz Elementary School 25,000

DCEO Chicago Chesed Fund Capital improvements 225,000

DCEO

Chicago International Charter School: Northtown Academy Capital improvements to the facility 25,000

DCEO City of Chicago Repairs to the walking and bike paths in Legion Park 25,000

DCEONiles Elementary School District 71 Capital improvements to the Clarence Culver School 25,000

DCEOChicago Public School District 299 Capital improvements to the Decatur Classical School 25,000

DCEOChicago Public School District 299 Capital improvements to the DeWitt Clinton Elementary School 25,000

DCEOEast Prairie School District 73 Capital improvements to the East Prairie Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Edgebrook Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Edison Regional Gifted Center 25,000

DCEO Skokie School District 73.5 Capital improvements to the Elizabeth Meyer School 25,000 DCEO School District 72 Capital improvements to the Fairview South Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Frederick Von Steuben High School 25,000

DCEO Golf School District 67 Capital improvements to Golf Middle School 25,000

DCEOChicago Public School District 299 Capital improvements to the Hannah G. Solomon Public School 25,000

DCEOChicago Public School District 299 Capital improvements to the Hibbard Elementary School 25,000

DCEO Hanul Family Alliance Capital improvements to the facility 25,000 DCEO Glenview CCSD 34 Capital improvements to the Hoffman Elementary School 25,000 DCEO Golf School District 67 Capital improvements to the Hynes Elementary School 25,000 DCEO Indo-American Center Facility renovations and expansion 150,000

DCEOIrish American Heritage Center Capital improvements 25,000

Page 9: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOChicago Public School District 299 Capital improvements to the Jamieson Elementary School 25,000

DCEOPark Ridge-Niles School District 64 Capital improvements to the Jefferson School 25,000

DCEOChicago Public School District 299 Capital improvements to the John M. Palmer Elementary School 25,000

DCEO Skokie School District 73.5 Capital improvements to the John Middleton Elementary School 25,000

DCEONiles Township District for Special Education 807 Capital improvements to the Julia S. Malloy Education Center 25,000

DCEO Keshet Construction of a cabin at the Camp Chi program 150,000 DCEO Korean Senior Center Facility renovations and improvements 100,000

DCEOLincolnwood School District 74 Capital improvements to the Lincoln Hall Middle School 25,000

DCEOSkokie and Morton Grove School District 69 Capital improvements to the Lincoln Junior High School 25,000

DCEO Lincolnwood Park District Capital improvements 50,000 DCEO Lincolnwood Public Library Capital improvements 25,000

DCEOSkokie and Morton Grove School District 69 Capital improvements to Madison Elementary School 25,000

DCEO

Martin and Gertrude Walder Science Laboratory and Learning Center Purchase and development of a mobile science lab 25,000

DCEOChicago Public School District 299 Capital improvements to the Mary G. Peterson Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Mather High School 25,000

DCEOEast Maine School District 63 Capital improvements to the Melzer School 25,000

DCEOMetropolitan Family Services Renovations and technology infra. Improvements. At the facility 70,000

DCEO Misercordia Home Capital improvements 150,000 DCEO Morton Grove Park District Capital improvements 50,000

DCEO Morton Grove Public Library Capital improvements 25,000

DCEOMuslim Women Resource Center Capital improvements 50,000

DCEONCSY - Midwest Mesorah Region Construction of a new facility 25,000

DCEO Niles Park District Capital improvements 25,000 DCEO Niles Public Library Capital improvements 25,000

DCEOChicago Public School District 299 Capital improvements to the Niles West High School 25,000

DCEOChicago Public School District 299 Capital improvements to the Northside College Preparatory High School 25,000

DCEOChicago Public School District 299 Capital improvements to the Northside TMH Learning Center 25,000

DCEONotre Dame High School located in Niles Capital improvements 25,000

DCEO Skokie School District 73.5 Capital improvements to the Oliver McCracken Middle School 25,000

DCEOChicago Public School District 299 Capital improvements to the Rogers Elementary School 25,000

DCEOLincolnwood School District 74 Capital improvements to the Rutledge Hall Elementary School 25,000

DCEOChicago Public School District 299 Capital improvements to the Sauganash Elementary School 25,000

DCEO Sauganash Neighbors A new park 75,000

DCEO ShalvaRenovations and improvements to the facility located at 1610 W. Highland, Chicago 25,000

DCEOShore Community Services Inc Accessibility improvements 30,000

DCEO Skokie Park District Capital improvements 25,000 DCEO Skokie Public Library Capital improvements 25,000

DCEOChicago Public School District 299 Capital improvements to the Stone Scholastic Academy 25,000

DCEO Telshe Yeshiva Chicago Renovations to the facility 100,000 DCEO The Ark Capital improvements 50,000

DCEOSkokie and Morton Grove School District 69 Capital improvements to the Thomas Edison Elementary School 25,000

DCEOLincolnwood School District 74 Capital improvements to the Todd Hall Elementary School 25,000

DCEO Torah Technical Institute Capital improvements 50,000

DCEOEast Maine School District 63 Capital improvements to the VH Maine Elementary School 25,000

DCEOWest Rogers Park Community Organization Capital improvements along Western Avenue in the City of Chicago 100,000

DCEOChicago Public School District 299 Wildwood Elementary School-capital improvement 25,000

DCEO Zam's Hope Capital improvement 25,000

Page 10: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO PTACH Capital improvements 25,000

DCEOKorean American Resourrce and Cultural Center Capital improvements 30,000

DCEO Village of Niles Street repairs 60,000 DCEO Jewish Federation Capital improvements 60,000 DCEO Thresholds Capital improvements 25,000 DCEO Agudath Israel Capital improvements 250,000 DCEO City of Chicago Senior Center in Mount Greenwood Community - construction 700,000 DCEO Chicago Park District Kennedy Park- capital improvements 100,000 DCEO Chicago Park District Monroe Park- capital improvements 50,000 DCEO Chicago Park District O'Halleran Park- capital improvements 50,000 DCEO Chicago Park District Dawes Park- capital improvements 25,000 DCEO Village of Evergreen Park Capital improvements to street and sewers within the village 200,000 DCEO Village of Oak Lawn capital improvements at grade crossings 200,000 DCEO City of Chicago Ridge Sewer and water projects 200,000 DCEO Village of Merrionette Park Street resurfacing within the village 50,000 DCEO City of Hometown Fire House renovations 50,000 DCEO Village of Alsip Energy Park- capital improvements 150,000 DCEO City of Palos Hills Public Safety Building- renovations 150,000 DCEO City of Palos Heights Central Business Parking Lot 150,000 DCEO Village of Palos Park Construction of new park 150,000 DCEO City of Hickory Hills Street construction and lighting within the City 150,000 DCEO Village of Worth improvements to technology infrastructure 120,000

DCEOPark Lawn School and Activity Center capital improvements to the facility 100,000

DCEOMetropolitan Family Services capital improvements to the facility 50,000

DCEOAdvocate Christ Hospital and Medical Center renovations to the Pediatric Emergency care center 100,000

DCEOLittle Company of Mary Hospital capital improvements to the hospital 100,000

DCEO Oak Lawn Park District Ice Arena- cooling tower renovations 30,000 DCEO Oak Lawn Library renovations to the facility bathrooms 50,000

DCEO Worth Public Library District renovations to the facility 25,000

DCEOEvergreen Park Public Library improvements to technology infrastructure 25,000

DCEOGarden Homes Sanitary District reconstruction of the water main system 50,000

DCEO Moraine Valley College renovations to the nursing allied health facilities 100,000 DCEO Ridge Historical Society renovations to the facility 25,000

DCEO

Beacon Therapeutic and Diagnostic Treatment Center Day Treatment Center for Children- renovations 25,000

DCEOSouthwest Special Recreation Association purchasing an electronic marquee 25,000

DCEOChicago Public School District 299 Art Velazquez Westside Technical School- capital improvements 500,000

DCEOChicago Public School District 299 Irene C. Hernandez Middle School- capital improvements 1,500,000

DCEOChicago Public School District 299 Benito Juarez High School- capital improvements 500,000

DCEOChicago Public School District 299 Thomas Kelly High School- capital improvements 500,000

DCEOJ. Sterling Morton High School District 201 Morton West High School- capital improvements 500,000

DCEOJ. Sterling Morton High School District 201 Morton East High School- capital improvements 500,000

DCEOCicero Public School District 99 capital improvements at facilities 500,000

DCEOLatino Youth Alternative School capital improvements at facilities 1,500,000

DCEO North Berwyn Park District Cuyler Park- capital improvements 1,000,000 DCEO Chicago Park District Celotex- site development 1,000,000 DCEO Chicago Park District Curie Metropolitan High School Field- capital improvements 500,000 DCEO North Berwyn Park District capital improvements at various parks 500,000 DCEO Chicago Park District Senka Park- capital improvements 1,500,000 DCEO Casa Aztlan Infrastructure improvements 200,000 DCEO Berwyn Park District capital improvements at various parks 1,000,000 DCEO Illinois Migrant Council Capital improvements 500,000 DCEO Pilsen Wellness Center capital improvements at the facility 1,500,000

DCEONational Latino Education Institute capital improvements at the facility 300,000

DCEO Erie Family Health Center Erie Humboldt Park Facility- renovations 500,000

DCEOPuerto Rican Cultural Center Facility at 2700 West Haddon in Chicago- renovations 450,000

DCEO Sinai Urban Health Institute Renovations to the Humboldt Community Diabetes Empowerment Center 300,000 DCEO Casa Norte Infrastructure improvements at the facility 150,000

Page 11: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOPuerto Rican Cultural Center Renovations to the Vida SIDA housing unit 300,000

DCEOFellowship Connection Community Center renovations at the facility 250,000

DCEOErie Elementary Charter School renovations at the facility 250,000

DCEOPuerto Rican Parade Civic Commission Facility at 1254 North California st in Chicago- renovations 100,000

DCEOChicago Public School District 299 Roberto Clemente Community Academy- renovations 250,000

DCEOChicago Dept. of Public Health Chronic Disease Center at West Town Neighborhood Center- renovations 100,000

DCEOHumboldt Park Family Health Center renovations at the facility 60,000

DCEOHealthcare Alternatives Services, Inc. renovations at the facility 100,000

DCEO Segundo Ruiz Belvis renovations at the facility 100,000

DCEO

Hispanic American Construction Industry Assoc. Job Training Center- renovations 140,000

DCEODivision st Business Development Assoc. renovations at the facility 200,000

DCEONear Northwest Neighborhood Network Paseo Boricus Arts Building- development 100,000

DCEOIllinois Maternal and Child Health Coalition facility repairs 25,000

DCEOArden Shore Child and Family Services acquisition and construction of a facility 720,000

DCEORosalind Franklin University of Medicine and Science construction of offices and classrooms at the facility 200,000

DCEO Chicago Botanic Garden restorations to the shorelines 500,000 DCEO Allendale Association renovations at the facility 55,900 DCEO Chicago Wellness Center Northbrook Facility-renovations 55,900 DCEO City of North Chicago replacement of sewer lining at Wadsworth Avenue 50,000 DCEO City of North Chicago Sidewalk repairs on Broadway Avenue 100,000 DCEO City of North Chicago Streetlights at Buckley/Amstutz Underpass and 24th Avenue 25,000 DCEO City of North Chicago replacing detector loops 25,000 DCEO City of North Chicago costs associated with the 2009 Thermoplastic Stripping Program 25,000 DCEO City of Park City construction of public works facility 500,000 DCEO City of Waukegan Carnegie Library Building- renovations 500,000 DCEO Anixter Center costs associated with acquisition of a building 10,000

DCEOCountryside Association for People with Disabilities renovations at the facility 10,000

DCEO Nicasa capital improvements to the facility 10,000 DCEO UCAN Residential Treatment Center- capital improvements 10,000

DCEO Special Education Services Lake Shore Academy- reconstruction of the parking lot 97,000 DCEO Village of Northbrook Public Works Center- renovations 45,000 DCEO Village of Stickney maintenance and repair to roadways within the village 500,000 DCEO City of Countryside purchase and installation stlights on LaGrange Road 300,000 DCEO Village of Forest View construction of public safety building 300,000 DCEO Village of McCook Development and construction of the Chicago Baseball Museum and Stadium 500,000 DCEO Village of Lyons Veterans Memorial Park- construction 200,000

DCEOJustice-Willow Springs Water Commission

costs associated with reservoir construction, pump station renovations and water main replacements 800,000

DCEO Village of LaGrange Park construction of public works facility 275,000 DCEO City of Berwyn Berwyn Fire Dept. facilities-capital improvements 100,000

DCEO Pleasant Dale Park District capital improvements to the parks 100,000 DCEO Lyons Township maintenance and repair to roadways 100,000 DCEO Greater LaGrange YMCA construction of a new facility 25,000 DCEO City of Evanston renovations to the municipal recreational facilities 750,000 DCEO Village of Glenview development and construction of an Amtrak Station 250,000 DCEO Village of Skokie Roadway maintenance and repairs 400,000

DCEOAccess Community Health Network relocation and expansion of Evanston-Rogers Park Family Health Center 250,000

DCEOEvanston Skokie School District No. 65 capital improvements to facilities 1,000,000

DCEOYouth Job Center of Evanston, Inc. renovations at the facility 200,000

DCEO CJE SeniorLife Lieberman Center- renovations 200,000 DCEO North Shore Senior Center Wellness Center Facilities- renovations 150,000

DCEOUniversity of Illinois College of Medicine Peoria Campus- construction of cancer research facility 1,300,000

DCEO Tri-County Urban League replacing roof and upgrading exterior of the facility 200,000 DCEO Easter Seals Peoria facility- renovations 200,000

DCEOFulton County Health Department Fulton County Dental Center- capital improvement 400,000

DCEO Canton Family YMCA Activity Centers- capital improvement 100,000

Page 12: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOTazewell County House of Hope renovations and improvements to the facility 25,000

DCEOHeartland Community Health Clinic capital improvements to the facility 500,000

DCEO City of Farmington water treatment plant- renovations 100,000

DCEOFriendship House of Christian Service renovations at the facility 250,000

DCEO Fulton County capital improvements to county facilities 125,000

DCEOSaline Valley Conservancy District Stonefort Water Supply Line- repairs 925,000

DCEOShawnee Community College capital improvements at the campus 40,000

DCEOSoutheastern Illinois College capital improvements at the campus 40,000

DCEO Village of Galatia repairing and replacing water lines 50,000 DCEO City of Shawneetown water and sewer improvements 50,000

DCEOEldorado Community School District No. 4 capital improvements to facilities 40,000

DCEO Gallatin County capital improvements to county facilities 25,000 DCEO Saline County capital improvements to county facilities 40,000 DCEO Norris City repairing and replacing water mains 25,000 DCEO City of Mounds replacing sewage lift station pumps 55,000 DCEO Union County capital improvements to county facilities 25,000 DCEO City of Equality Capital improvements 25,000 DCEO Village of Royalton Capital improvements 75,000 DCEO City of Johnston City Repairing and replacing water mains 75,000 DCEO City of Marion Repairing and replacing water mains 75,000

DCEOWest Frankfort Community Unit School District High School- capital improvements 75,000

DCEO City of Benton sewer replacement 740,800 DCEO City of Christopher replacement of water tower 163,400 DCEO Village of Colp maintenance and repair to roadways within the village 205,000 DCEO City of Herrin replacing water mains 324,300 DCEO City of Buckner Maintenance and repair to roadways within the city 90,000 DCEO City of Energy Capital improvements 40,000 DCEO City of Chicago Repair and maintenance to sidewalks and curbs at 134th Street 600,000 DCEO Village of Calumet Park repair and maintenance to streets within the village 100,000 DCEO Village of Dixmoor Seeley Avenue-road construction 200,000 DCEO Village of Dolton Kimbark Avenue and Dorchester Avenue- resurfacing 250,000 DCEO Village of Burnham maintenance and repair to roadways within the village 100,000 DCEO Calumet City construction of left turn lanes at River Oaks Drive and Paxton Avenue 150,000 DCEO Village of Thornton maintenance and repair to roadways within the village 175,000 DCEO Village of Ford Heights renovations to the senior center 307,000 DCEO Village of Phoenix renovations to village buildings 250,000 DCEO Village of Homewood replacement of the HVAC at the Public Safety building 100,000 DCEO Village of Robbins maintenance and repair to roadways within the village 50,000 DCEO Village of Robbins installation of fire hydrants within the village 250,000 DCEO Village of South Holland capital improvements to Public Safety building 368,000

DCEOCommunity Mental Health Council, Inc renovations and upgrades to the facilities 450,000

DCEO

Fulfilling Our Responsibilties Unto Mankind renovations and upgrades to the facilities 200,000

DCEOSouth Central Community Services, Inc. renovations to the facility 100,000

DCEOChicago Family Health Center construction of dental facilities 100,000

DCEO Black on Black Love acquisition and renovation of a new facility 200,000 DCEO TCA Health, Inc. renovations to the facility 100,000

DCEO

Southeast United Methodist Youth and Community Center upgrades to the heating system at the facility 50,000

DCEOAfrican American Police League renovations to the facility 75,000

DCEO Regal Theater construction of parking garage 200,000

DCEOPublic Image Partnership, NFP purchasing a modular building 75,000

DCEOA. Phillip Randolph Pullman Porter Museum renovations to the facility 25,000

DCEOColes Elementary Language Academy renovations to the facility 50,000

DCEOChatham Avalon Park Community Council acquisition and development of new office space 100,000

DCEO City of Burnham repair to sidewalks and curbs within the city 100,000 DCEO City of Chicago installation of streetlights within the 6th ward 100,000

DCEOETA Creative Arts Foundation renovations to the facility 500,000

DCEO Global Girls, Inc. purchasing a modular building 50,000

DCEO Henry's Sober Living House renovations to the facility 50,000

Page 13: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOHumanity Foundation of Chicago renovations to the facility 50,000

DCEOMetropolitan Family Services renovations to the facility 100,000

DCEOSoutheast Alcohol and Drug Abuse Center replacing the roof at the facility 125,000

DCEO Thornton Township Job Training Center- renovations 100,000 DCEO Village of Lansing Capital improvements 100,000 DCEO Mr. Malo Youth Center renovations to the facility 50,000 DCEO South Shore Hospital renovations to the facility 150,000 DCEO Allendale Association renovations to the campus 25,000 DCEO Apple Tree Theater renovations to the facility 100,000 DCEO City of Highwood improvements to the Municipal Road 350,000

DCEO City of Lake Forestrepairs and maintenance to the intersection of Waukegan Road and Westleigh Road 500,000

DCEOCommunity Family Center, Inc. construction of a new facility 100,000

DCEOPark District of Highland Park construction of lakefront pavilion 250,000

DCEO Shields Township drainage improvements within the township 50,000 DCEO Village of Glencoe repairs and maintenance to the traffic medians on Green Bay Road 100,000 DCEO Village of Glencoe repairs and maintenance to Stone Bridge rails on Sheridan Road 100,000 DCEO Village of Lake Bluff installation of signal lights on North Shore Drive 1,000,000 DCEO Village of Mount Prospect repairs and maintenance to the intersection on Kensington Road 100,000 DCEO Village of Northbrook repairs and maintenance to the intersection of the sanitary sewers 200,000 DCEO West Deerfield Township resurfacing Roads 50,000 DCEO Wings Program acquisition and renovation of property located in Niles 100,000 DCEO Village of Glenview construction of road salt storage facility 125,000 DCEO Jewish United Fund Weingberg Campus Facility Deerfield- replacing elevators 50,000 DCEO Barnes Jewish Hospital Alton Memorial Hospital- lab upgrades 70,000

DCEOCommunity Counseling Center in Alton building improvements 50,000

DCEO City of Forest Homes Maple Park Water District- water main replacement 75,000 DCEO WYCA of Alton renovations to the facility 30,200

DCEOLewis and Clark Society of America, Inc.

Waterline improvements and picnic shelter upgrades at the Hartford State Historic Site 150,000

DCEO Nameoki Township lift station repairs and improvements 25,000

DCEOMitchell Public Water District water line relocation 117,500

DCEO St. Anthony's Health Center lab system and diagnostic improvements 125,000

DCEO

Willam M. BeDell Achievement and Resource Center building improvements 50,000

DCEO City of Alton Phase Three of Fosterberg Road Repair 600,000 DCEO Village of South Roxana Illinois Route 111 waterline extension 250,000 DCEO Village of Bethalto improvements to West Corbin Avenue 538,800 DCEO Village of East Alton Shamrock Avenue to St. Louis Avenue 310,000 DCEO Worden Public Library various capital upgrades 95,000 DCEO Village of Maryville Illinois Route 157 to Stonebridge Drive 50,000

DCEOHollywood Heights Fire Department renovations and/or additions to the firehouse 50,000

DCEO Village of Glen Carbon construction and development of parks 35,000 DCEO Village of Glen Carbon water and drainage improvements 25,000 DCEO City of Collinsville construction of a well for water distribution 50,000 DCEO City of Fairview Heights general infrastructure improvements 50,000

DCEO Village of Pontoon Beach land acquisition, development of a park, and general infrastructure improvements 42,500

DCEOCollinsville Township Highway Department repair, resurfacing, and infrastructure needs of Roger Drive 31,000

DCEOHospice of Southern Illinois, Inc.

infrastructure improvements and construction of a hospice home in Edwardsville Township 300,000

DCEO City of Granite Cityfence replacement and infrastructure repairs for Nameoki Road and East 23rd Street 30,000

DCEO City of Edwardsville infrastructure improvements and streetscape in the historic district 50,000 DCEO City of Belleville infrastructure improvements located within the City of Belleville 500,000 DCEO City of O'Fallon infrastructure improvements located within the City of O'Fallon 400,000 DCEO City of East St. Louis Infrastructure improvements 500,000 DCEO City of Centreville infrastructure improvements located within the City of Centreville 200,000 DCEO City of Swansea infrastructure improvements located within the City of Swansea 150,000 DCEO City of Madison infrastructure improvements located within the City of Madison 150,000 DCEO City of Granite City infrastructure improvements located within the City of Granite City 300,000 DCEO City of Millstadt infrastructure improvements located within the City of Millstadt 100,000 DCEO City of Brooklyn infrastructure improvements located within the City of Brooklyn 100,000 DCEO City of Alorton infrastructure improvements located within the City of Alorton 75,000 DCEO City of Caseyville infrastructure improvements located within the City of Caseyville 100,000 DCEO City of Mascoutah infrastructure improvements located within the City of Mascoutah 100,000 DCEO City of Cahokia infrastructure improvements located within the City of Cahokia 100,000 DCEO City of Fairview Heights infrastructure improvements located within the City of Fairview Heights 100,000 DCEO City of Shiloh infrastructure improvements located within the City of Shiloh 100,000

Page 14: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOVenice Township/Eagle Park infrastructure improvements located within Venice Township/Eagle Park 100,000

DCEO City of Sauget infrastructure improvements located within the City of Sauget 100,000 DCEO Trinity Services Inc Renovations to the Trinity State Street House 25,000 DCEO Aspira, Inc. of Illinois construction and development of new Aspira Charter Schools 200,000 DCEO Puerto Rican Arts Alliance renovations to the Puerto Rican Arts Alliance facility 750,000

DCEOAccess Community Health Network renovation of the Armitage Family Health Center 60,000

DCEO Erie Family Health Center Site improvements to the Erie Helping Hands Health Center 250,000

DCEOAdvocate Illinois Masonic Medical Center remodeling prenatal and trauma center 275,000

DCEO Chicago Public Library Construction of a new Independence Park Library 500,000

DCEOBickerdike Redevelopment Corp. construction of Zapata 75 unit affordable housing complex and commercial space 100,000

DCEO The Miracle CenterAcquisition and renoavation of a new facility to provide youth and arts programming 250,000

DCEOLatino Pastoral Action Center, Inc.

construction/renovation of a Holistic Family Wellness Center at Chicago Midwest location 100,000

DCEOInstitute for Puerto Rican Arts and Culture construction of a world-class museum and Fine Arts Center 65,000

DCEOBrentano Math and Science Academy site improvements 25,000

DCEOHealthcare Alternative Systems renovation of a drug rehab center and technology center 100,000

DCEO Voice of the City renovation of the Arts Studio 75,000 DCEO UCAN remodeling and upgrading the technology infrastructure system 200,000 DCEO Ignatia House renovation of a half-way home for women 50,000 DCEO City of Chicago Logan Square Boulevard Renovation 100,000 DCEO Chicago Park District infrastructure improvements at the Avondale Park Field House 100,000

DCEO City of Chicago

Installation of new stop light systems located at Devon and Greenview, Peterson and Ravenswood, and Foster and Albany through the Chicago Departmenet of Transportation 400,000

DCEO City of ChicagoRenovations of sidewalks and curbs on Clark Street from Montrose to Lawrence through the Chicago Department of Transportation 200,000

DCEO Chicago Park District renovations and improvements at Clarendon Park 250,000 DCEO Chicago Park District renovations and improvements at Mather Park 200,000 DCEO Chicago Park District renovations and improvements to Leone Park Beach Field House 200,000 DCEO Chicago Public Schools renovations and improvements at Uplift Community School 250,000 DCEO Chicago Public Schools renovations and improvements at McCutcheon Elementary School 300,000 DCEO Chicago Public Schools renovations and improvements at Ravenswood Elementary School 200,000 DCEO Heartland Alliance renovations at the Kovler Center 100,000

DCEOEpworth United Methodist Church renovations and improvements to the facility's Community House 100,000

DCEOTest Positive Aware Network Renovations at the facility located at 5537 N. Broadway in Chicago 250,000

DCEOHoward Area Community Center renovations and improvements to the facility 250,000

DCEO Chicago Public Library renovations and repairs to the Edgewater Branch facility 150,000 DCEO Better Existence with HIV renovations to the Thorndale location 100,000

DCEO Anixter Center

Costs associated energy efficiency projects at 2045 West Jarvis, Chicago; 1727 West Northshore, Chicago; 1761 West Wallen, Chicago; 6506 North Bosworth, Chicago; and, 5615 North Rockwell, Chicago 250,000

DCEO City of Elgin costs associated with river front improvements 1,000,000 DCEO Village of East Dundee storm water detention and flood control 300,000

DCEOFox Valley Mental Health Foundation construction of housing 500,000

DCEO Village of Hoffman Estates construction of a police station and public safety facility 500,000 DCEO Village of Carpentersville Streetlight inStreetallation 250,000 DCEO Hanover Park Park District construction of safety facilities 50,000 DCEO Village of Streamwood Street resurfacing 300,000 DCEO Village of Schaumburg public safety and health projects 300,000 DCEO City of Berwyn Street resurfacing 500,000

DCEO City of ChicagoArterial street resufacing located on West 55th, West 47th, and South Kildare from 40th Street to South 47th Street in the 14th Ward 1,000,000

DCEO City of Chicago purchase and installation of street lighting in the 23rd Ward 500,000 DCEO Chicago Park District Infrastructure improvements to Archer Park 100,000

DCEOMidwest High Speed Rail Association engineering and study work related to high speed rail 250,000

DCEO Town of Cicero purchase and installation of street lighting 500,000

DCEO Chicago Public Schools 299 renovation and improvements to the facility at Sandoval School 50,000

DCEO Chicago Public Schools 299 renovation and improvements to the facility at Peck School 25,000

DCEO Chicago Public Schools 299 renovation and improvements to the facility at Sawyer School 25,000

DCEO Chicago Public Schools 299 renovation and improvements to the facility at Columbia Explorers 25,000

DCEO Berwyn School District #98 renovation and improvements to the facility at Havlicek School 25,000

DCEO Berwyn School District #98 renovation and improvements to the facility at Lincoln Middle School 25,000

Page 15: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO Berwyn School District #98 renovation and improvements at Komensky School 25,000

DCEO Berwyn School District #98 renovation and improvements to the facility at Freedom Middle School 25,000

DCEO Berwyn School District #98 renovation and improvements to the facility at Hiawatha Elementary School 25,000

DCEO St. Odilo Elementary School renovation and improvements to the facility 25,000

DCEOSt. Richards Elementary School renovation and improvements to the facility 25,000

DCEO St. Gall Elementary School renovation and improvements to the facility 25,000

DCEOSt. Bruno Elementary School renovation and improvements to the facility 25,000

DCEO Town of Cicero costs associated with capital improvements 5,000,000 DCEO City of Aurora replacement of Reckinger Road Bridge 950,000

DCEOIllinois Math and Science Academy renovations to residence halls 150,000

DCEO Village of Montgomery construction of a water supply well 200,000 DCEO Village of Oswego streetscaping 500,000

DCEO Chicago Zoological Society repairs and renovations to the Dolphinarium at the Brookfield Zoo 100,000 DCEO Cornerstone Services, Inc. construction of a rehab facility 50,000 DCEO Plainfield Park District construction of the Renwick Community Park Recreation Center 550,000

DCEO Troy Fire Protection District construction of a fire station 350,000 DCEO City of Aurora Construction of an early Childhood Care and Education Center 100,000 ??? Individual Advocacy Center purchasing a building for Developmental Training 100,000 DCEO City of Zion Capital improvements 1,000,000 DCEO Village of Wadsworth Capital improvements 200,000

DCEOAdeline Geo-Karis State Park Capital improvements 200,000

DCEO Village of Antioch Capital improvements within the village 500,000

DCEOUniversity Center of Lake County repairs and renovations to the facility 125,000

DCEO Youthbuild Lake County construction of affordable housing units 240,000 DCEO Village of Beach Park water main extensions within the village 145,000

DCEOGreat Lakes Disaster Training Center Capital improvements at the facility 200,000

DCEOCountryside Association for People w/Disabilities renovations to facility bathrooms 100,000

DCEO Village of Winthrop Harbor Construction of a hangar for the Winthrop Harbor Police Department 190,000 DCEO Zion City of Miracles acquisition and renovation of a facility 50,000

DCEOLake Villa Memorial VFW Post 4308 Capital improvements to the facility 50,000

DCEO Sequoit VFW Post 4551 Capital improvements to the facility 50,000

DCEOWinthrop Harbor Memorial VFW Post 7448 Capital improvements to the facility 50,000

DCEORound Lake Area VFW Post Illinois 9649 Capital improvements to the facility 50,000

DCEOGurnee American Legion Post 771 Capital improvements to the facility 25,000

DCEOPFC Geoffrey Morris Memorial Foundation Construction of the Heroes of Freedom Memorial 25,000

DCEOArbor Park School District No. 145 Repairs and renovations to facilities 367,000

DCEO Bremen Youth Center construction of a youth center 50,000 DCEO City of County Club Hills construction of a fire training tower 200,000

DCEOCity of Markham Park District repairs and renovations to facilities and parking lots 35,500

DCEO City of Markham energy efficiency and renewable energy capital projects 150,000 DCEO Village of Matteson construction of a roadway bridge on Matteson Avenue 200,000 DCEO City of Oak Forest Repairs and maintenance to the Metra Station access sidewalks 200,000 DCEO Oak Forest Park District repairs to the facility 50,000 DCEO City of Oak Forest capital improvements to the Police Department's shooting range 50,000

DCEOFrankfort Square Park District construction of the Island Prairie Park Nature Center 25,000

DCEO Grand Prairie Services construction of an Outpatient Behavioral Healthcare Facility 75,000 DCEO South Suburban College repairs and maintenance to the roof at the facility 75,000

DCEOSouth Suburban Family Shelter renovations to the facility 25,000

DCEO Southstar Services renovations to the facility 50,000 DCEO Together We Cope renovations to the Tinley Park Facility 55,000 DCEO Village of Flossmoor Engineering and reconstruction of the Brookwood Bridge Deck 55,000 DCEO Village of Hazel Crest construction and maintenance projects 200,000 DCEO Village of Homewood Village Fire Training and Emergency Operations Center 75,000 DCEO Village of Olympia Fields installation of Handicap Sidewalk Ramps 155,000 DCEO Village of Orland Hills Pepperwood Retention Area 37,500 DCEO Village of Orland Hills Roadway resurfacing 200,000 DCEO Village of Orland Park replacement of air units at Franklin Loebe Center Gymnasium 75,000 DCEO Village of Orland Park replacement of air units at the Civic Center 125,000

Page 16: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Orland Township construction and renovation of the Admin. Bldg. 25,000 DCEO Village of Park Forest renovation of police department facility 35,000 DCEO Village of Park Forest renovation of Freedom Hall 75,000 DCEO Prairie State College renovations and improvements to the campus 75,000 DCEO Village of Richton Park brownfield and leaking underground storage tank remediation 200,000 DCEO Rich Township renovations and improvements 85,000

DCEOSertoma Speech and Hearing Center renovations to the facility 25,000

DCEO Sertoma Centre, Inc. addition to the facility 25,000

DCEO

South Suburban Council on Substance and Alcohol Abuse repairs to the facility 75,000

DCEOCrisis Center of South Suburbia repairs and renovations 25,000

DCEOSouth Suburban Crisis Center renovations to the facility 25,000

DCEOAda S. McKinley Community Services renovations to the Ersula Howard Childcare Center 25,000

DCEOAda S. McKinley Community Services renovations to the South Chicago Neighborhood House 25,000

DCEO Allendale Association facility replacement 25,000 DCEO Black Ensemble Theater theater improvements 100,000 DCEO Chicago Park District repairs to Rainbow Beach and Park 45,000 DCEO Chicago Park District repairs to Russell Square Park 40,000 DCEO Illinois Channel acquisition and renovation of property 90,000 DCEO Chicago Park District repairs to Harold Washington Park 50,000

DCEOChicago Public School District 299 capital improvements to the Black Branch Magnet School -

DCEOChicago Public School District 299 capital improvements to the Bouchet Math and Science Academy 25,000

DCEOChicago Public School District 299 capital improvements to Canter Middle School 25,000

DCEOChicago Public School District 299 capital improvements to Carnegie Elementary School -

DCEOChicago Public School District 299 capital improvements to Harte Elementary School 25,000

DCEOChicago Public School District 299 capital improvements to Mireles Academy -

DCEOChicago Public School District 299 capital improvements to Ninos Heroes Academic Center -

DCEOChicago Public School District 299 capital improvements to Parkside Academy 25,000

DCEOChicago Public School District 299 capital improvements to Woodsworth Elementary School 25,000

DCEOChicago Public School District 299 capital improvements to Kenwood Academy 50,000

DCEO Chicago Youth Center renovations to the Crowne Center Building 25,000

DCEO

Black Metropolis Convention and Tourism Council renovations to the facility 50,000

DCEO Edward G. Irvin Foundation acquisition and renovation of a facility 400,000

DCEOETA Creative Arts Foundation renovation to the facility 100,000

DCEOExcellent Way Homeless Shelter renovations to the facility 25,000

DCEOHyde Park Neighborhood Club renovations to the facility 150,000

DCEO Black United Council acquisition and renovation of property 175,000

DCEOKenwood Oakland Community Organization facility acquisition 60,000

DCEO Muntu Dance Theater Inc theater improvements 450,000

DCEO Kwame Nkrumah Academy construction of a new facility 450,000

DCEOSouth Central Community Service renovations to the South Shore Campus 25,000

DCEO South Chicago YMCA renovations to the facility 25,000

DCEOAccess Community Health Network renovation of the Booker Family Health Center 60,000

DCEO Black United Fund of Illinois Improvements to the facility located at 1750 East 71st Street in Chicago 100,000 DCEO Centers for New Horizons renovations to the Elam House 250,000

DCEO Friend Family Health Center expansion and renovation of the facility 200,000

DCEOHarris Park Advisory Council renovations to the facility 50,000

DCEOSouth East Alcohol and Drug Abuse Center renovations to the facility 25,000

DCEO Featherfist Center costs associated with the development of the center 200,000

DCEOLocal Intitiative Support Corporation construction of a healthcare clinic at Reavis Elementary School 175,000

DCEO Allendale Association renovations and repairs 3,650,000

Page 17: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOPeggy Notebart Nature Museum construction of a Green City Market Structure 1,000,000

DCEORehabilitation Institute of Chicago purchase of VersaCare Beds 220,000

DCEO Fox Waterway Agency capital upgrade to waterway 1,000,000

DCEODanville Area Community College addition of a geo-thermal system and a wind turbine 5,190,400

DCEOBack of the Yards Neighborhood Council capital improvements to the community center 1,000,000

DCEO Senior Services of Elgin renovations to the facility 30,000 DCEO N'DIGO Capital improvements 600,000

DCEOWestside Youth Technical Entrepreneur Center Capital improvements 500,000

DCEOFood and Shelter Foundation Capital improvements 750,000

DCEODrive Martin Luther King, Jr. Boys and Girls Club Capital improvements 250,000

DCEOAustin Peoples Action Center Capital improvements 100,000

DCEO MIW Foundation Capital improvements 800,000 DCEO Beat Creators Capital improvements 1,000,000

DCEOCleaner Greener Neighborhoods Capital improvements 500,000

DCEO Christian Love M.B. Church Capital improvements 250,000 DCEO Jubilee Market, Inc. Capital improvements 1,000,000 DCEO Bethel Lutheran Church Capital improvements 200,000 DCEO Allison United Foundation Capital improvements 300,000 DCEO Learning Network Center Capital improvements 600,000 DCEO St. Malachy School Capital improvements 700,000

DCEOWestside Service Organization Capital improvements 1,000,000

DCEO St. Anthony W.W. Temple Capital improvements 750,000

DCEOWMC West Side Ministers Coalition Capital improvements 100,000

DCEOMajor Adams Community Committee Capital improvements 100,000

DCEOWindy City Wildcats Youth Program Capital improvements 125,000

DCEO Educare Capital improvements 1,500,000

DCEOOld Town School of Folk Music Capital improvements 2,000,000

DCEOJewish Federation of Metropolitan Chicago infrastructure improvements at Jewish Day schools 200,000

DCEOJewish Federation of Metropolitan Chicago elevator installation at Sampson Katz Center 250,000

DCEOJewish Federation of Metropolitan Chicago improvements to Bernard Horwich JCC 175,000

DCEOJewish Federation of Metropolitan Chicago installation of a handicap accessible ramp at Bernard Horwich JCC 100,000

DCEOJewish Federation of Metropolitan Chicago ADA compliance throughout buildings at CJE Jarvis/Farwell Buildings 500,000

DCEOJewish Federation of Metropolitan Chicago construction and renovation of a facility for DD clients 265,000

DCEO Weiss Hospital capital improvements to the Cancer Center 1,000,000

DCEO

Southern Illinois University Edwardsville School of Dentistry construction of a laboratory 4,121,400

DCEO Metropolitan Prep School infrastructure improvements 2,525,000 DCEO Judson College purchase and installation of security system 80,000 DCEO Misericordia Center Infrastructure improvements 180,000

DCEOLincoln Park Conservacy Center Construction of a North Pond Rustic Pavilion 100,000

DCEOHoward Brown Health Center Infrastructure improvements 100,000

DCEO Center on Halsted Facility upgrades 100,000 DCEO Anixter Center Technology infrastructure improvements 600,000

DCEOAIDS Foundation of Chicago Facility improvements 500,000

DCEOKankakee Community College Infrastructure improvements 5,000,000

DCEO County of Macoupin Capital improvements to the courthouse 100,000 DCEO County of Christian Capital improvements to the courthouse 100,000 DCEO County of Jersey Capital improvements to the courthouse 100,000 DCEO County of Montgomery Capital improvements to the courthouse 100,000 DCEO County of Greene Capital improvements to the courthouse 100,000 DCEO County of Calhoun Capital improvements to the courthouse 100,000 DCEO County of Pike Capital improvements to the courthouse 100,000 DCEO County of Morgan Capital improvements to the courthouse 100,000 DCEO We Care Recycling Renovation and Expansion of the facility 50,000 DCEO Routt Catholic High School Repairs to the roof at the facility 200,000

Page 18: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOCalhoun Community Unit School District 40 Repairs to the roof at Calhoun High School 100,000

DCEO City of Coffeen City Hall repairs 70,000 DCEO City of Carrollton Capital improvements 70,000

DCEOGreenfield Community Unit District 10 Purchase of bleachers 96,000

DCEO Village of Royal Lakes Capital infrastructure improvements 70,000 DCEO City of Virden Playground equipment 30,000

DCEOLitchfield Community School District 12 Converting a classroom into a science lab at the junior high 150,000

DCEO City of White Hall Playground equipment 25,000

DCEO South Otter Township Building a storage facility and make improvements to the Township Village Hall 50,000 DCEO Village of Shipman Building restrooms at the city park 50,000 DCEO Village of Modesto Replacement of fire hydrants and gate valves 50,000 DCEO City of Pittsfield Capital improvements to municipal facilities 70,000 DCEO City of Pittsfield Feasibility study for capital improvements 100,000

DCEOGreenfield Community Unit District 10 Portable wheel chair lift 25,000

DCEO City of Taylorville Repairs to Manners Park Pool 75,000 DCEO Village of Tovey Repairs or demolition of Tovey Elementary School 50,000 DCEO Blackburn College Parking lot repairs and resident hall upgrades 165,000 DCEO City of Girard Capital improvements throughout the city 100,000 DCEO City of Manchester City park upgrades 85,000

DCEOMorrisonville Community Unit School District 1 Upgrade to the fire alarm system 44,000

DCEO City of Bunker Hill Various capital improvements throughout the city 100,000

DCEOTaylorville Community School District 3 Improvements to technology infrastructure 50,000

DCEO Village of Royal Lakes Capital improvements to Royal Lakes Community Center and gym 25,000 DCEO Montgomery County Mt. Olive Trail upgrade between Mt. Olive and Walshville 200,000 DCEO Walshville Township Construction of a new township office 200,000 DCEO City of Bunker Hill Construction of the Bunker Hill Medical Center 100,000

DCEOAccess Community Health Network Purchase of exam room equipment for the Access Alma Family Health Center 30,000

DCEOAccess Community Health Network

Renovations and repairs to the Access West Division located at 4401 West Division Street in Chicago 30,000

DCEOAustin People's Action Center

Purchase and renovation of foreclosed properties for low-income housing and the development and construction of a Women's Wellness Center 450,000

DCEO Bethel New Life, Inc. Conversion of a six-story parking garage into low-income senior housing 250,000

DCEOBoys and Girls Club of West Cook County Renovations and repairs to the facility 125,500

DCEO City of Berwyn Replacing the existing boiler at City Hall 95,000 DCEO City of Berwyn Purchase and installation of a power generator for City Hall 50,000 DCEO City of Berwyn Masonry repairs at City Hall and the Fire Department 40,000 DCEO Habilitative Systems Inc Renovations and repairs to the facility 200,000

DCEOPleasant Ridge Missionary Baptist Church

Construction of a new training and educational development center located at 112 South Central Avenue in Chicago 100,000

DCEO Progressive Ministries Renovations to the facility's Community Service Room 250,000

DCEO Proviso Township New equipment including a new HVAC system for the township's office building 50,000

DCEOProviso-Leyden Council for Community Action, Inc. Replacement of facility's roof 250,000

DCEOResource Center for Westside Communities Purchase and renovation of foreclosed properties for low-income housing 450,000

DCEO Village of North Riverside Renovations and repairs to the North Riverside Civic Center 200,000 DCEO Vision of Restoration, Inc. Development of the Rock Heritage Center 500,000

DCEOWestside Holistic Family Services Renovation of Westside Alternative High School 350,000

DCEO Chicago Park District Capital improvements at Hamilton Park 30,000 DCEO Chicago Park District Renovations to the bathrooms at Harris Memorial Park 100,000 DCEO Chicago Park District Capital improvements at Hayes Park 100,000 DCEO Chicago Park District Capital improvements to Mahalia Jackson Park 25,000

DCEOChildren's Museum of Oak Lawn Capital improvements to the facility 100,000

DCEO City of Chicago Street resurfacing on 87th Street from Ashland Avenue to Pulaski Road 300,000 DCEO City of Chicago Renovation of viaducts at 79th Street and 75th Street 100,000

DCEOCommunity Youth Development Institute Renovations to the facility 150,000

DCEOGreater Auburn Gresham Development Renovations to the building located at 934 West 79th Street in Chicago 100,000

DCEO Maria High School Repaving the parking lot at the facility 125,000 DCEO Maria High School Renovations to the auditorium at the facility 25,000 DCEO New Direction Outreach Construction of a family enrichment center 250,000 DCEO Oak Lawn Park District Capital improvements to Worthbrook Park 150,000 DCEO Oak Lawn Park District Capital improvements at Centennial Park 80,000

DCEOGreater Auburn Gresham Development Corporation

Infrastructure improvements and development at the Metra Station located at 79th Street and Fielding Avenue, Chicago 500,000

DCEO THG Restaurant Group Renovations to the facility located at 76th and Racine in Chicago 250,000 DCEO Holy Cross Hospital Replacement of the utility connecting tunnel 500,000 DCEO Village of Justice Road improvement projects within the village 90,500

Page 19: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO Henry's Sober Living House Renovations at the facility located at 7143 South Harvard in Chicago 25,000

DCEOInner-City Muslim Action Network Feasibility study for capital improvements at Marquette Park 200,000

DCEOBlandinsville Senior Citizens Organization Acquisition and renovation of a new facility 25,000

DCEO Cass County Bridge construction 50,000

DCEO City of BeardstownResurfacing Sixth Street from US 67 to Arenz Street and Arenz Street from Sixth Street to Main Street 100,000

DCEO City of Carthage City Hall and Fire Department renovations and repairs 75,000 DCEO City of Colchester Sewer system improvements 25,000 DCEO City of Griggsville Sewer system improvements 75,000 DCEO City of Hamilton Sewer system improvements 75,000 DCEO City of Havana Expansion of the business park 100,000 DCEO City of Macomb Sanitary Sewer improvements 200,000 DCEO City of Monmouth Construction of a co-generation power facility 100,000 DCEO City of Nauvoo Water system improvements 75,000 DCEO City of Winchester Commercial Street Structure Replacement 50,000

DCEOFairview Fire Protection District Construction of a storage facility 25,000

DCEOFulton County Health Department Construction of a dental facility 50,000

DCEO Hancock County Basco Road Truck Route connecting US 336 and IL 96 50,000 DCEO Henderson County Levy repairs 400,000

DCEOJohn Wood Community College Renovation of facilities 200,000

DCEO Kirkwood Village Construction of shallow well 50,000 DCEO Village of London Mills Costs associated with the installation of emergency sirens 25,000 DCEO McDonough County Road improvements 25,000 DCEO McDonough County Courthouse roof repair 75,000 DCEO Village of Mount Sterling Irrigation and wastepower improvements 50,000

DCEONorth Pike Fire Protection District Renovation of North Pike firehouse 50,000

DCEO Village of Perry Water and sanitary system improvements and repairs 50,000 DCEO City of Quincy Construction of the Hydro-Project 350,000 DCEO Village of Roseville Sewer repairs 50,000

DCEORoseville Fire Protection District Construction of a new fire station 50,000

DCEO City of Rushville Brick Streets Reconstruction Projects 100,000

DCEOSchuyler County Highway Department Improvements and repairs 50,000

DCEO Scott County Repair of courthouse roof 50,000 DCEO Village of Vermont Water main replacement 25,000 DCEO Village of Alsey Water improvement systems 25,000 DCEO Village of Ashland Storm water and flooding improvements 25,000 DCEO Village of Avon Street resurfacing 25,000 DCEO Village of Biggsville Water system improvements 25,000 DCEO Village of Bluffs Replacement of a ground storage tank 25,000 DCEO Village of Easton Road improvements 25,000 DCEO Village of Manchester Storm drainage improvements 25,000 DCEO Village of Mendon Water system improvements 25,000 DCEO Village of Oquawka Construction of waste water treatment facility 50,000 DCEO Village of Versailles Sidewalk repair and replacement 50,000 DCEO Warren County Repair of courthouse roof 50,000 DCEO Warsaw Sewer line construction 25,000 DCEO Dallas City Roadway maintenance and repairs 25,000 DCEO City of Bushnell Sewer system improvements 50,000 DCEO Village of Astoria Roadway maintenance and repairs 50,000 DCEO Village of Alexis Wastewater improvements 25,000 DCEO Village of Manitno Wastewater improvements 25,000 DCEO Gulfport Repairs from flood damage 50,000 DCEO Mason City Wastewater improvements 25,000 DCEO Village of Camp Point Wastewater improvements 25,000 DCEO Village of Liberty Renovation and repairs to the City Hall building 25,000 DCEO Big Brothers Big Sisters New building and signage 70,000

DCEO Easter SealsReplacement of heating and cooling units/system and renovations in the childcare rooms 50,000

DCEOForest Park Community Center Building improvements to the Center in Joliet 25,000

DCEOFriends of Community Public Art Roof replacement, classroom and studio renovations 25,000

DCEO Greater Joliet Area YMCA Construction of an outdoor complex 50,000 DCEO Illinois Advocacy Group Acquisition and renovations of a new location in Joliet 100,000 DCEO Trinity Services Infrastructure improvements 50,000 DCEO United Cerebral Palsy Renovation of bathroom facilities 50,000

DCEOWill County Historical Society Renovations to the facility 50,000

DCEO Village of Bolingbrook Honeywell Project 100,000 DCEO Village of Bolingbrook Infrastructure improvements 400,000 DCEO Village of Channahon Infrastructure improvements 75,000 DCEO City of Crest Hill Infrastructure improvements 150,000

Page 20: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Elwood Infrastructure improvements 85,000 DCEO City of Joliet Mound Road Overlay project 100,000 DCEO City of Joliet Rialto Square Theater-University of st Francis Downtown Campus Project 150,000 DCEO City of Joliet Eastside Water Treatment Facility Plant Outfall Project 150,000 DCEO City of Lockport Infrastructure improvements 150,000 DCEO Village of Manhattan Infrastructure improvements 85,000 DCEO Village of Rockdale Infrastructure improvements 50,000 DCEO Village of Romeoville Infrastructure improvements 300,000 DCEO Village of Shorewood Construction of a Veteran's Memorial 50,000 DCEO DuPage Township Infrastructure improvements 50,000

DCEOGreen Garden Township Highway Department Infrastructure improvements 25,000

DCEO Jackson Township Infrastructure improvements 30,000 DCEO Joliet Township Renovations to the Joliet Township Animal Control building 50,000 DCEO Lockport Township Infrastructure improvements 50,000 DCEO Manhattan Township Infrastructure improvements 30,000 DCEO Troy Township Infrastructure improvements 30,000 DCEO Bolingbrook Park District Infrastructure improvements 50,000

DCEOLockport Township Park District Infrastructure improvements 50,000

DCEO Joliet Park District Infrastructure improvements 100,000 DCEO Manhattan Park District Infrastructure improvements 50,000

DCEOVillage of Romeoville Parks and Recreation Construction and renovation of park trails 50,000

DCEO Cornerstone Services, Inc. Construction and renovation of facilities in Will County 100,000 DCEO Cornerstone Services, Inc. Construction and renovation of facility 500,000

DCEOForest Park Preserve District of Will County Infrastructure improvements 120,000

DCEOJoliet Arsenal Development Authority Planning costs associated with capital improvements 100,000

DCEO Village of Crestwood Purchase and Installation of a generator for the village hall building 80,000 DCEO City of Blue Island Purchase and installation of a generator for the police department building 150,000 DCEO City of Blue Island Purchase and installation of an HVAC system for the public works building 75,000

DCEO Chicago School District 299 Renovations to the Henry R. Clissold School 58,000

DCEO Chicago School District 299 Renovations of the fire alarms system at Henry R. Clissold School 79,000

DCEO Chicago School District 299 Renovations to the student lockers at Henry R. Clissold School 36,000

DCEO Chicago School District 299 Renovations of the LAN power distributor at Henry R. Clissold School 65,000

DCEO Chicago School District 299 Renovations to the Fort Dearborn Elementary School 160,000 DCEO Village of Palos Park Replacing the HVAC system at the Kaptur Administrative Center 50,000 DCEO Village of Palos Park Renovations and improvements to the Historic Recreation Center 140,000 DCEO Village of Palos Park Construction of a railroad quiet zone at 86th Street and 127th Street 60,000 DCEO Village of Palos Park Installation of Traffic light signals at Creek Road and Illinois Route 45 150,000 DCEO Village of Palos Park Renovations to the McCord House 85,000 DCEO Village of Posen Renovations and repairs to the village Community Center 250,000 DCEO Village of Robbins Resurfacing 139th Street 50,000

DCEOLillian Smith Center for Youth Development Construction and renovations of a facility 112,000

DCEO City of Chicago Installation of street lights within the 34th ward 150,000 DCEO City of Chicago Infrastructure improvements to sidewalks within the 34th ward 125,000 DCEO City of Chicago Installation of street lights within the 9th ward 150,000 DCEO City of Chicago Infrastructure improvements to sidewalks within the 9th ward 125,000 DCEO Village of Calumet Park Construction and renovations of the Saltdome 65,000 DCEO Village of Calumet Park Infrastructure improvements to sidewalks within the village 50,000

DCEOCalumet Park Recreation Center Renovations to the facility 25,000

DCEO City of Blue Island Infrastructure improvements to sidewalks within the 2nd ward 100,000 DCEO City of Blue Island Infrastructure improvements to sidewalks within the 6th ward 50,000 DCEO Blue Island Park District Capital improvements to parks 150,000 DCEO Calumet Township Capital improvements within the township and purchase of property 150,000 DCEO Midlothian Park District Capital improvements 30,000 DCEO Village of Crestwood Construction and renovation of the Saltdome 65,000 DCEO City of Oak Forest Infrastructure improvements to sidewalks 50,000 DCEO City of Blue Island Infrastructure improvements to sidewalks within the 7th ward 50,000 DCEO Cornerstone Chicago Renovation of Halfway House Recovery Home 25,000 DCEO Bridge the Gap, Inc. Capital improvement to that facility 25,000 DCEO Blue Island Little League Capital improvements 25,000

DCEOMetropolitan Family Services Capital improvements 25,000

DCEO Blue Island Fire Department Infrastructure improvements at the facility 25,000 DCEO Village of Robbins Infrastructure improvements to sidewalks within the village 35,000 DCEO Oak Forest Park District Infrastructure improvements 25,000 DCEO Village of Midlothian Infrastructure improvements to sidewalks within the village 30,000 DCEO Village of Crestwood Infrastructure improvements within the village 25,000 DCEO Bremen Township Infrastructure improvements within the township 25,000

Page 21: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO18th st Development Corporation Capital improvements to the facility 75,000

DCEOBack of the Yards Neighborhood Council Construction of a community center 800,000

DCEOOur Lady of Good Council Church

Purchase and installation of a new heating and cooling unit for the Blessed Sacrament Youth Program 100,000

DCEO

City of Chicago, sts and Sanitation, Bureau of Electricity Residential st lighting at South Artesian st from 51st st to 49th st 140,000

DCEO

City of Chicago, sts and Sanitation, Bureau of Electricity Residential st lighting at South Campbell st from 51st st to 49th st 140,000

DCEO

City of Chicago, sts and Sanitation, Bureau of Electricity Residential st lighting at South Washtenaw st from 51st st to 49th st 140,000

DCEO

City of Chicago, sts and Sanitation, Bureau of Electricity Residential st lighting at South Rockwell st from 51st st to 49th st 140,000

DCEOOfficer Donald Marquez Charter School development of a soccer field 250,000

DCEO Mujeres Latinas En Accion Capital development and neighborhood improvements 200,000

DCEOLouis L. Valentine Boys and Girls Club of Chicago Renovations and repairs to the facility 511,000

DCEO

General Robert E. Woods Boys and Girls Club of Chicago Capital improvements at the facility 250,000

DCEO Rauner Family YMCA Capital improvements to the facility 500,000 DCEO Alivio Medical Center Capital improvements at the facility 200,000 DCEO Saint Paul Parish Capital improvements at the facility located at 2127 W/ 22nd Place, Chicago 100,000 DCEO St. Ann Catholic School Capital improvements at the school 100,000

DCEOBrighton Park Neighborhood Council Capital improvements at the facility 450,000

DCEO Gale Sayers Center Renovations and repairs to the facility 100,000

DCEOAccess Community Health Network Capital improvements to the Cabrini Family Health Center 100,000

DCEO Centro De Salud Esperanza Improvements to the facility 100,000 DCEO Chicago Park District Capital improvements at Gage Park 90,000 DCEO Chicago Area Project Purchase and rehabilitation of property 500,000 DCEO Centers for New Horizons Upgrades to Elam House 250,000 DCEO Chicago Baptist Institute Capital improvements to the library 75,000

DCEOBishop Shepard Little Memorial Center, Inc. Costs associated with the construction of a community center 75,000

DCEO Community Health Renovations and capital improvements to Englewood satellite site 100,000

DCEODiversified Behavioral Comprehensive Care Purchase of property and renovations to the buildings purchased 500,000

DCEO Gordie's Foundation, Inc. Construction and renovation to the existing facility 400,000 DCEO Institute for Positive Living Purchase and renovation of a building located at 5859 South State in Chicago 445,000

DCEOPlano Child Development Center

Purchase and or rehabilitation of a building to expand the "Eye Can Learn" program 300,000

DCEOUnited Services of Chicago, Inc.

Repair and rehabilitation of the properties located at 3656 South King Drive and 330 East 37th st in Chicago 100,000

DCEOAda S. McKinley Community Services. Inc.

Costs associated with the renovations of buildings located at 6033 South Wentworth Avenue and 2920 South Wabash Avenue 75,000

DCEODaniel J. Nellum Youth Services, Inc. Capital improvements to the facility 45,000

DCEO

Human Resources Development Institute, Inc. (HRDI) Building repairs and ADA upgrades at 340 East 51st st in Chicago 35,000

DCEOSouth Side Community Act Center Building repairs and waterproofing 25,000

DCEOUnion Missionary Baptist Church Renovation to the church facility, including previously incurred costs 75,000

DCEOAccess Community Health Network Acquisition and renovation of a facility 50,000

DCEO South Park Baptist ChurchConstruction of the Senators Fred and Margaret Smith East of Eden Housing and Senior Services Center 100,000

DCEOCommunity Mental Health Council, Inc. Building improvements 50,000

DCEOChicago Heights Park District Park improvements 100,000

DCEO City of Chicago Heights Development and construction of a new 911 dispatch center 300,000

DCEO City of Chicago HeightsDevelopment and construction of a new middle school academy located at the corner of Dixie Highway and 10th Street, Chicago Heights 250,000

DCEO City of Momence Reconstruction of the waterbank and sidewalk 50,000

DCEOEastern Will County Senior Transit Renovations and repair to facility 275,000

DCEO Village of Aroma Park Roadway and maintenance repairs 155,000 DCEO Village of Beecher renovations to sewer plant 50,000 DCEO Village of Bradley New fire station 75,000 DCEO Village of Crete Expansion of village water utility system 300,000

Page 22: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Flossmoor Replacement of stlights 200,000 DCEO village of Glenwood Forest Area water main replacement 100,000 DCEO village of Homewood Renovations and improvements to the village sewer system 50,000

DCEOPembroke Township Library District Construction of village library in Ida Bush School 300,000

DCEO Village of Olympia Fields Expansion and renovation of the Southwest Water System 50,000 DCEO Village of Sauk Village Renovations and repairs to Arrowhead and Carroll Parks 135,000 DCEO Village ot Steger Installation of stlights on the Sauk Trail 75,000 DCEO Glenwood School for Boys Facility improvements 25,000

DCEOChicago Heights Youth Committee Facility improvements 25,000

DCEOSouth Suburban Area Project Facility improvements 25,000

DCEO Grand Prairie Services Facility improvements 25,000

DCEOAunt Martha's Health Care Network Facility improvements 25,000

DCEO South Star Services Facility improvements 25,000 DCEO Lynwood Infrastructure improvements 50,000 DCEO Bloom Township Infrastructure improvements 30,000 DCEO South Chicago Heights Infrastructure improvements 125,000 DCEO Washington Township Infrastructure improvements 15,000 DCEO Kankakee Courthouse Improvements to the courthouse 375,000 DCEO Thrive Counseling Center Renovations 50,000 DCEO City of Northlake Renovation and expansion of the city police department 300,000 DCEO Dominican University Restoration of the Hemingway Boyhood Home 150,000

DCEOGreat True Vine Baptist Church Associated with repairs to the facility 50,000

DCEOHephzibah Childrens Association Repairs and renovations to the facility at 946 N. Boulevard in Oak Park 100,000

DCEO Triton College Renovations to facilities including roof replacements 400,000

DCEOUnity Temple Unitarian Restoriation Foundation Replacement of the HVAC system 250,000

DCEO Village of River Grove Improvements to municipal facilities 600,000 DCEO Village of Rosemont Improvements to municipal facilities 500,000 DCEO Village of Stone Park Construction of a public safety building 900,000 DCEO Lincoln Park Zoo Capital improvements 1,600,000 DCEO Clearbrook Capital improvements 829,000 DCEO Village of Tinley Park Infrastructure improvements 150,000

DCEO

Illinois Coalition for Immigrant and Refugee Rights John Donahue Immigrant Training Center 250,000

DCEO Chicago Public Schools ADA compliant building at Whittier Elementary School 200,000 DCEO La Casa Fallen Police Memorial in Pisen 100,000 DCEO St. Pius V Parish Construction of a second level at the Casa Juan Diego Youth Center 200,000 DCEO Alivio Medical Center Expand the Western Avenue clinic 200,000 DCEO St. Paul Church New community center 100,000

DCEO

Peace and Education Coalition of Back of the Yards Infrastructure improvements 500,000

DCEO St. Ann Catholic School Building improvements 100,000 DCEO Mujeres Latinas en Accion General infrastructure 200,000 DCEO Gale Sayers Center General infrastructure 100,000

DCEODorman Dunn Chapter of Veterans of Foreign Wars General infrastructure 50,000

DCEOMcKinley Chapter of Veterans of Foreign Wars General infrastructure 50,000

DCEO Chicago Public Schools Renovation of soccer field at Ames Middle School 20,000 DCEO Chicago Public Schools Renovations at Nixon Elementary School 100,000 DCEO Chicago Public Schools Renovations at Prosser Career Academy 100,000 DCEO Chicago Public Schools Renovations to the track at Steinmetz Academic Centre 100,000 DCEO Chicago Public Schools Renovations to the restrooms at Hanson Park Stadium 100,000 DCEO Chicago Park District Playground at Blackhawk Park 75,000 DCEO Chicago Park District Renovations to Greenbaum Play lot Park 75,000 DCEO Chicago Park District Renovations at Hermosa Park 75,000 DCEO Chicago Park District Renovations at Mozart Park 35,000 DCEO Chicago Park District Playground at Riis Park 125,000 DCEO Seeds of Hope, Inc. Infrastructure improvements on Fullerton Avenue 20,000 DCEO YMCA of Metro. Chicago Pool at McCormick Tribune YMCA 300,000

DCEO

Hispanic American Construction Industry Association Land purchase and renovations 850,000

DCEO La Casa Puertorriquena Infrastructure improvements 100,000

DCEOHispanic Houseing Development Corporation General infrastructure 30,000

DCEOHealthcare Alternative Systems Expansion of facilities 150,000

DCEOLatino Arts and Communications Real property and upgrades to utility systems 125,000

DCEO Namioki Township General infrastructure 75,000

DCEOVillage of Godfrey - Piasa Hills General infrastructure 100,000

Page 23: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of East Alton General infrastructure 100,000

DCEO St. Anthony's Health Center Lab system and diagnostic improvements 100,000

DCEOForest Homes - Maple Park Water District Replacement of a water main 75,000

DCEO Alton YMCA Building improvements 25,000 DCEO Lewis and Clark Society Waterlines and a picnic shelter at the state historic site in Hartford 100,000

DCEOFosterburg Fire Protection District Emergency generator 25,000

DCEOMitchell Public Water District Water line relocation 75,000

DCEOHoliday Shores Fire Department Natural gas generator 25,000

DCEO Village of Roxana General infrastructure 100,000

DCEORosewood Heights Sanitary District Relining of the main water line 75,000

DCEO Alton Memorial Hospital Lab upgrade 70,000 DCEO Alton Township General infrastructure 50,000 DCEO City of Granite City General infrastructure 30,000

DCEO

Community Counseling Center of Northern Madison County Building improvements 50,000

DCEO City of Alton General infrastructure 125,000 DCEO Choteau Nameoki Venice Drainage district, tree removal, and ditch improvements 25,000 DCEO City of Wood River General infrastructure 100,000 DCEO William BeDell Center Building improvements 25,000 DCEO Village of Bethalto General infrastructure 150,000 DCEO Village of South Roxana General infrastructure 50,000 DCEO Village of Hartford General infrastructure 50,000

DCEO City of ChicagoFor clean up of the Eagle Monument, new lighting, and other upgrades in Logan Square 100,000

DCEOHealthcare Alternative Systems, Inc Façade Renovations 100,000

DCEOInstitute for Puerto Rican Arts and Culture Completion of museum construction 50,000

DCEO Voice of the City Space Renovations 50,000

DCEO The Miracle Center, Inc.New building of afterschool programs, weekend programs, and teen reach activities at the Grace and Peace Center 250,000

DCEO Aspira Incorporated Construction of a new school 100,000 DCEO Puerto Rican Arts Alliance General infrastructure 250,000 DCEO Chicago Park District Field house improvements at Koscinszko Park 165,000

DCEOBickerdike Redevelopment Corp. Affordable housing at Zapata Apartments 250,000

DCEO Chicago Park District Field house improvements at Kelvyn Park 100,000 DCEO City of Chicago General infrastructure in the 31st Ward 100,000 DCEO City of Chicago General infrastructure in the 35th Ward 100,000

DCEOLatino Pastoral Action Center General Infrastructure 100,000

DCEO Chicago Public Schools General infrastructure at Kelvyn Park High School 50,000 DCEO Blackhawk College Energy efficient infrastructure upgrades 1,000,000

DCEO

Association of Retarded Citizens of Rock Island County Energy efficient infrastructure upgrades 600,000

DCEORend Lake Conservancy District Infrastructure improvements 45,000

DCEO John A. Logan College Infrastructure improvements 100,000 DCEO Village of Stonefort Infrastructure improvements 25,000 DCEO Village of Ziegler Infrastructure improvements 90,000 DCEO Village of Freeman Spur Infrastructure improvements 30,000 DCEO City of West Frankfort Infrastructure improvements 100,000 DCEO Village of Crainville Infrastructure improvements 50,000 DCEO Village of North City Infrastructure improvements 25,000 DCEO Williamson County Infrastructure improvements 100,000 DCEO City of Marion Infrastructure improvements 150,000 DCEO Village of Bush Infrastructure improvements 30,000 DCEO Village of Cambria Infrastructure improvements 50,000 DCEO City of Carterville Infrastructure improvements 90,000 DCEO Franklin County Infrastructure improvements 100,000 DCEO Village of Ewing Infrastructure improvements 25,000 DCEO City of McLeansboro Infrastructure improvements 50,000 DCEO City of Sesser Infrastructure improvements 50,000 DCEO City of Creal Springs Infrastructure improvements 30,000 DCEO Village of Hurst Infrastructure improvements 30,000 DCEO Village of Hanaford Infrastructure improvements 30,000 DCEO Village of Thompsonville Infrastructure improvements 35,000 DCEO Village of Pittsburgh Infrastructure improvements 35,000 DCEO Village of Spillertown Infrastructure improvements 30,000 DCEO City of Orient Infrastructure improvements 35,000 DCEO Village of Crab Orchard Infrastructure improvements 35,000 DCEO City of West City Infrastructure improvements 25,000 DCEO McLeansboro Township Infrastructure improvements 100,000

Page 24: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOWilliamson County Airport Authority Infrastructure improvements 80,000

DCEO Village of Evergreen Park st Repaving, sewers, and water main repairs 300,000 DCEO Village of Oak Lawn st Repaving, sewers, and water main repairs 300,000 DCEO Village of Chicago Ridge st repaving, gutters, and sewers 250,000

DCEOAdvocate Christ Medical Center Pediatric Emergency Care Center 100,000

DCEOLittle Company of Mary Hospital Hospital construction 100,000

DCEO Village of Park Lawn Improvements of upgrades to the Park Lawn Center and Rehab Center 100,000 DCEO Misericordia Home Construction of a CILA home 150,000 DCEO Oak Lawn Public Library Repairs to Equipment 25,000

DCEOEvergreen Park Public Library Tech upgrades 25,000

DCEO Oak Lawn Park District Park improvements 25,000

DCEOChicago Ridge Public Library Tech upgrades 25,000

DCEOMetropolitan Family Services Infrastructure improvements 25,000

DCEO Chicago Park District Improvements to Foster Park 25,000 DCEO Chicago Park District Improvements to O'Hallaren Park 25,000 DCEO Village of Evergreen Park Improvements at Klein Park 25,000

DCEO Village of Evergreen Park Improvements to the Senior Citizens Center and installation of an HVAC system 100,000 DCEO Holy Cross Hospital Infrastructure upgrades 300,000 DCEO Berwyn Park District Upgrades to Janura Park 400,000 DCEO Universidad Popular Energy efficient infrastructure upgrades 180,000

DCEOMetropolitan Family Services General infrastructure upgrades 500,000

DCEO Mobile CARE FoundationGeneral infrastructure program for a program to address asthma problems in minority populations 220,000

DCEO Muntu Dance Theatre General Infrastructure 750,000 DCEO City of Chicago Infrastructure in the 4th ward 600,000 DCEO City of Chicago Infrastructure improvements in the 20th ward 200,000 DCEO Walter McCrone Industries General infrastructure 150,000 DCEO Center for New Horizons General infrastructure 150,000 DCEO United Services of Chicago General infrastructure 150,000

DCEO Black United Fund of Illinois General infrastructure 50,000

DCEODuSable Museum of African American History General infrastructure 100,000

DCEO Edward G Irvin Foundation General infrastructure 100,000

DCEONorth Aurora Fire Protection District Building of a new classroom 50,000

DCEO Paramount Arts Centre Renovation of the Paramount Theatre 100,000 DCEO Aurora Township Sewers 50,000 DCEO City of Aurora Repairs to Downers Place Bridge 500,000 DCEO Hesed House Building project 50,000 DCEO Moecherville Fire Dpt. Infrastructure Improvements 50,000

DCEOAssociation for Individual Development Construction of Facilities 50,000

DCEONorth Aurora Fire Protection District Sidewalks on Route 31 100,000

DCEO City of Montgomery Bridge implementation project at U.S. Route 30 and Orchard Road 100,000 DCEO City of Aurora Aurora Early Learning Center 330,000

DCEOEast Aurora School District 131 Infrastructure updates to tech and equipment 200,000

DCEOWaubonsee Community College infrastructure improvement, updates and repairs 20,000

DCEOFifth City Chicago Reformulation Corporation building renovations and rehabilitation 500,000

DCEO Chicago Area Project infrastructure improvements 300,000

DCEOAcademy of Scholastic Achievement infrastructure improvements 200,000

DCEO Chicago Park District infrastructure improvements to Smith Park 200,000 DCEO Chicago Park District infrastructure improvements to Garfield Park - DCEO Mt. Vernon Baptist Church construction of a commercial kitchen at JLM Abundant Life Center 200,000

DCEOHaven of Rest Missionary Baptist Church

building improvements and renovations of the John Conner Fellowship Hall and Community Center 400,000

DCEOYMCA of Metropolitan Chicago improvements to the pool and gym a the South Chicago YMCA 150,000

DCEOCalvary Baptist Chuch in Chicago infrastructure improvements at the Complex and Gymnasium 150,000

DCEOXi Lambda Chapter of A Phi A, Inc.

installation and renovation of Americans with Disabilities Act (ADA) accessible improvements 100,000

DCEOOur Lady of Peace in Chicago ADA approved accessibility improvements 45,000

DCEOHegewisch Chamber of Commerce renovations to the chamber office building 75,000

DCEO City of Chicago decorative st lights in eight blocks in the 8th Ward 295,000

Page 25: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOLa Causa Community Committee facility renovations 85,000

DCEOHegewisch Community Committee interior rehabilitations 75,000

DCEO Streamwood Park District infrastructure improvements at Dolphin Park 115,000 DCEO Streamwood Park District playground renovations to Kiddie Corner Park 75,000 DCEO Hanover Park Park District exterior repairs to the Community Center 150,000 DCEO Hanover Park District infrastructure improvements at Ahlstrand Park 150,000 DCEO Village of Hoffman Estates construction of a police station 175,000

DCEO

The Children's Advocacy Center of North and Northwest Cook County reconstruction of the building 30,000

DCEO Village of Streamwood construction and repairs to the Bartlett Fire Training Tower 25,000 DCEO Village of Hanover Park reconstruction of Astor Avenue 100,000 DCEO Village of Streamwood construction of a sanitary sewer rehabilitation project 77,000

DCEOWomen in Need Growing Stronger (WINGS) construction of a domestic violence shelter 30,000

DCEO Roosevelt University construction of a pharmacy school 75,000

DCEOHoffman Estates Park District infrastructure improvements at Canterbury Fields Park 48,000

DCEO Streamwood Park District playground construction at Shady Oaks Park 75,000 DCEO Village of Schaumburg replace a sidewalk 50,000 DCEO Streamwood Park District infrastructure improvements at Hoosier Grove Park 25,000 DCEO Chicago Park District physical plant repairs to Don Nash Park 100,000 DCEO Chicago Park District physical plant repairs to Rainbow Beach and Park 100,000 DCEO Chicago Park District physical plant repairs to Russell Square Park 100,000 DCEO Chicago Park District physical plant repairs to Veterans Memorial Park 100,000 DCEO Chicago Park District rehabilitation to Harold Washington Park 100,000 DCEO Chicago Public Schools building repairs at Robert A. Black Magnet School 50,000 DCEO Chicago Public Schools building repairs at Bouchet Elementary Math and Science Academy 50,000

DCEO Chicago Public Schoolsbuilding repairs at Myra Bradwell Communitions Arts and Sciences Elementary School 50,000

DCEO Chicago Public Schools building repairs at Canter Middle School 50,000 DCEO Chicago Public Schools building repairs at Andrew Carnegie Elementary School 50,000 DCEO Chicago Public Schools building repairs at Harte Elementary School 50,000 DCEO Chicago Public Schools building repairs at Mireless Elementary Academy 50,000 DCEO Chicago Public Schools building repairs to Ninos Heroes Elementary Academic Center 50,000 DCEO Chicago Public Schools building repairs at Parkside Elementary Community Academy 50,000 DCEO Chicago Public Schools building repairs at South Chicago Elementary School 50,000 DCEO Chicago Public Schools building repairs at New Sullivan School 50,000 DCEO Chicago Public Schools building repairs at Wadsworth Elementary School 50,000 DCEO Chicago Public Schools building repairs at Kenwood Academy High School 200,000 DCEO Chicago Public Schools building repairs at Hyde Park Academy High School 200,000

DCEOChicago Department of Transportation traffic intersection upgrades at 59th and Cornell Drive 200,000

DCEOChicago Department of Transportation new traffic signals at 81st at Exchange Avenue 400,000

DCEOAda S McKinley Community Services, Inc renovations to the Ersula Howard Childcare Center 50,000

DCEOAda S McKinley Community Services, Inc renovations to the South Chicago Neighborhood House 50,000

DCEO Chicago Youth Centers Crowne Center Building renovations 50,000

DCEOExcellent Way Urban Outreach renovations to Excellent Way Homeless Shelter 25,000

DCEOHyde Park Neighborhood Club renovations 50,000

DCEOSouth Central Community Services, Inc. renovations to the South Shore Campus 75,000

DCEOSouth East Alcohol and Drug Abuse Center renovations 50,000

DCEOYMCA of Metropolitan Chicago renovations to South Chicago YMCA 75,000

DCEOYMCA of Metropolitan Chicago renovations to South Chicago YMCA 75,000

DCEOACCESS Community Health Network for physical plant improvements at Brandon Family Health Center 100,000

DCEOChicago Family Health Center for physical plant improvements 100,000

DCEO Family Rescue plant improvements 100,000

DCEOBlack United Fund of Illinois Incorporated for physical plant improvements 100,000

DCEOYMCA of Metropolitan Chicago pool upgrades at the Niles Leaning Tower YMCA 60,000

DCEO Niles Park District improvements to athletic fields 25,000 DCEO Chicago Park District renovations to Eugene Field park 150,000 DCEO Chicago Park District renovations to Gompers Park 225,000 DCEO Chicago Park District construction of a new playground at Sauganash Park 150,000 DCEO Chicago Park District construction of a new playground w/ a water system at Mather Park 100,000 DCEO City of Niles reconstruction of an alley between Riverside Drive and Days Terrace 70,000 DCEO Morton Grove Park District renovations to athletic fields at Palma Lane Park 75,000 DCEO Chicago Public Schools renovations and additions to Sauganash Elementary School 50,000

Page 26: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Chicago Public Schools renovations and additions to Palmer Elementary School 50,000 DCEO Chicago Park District lighting and landscaping at Wildwood Park 50,000 DCEO Chicago Park District replacement of the "Pirate Ship" playground at Peterson Park 45,000 DCEO Chicago Public Schools renovations and additions to Solomon Elementary School 50,000 DCEO Misericordia Home infrastructure improvements 75,000 DCEO Chicago Public Schools renovations and additions to Edgebrook Elementary School 50,000

DCEOIrish American Heritage Center renovations to the building 50,000

DCEO Morton Grove Park District renovations to the playground at Jacob's Park 75,000

DCEO Chicago Public Schools renovations, constructions, and improvements to Wildwood World Magnet School 50,000 DCEO City of Chicago renovations to the North park Village senior center 100,000 DCEO Chicago Public Schools renovations to Jamieson Elementary School 50,000

DCEOAlbany Park Community Center renovations to the building 50,000

DCEO Chicago Public Schools renovations of Shoop School 55,000 DCEO Village of Calumet Park infrastructure improvements 50,000 DCEO City of Crestwood infrastructure improvements 25,000 DCEO Chicago Park District infrastructure improvements for Brainerd Park 250,000 DCEO Chicago Park District infrastructure improvements for Oakdale Park 100,000 DCEO Chicago Park District Jackie Robinson Field restorations 7,000 DCEO Chicago Public Schools Clissold Elementary School infrastructure improvements 150,000 DCEO Chicago Public Schools Fort Dearborn infrastructure improvements 40,000

DCEO Kwame Nkrumah Academy infrastructure improvements 100,000 DCEO Village of Palos Park infrastructure improvements 50,000 DCEO Chicago Public Schools Esmond School technology improvements 75,000 DCEO Chicago Public Schools Morgan Park High School technology and infrastructure improvements 275,000 DCEO Chicago Public Schools Percy Julian High School technology and infrastructure improvements 25,000 DCEO Chicago Public Schools Green Elementary School technology and infrastructure improvements 60,000 DCEO Chicago Public Schools Kipling Elementary School technology and infrastructure improvements 60,000

DCEO Chicago Public Schoolssecurity and infrastructure improvements for a building located at 1234 West 95th st in Chicago 20,000

DCEO City of Alsip technology and infrastructure improvements 75,000 DCEO Chicago Park District Crescent Park infrastructure improvements 100,000 DCEO City of Blue Island technology and infrastructure improvements 25,000

DCEOBrainerd Community Development Corp infrastructure improvements 533,000

DCEO Village of Calumet Park infrastructure improvements and/or renovations 100,000 DCEO Village of Riverdale infrastructure improvements and/or renovations 100,000 DCEO City of Dolton infrastructure improvements associated w/ the 911 dispatch switch 87,500 DCEO City of Harvey infrastructure improvements and/or renovations 100,000 DCEO City of Markham infrastructure improvements 125,000 DCEO Village of Phoenix infrastructure improvements and/or renovations 75,000 DCEO Village of Dixmoor infrastructure improvements and/or renovations 50,000 DCEO Village of East Hazel Crest infrastructure improvements and/or renovations 75,000 DCEO Village of Hazel Crest infrastructure improvements and/or renovations 75,000 DCEO Village of Homewood infrastructure improvements and/or renovations 100,000 DCEO City of Oak Forest infrastructure improvements and/or renovations 100,000 DCEO Village of Midlothian infrastructure improvements and/or renovations 100,000 DCEO Village of Posen infrastructure improvements and/or renovations 70,000

DCEO Village of Posen infrastructure improvements and/or renovations to the Posen Recreation Center 25,000 DCEO Village of Robbins infrastructure improvements and/or renovations 150,000

DCEO City of Blue Islandinfrastructure improvements and/or renovations to the Blue Island Recreation Center 25,000

DCEO City of Chicago infrastructure improvements and/or renovations to the 9th Ward 100,000 DCEO City of Chicago infrastructure improvements and/or renovations to the 34th Ward 80,000 DCEO Village of Robbins infrastructure improvements and/or renovations to the Robbins Center 37,500 DCEO Thornton Township infrastructure improvements and/or renovations 25,000 DCEO Village of Park Forest general infrastructure 50,000

DCEOChicago Hieghts Park District general infrastructure 25,000

DCEOCrete Township Fire Protection District general infrastructure 25,000

DCEO Village of Lansing general infrastructure 25,000 DCEO Village of Lynwood general infrastructure 25,000 DCEO Village of University Park general infrastructure 25,000 DCEO Bloom Township general infrastructure 30,000 DCEO Washington Township general infrastructure 20,000 DCEO Village of Crete general infrastructure 238,300 DCEO City of Chicago Heights general infrastructure 438,300 DCEO Crete Township general infrastructure 50,000 DCEO Village of Olympia Fields general infrastructure 50,000 DCEO Village of Glenwood general infrastructure 50,000 DCEO Village of Homewood general infrastructure 50,000

DCEOVillage of South Chicago Heights general infrastructure 161,700

DCEO Sauk Village general infrastructure 211,700 DCEO Village of Steger general infrastructure 50,000 DCEO Village of Flossmoor general infrastructure 50,000

Page 27: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Beecher general infrastructure 25,000 DCEO City of Kankakee general infrastructure 150,000 DCEO City of Momence general infrastructure 100,000

DCEO Village of Sun River Terrace general infrastructure 100,000 DCEO Village of Beaverville general infrastructure 50,000 DCEO Village of Bradley general infrastructure 150,000 DCEO Village of Donovan general infrastructure 50,000 DCEO Village of Grant park general infrastructure 100,000 DCEO Village of Martinton general infrastructure 50,000 DCEO Village of Papineau general infrastructure 50,000 DCEO Village of St. Anne general infrastructure 100,000 DCEO Village of Symerton general infrastructure 50,000 DCEO Village of Aroma Park general infrastructure 100,000 DCEO Village of Beecher general infrastructure 50,000 DCEO Village of Hopkins Park general infrastructure 300,000 DCEO Village of Peotone general infrastructure 100,000 DCEO Pembroke Township general infrastructure 100,000 DCEO Matthew House general infrastructure upgrades 20,000

DCEODoor of Hope Rescue Mission general infrastructure upgrades 60,000

DCEO Centers for New Horizons construction and renovation 250,000

DCEO Chicago Public Schoolsinfrastructure upgrades at McCorcle, Overton, Carter, Manierre, South Loop and Dulles elementary schools 330,000

DCEOHuman Resources Development Institute general infrastructure upgrades 50,000

DCEO Brand New Beginnings general infrastructure upgrades 100,000 DCEO City of Chicago construction and renovation at Eden's Place Nature Center in Fuller Park 250,000

DCEOOld Town Merchants and Residents Association general infrastructure upgrades 100,000

DCEOYMCA of Metropolitan Chicago General infrastructure upgrades at Lawson House YMCA 100,000

DCEO Chicago Park DistrictLorraine Hansberry Park. Fuller Park, Taylor Park. Cottontail Park, Dearborn Park, and Metcalf Park 240,000

DCEOBoys' Club/Girls' Club of Chicago Construction and renovation at the Yancey Boys' Club/Girls' Club 30,000

DCEOK.L.E.O. Community Family Life Center Parking lot resurfacing and renovation 70,000

DCEO City of Elgin Raymond st overlay 220,000

DCEOCarpentersville Fire Department Renovations of Fire Station 2 100,000

DCEO Elgin U-46 School District Building and sidewalk improvements at Elgin High School and Larkin High School 240,000

DCEOCarpentersville School District 300 Building improvements 250,000

DCEODundee Township Park District

Replacing the roof of the Recreation Center, for resurfacing parking lots, and for a bike path 200,000

DHS Building repairs at Elgin Mental Health Center 100,000 DCEO Village of Carpentersville Road repairs 50,000 DCEO Village of East Dundee Road repairs 20,000 DCEO Village of South Elgin Road repairs 20,000 DCEO Chicago Park District Infrastructure improvements at Weisman Park 100,000

DCEOHoward Brown Health Center in Chicago Clinical space modifications 195,000

DCEOJewish Federation of Metropolitan Chicago General renovations and repairs at the Florence Heller Jewish Community Center 155,000

DCEO Night Ministry Permanent improvements at the Night Ministry Center 44,000

DCEOLincoln Park Conservancy in Chicago

Repair, rehabilitation and restoration to Caldwell Lily Pool, North Pond and the Diversey Building 200,000

DCEOJewish Federation of Metropolitan Chicago Fire escape replacement at the Ezra Multi-Service Center 124,000

DCEOCounseling Center of Lakeview in Chicago New roof 25,000

DCEO Thresholds in Chicago General repairs to the building that houses Mother's Project 30,000 DCEO Thresholds in Chicago General repairs and renovations at the Dincin Center 100,000

DCEOCenter on Halsted in Chicago General repairs and renovations 195,000

DCEO Bonaventure House Room renovations 100,000

DCEOIllinois Masonic Medical Center Renovations and repairs to the neo-natal intensive care unit 232,000

DCEOHolocaust Memorial Foundation of Illinois

Infrastructure improvements at the Illinois Holocaust Museum and Education Center in Skokie 100,000

DCEO Village of Findlay General infrastructure 150,000 DCEO Whitmore Township Road repairs 100,000 DCEO Village of Lovington Design and construction of flood control 150,000 DCEO City of Windsor General infrastructure 150,000 DCEO Moultrie County Courthouse boiler repairs 45,000 DCEO Village of Arthur Palmer st Bridge replacement 112,500

DCEOSt. Mary's Hospital in Decatur Fire sprinkler expansion 250,000

DCEO Shelby County Okaw-Windsor Bridge and road repairs 160,000

Page 28: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Decatur Memorial Hospital Construction of a pedestrian corridor 120,000

DCEOArgenta-Oreana Fire Department Construction and repair 50,000

DCEO Village of Mt. Zion Henderson st improvements 80,000 DCEO Village of Findlay Park improvements 25,000 DCEO City of Sullivan Route 32 drainage improvements 100,000 DCEO Village of Moweaqua Infrastructure improvements 57,500 DCEO Village of Dalton City Infrastructure improvements 50,000 DCEO City of Chicago Local infrastructure improvements in the 18th ward 150,000 DCEO Village of Oak Lawn Infrastructure improvements to schools, libraries, parks and museums 150,000 DCEO Village of Bridgeview Infrastructure improvements to schools, libraries, parks and museums 130,000 DCEO St. Bernard Hospital Building renovations and improvements 45,000 DCEO City of Chicago local infrastructure improvements in the 21st ward 100,000 DCEO Holy Cross Hospital Building renovations and improvements 195,000 DCEO Leo Catholic High School Building renovations and improvements 300,000 DCEO Village of Justice Infrastructure improvements to schools, libraries, parks and museums 130,000 DCEO City of Chicago Local infrastructure improvements in the 17th ward 150,000

DCEOMuhammad Holy Temple of Islam Facility improvements at the Salaam Conference Center 150,000

DCEO City of Chicago Local infrastructure improvements in the 6th ward 100,000 DCEO Chicago Public Schools Construction of an addition at Joseph Lovett Elementary School 200,000 DCEO Catholic Bishop of Chicago General infrastructure St. Martin de Porres Church 140,000 DCEO Bethel New Life, Inc Construction of 150 new senior apartments in Chicago 200,000

DCEOAustin Chamber of Commerce Construction of a new facility 500,000

DCEO Habilitative Systems, Inc General infrastructure 50,000 DCEO Life Missionary Baptist Construction of an ex-offender building 100,000

DCEOCPS INFRASTRUCTURE (SPENCER ELIM INFRA. AT SPNECER ELEMETARY MATH AND SCIENCE 50,000

DCEO Park District Oak Park General Infrastructure 100,000 DCEO Chicago Public Schools General Infrastructure Clark G.R. Elem. Chicago 50,000 DCEO City of Berwyn Infrastructure 50,000 DCEO Chicago Public Schools Security Improvements and general infrastructure at Nash Elem 50,000

DCEOMid Austin Steering Committee General infrastructure Repairs 60,000

DCEO Chicago Public Schools Lewis Elementary. Security $ General Infra 50,000 DCEO Chicago Public Schools McNair Elem Security and General Infra 50,000 DCEO Island Civic Association General Infra. 30,000 DCEO Chicago Public Schools Armstrong L. Elem Security and General Infra. 50,000 DCEO Chicago Public Schools May Community Academy Security Infra 50,000 DCEO Chicago Public Schools John Hay Community Academy security infra, IT and general infra 50,000

DCEO

Austin African American Business Networking Association General infrastructure 45,000

DCEOHouse of Prayer Deliverance Center Church General infrastructure 30,000

DCEO Village of North Riverside Lighting at the community theater 25,000

DCEORhema Community Development Corporation General infrastructure 50,000

DCEO Chicago Public Schools General infrastructure at Clark Academic Preperatory Magnet High School 60,000 DCEO Westside Health Authority General infrastructure 60,000 DCEO Village of Schaumburg Lighting on Plum Grove Road 400,000 DCEO Village of Hoffman Estates Construction of a 911 dispatch center 150,000 DCEO City of Rolling Meadows Infrastructure improvements 50,000 DCEO Hanover Park District Renovations and improvements at Safari Springs 75,000 DCEO Elk Grove Village Renovations and infrastructure improvements to the Devon Avenue lift station 100,000 DCEO Village of Bloomingdale Infrastructure improvements to the Indian Lakes drainage project 50,000 DCEO Village of Roselle Reconstruction project to Foster Avenue 75,000

DCEO ClearbrookConstruction and infrastructure improvements of the Community Integrated Living Arrangement (CILA) 30,000

DCEO Alfred Campanelli YMCA Lighting upgrades 35,000

DCEOCountryside Association for People with Disabilities Inc Lighting upgrades at the training center 35,000

DCEO Village of Hanover Park Reconstruction and infrastructure improvements on Arden Avenue 50,000 DCEO Roosevelt University Construction of a pharmacy school on campus 75,000

DCEOHoffman Estates Park District Renovations and improvements at Canterbury Park 75,000

DCEO St. Bernard Hospital Renovations and infrastructure improvements 300,000

DCEO Chicago Park DistrictOutfield construction for a new fieldhouse at the Taylor-Lauridsen Playground Park 300,000

DCEOPeace and Education Coalition Renovations to the youth facility 70,000

DCEOAda S McKinley Community Services, Inc Building renovations and infrastructure improvements 105,000

DCEODaniel J. Nellum Youth Services, Inc Renovations 50,000

DCEO City of Chicago Security and infrastructure upgrades in the 16th ward 50,000

DCEOBishop Shepard Little Memorial Center New construction 200,000

Page 29: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO Chicago Park DistrictResurfacing the basketball court and installation of a water fountain inside the field house at Lowe Playground Park 125,000

DCEO Chicago Park District Infrastructure improvements at Lindblom Park 100,000

DCEOAccess Community Health Network New health center at 52nd Avenue and Ashland Avenue 200,000

DCEO Chicago Public Schools Cesar Chavez Elementary School infrastructure improvements 100,000 DCEO Village of Carbon Hill General infrastructure improvements 200,000 DCEO City of Morris Construction of turn lanes on Route 6 50,000 DCEO Village of Buckingham General infrastructure improvements 300,000 DCEO City of Wilmington Resurfacing improvements on Route 53 150,000 DCEO Wesley Township Road improvements to Route 102 175,000 DCEO Village of Ransom General infrastructure improvements 50,000 DCEO Village of Braceville General infrastructure improvements 100,000 DCEO Village of Kinsman General infrastructure improvements 50,000 DCEO Village of Mazon General infrastructure improvements 50,000 DCEO City of Braidwood General infrastructure improvements 50,000 DCEO Custer Township Road repairs and resurfacing projects 50,000 DCEO Village of Gardner General infrastructure improvements 50,000 DCEO Village of Coal City General infrastructure improvements 50,000 DCEO Village of Herscher General infrastructure improvements 50,000 DCEO Village of Campus General infrastructure improvements 50,000 DCEO Village of Diamond General infrastructure improvements 50,000 DCEO Limestone Township General infrastructure improvements 25,000 DCEO Village of Essex General infrastructure improvements 50,000 DCEO Village of Godley General infrastructure improvements 50,000 DCEO YWCA of Peoria Infrastructure upgrades 500,000 DCEO Kickapoo Township Safety enhancements for baseball fields 40,000 DCEO Tri-County Urban League General infrastructure improvements 100,000 DCEO Peoria Cancer Center General infrastructure improvements 200,000

DCEO Peoria School District 150Manual High School Family and Community Center for general infrastructure improvements 100,000

DCEONeighborhood Alliance of Peoria General infrastructure improvements 100,000

DCEOLimestone Community High School District 310 General infrastructure improvements at Limestone High School 50,000

DCEO City of Peoria General infrastructure improvements 100,000 DCEO Easter Seals of Peoria General infrastructure improvements 25,000 DCEO City of West Peoria General infrastructure improvements 70,000

DCEOPeoria Heights Community Unit School District General infrastructure improvements at Peoria Heights High School 50,000

DCEO Junior League of Peoria The Peoria Playhouse general infrastructure improvements 25,000 DCEO City of Evanston General infrastructure 350,000 DCEO City of Wilmette General infrastructure 150,000

DCEO

Holocaust Memorial Foundation of Illinois d.b.a. Illinois Holocaust Museum and Education Center General infrastructure 100,000

DCEO Evanston History Center General infrastructure 200,000 DCEO Family Focus, Inc Facility renovations, plus prior year costs 300,000

DCEOShore Community Services Inc Energy efficiency infrastructure upgrades 95,000

DCEOJewish Federation of Metropolitan Chicago Technology infrastructure upgrades 85,000

DCEOJewish Federation of Metropolitan Chicago Fiedler Hillel for general infrastructure 35,000

DCEOYouth Organizations Umbrella, Inc Construction of a new building 250,000

DCEOCarepoint Adult, Child and Family Association Construction and renovation 35,000

DCEO City of Virden Infrastructure improvements 100,000 DCEO City of Litchfield Construction of an underwater sediment catch basin for Lake Lou Yeager 350,000 DCEO City of Benld Reimbursement of previous expenses 300,000

DCEOLincoln Land Community College, Taylorville Campus Construction of permanent facilities 250,000

DCEO City of Staunton Infrastructure improvements 200,000 DCEO Bunker Hill Library District Construction projects 100,000 DCEO City of Mount Olive Infrastructure improvements 100,000 DCEO City of Gillespie Infrastructure improvements 200,000

DCEO Chicago Park DistrictRemodeling and replacement of equipment at the Langdon Albion play lot or other permanent improvements 100,000

DCEO Chicago Park DistrictRemodeling and replacement of equipment at the Mellin play lot or other permanent improvements 100,000

DCEOOld Town School of Folk Music Planning and design for an expansion 300,000

DCEO City of Chicago Reconstruction of the Lake Shore Drive overpass at Montrose Avenue 200,000

DCEO Chicago Park District Expansion of the Clarendon Park Field House or other permanent improvements 100,000

DCEO Chicago Park DistrictChase Park play lot and field house rehabilitation or other permanent improvements 100,000

Page 30: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO Chicago Park DistrictButtercup Park and McCutcheon School play lot or other permanent improvements 100,000

DCEO Chicago Public Schools School Life Safety and ADA improvements to Ravenswood School 300,000 DCEO Chicago Public Schools Expansion of the Uplift School cafeteria 100,000 DCEO City of Chicago Streetscape of Lawrence Avenue from the Chicago River to Clark Street 300,000

DCEO City of ChicagoNew traffic signals at Foster Avenue and Albany Avenue and at Peterson Avenue and Ravenswood Avenue and at Devon Avenue and Greenview Avenue 300,000

DCEO City of Cicero Construction of the Cicero Aquatic Center 585,000 DCEO City of Berwyn Elevator replacement at Berwyn Library 160,000 DCEO City of Cicero Construction of the Corazon Green Youth Center 100,000 DCEO City of Cicero Construction of a dental facility at the Alivio Health Center 100,000

DCEO City of CiceroResurfacing of the walking track and the sodding of fields at Hawthorne Park District 50,000

DCEO Berwyn Fire Department Ladder refurbishment 50,000

DCEO City of BerwynPlumbing and concrete work at Pavek pool, lighting at Janura Park softball field, and general infrastructure at Janura Park soccer field 50,000

DCEO City of Cicero General infrastructure at Clyde Park District facilities 100,000 DCEO City of Cicero General infrastructure at Community Support Services facilities 180,000 DCEO City of Cicero Renovations for Seguin Services, Inc 125,000 DCEO North Berwyn Park District General infrastructure at Cuyler Park 100,000 DCEO Collinsville Township Building addition at the Senior Center 100,000

DCEO Village of MaryvilleConstruction of a water line from Illinois Route 157 to Stonebridge Drive and general infrastructure 50,000

DCEOMaryville Volunteer Fire Department Firehouse remodeling and general infrastructure 50,000

DCEO Village of Maryville Construction of a pavilion and playground equipment at Fred Winters Park 85,000

DCEOHollywood Heights Fire Department Firehouse addition and renovation and general infrastructure 50,000

DCEO Village of Glen Carbon Purchase, construction and development of parks and walking trails 35,000

DCEO Village of Glen CarbonMiner Park drainage improvements, a water main extension along Chain of Rocks rd and general infrastructure 25,000

DCEO Village of Glen Carbon West Main Sewer Replacement project and general infrastructure 80,000 DCEO City of Collinsville Construction of a well for water distribution and general infrastructure 50,000 DCEO Fairview Heights General infrastructure 50,000 DCEO Village of Pontoon Beach Purchase of land and development of a park and general infrastructure 42,500 DCEO Nameoki Township Heating and air-conditioning replacement at the Senior Center 25,000 DCEO Nameoki Township Replacement of pumps at Courtney and Wabash pump stations 20,000

DCEOCollinsville Township Highway Department Repair and resurfacing of Roger Drive and general infrastructure -

DCEOCollinsville Township Highway Department

Lakeview Acres, Rex's Drive, Meyer Drive, and Wilson Heights resurfacing and general infrastructure 136,000

DCEO City of Granite City Construction of a salt dome and general infrastructure 30,000

DCEO City of Granite City Nameoki Road and East 23Road Street fence replacement and general infrastructure 30,000

DCEO Granite City Township Bus garage additions and parking lot improvements and general infrastructure 65,000 DCEO City of Edwardsville stscape in historic districts and general infrastructure 50,000

DCEO Collinsville Township A backup generator for heating and air conditioning and general infrastructure for the Senior Center 50,000

DCEO City of Edwardsville Wildey Theater renovation 50,000 DCEO Edwardsville Township Township building renovation and general infrastructure 50,000

DCEO Edwardsville TownshipBathroom renovation at the Township Park, Hays Mallory building renovation and general infrastructure 55,000

DCEOGlen Carbon Volunteer Fire Department Improvements to fire station and general infrastructure 50,000

DCEO City of Granite City Fire station improvements and general infrastructure 25,000

DCEO Long Lake Fire Department Fire station improvements and general infrastructure 25,000

DCEO Hospice of Southern IllinoisInfrastructure improvements and construction of the Community Hospice Home in Edwardsville Township 300,000

DCEO Nameoki TownshipDrainage improvements on Angela Drive and Roney Drive and general infrastructure 21,000

DCEO City of Belleville General infrastructure 1,000,000 DCEO City of Granite City General infrastructure 500,000 DCEO City of Madison General infrastructure 75,000 DCEO City of Fairview Heights General infrastructure 200,000 DCEO Village of Caseyville General infrastructure 200,000 DCEO Village of Swansea General infrastructure 200,000 DCEO Village of Fairmont City General infrastructure 75,000 DCEO Township of Stookey General infrastructure 50,000

DCEO St. Clair CountyEmergency response team and fire department grants for general infrastructure upgrades 300,000

DCEO City of Chicago Local infrastructure improvements in the 5th ward 40,000 DCEO City of Chicago Local infrastructure improvements in the 6th ward 575,000 DCEO City of Chicago Local infrastructure improvements in the 7th ward 44,200 DCEO City of Chicago Local infrastructure improvements in the 8th ward 180,800 DCEO City of Chicago Local infrastructure improvements in the 9th ward 100,000 DCEO City of Chicago Local infrastructure improvements in the 10th ward 100,000 DCEO City of Chicago Local infrastructure improvements in the 21st ward 120,000 DCEO Village of Burnham Reconstruction of Alice Avenue from State Street to Hammond Avenue 40,000 DCEO City of Calumet City Local infrastructure improvements 260,000 DCEO Village of Lansing Local infrastructure improvements 140,000

Page 31: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO City of Venice City Hall, library and senior center renovations 150,000 DCEO City of Madison General infrastructure improvements 125,000 DCEO City of Belleville General infrastructure improvements 100,000

DCEO Village of Washington Park General infrastructure improvements 200,000 DCEO Village of Centerville General infrastructure improvements 200,000 DCEO City of East St. Louis General infrastructure improvements 700,000 DCEO City of Mascoutah General infrastructure improvements 125,000 DCEO Village of Millstadt General infrastructure improvements 100,000 DCEO City of O'Fallon General infrastructure improvements 150,000 DCEO Village of Shiloh General infrastructure improvements 150,000 DCEO Village of Cahokia General infrastructure improvements 125,000 DCEO Village of Brooklyn General infrastructure improvements 150,000 DCEO Village of Alorton General infrastructure improvements 100,000 DCEO Village of Swansea General infrastructure improvements 100,000 DCEO Stites Township General infrastructure improvements 50,000 DCEO City of Madison General infrastructure improvements at Eagle Park 75,000

DCEOOrpheum Children's Museum Expanding new facilities 250,000

DCEO Crisis Nursery in Urbana Expanding new facilities 200,000 DCEO University of Illinois YMCA General infrastructure improvements 250,000 DCEO Urbana Park District General infrastructure improvements 200,000 DCEO Champaign Park District General infrastructure improvements 200,000

DCEOChampaign County Mental Health General infrastructure improvements 25,000

DCEO

Preservation & Conservation Association of Champaign County Construction and renovation 250,000

DCEO

Developmental Services Center of Champaign County Construction of a larger building 225,000

DCEORockford Rescue Mission Ministries Infrastructure improvements 100,000

DCEO Rockford Park District Infrastructure improvements 200,000

DCEOPatriots Gateway Community Center Infrastructure improvements 100,000

DCEOSt. Elizabeth Catholic Community Center Infrastructure improvements 100,000

DCEORockford Mass Transit District Infrastructure improvements 200,000

DCEO Carpenter's Place Infrastructure improvements 150,000 DCEO Rosecrance, Inc Infrastructure improvements 100,000

DCEOBooker Washington Community Center Infrastructure improvements 200,000

DCEO Ethnic Heritage Museum Infrastructure improvements 100,000

DCEO

Progressive West Rockford Community Development Corporation Infrastructure improvements 100,000

DCEONorthwest Community Center Infrastructure improvements 100,000

DCEO Rockford Public Library Infrastructure improvements 100,000

DCEOGirl Scouts-Rock River Valley Council Infrastructure improvements 50,000

DCEOBlackhawk Area Council of Boy Scouts of America, Inc Infrastructure improvements 50,000

DCEOWinnebago County Health Department Infrastructure improvements to the Ellis Heights United Neighborhood Center 50,000

DCEOBoys and Girls Club of Rockford Infrastructure improvements 50,000

DCEO City of ChicagoAcquisition and construction of a building for a senior services center in the Mt. Greenwood neighborhood of the 19th ward in the City of Chicago 300,000

DCEO Chicago Park DistrictKennedy Park, McKiernan Park, Munroe Park and Ridge Park for infrastructure improvements 250,000

DCEO Village of Alsip Creation of Energy Park 50,000 DCEO Village of Oak Lawn st, sewer, curb and gutter infrastructure improvements 100,000 DCEO Village of Oak Lawn Railroad quiet zone infrastructure improvements 50,000 DCEO Village of Merrionette Park Infrastructure improvements 50,000 DCEO Worth Park District Restoration of the Gale Moore Park Pavilion 75,000 DCEO City of Palos Heights central business district parking lot infrastructure improvements 100,000 DCEO City of Palos Hills public safety bldg infrastructure improvement 100,000 DCEO Village of Palos Park development of 5 acres park site 75,000 DCEO Village of Palos Park Railroad quiet zone infrastructure improvements 50,000 DCEO Village of Worth Storage bldg infrastructure improvements 150,000 DCEO Green Hills Public Library Creation of children's reading and educational garden 50,000 DCEO Misericordia Home Construction of CILA home 100,000

DCEOHelping Hand RehabilitationCenter Upgrading Helping Hnad Rehab Center technology lab located in Lyons Township 25,000

DCEO Village of Park lawn Capital improvements and upgrades to the Park lawn center and rehab center 25,000

DCEO Chicago Public Schools Mt Greenwood Elementary School technological and infrastructure improvements 50,000

Page 32: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Niles Township Construction of food pantry 100,000 DCEO Village of Morton Grove Long Avenue water main installation 100,000 DCEO Village of Morton Grove Resurfacing of Central Avenue 75,000

DCEOHolocaust Memorial Foundation of IL Infrastructure improvements of the Holocaust Memorial Museum in Skokie 200,000

DCEO Skokie Public Library Infrastructure improvements 50,000

DCEO Shore Community Services Improvement to basement 50,000 DCEO Skokie Park District Remodel playground at Oakton park 300,000

DCEOMetropolitan Family Services Remodel kitchen 40,000

DCEO Oakton Community College Ongoing capital needs at the Skokie Campus 100,000

DCEOJewish Federation of Metropolitan Chicago general infrastructure improvements 175,000

DCEO Village of Lincolnwood sidewalks 200,000 DCEO Village of Lincolnwood Sewer improvements 240,000 DCEO Village of Skokie Resurface Main Street from Crawford Avenue to McCormick Blvd 820,000 DCEO Vital Birdges NFP Infrastructure improvements 100,000 DCEO Misericordia Home Infrastructure improvements 100,000 DCEO Agudath Israel of IL Remodeling of Soulu 250,000 DCEO Indo-American Center Facility renovation and expansion 100,000

DCEOLawrence Hall Youth svcs of Chicago General infrastructure 40,000

DCEOCopernicus Foundation of Chicago General infrastructure 25,000

DCEO Misericordia Home General infrastructure 40,000

DCEOIrish American Heritage Center of Chicago General infrastructure 25,000

DCEO Saint Patrick High School General infrastructure 30,000

DCEOLuther North School Association Inc in Chicago General infrastructure 25,000

DCEO Chicago Park District General infrastructure at Portage and Thomas Jefferson Memorial Parks 400,000

DCEODaughters of St. Mary of Providence of Chicago Construction of a Developmentally Disabled home for children and adults 25,000

DCEO CTA Security Infrastructure upgrades at Jefferson Park Terminal 200,000

DCEO Chicago Public Schools

General infrastructure: Beard, Beaubien, Chicago Academy Elementary, Chicago Academy High, Farnsworth, Gray, Hitch, Portage Park, Prussing, Reinberg, Smyser, Thorp Academy, and Vaughn Occupational 520,000

DCEO New Horizons in Chicago General infrastructure 25,000

DCEO

Maryville Center for Children Crisis Nursery in Chicago General infrastructure 25,000

DCEOFranciscan Outreach Association General infrastructure 25,000

DCEOUhlich Children's Advantage Network in Chicago General infrastructure 25,000

DCEOArchdiocese of Chicago office of Education

General infrastructure: St. Tarcissus, St. Cornelius, St. Constance, St. Robert Bellarmine, St. Edwards, Our lady of Victory, St. Pascals, St. Bartholomew and St. Ladislaus 135,000

DCEOMetropolitan Family Services in Chicago General infrastructure 35,000

DCEO City of Ottawa Infrastructure improvements 300,000 DCEO Village of Cherry Infrastructure improvements 75,000 DCEO City of Spring Valley Infrastructure improvements 200,000 DCEO Village of Ladd Infrastructure improvements 200,000 DCEO Village of Naplate Infrastructure improvements 25,000 DCEO Village of North Utica Infrastructure improvements 50,000 DCEO Village of Cedar Point Infrastructure improvements 50,000 DCEO City of Earlville Infrastructure improvements 150,000 DCEO Village of Grand Ridge Infrastructure improvements 50,000 DCEO Village of Van Orin Infrastructure improvements 25,000 DCEO Village of Hollowayville Infrastructure improvements 25,000 DCEO Village of Arlington Infrastructure improvements 75,000 DCEO Village of Standard Infrastructure improvements 25,000 DCEO Villlage of Malden Infrastructure improvements 25,000 DCEO Village of DePue Infrastructure improvements 150,000 DCEO Village of Dayton Infrastructure improvements 25,000 DCEO Village of Dalzell Infrastructure improvements 75,000 DCEO City of Lasalle Infrastructure improvements 150,000 DCEO Village of Triump Infrastructure improvements 25,000 DCEO Village of Troy Grove Infrastructure improvements 25,000 DCEO Village of Lamoille Infrastructure improvements 75,000 DCEO Villlage of Putnam Infrastructure improvements 25,000 DCEO City of Streator Infrastructure improvements 300,000 DCEO Village of Mark Infrastructure improvements 25,000 DCEO Village of Magnolia Infrastructure improvements 50,000 DCEO Village of Oglesby Infrastructure improvements 150,000 DCEO City of Mendota Infrastructure improvements 300,000 DCEO City of Peru Infrastructure improvements 350,000

Page 33: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Deerfield Park District General infrastructure 50,000 DCEO Village of Bannockburn General infrastructure 100,000 DCEO West Deerfield Township Resurfacing roads 50,000 DCEO Village of Deerfield General infrastructure 300,000 DCEO Cancer Wellness Center General infrastructure 50,000 DCEO Center for Enriched Living Construction and renovation 50,000 DCEO Anixter Center General infrastructure 100,000

DCEOCommunity Family Center in Highland Park General infrastructure 800,000

DCEOJewish Federation of Metropolitan Chicago

Weinger Jewish Community Center in Northbrook - security infrastructure upgrades 100,000

DCEO Village of Bolingbrook general infrastructure improvements 150,000 DCEO City of Lockport general infrastructure improvements 150,000 DCEO City of Crest Hill general infrastructure improvements 150,000 DCEO Village of Romeoville general infrastructure improvements 150,000

DCEO Dupage TowshipConstruction and improvements to the Community Center parking lot or general infrastructure improvements 50,000

DCEO Lockport Township general infrastructure improvements 50,000

DCEOValley View School District 365U Asbestos abatement and other infrastructure improvements 140,000

DCEO Lockport School District general infrastructure improvements 20,000 DCEO Taft School District 90 general infrastructure improvements 20,000

DCEOChaney-Monge School District 88 general infrastructure improvements 20,000

DCEOLockport Towship High School District 205 general infrastructure improvements at Lockport high school 40,000

DCEORichland Public School District 88A general infrastructure improvements 20,000

DCEOWill County Public School District 92

general infrastructure improvements and improvements at Walsh and Ludwig Elementary schools 20,000

DCEO Fairmont School District 89 general infrastructure improvements 20,000

DCEO Cornerstone Services, IncConstruction of comprehensive community based rehab center Northern Will County 100,000

DCEOLockport Towship Park District Construction of accessible playground or splash park 40,000

DCEO Bolingbrook Park district General infrastructure improvements or Remington Lakes restroom improvements 40,000

DCEO WILCO Area Career Center general infrastructure improvements 20,000 DCEO Village of Tinley Park Renovations to the Timber Drive signal 150,000 DCEO Village of Tinley Park Construction and repairs to the 76th Avenue culvert 300,000 DCEO Village of Orland Park 156th Street extension construction 400,000 DCEO Village of Orland Hills Road resurfacing of 159th Place 62,500 DCEO Village of Orland Hills Road resurfacing of 91st Avenue 187,500 DCEO Village of Oak Forest Road construction and repairs of Victoria Drive and 155th Street 250,000 DCEO Frankfort Township Road projects 50,000 DCEO Tinley Park Park District Reconstruction of community theatre 60,000 DCEO Oak Forest Park District Construction and playground equipment at Vergne-Way Park 30,000

DCEOBig Brothers Big Sisters of Will and Grundy Counties Purchase and Renovation of new administration center 50,000

DCEOFrankfort Square Park District

Design and construction of a parking garage for the South Suburban Special recreation association 50,000

DCEO Township of Orland Renovations and additions to township admin bldg 50,000

DCEOSouthwest Community Services Repaving, striping and construction of parking lot 35,000

DCEO Sertoma Centre-ALSIP repair and replacement of facility roof 25,000 DCEO Township of Bremen Construction of parking garage 50,000 DCEO Joilet Junior College Infrastructure improvements on campus 100,000 DCEO Village of Rockdale Extension to the Route 6 water main 200,000 DCEO Village of Elwood Infrastructure improvements to Gardner Street 400,000 DCEO Village of Manhattan Road repairs 50,000 DCEO Village of Rockdale Reconstruction of Moon Avenue 300,000 DCEO Village of Elwood Infrastructure improvements to Route 53 100,000 DCEO Village of Manhattan Extension of water main 100,000

DCEOJoilet District 86 Grade Schools Infrastructure improvements 100,000

DCEOHousing Foundation of Will County Renovations and improvements to the Daybreak Center 50,000

DCEO Villlage of Elwood Infrastructure improvements to the Diagonal Road 50,000 DCEO Will County Ridgewood water and sewer improvement project 100,000 DCEO Manhattan Towhship Bldg infrastructure improvements 25,000

DCEOWill-Grundy Center for Independent Living Infrastructure improvements to facility 25,000

DCEO Ignatia Foundation Infrastructure, electrical and plumbing improvements to Ignatia House 85,000 DCEO Chicago Park District Renovations and improvements of Athletic Field Park 180,000 DCEO Chicago Park District Construction of new playground at Algonquin Play lot Park 100,000

DCEO Chicago Park District Restoration of a bungalow and infrastructure improvements at Independence Park 100,000 DCEO Chicago Public Schools Construction of a new playground at CICS Irving Park 35,000 DCEO Chicago Park District Renovations to pool bldg at River Park 50,000

Page 34: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Chicago Public Library Construction of new bldg at Independence Park Library 500,000 DCEO Chicago Public Schools Construction of a new playground at Murphy Elementary School 100,000

DCEO Chicago Public Schools Infrastructure improvements and upgrades to Jonathan Y Scammon Public School 135,000 DCEO Erie Family health Center Construction of a new bldg 200,000 DCEO Chicago Public Schools Renovation of auditorium at Kelly High School 60,000 DCEO Chicago Public Schools Installation of fencing at Gage Park High School 80,000

DCEO Enlance ChicagoCommunity development project at West 31st Street and Kiddies Avenue in Chicago 500,000

DCEO Chicago Park District General infrastructure upgrades at Cornell Square Park 40,000 DCEO Chicago Public Schools General infrastructure at Gresham Elementary School 40,000 DCEO Chicago Public Schools General infrastructure at Carson Elementary school 40,000

DCEOBrighton Park Neighborhood Council Acquisition of land and construction of a community center 450,000

DCEO Chicago Park District General infrastructure improvements at Gage Park 40,000 DCEO YMCA of Metro Chicago Expansion of health and wellness center at the Rauner Family YMCA 300,000

DCEOAccess Community Health Network Kedzie Family Health Center expansion at 3213-27 West 47th Place in Chicago 50,000

DCEO Ciy of Calumet City Left turn lane at River Oaks and Paxton Avenue 210,500 DCEO Village of Thornton Resurfacing of local sts 175,000 DCEO Village of Dolton 911 Dispatch Switch (CADS system) 137,500 DCEO Village of Dolton Infrastructure improvements for traffic safety and control 20,000 DCEO Village of Glenwood Glenwood Lynwood Public Library and general infrastructure 30,000 DCEO Village of S. Holland Veterans Memorial Park reconstruction 250,000 DCEO Village of S. Holland Construction of salt dome 50,000 DCEO Village of Glenwood Sewer and infrastructure regarding flooding 175,000

DCEO Village of BurnhamGeneral infrastructure improvements to 143rd street from Marquette Avenue to Manistee Avenue 107,000

DCEO Village of lynwood Emergency backup power generator for 911 system 175,000 DCEO Village of Ford heights st and storm sewer improvements 360,000 DCEO Village of Lansing Reconstruction of public works bldg 110,000

DCEOMaine Township and Northfield Township General infrastructure 150,000

DCEO City of Prospect Heights General infrastructure 100,000 DCEO Wheeling Township Road resurfacing 100,000 DCEO Maine Township Road resurfacing 40,000 DCEO Village of Glenview General infrastructure 150,000 DCEO North Suburban YMCA General infrastructure 50,000 DCEO Village of Northbrook General infrastructure 200,000 DCEO City of Des Plaines Traffic infrastructure upgrades 250,000 DCEO Village of Niles General infrastructure 100,000 DCEO Village of Mount Prospect Fire Station construction 100,000

DCEOMount Prospect School District 26 Construction and renovation 90,000

DCEODes Plaines School District 62 Construction and renovation 90,000

DCEOGlenkirk Association for Retarded Citizens Construction and renovation 50,000

DCEO

Advocate Health and Hospitals Corp for Adult Down Syndrome Center in Des Plaines Construction and renovation 50,000

DCEO

Holocaust Memorial Foundation of Illinois d.b.a. Illinois Holocaust Museum and Education Center Construction and renovation 50,000

DCEOJewish Federation of Metropolitan Chicago Construction and renovation 30,000

DCEO Chicago Park District General infrastructure at Brdway Armory Park 100,000 DCEO Chicago Public Library Construction of Edgewater Library 200,000 DCEO Chicago Public Schools General infrastructure at Senn High School 1,000,000

DCEOBetter Existence w/ HIV in Chicago General infrastructure 200,000

DCEO Chicago Park District General infrastructure in Lincoln Park 50,000 DCEO City of Harrisburg General infrastructure improvements 100,000

DCEOHarrisburg Community Unit #3 General infrastructure improvements 100,000

DCEO City of Cairo General infrastructure improvements 100,000 DCEO City of Metropolis General infrastructure improvements 100,000 DCEO City of Eldorado General infrastructure improvements 75,000

DCEOFamily Counseling Centers Inc General infrastructure improvements 75,000

DCEO City of Anna General infrastructure improvements 50,000 DCEO Harrisburg Hospital General infrastructure improvements 50,000 DCEO Pulaski County General infrastructure improvements 50,000 DCEO Pope County General infrastructure improvements 50,000 DCEO Johnson County General infrastructure improvements 50,000 DCEO Massac County General infrastructure improvements 50,000 DCEO City of Buncombe General infrastructure improvements 50,000 DCEO Village of Tamms General infrastructure improvements 50,000 DCEO Village of Dongola General infrastructure improvements 25,000

Page 35: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Thebes General infrastructure improvements 25,000

DCEO Community of Olive Branch General infrastructure improvements 25,000 DCEO White County General infrastructure improvements 25,000 DCEO Village of Norris City General infrastructure improvements 25,000 DCEO Village of Enfield General infrastructure improvements 25,000 DCEO Village of New Haven General infrastructure improvements 25,000 DCEO Village of Galatia General infrastructure improvements 25,000 DCEO Village of Raleigh General infrastructure improvements 25,000 DCEO Village of Stonefort General infrastructure improvements 25,000 DCEO Village of Omaha General infrastructure improvements 25,000 DCEO Village of Cypress General infrastructure improvements 25,000 DCEO Village of New Burnside General infrastructure improvements 25,000 DCEO Village of Goreville General infrastructure improvements 25,000 DCEO Village of Ridgeway General infrastructure improvements 25,000 DCEO Village of Shawneetown General infrastructure improvements 25,000

DCEO Village of Old Shawneetown General infrastructure improvements 25,000 DCEO City of Rosiclare General infrastructure improvements 25,000 DCEO City of Golconda General infrastructure improvements 25,000 DCEO Village of Equality General infrastructure improvements 25,000 DCEO Village of Joppa General infrastructure improvements 25,000 DCEO City of Vienna General infrastructure improvements 25,000 DCEO Village of Carrier Mills General infrastructure improvements 25,000 DCEO Egyptian Health Dept. General infrastructure improvements 25,000 DCEO Hardin County General infrastructure improvements 25,000 DCEO City of Brookport General infrastructure improvements 25,000 DCEO Village of Baldwin General infrastructure 30,000 DCEO Village of Cahokia General infrastructure 50,000 DCEO City of Chester General infrastructure 50,000 DCEO City of Columbia General infrastructure 50,000 DCEO Village of Coulterville General infrastructure 30,000 DCEO Village of Cutler General infrastructure 25,000 DCEO Village of Dupo General infrastructure 40,000 DCEO Village of East Carondelet General infrastructure 30,000 DCEO Village of Ellis Grove General infrastructure 30,000 DCEO Village of Evansville General infrastructure 30,000 DCEO Village of Fayetteville General infrastructure 35,000 DCEO City of Freeburg General infrastructure 50,000 DCEO Village of Hecker General infrastructure 25,000 DCEO Village of Lenzburg General infrastructure 25,000 DCEO Village of Maeystown General infrastructure 30,000 DCEO Village of Marissa General infrastructure 50,000 DCEO Village of Millstadt General infrastructure 30,000 DCEO Village of New Athens General infrastructure 30,000 DCEO Village of Percy General infrastructure 30,000

DCEO Village of Prairie du Rocher General infrastructure 30,000 DCEO city of Red Bud General infrastructure 40,000 DCEO Village of Ruma General infrastructure 25,000 DCEO Village of Sauget General infrastructure 30,000 DCEO Village of St. Libory General infrastructure 25,000 DCEO Village of Smithton General infrastructure 50,000 DCEO City of Sparta General infrastructure 50,000 DCEO Village of Steeleville General infrastructure 35,000 DCEO Village of Tilden General infrastructure 30,000 DCEO Village of Valmeyer General infrastructure 30,000 DCEO City of Waterloo General infrastructure 35,000 DCEO Village of Willisville General infrastructure 25,000 DCEO Randolph County General infrastructure 125,000

DCEOMonroe County History Museum General infrastructure 25,000

DCEO Monroe County General infrastructure 125,000 DCEO Jarrot Mansion General infrastructure 25,000

DCEOPerandoe Evansville Program General infrastructure 25,000

DCEO Beck Vocational Center General infrastructure 25,000

DCEO

st Clair County Intergovernmental Grants Dept Road projects 150,000

DCEO Waterloo library General infrastructure 25,000 DCEO Village of Richton Park Infrastructure, water, sewer and facility projects 193,900 DCEO Village of Matteson Infrastructure, water, sewer and facility projects 193,900 DCEO City of Country Club Hills Infrastructure, water, sewer and facility projects 193,900 DCEO Village of Olympia Fields Infrastructure, water, sewer and facility projects 182,200 DCEO Village of Park Forest Infrastructure, water, sewer and facility projects 158,100 DCEO Village of Hazel Crest Infrastructure, water, sewer and facility projects 174,300 DCEO Village of Homewood Infrastructure, water, sewer and facility projects 49,500 DCEO Village of Flossmoor Infrastructure, water, sewer and facility projects 157,800 DCEO City of Markham Infrastructure, water, sewer and facility projects 176,200 DCEO Bremen Township Local infrastructure improvements 85,000

Page 36: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO City of Harvey Infrastructure, water, sewer and facility projects 35,200 DCEO Calumet Township General infrastructure and purchase of property 150,000 DCEO City of Chicago Infrastructure and street lights in the 34th ward 150,000 DCEO City of Chicago Infrastructure and sidewalks in the 34th ward 125,000 DCEO Midlothian Park district Infrastructure improvements 30,000 DCEO City of Blue Island Infrastructure and sidewalks in the 7th ward 50,000 DCEO Village of Robbins General infrastructure 35,000 DCEO Blue Island Park District General infrastructure and purchase of property 150,000 DCEO Oak Forest Park District General infrastructure 25,000 DCEO City of Blue Island Capital improvements to the local fire dpt 25,000 DCEO City of Chicago Infrastructure and street lights in the 9th ward 150,000 DCEO City of Oak forest Infrastructure and sidewalks 50,000

DCEOCalument Recreation Center General infrastructure 25,000

DCEOCornerstone Recovering Community General infrastructure 25,000

DCEO City of Blue island Sidewalk improvements in the 6th Ward 50,000 DCEO City of Chicago Sidewalk improvements in the 9th Ward 125,000 DCEO Village of Midlothian Sidewalk improvements 30,000 DCEO Village of Crestwood General Infrastructure 25,000 DCEO Bremen Township General Infrastructure 25,000 DCEO City of Blue Island Sidewalk improvements in the 2nd ward 100,000 DCEO the Guildhaus General Infrastructure 25,000 DCEO Village of Calumet Park Salt dome 65,000 DCEO Village of Crestwood Salt dome 65,000 DCEO Village of Calumet Park Sidewalk improvements in the 2nd ward 50,000

DCEOMetropolitan Family Services General Infrastructure 25,000

DCEO Calumet Township General Infrastructure for the Blue Island Little League 25,000 DCEO Allendale Association General Infrastructure 100,000

DCEOAlexian Brother Center for Mental Health General Infrastructure upgrades 100,000

DCEO Anixter Center General Infrastructure upgrades 100,000 DCEO Avenues for Independence Construction and renovations 75,000

DCEOBoys' Club/Girls' Club of Lake County, Waukegan Facility expansion 25,000

DCEOYMCA of Greater Lake County Central Lake YMCA for facility expansion 150,000

DCEO Center for Enriched Living General Infrastructure upgrades 25,000 DCEO Clearbrook General Infrastructure upgrades 35,000

DCEOCountryside Association for People with Disabilities Facility expansion 100,000

DCEO Haven Center General Infrastructure upgrades 25,000

DCEOThresholds Psychiatric Rehabilitation Centers Facility expansion 100,000

DCEO Nicasa, NFP General Infrastructure upgrades 140,000

DCEO Northpointe Resources, Inc. General Infrastructure upgrades 100,000

DCEO Rosalind Franklin University

General Infrastructure upgrades at the Pharmacy School, Department of Nursing, Center for Stem Cell Research and Regenerative Medicine, Student Learning Center, and Information Commons 150,000

DCEO Shelter, Inc General Infrastructure upgrades 25,000

DCEOUhlich Children's Advantage Network General Infrastructure upgrades 100,000

DCEO WINGS Program, Inc. Facility upgrades 50,000

DCEOZacharias Sexual Abuse Center General Infrastructure upgrades 50,000

DCEOLake County Center for Independent Living General Infrastructure upgrades 150,000

DCEO Village of Banner General Infrastructure 25,000 DCEO Village of Bartonville General infrastructure 50,000 DCEO Village of Bryant General infrastructure 25,000 DCEO City of Canton General infrastructure 125,000 DCEO Village of Creve Coeur General infrastructure 75,000 DCEO City of Cuba General infrastructure 50,000 DCEO Village of Dunfermline General infrastructure 25,000 DCEO City of East Peoria General infrastructure 125,000 DCEO Village of Fairview General infrastructure 25,000 DCEO City of Farmington General infrastructure 50,000 DCEO Village of Glasford General infrastructure 25,000 DCEO Village of Kingston Mines General infrastructure 25,000 DCEO City of lewistown General infrastructure 50,000 DCEO Village of Liverpool General infrastructure 25,000 DCEO Village of Mapleton General infrastructure 25,000 DCEO City of Marquette Heights General infrastructure 50,000 DCEO Village of Norris General infrastructure 25,000 DCEO Village of North Pekin General infrastructure 25,000 DCEO City of Pekin General infrastructure 125,000 DCEO Village of St. David General infrastructure 25,000 DCEO Village of South Pekin General infrastructure 25,000 DCEO Fulton County General infrastructure 100,000

Page 37: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Buckheart Township General infrastructure 50,000 DCEO Groveland Township General infrastructure 50,000 DCEO Limestone Township General infrastructure 50,000 DCEO Orion Township General infrastructure 100,000 DCEO Pekin Township General infrastructure 50,000

DCEO Farmington Sanitary District General infrastructure 100,000

DCEO Lewistown Fire Department General infrastructure 100,000

DCEOChicago Puerto Rican Arts Alliance New construction at its main facility 100,000

DCEOErie Neighborhood House in Chicago General infrastructure 80,000

DCEOHoly Trinity High School in Chicago Renovation of science laboratories and technology 50,000

DCEOPuerto Rican Cultural Center in Chicago Capital improvements and general infrastructure at Vida-SIDA 50,000

DCEO

Near Northwest Neighborhood Network in Chicago Improvements and general infrastructure 70,000

DCEO Chicago Public Schools General infrastructure at Stowe Elementary School 150,000

DCEOHealthcare Alternative Systems in Chicago General infrastructure 20,000

DCEOSpanish Action Committee of Chicago Brick and mortar renovation and general infrastructure 100,000

DCEO Chicago Public SchoolsConstruction of hydroponics rooftop greenhouses and conservatory at Pedro Albizu Campos High School 100,000

DCEOWilbur Wright College in Chicago

Feasibility study for a building expansion at the Humboldt Park Vocational Education Center 100,000

DCEONorthwestern University Settlement House Renovations and general infrastructure 50,000

DCEONew Life Covenant Church in Chicago

Upgrading of the façade and installation of energy efficient windows at the North Avenue facility 100,000

DCEOMcCormick YMCA of Metropolitan Chicago Construction of an Aquatic Center 300,000

DCEOInstitute for Puerto Rican Arts and Culture Renovations to its museum and construction of a Fine Arts center 100,000

DCEOHispanic Housing in Chicago North and Talman Phase III redevelopment and general infrastructure 150,000

DCEOCentro Sin Fronteras in Chicago General infrastructure 150,000

DCEOAccess Community Health Network in Chicago Renovation of existing health center 100,000

DCEO Chicago Park District Expansion of Harris Memorial Park 12,500 DCEO Chicago Park District Expansion of Meyering Playground Park 12,500

DCEOChicago Department of Transportation Road repairs in the 18th ward 40,000

DCEOChicago Department of Transportation Road repairs in the 15th ward 160,000

DCEOChicago Department of Transportation Road repairs in the 20th ward 150,000

DCEOChicago Department of Transportation Road repairs in the 16th ward 50,000

DCEOChicago Department of Transportation Viaduct repairs in the 18th ward 40,000

DCEOChicago Department of Transportation Viaduct repairs in the 17th ward 20,000

DCEOChicago Department of Transportation Viaduct repairs in the 15th ward 50,000

DCEOChicago Department of Transportation Viaduct repairs in the 20th ward 50,000

DCEO City of Chicago Sidewalks and lighting in the 15th ward 60,000 DCEO City of Chicago Sidewalks and lighting in the 18th ward 300,000 DCEO Chicago Public Schools Rehabilitation of O'Toole School 20,000 DCEO Chicago Public Schools Rehabilitation of Marquette School 20,000 DCEO Chicago Public Schools Rehabilitation of Brownell School 25,000 DCEO Holy Cross Hospital Construction of a professional building 150,000 DCEO City of Chicago 69th Street development in the 17th ward 50,000

DCEOChicago Department of Transportation 69th Street development in the 17th ward 50,000

DCEO City of Chicago 71st Street development in the 17th ward 50,000

DCEOChicago Department of Transportation 71st Street development in the 17th ward 50,000

DCEO Chicago Park District Improvement project at the Sheridan Park baseball field 100,000 DCEO AIDScare Veterans' Home General infrastructure improvements 150,000

DCEOAccess Community Health Network Renovation project 150,000

DCEOLawndale Christian Development Corporation Housing development project 50,000

DCEOLawndale Christian Health Center Construction of a new dental center 150,000

Page 38: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO MLK Developer LLC Housing development projects 50,000

DCEOChicago Lighthouse for the Blind Infrastructure expansion project 250,000

DCEO Haymarket Center Infrastructure expansion 200,000

DCEOThe Museum of Brdcast Communications General infrastructure improvements 200,000

DCEOJewish Federation of Metropolitan Chicago Expansion of the emergency and security infrastructure 125,000

DCEO Roosevelt Square Partners Housing development projects 250,000 DCEO Habilitative Systems Inc. General infrastructure improvements 100,000

DCEOCommunity Christian Alternative Academy General infrastructure improvements 150,000

DCEOLawndale Christian Reform Church and School General infrastructure renovations 100,000

DCEOHoman Square Power House Renovations to the Homan Square Power House High School 150,000

DCEOMercy Home for Boys and Girls General infrastructure renovations 100,000

DCEOChicago Rehabilitation Network General infrastructure projects 150,000

DCEOUhlich Children's Advantage Network for Children General infrastructure improvements 125,000

DCEOChristian Valley Baptist Church General infrastructure improvements 50,000

DCEO The Allendale Association General infrastructure improvements 100,000 DCEO Child Link, Inc. General infrastructure 150,000

DCEOBlack United Fund of Illinois, Inc. Infrastructure renovations 50,000

DCEO Village of Andalusia General infrastructure improvements 50,000 DCEO Bowling Township General infrastructure improvements 50,000 DCEO Village of Matherville General infrastructure improvements 50,000 DCEO Village of New Windsor General infrastructure improvements 50,000

DCEORockridge Community Unit School District 300 General infrastructure improvements 50,000

DCEOSherrard Community Unit School District 200 General infrastructure improvements 50,000

DCEO Village of Milan General infrastructure improvements 75,000 DCEO Village of Viola General infrastructure improvements 50,000 DCEO Mercer County General infrastructure improvements 100,000 DCEO City of Moline Renovations to City Hall 190,000 DCEO City of Rock Island General infrastructure improvements 190,000 DCEO Village of Reynolds General infrastructure improvements 50,000

DCEORock Island Alleman High School General infrastructure improvements 50,000

DCEO City of Aledo General infrastructure improvements 100,000 DCEO City of Keithsburg General infrastructure improvements 50,000 DCEO Aledo School District 201 General infrastructure improvements 50,000

DCEOHope Creek Care Center Auxiliary General infrastructure improvements 100,000

DCEO Moline School District 40 General infrastructure improvements at Moline High School 50,000

DCEORock Island/Milan School District 41 General infrastructure improvements at Rock Island High School 50,000

DCEO Village of Sherrard General infrastructure improvements 25,000

DCEOIllinois City/Buffalo Prairie fire protection district General infrastructure improvements 100,000

DCEOBig Island Soil and Water Preservation Association General infrastructure improvements 70,000

DCEO City of Rolling Meadows Fire station construction 100,000 DCEO Elk Grove Village Resurfacing Tonne Road 175,000 DCEO Public School District 214 Asbestos abatement at Prospect High School 100,000 DCEO Village of Mount Prospect Hatlen Heights storm sewer 100,000

DCEOArlington Heights Park District Facilities improvements at Carefree Park and Victory Park 200,000

DCEO City of Des Plaines Storm water mitigation 175,000

DCEORoosevelt University, Shaumburg Infrastructure improvements at the Roosevelt University School of Pharmacy 100,000

DCEO Public School District 62 Infrastructure improvements and maintenance 75,000 DCEO Village of Mount Prospect Construction of the Mount Prospect Neighborhood Resource Center 95,000 DCEO Public School District 214 Infrastructure improvements and maintenance 80,000

DCEO

Foss Park District-North Chicago on behalf of Greater North Chicago Senior Citizens Expansion and renovations 100,000

DCEO Waukegan Township General infrastructure 750,000 DCEO Waukegan Park District Construction and renovation 100,000 DCEO Waukegan Public Library General infrastructure upgrades 60,000

DCEO Waukegan Fire Department General infrastructure upgrades 75,000

DCEOBlack Chamber of Commerce of Lake County Construction and renovation 300,000

Page 39: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOBoys' Club/Girls' Club of Waukegan Facility renovation and upgrade 75,000

DCEO Waukegan Regional Airport General infrastructure 75,000

DCEOLake County Forest Preserve Expansion of Green Belt Cultural Center 50,000

DCEOWaukegan Baptist Bible Church, Inc. General infrastructure 100,000

DCEO Village of Hillside Construction of new sidewalks 200,000 DCEO Brdview Park District General infrastructure improvements 200,000 DCEO Village of Bellwood General infrastructure improvements 250,000 DCEO Village of Maywood Renovations to the municipal building 500,000

DCEO Village of Westchester General infrastructure improvements to Westchester Emergency Operation Center 200,000 DCEO Village of Forest Park Expansion of the police department 200,000 DCEO Aspire of Illinois General infrastructure 50,000 DCEO Village of Summit General infrastructure 240,000

DCEOCity of Berwyn Police Department Technology infrastructure upgrades 85,000

DCEO Village of Riverside General infrastructure 100,000

DCEOCity of Berwyn Public Library General infrastructure 120,000

DCEO Village of Lyons Construction at Veterans Memorial Park 222,000

DCEO

Villages of LeGrange, LaGrange Park, and McCook Infrastructure renovation of the site for the new YMCA of Greater LaGrange 100,000

DCEO Village of McCook General road resurfacing 100,000 DCEO Village of Brookfield Construction and renovation 303,000 DCEO Village of LaGrange Park Public works municipal garage 150,000

DCEOLaGrange Park/Brookfield School District 95 Window replacement 90,000

DCEO City of Berwyn General infrastructure for Proska Park 90,000 DCEO Village of Stone Park Construction of a public safety building 300,000

DCEOAccess Community Health Network Renovations to the Austin Family Health Center 50,000

DCEOUnity Temple Restoration Foundation Frank Lloyd Wright building restoration 125,000

DCEO City of Chicago Infrastructure repairs and lighting upgrades in the 37th ward 300,000 DCEO Hope Community Church General infrastructure improvements 200,000

DCEOAustin Chamber of Commerce New building construction 175,000

DCEO City of Chicago Street lighting and resurfacing in the 29th ward 400,000 DCEO Chicago Park District Renovation of Austin Town hall 375,000 DCEO Village of Melrose Park Alley resurfacing 300,000 DCEO Village of Oak Park North Avenue maintenance repairs 225,000

DCEOSankofa Cultural Arts and Business Center General infrastructure improvements 50,000

DCEO Erie Family Health Center General infrastructure - DCEO Association House General infrastructure - DCEO Chicago Public Schools General infrastructure at Wells High School 250,000 DCEO Casa Norte, Inc. General infrastructure 100,000 DCEO Julia Center, Inc. General infrastructure 100,000 DCEO Youth Service Project General infrastructure 100,000

DCEOBoys and Girls Clubs of Chicago General infrastructure at the Barreto Boys and Girls Club 20,000

DCEOUnion League Boys and Girls Clubs General infrastructure at the Club One location 200,000

DCEO A Knock at Midnight, NFP Erie Family Health Center for general infrastructure 300,000 DCEO Pullman Business Council Rehabilitation of a building 150,000 DCEO Bridging the Tys to Jordan Rehabilitation of a building 100,000

DCEO Henry's Sober Living House Rehabilitation of a facility 100,000 DCEO Village of Lansing Road resurfacing 175,000 DCEO Village of Glenwood ADA compliance sidewalk replacement program 75,000 DCEO Village of Glenwood Costs associated with elevated tank renovations 150,000

DCEOUniversity of Illinois College of Dentistry Pediatric Dental Clinic 175,000

DCEO City of Calumet City Raod resurfacing 150,000 DCEO Village of Thornton Road resurfacing 75,000

DCEOAssociation House of Chicago General infrastructure 200,000

DCEOErie FamilyHealth Center, Inc. General infrastructure 60,000

DCEO City of Chicago Resurfacing of Lincoln Avenue from Winnemac to Peterson 100,000 DCEO Chicago Park District General infrastructure at the West Ridge Nature Preserve 150,000

DCEOChrist the King Jesuit College Preparatory School A new building 500,000

DCEO Village of Orland Hills Road resurfacing of 160th Place 75,000 DCEO Village of Orland Park st lighting and infrastructure 225,000 DCEO Village of Tinley Park Sewer infrastructure and improvements 200,000

Page 40: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Chicago Public Schools Rehabilitation of William J. Bogan High School 20,000 DCEO Chicago Public Schools Rehabilitation of Dawes Elementary School 20,000 DCEO Chicago Public Schools Rehabilitation of Hampton School 20,000 DCEO Chicago Public Schools Rehabilitation of McKay School 20,000 DCEO Chicago Public Schools Rehabilitation of Owen Elementary Scholastic Academy 20,000 DCEO Chicago Public Schools Rehabilitation of Tarkington School of Excellence 20,000 DCEO Chicago Public Schools Rehabilitation of Harper School 20,000 DCEO Chicago Public Schools Rehabilitation of Eberhart Elementary School 20,000 DCEO Chicago Public Schools Rehabilitation of Yale Elementary School 20,000 DCEO Chicago Public Schools Rehabilitation of Wentworth Elementary School 20,000 DCEO Chicago Public Schools Rehabilitation of Bond Elementary School 20,000 DCEO Chicago Public Schools Rehabilitation of Altgeld Elementary School 20,000 DCEO Mt. Zion Sheila Day Care General infrastructure 65,000 DCEO Sheridan Crossing General infrastructure, upgrades, and renovations 100,000

DCEODiamond in the Ruff Children Society General infrastructure 100,000

DCEOPositive Anti-Crime Thrust, Inc. General infrastructure 50,000

DCEODaisy's Resource Developmental Center General infrastructure 50,000

DCEOCountryside Association for People with Disabilities General infrastructure 50,000

DCEO The United Youth Academy General infrastructure at the Zion facility 100,000

DCEO Family First Support Center General infrastructure at the Waukegan facility 50,000 DCEO Chicago Public Schools Renovation of Funston Elementary School 25,000 DCEO Chicago Public Schools Renovation of Lyons Elementary School 25,000 DCEO Chicago Public Schools Renovation of Northwest Middle School 25,000

DCEO El Rincon Community Clinic Renovations 100,000

DCEOSegundo Ruiz Belvis Cultural Center Renovations 200,000

DCEONight's Schield in West Frankfort Infrastructure improvements to the Roan Center 125,000

DCEO City of Benton Infrastructure improvements to the Benton Civic Center 25,000 DCEO City of Herrin Infrastructure improvements to the Herrin Civic Center 25,000

DCEOWilliamson County Child Advocacy Center Infrastructure improvements 125,000

DCEO Southern Illinois Healthcare Infrastructure improvements at Herrin Hospital 50,000

DCEOHeartland Regional Medical Center Infrastructure improvements 50,000

DCEO Franklin Hospital Infrastructure improvements 45,000

DCEOThe Lighthouse Shelter in Marion Infrastructure improvements 125,000

DCEO CASA of Franklin County Infrastructure improvements 25,000

DCEOMarion Regional Humane Society Infrastructure improvements 25,000

DCEOCASA of Williamson County, Inc. Infrastructure improvements 25,000

DCEO Rockford Fire Department Infrastructure improvements 50,000 DCEO La Voz Latina, Inc. Infrastructure improvements 100,000

DCEOSouthwest Ideas For Today and Tomorrow, Inc. Infrastructure improvements 50,000

DCEOVeterans Memorial Hall in Rockford Infrastructure improvements 50,000

DCEO YMCA of Rock River Valley Infrastructure improvements 50,000

DCEO

Young Women's Christian Association of Rockford, Illinois Infrastructure improvements 50,000

DCEOLifescape Community Services, Inc. Infrastructure improvements 50,000

DCEOBarbara Olson Center of Hope, Inc. Infrastructure improvements 50,000

DCEOJanet Wattles Mental Health Center, Inc. Infrastructure improvements 50,000

DCEO Pleasant Dale Park District General infrastructure 289,000 DCEO City of Washington General infrastructure at the Five Points Washington Community Center 500,000

DCEOMetropolitan Family Services General infrastructure 325,000

DCEO Misericordia Homes General infrastructure 1,710,000

DCEOHolocaust Memorial Foundation of Illinois general infrastructure to the Holocaust Museum 1,000,000

DCEO Rosecrance Health Network general infrastructure to Rockford Men's Recovery Home 150,000

DCEOKane County Sheriff's Department general infrastructure 100,000

DCEO Catholic Charities general infrastructure 7,000,000

Page 41: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Seguin Services The Garden Center and building renovations 750,000 DCEO Village of Maywood police station 2,250,000 DCEO Village of Justice general infrastructure 1,600,000 DCEO Chicago lighting improvements in 34th Ward 50,000 DCEO Chicago Park District Running track 50,000 DCEO Chicago lighting improvements in 21st Ward 50,000 DCEO Peoria Public Library general infrastructure at the Lincoln Branch Library 25,000 DCEO Peoria infrastructure for Peoria Fire Department 25,000

DCEOLimestone Township in Peoria County general infrastructure for the Limestone Fire Department 25,000

DCEOWest Peoria Residents Association general infrastructure 25,000

DCEOPleasant Hill Elementary School District 69 general infrastructure 25,000

DCEO Alpha Park Library general infrastructure 25,000

DCEO Peoria Citizen's Committee Economic Opportunity, Inc for general infrastructure 50,000 DCEO Peoria Park District general infrastructure at the Africa Exhibit in Glen Oak Park 40,000 DCEO Southeast Chicago Chamber Renovation of offices 30,000 DCEO Chicago Park District Construction fo a field house an dplay lot at Bradley Park 525,000 DCEO Chicago Park District Construction and pedestrian improvements at Dixon Park 300,000 DCEO Sullivan House Renovation fo the gym and several classrooms 100,000 DCEO Catholic Charities of the Arch Renovations to the common recreation areas at the St. Ailbe Faith and St. Ailbe Lov 45,000 DCEO Chicago Park District Renovations of the field house at Mann Park 125,000 DCEO Chicago Park District Construction of a play lot at Grand Crossing Park 100,000 DCEO Greater Galilee Babtist ChurcInfrastructure upgrades 50,000 DCEO Fire House Project Infrastructure upgrades 50,000 DCEO Chicago Public Schools ADA Improvements at Newton Bateman Elementary School 115,000 DCEO Village of Valier Infrastructure upgrades 30,000 DCEO Seretoma Center in Alsip Infrastructure upgrades 25,000 DCEO Truth and Deliverance Interna Roofing and infrastructure upgrades 40,000 DCEO Pleasant Ridge Missionary B Infrastructure upgrades 35,000 DCEO Marillac Social Center Infrastructure upgrades 100,000 DCEO Deborah's Place Infrastructure upgrades 100,000 DCEO Chicago Park District New field house in Haas Park 100,000 DCEO Chicago Park District infrastructure upgrades at Kenwell Park 25,000 DCEO Chicago Public Schools infrastructure upgrades at Avondale Elementary School 20,000 DCEO Chicago Public Schools infrastructure upgrades at Barry Elementary School 20,000 DCEO Chicago Public Schools infrastructure upgrades at Lorenzo Brentano Math and Science Academy 20,000

DCEO Chicago Public Schools For infrastructure improvements at Lorenzo Brentano Math and Science Academy 20,000 DCEO Chicago Public Schools For infrastructure improvements at Darwin Elementary School 20,000 DCEO Chicago Public Schools For infrastructure improvements at Falconer Elementary School 20,000 DCEO Chicago Public Schools For infrastructure improvements at Goethe Elementary School 20,000 DCEO Chicago Public Schools For infrastructure improvements to Logandale Middle School 20,000 DCEO Chicago Public Schools For infrastructure improvements at Monroe Elementary School 20,000 DCEO Chicago Public Schools For infrastructure improvements at Schubert Elementary School 20,000 DCEO Chicago Public Schools For infrastructure improvements Yates Elementary School 20,000

DCEO

North Center for Handicapped Children and Adults For roof repair and general infrastructure needs 20,000

DCEO Grace Lutheran School For infrastructure improvements 20,000

DCEOHumboldt Community Christian School For infrastructure improvements 20,000

DCEO Salem Christian Academy For infrastructure improvements 20,000 DCEO Archdiocese of Chicago For infrastructure improvements at St. Hyacinth School 20,000 DCEO Archdiocese of Chicago For infrastructure improvements at St.John Berchmans School 20,000 DCEO Archdiocese of Chicago For infrastructure improvements at St. Sylvester School 20,000

DCEORegional Transportation Authority For a Metra station at Peterson Avenue and Ravenswood Ave. 10,000,000

DCEO Chicago Park District For construction of a play lot in Hartigan Park 50,000 DCEO Alden Township Road infrastructure improvements 75,000 DCEO Algonquin Township Road infrastructure improvements 150,000 DCEO Burton Township Road infrastructure improvements 75,000 DCEO Chemung Township Road infrastructure improvements 75,000 DCEO Coral Township Road infrastructure improvements 75,000 DCEO Dorr Township Road infrastructure improvements 75,000 DCEO Dunham Township Road infrastructure improvements 75,000 DCEO Grafton Township Road infrastructure improvements 75,000 DCEO Greenwood Township Road infrastructure improvements 75,000 DCEO Hartland Township Road infrastructure improvements 75,000 DCEO Hebron Township Road infrastructure improvements 75,000 DCEO Marengo Township Road infrastructure improvements 75,000 DCEO McHenry Township Road infrastructure improvements 150,000 DCEO Nunda Township Road infrastructure improvements 75,000 DCEO Richmond Township Road infrastructure improvements 75,000 DCEO Riley Township Road infrastructure improvements 75,000 DCEO Seneca Township Road infrastructure improvements 75,000 DCEO Village of Hebron public safety construction and road infrastructure improvements 150,000

DCEOVillage of Richmond Fire Protection District public safety improvements and construction of a parking lot 80,000

Page 42: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Johnsburg Water and wastewater infrastructure 500,000 DCEO Crystal Lake Road infrastructure improvements 700,000 DCEO Woodstock Road infrastructure improvements 300,000 DCEO Lake in the Hills Park Development and Improvements 300,000 DCEO Marengo Township Water and wastewater infrastructure 150,000 DCEO Fox Waterway Agency Reconstruction and shoreline stabilization (Trinski Island) 500,000

DCEOPioneer Center for Human Services Homeless and group home infrastructure and renovations 80,000

DCEO Athens Village Hall Infrastructure improvements 214,000 DCEO Auburn Capitol improvements to Red Bud Park 106,500 DCEO Irwin Park Association parking lot, pavilion, and bridge 106,500 DCEO Berlin Playground equipment and lighting 25,000 DCEO Berlin lighting and parking lot repairs 27,000 DCEO Broadwell hydropneumatic storage tank rehabilitation 52,000 DCEO Chatham 18 inch water main transmission 214,000 DCEO Curran Sanitary sewer system and/or construction of a waterway 52,000 DCEO Divernon Water Main Upgrades 214,000 DCEO Elkhart Water system upgrades 214,000 DCEO Greenview Wheelchair accessible restrooms in the community building 36,000 DCEO Lincoln new roof and gutters in the fire station 156,000 DCEO Lincoln general repair work in the downtown area 40,000 DCEO Lincoln Resurfacing parking lots 100,000 DCEO Loami Expansion to the fire station 125,000 DCEO Loami Lighting upkeep 25,000

DCEO Middletown Stagecoach Inn Major renovations and improvements 42,000 DCEO New Berlin Reconstruction of North Cedar st 214,000 DCEO Oakford Updates and major repairs to the Village Hall 100,000 DCEO Pawnee Repairs to the San Terra San sewer lift station 48,000 DCEO Pawnee Storm sewer repairs on the north side of Route 104 114,000 DCEO Pawnee Sidewalks and lighting 52,000 DCEO Petersburg Lighting, sidewalks, wiring, and water line replacement 214,000 DCEO Pleasant Plains Clayville Historic Site and roads and lighting 214,000 DCEO Rochester Sanitary replacement at Black Branch Creek 214,000 DCEO Sherman Drainage and infrastructure improvements 214,000 DCEO Southern View New municipal building 214,000 DCEO Springfield Senior/Youth Community Center 69,000

DCEOFree and Accepted Masons of Springfield Restoring the Central Lodge #3 facility 150,000

DCEOIllinois Channel Organization Acquisition of a facility 100,000

DCEO Springfield YMCA New building and a parking lot 200,000 DCEO Tallula Drainage west of town 150,000 DCEO Williamsville Sanitary Sewer Repair 214,000 DCEO Amboy New maintenance building 250,000 DCEO Ashton Construction of a water main loop 150,000 DCEO Atkinson Emergency and industrial water well activation phase I 125,000 DCEO Dakota Reconstruction of Main st 100,000 DCEO Lowden State Park Restoration Projects 350,000 DCEO Dixon River st Parking Reconstruction 300,000 DCEO East Dubuque Water and sewer extension along highway 35 200,000 DCEO Village of Franklin Grove New well house 125,000 DCEO Freeport new water well 400,000 DCEO Hanover new water tower 100,000 DCEO Dixon Dixon YMCA for locker room reconstruction and ventilation 230,000

DCEODepartment. of Natural Resources Purchase of property near Grant's home and the Grant Washburne Facility 120,000

DCEO Highland College Wind Turbine Tech building, including all prior costs 50,000 DCEO Lanark replacement of the east sewer lift station 100,000 DCEO West Brooklyn Water Main replacement 75,000 DCEO Forreston Water Main replacement 75,000 DCEO City of Galena Gateway Park Land Acquisition 67,000 DCEO Phenix New township building 110,000 DCEO Pearl City Water distribution system upgrades 150,000 DCEO Rock Falls Water Main extension along US Route 30 303,000 DCEO Sterling YMCA Roof replacement 250,000 DCEO Village of Scales Mound Village Hall renovation, including handicap accessibility 100,000 DCEO Stephenson County Reconstruction of Forest and Pearl City Roads 500,000 DCEO Village of Addison Infrastructure, public security, and safety improvements 250,000 DCEO Village of Glendale Heights Infrastructure, public security, and safety improvements 250,000 DCEO Village of Itasca Infrastructure, public security, and safety improvements 250,000 DCEO City of Wood Dale Infrastructure, public security, and safety improvements 250,000 DCEO Village of Bensenville Infrastructure, public security, and safety improvements 150,000 DCEO Village of Bloomingdale Infrastructure, public security, and safety improvements 150,000 DCEO Village of Carol Stream Infrastructure, public security, and safety improvements 150,000 DCEO City of Elmhurst Infrastructure, public security, and safety improvements 150,000 DCEO Village of Roselle Infrastructure, public security, and safety improvements 150,000 DCEO City of Wheaton Infrastructure, public security, and safety improvements 150,000 DCEO Village of Lombard Infrastructure, public security, and safety improvements 50,000 DCEO Village of Glen Ellyn Infrastructure, public security, and safety improvements 50,000 DCEO Village of Villa Park Infrastructure, public security, and safety improvements 50,000

Page 43: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Winfield Infrastructure, public security, and safety improvements 50,000

DCEOForest Preserve District of DuPage County

Land acquisition and site development for a multi-use path connector to Meacham Grove Forest Preserve and North Central DuPage Regional Trail at Foster Avenue 450,000

DCEOForest Preserve District of DuPage County Land acquisition and development at Medinah Wetlands 50,000

DCEOForest Preserve District of DuPage County Construction of a multi-purpose trail bridge on County Farm Road 500,000

DCEOForest Preserve District of DuPage County Construction of Woodland Hawk multi-purpose trail 470,000

DCEO Addison Park District Infrastructure, public security, and safety improvements 50,000 DCEO Bloomingdale Park District Infrastructure, public security, and safety improvements 50,000 DCEO Carol Stream Park District Infrastructure, public security, and safety improvements 50,000 DCEO Elmhurst Park District Infrastructure, public security, and safety improvements 50,000 DCEO Itasca Park District Infrastructure, public security, and safety improvements 50,000 DCEO Medinah Park District Infrastructure, public security, and safety improvements 50,000 DCEO Roselle Park District Infrastructure, public security, and safety improvements 50,000 DCEO Wheaton Park District Infrastructure, public security, and safety improvements 50,000 DCEO Wood Dale Park District Infrastructure, public security, and safety improvements 50,000 DCEO Itasca Library District Infrastructure, public security, and safety improvements 50,000

DCEODuPage-Chicago Area Project (DUCAP) Infrastructure, public security, and safety improvements 60,000

DCEONortheast DuPage Special Recreation Association Infrastructure, public security, and safety improvements 50,000

DCEOWestern DuPage Special Recreation Association Infrastructure, public security, and safety improvements 50,000

DCEO City of Mattoon Road improvements 625,000

DCEOArcola Fire Protection District For the construction of a new fire station 200,000

DCEO City of Tuscola Sewer infrastructure improvements 150,000 DCEO Village of Bement Upgrade of the water well system 200,000 DCEO Village of Arthur Water infrastructure development 250,000

DCEOCharleston Transitional Facility Capital improvements 50,000

DCEO Village of Jewett Infrastructure improvements 25,000 DCEO City of Paris Capital costs associated with the Ed-Plex Building 100,000 DCEO City of Lawrenceville Infrastructure improvements 50,000 DCEO City of St. Francisville Infrastructure improvements 25,000 DCEO Oblong Children's Home Capital improvement to the facilities 55,000 DCEO Village of Altamont Infrastructure improvements 50,000 DCEO City of Shelbyville Infrastructure improvements 50,000

DCEOColes County Association for the Retarded (CCAR) Renovation of physical facilities 100,000

DCEO Camp New Hope Construction and renovation of physical facilities 200,000

DCEODouglas County Public Health Department Completion of the Dental Clinic 100,000

DCEO City of Martinsville Sidewalk improvements 150,000

DCEO

Lawrence/Crawford Association for Exceptional Citizens Renovation of physical facilities 200,000

DCEO

Crawford County Senior Citizens Senior Nutrition Program Renovation and/or purchase of kitchen and meal delivery facilities 100,000

DCEO Village of Shumway Sewer and/or septic improvements 150,000 DCEO City of Bridgeport Sewer lagoon improvements 300,000 DCEO City of Neoga Water and/or sewer line replacement 100,000 DCEO Village of Beecher City Septic system improvements 25,000 DCEO Village of Strasburg Sewer system improvements 100,000 DCEO Shelby County Bridge improvements 200,000 DCEO Village of Sigel Water system improvements 125,000 DCEO City of Mount Carmel Water system improvements 200,000 DCEO Village of Hutsonville Construction of a new fire station 150,000 DCEO Village of Kansas Infrastructure improvements 100,000 DCEO City of Chrisman Infrastructure improvements 100,000 DCEO City of Elmhurst Streetscaping along Spring road 250,000 DCEO Village of Villa Park Repair of St. Charles Road bridge over Salt Creek 80,000 DCEO Village of Villa Park Renovation of the Village Hall 50,000

DCEO Village of LombardMain Street Local Area Preservation Project from North Avenue to St. Charles Road 500,000

DCEO Village of Oak Brook Repair, renovation, and improvement of park, recreation, and athletic facilities 187,800 DCEO Village of Downers Grove Construction of new sidewalks on Ogden Avenue 500,000 DCEO Village of Berkeley Streetscaping along St. Charles Road 250,000

DCEO Village of WestchesterReconstruction, repairs, and improvements to the parking lot surrounding Village Hall 250,000

DCEO Village of North Riverside Infrastructure improvements and/or the purchase of a fire inspection vehicle 45,000 DCEO Village of North Riverside Purchase and installation of digital video cameras for squad cars 60,000

DCEO Village of LaGrange ParkConstruction of parking lot adjacent to 31st st Commercial District (Beach Avenue parking) 100,000

DCEOFriends of DuPage County Animal Care and Control Repairs and renovations to the DuPage County facility 25,000

DCEO Township of York Water improvement project 100,000

Page 44: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEODuPage County Housing Authority Development of housing for disabled veterans 25,000

DCEOTownship of Milton Highway Department Repairs, reconstruction of curbs, and construction of ADA accessible facilities 25,000

DCEO Ray Graham Association Repairs, renovations, and improvements to the Hanson Center in Burr Ridge 100,000 DCEO Ray Graham Association Construction, renovations, and improvements for a new headquarters building 200,000 DCEO DuPage Easter Seals Repairs, renovations, and improvements to the Villa Park Center 100,000

DCEO Aspire Repairs, renovations, and improvements to residential and therapeutic facilities 100,000 DCEO Joseph Academy Repairs, renovations, and improvements to facilities in Melrose Park 25,000

DCEOParents Allied with Children and Teachers for Tomorrow

Repairs, renovations, and improvements to facilities, including group homes in Oak Park and Elmwood Park 25,000

DCEONortheast DuPage Special Recreation Association

Repairs, renovations, and improvements to facilities, including the purchase of wheelchairs 25,000

DCEO Good Samaritan Hospital Repairs, renovations, and improvements to the south parking garage 100,000

DCEO Chicago Zoological Society Acquisition and construction of new facilities and attractions at Brookfield Zoo 150,000

DCEODuPage County Convalescent Center Kitchen remodel project 25,000

DCEO Township of ProvisoConstruction and renovation of office space to facilitate relocation of mental health services 25,000

DCEO Child's Voice SchoolPurchase of an Auditory Brainstem Response Machine including peripheral hardware and equipment 25,000

DCEO Elmhurst Park District Construction of walkways in Wilder Park 300,000

DCEO Plunkett Foundation

Development and construction of athletic fields and facilities with Elmhurst Park District and Immaculate Conception High School in and around Plunkett Park, Immaculate Conception Fields, Lewis Stadium and the Elmhurst Park District 250,000

DCEOFullersburg Historic Foundation Restoration of Ben Fuller Farmhouse 75,000

DCEOLisle-Woodridge Fire Protection District Purchase and installation of a traffic control device at Ogden and Center in Lisle 32,200

DCEO Montini High School Flood retention and mitigation 50,000

DCEOElmhurst School District 205 Foundation

Development of technological alternatives to textbooks and textbook formats including various digital formats 25,000

DCEOVilla Park School District 45 for Jackson Middle School Cafeteria expansion, renovation, and construction 150,000

DCEO Village of HennepinConstruction of an emergency service/fire station building and purchase of a back-up generator 150,000

DCEO Village of McNabb Resurfacing the parking lot at the fire station 70,000 DCEO Village of DePue Purchase and installation of a tornado warning system 50,000 DCEO City of LaSalle Replacement of windows in the bathhouse and lighting at City Park 115,000 DCEO Village of Seatonville Water plant upgrade 40,000 DCEO Village of Kangley Construction of new storm water drainage 135,000 DCEO Village of Tonica Construction of new public works garage, office, and shop 280,000

DCEOPutnam County Emergency Management Agency Construction of a building 300,000

DCEOLaSalle County Sheriff's Department Upgrades in communication and safety equipment 250,000

DCEOBureau County Sheriff's Department Upgrades in communication and safety equipment 150,000

DCEOPutnam County Sheriff's Department Upgrades in communication and safety equipment 150,000

DCEOGrundy County Sheriff's Department Upgrades in communication and safety equipment 200,000

DCEOKankakee County Sheriff's Department Upgrades in communication and safety equipment 150,000

DCEOIroquois County Sheriff's Department Upgrades in communication and safety equipment 50,000

DCEO Village of Carbon Hill Reconstruction and replacement of deteriorated sts 350,000

DCEO Village of SenecaConstruction of an addition to the Village Hall to house the Police Department, 911 Center, and Public Safety Department 325,000

DCEO Village of GrandviewA construction project to permanently separate storm and sanitary sewers in critical parts of the village 545,000

DCEO Village of Gardner Water main project 400,000 DCEO Village of Bureau Junction Construction of a new building for the Fire Department 215,000 DCEO Village of East Brooklyn Storm sewer and st improvement projects 300,000 DCEO City of Chenoa Infrastructure improvements 50,000 DCEO City of El Paso Infrastructure improvements 25,000 DCEO City of Fairbury Infrastructure improvements 50,000 DCEO City of Gibson City Infrastructure improvements 50,000 DCEO City of Gilman Infrastructure improvements 25,000 DCEO City of Hoopeston Infrastructure improvements 25,000 DCEO City of LeRoy Infrastructure improvements 25,000 DCEO City of Lexington Infrastructure improvements 25,000 DCEO City of Minonk Infrastructure improvements 25,000 DCEO City of Paxton Infrastructure improvements 50,000 DCEO City of Pontiac Infrastructure improvements related to the area of tourism 530,000

Page 45: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO City of Washington Infrastructure improvements 100,000 DCEO City of Watseka Infrastructure improvements 50,000

DCEO Eureka Community Hospital Infrastructure improvements 25,000 DCEO Gibson Area Hospital Infrastructure improvements 25,000

DCEOHoopeston Regional Health Center Infrastructure improvements 25,000

DCEOIroquois Memorial Hospital and Resident Center Infrastructure improvements 25,000

DCEOLeonore Volunteer Fire Protection District Infrastructure improvements 25,000

DCEO Livingston County Infrastructure improvements 500,000

DCEOMcLean County Highway Department Infrastructure improvements 500,000

DCEORossville Community Fire Protection District Infrastructure improvements 50,000

DCEO St. James Hospital Infrastructure improvements 50,000 DCEO Town of Chatsworth Infrastructure improvements 25,000 DCEO Village of Anchor Infrastructure improvements 25,000 DCEO Village of Arrowsmith Infrastructure improvements 25,000 DCEO Village of Ashkum Infrastructure improvements 25,000 DCEO Village of Bellflower Infrastructure improvements 25,000 DCEO Village of Buckley Infrastructure improvements 25,000 DCEO Village of Cabery Infrastructure improvements 25,000 DCEO Village of Campus Infrastructure improvements 25,000 DCEO Village of Carlock Infrastructure improvements 25,000 DCEO Village of Chebanse Infrastructure improvements 25,000 DCEO Village of Clifton Infrastructure improvements 25,000 DCEO Village of Colfax Infrastructure improvements 25,000 DCEO Village of Cooksville Infrastructure improvements 25,000 DCEO Village of Cornell Infrastructure improvements 25,000 DCEO Village of Crescent City Infrastructure improvements 25,000 DCEO Village of Cullom Infrastructure improvements 25,000 DCEO Village of Dana Infrastructure improvements 25,000 DCEO Village of Danforth Infrastructure improvements 25,000 DCEO Village of Danvers Infrastructure improvements 25,000 DCEO Village of Deercreek Infrastructure improvements 25,000 DCEO Village of Downs Infrastructure improvements 25,000 DCEO Village of Dwight Infrastructure improvements 50,000 DCEO Village of Ellsworth Infrastructure improvements 25,000 DCEO Village of Emington Infrastructure improvements 25,000 DCEO Village of Fisher Infrastructure improvements 25,000 DCEO Village of Flanagan Infrastructure improvements 25,000 DCEO Village of Forrest Infrastructure improvements 25,000 DCEO Village of Gridley Infrastructure improvements 25,000 DCEO Village of Hudson Infrastructure improvements 25,000 DCEO Village of Iroquois Infrastructure improvements 25,000 DCEO Village of Kempton Infrastructure improvements 25,000 DCEO Village of Loda Infrastructure improvements 25,000 DCEO Village of Long Point Infrastructure improvements 25,000 DCEO Village of Lostant Infrastructure improvements 25,000 DCEO Village of Melvin Infrastructure improvements 25,000 DCEO Village of Morton Infrastructure improvements 100,000 DCEO Village of Odell Infrastructure improvements 25,000 DCEO Village of Onarga Infrastructure improvements 25,000 DCEO Village of Piper City Infrastructure improvements 25,000 DCEO Village of Roberts Infrastructure improvements 25,000 DCEO Village of Rossville Infrastructure improvements 50,000 DCEO Village of Rutland Infrastructure improvements 25,000 DCEO Village of Saunemin Infrastructure improvements 25,000 DCEO Village of Saybrook Infrastructure improvements 25,000 DCEO Village of Secor Infrastructure improvements 25,000 DCEO Village of Sheldon Infrastructure improvements 25,000 DCEO Village of Sibley Infrastructure improvements 25,000 DCEO Village of Stanford Infrastructure improvements 25,000 DCEO Village of Strawn Infrastructure improvements 25,000 DCEO Village of Thawville Infrastructure improvements 25,000 DCEO Village of Towanda Infrastructure improvements 25,000 DCEO Village of Wellington Infrastructure improvements 25,000 DCEO Village of Woodland Infrastructure improvements 25,000 DCEO Ford County Infrastructure improvements 150,000 DCEO Iroquois County Infrastructure improvements 150,000 DCEO Village of Milford Infrastructure improvements 25,000 DCEO Woodford County Infrastructure improvements 200,000 DCEO Village of Barrington Repaving project 200,000 DCEO Village of Cary For all costs associated with Route 14 and Jandus Road intersection

improvements 450,000 DCEO Village of Crystal Lake For all costs associated with the North Shore Flooding Improvement Project 482,000 DCEO Village of Deer Park For all costs associated with a storm water improvement project 150,000 DCEO Village of Fox Lake For all costs associated with the construction of a de-icing storage and

containment facility. 185,000

Page 46: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Fox River Grove For all costs associated with a reconstruction and public utility extension project

200,000 DCEO Village of Hawthorn Woods For all costs associated with the Glennshire Water System Replacement Project

173,000 DCEO Village of Lake Barrington For all costs associated with environmental compliance and/or neighborhood

dump cleanup 430,000 DCEO Village of Lake Zurich For all costs associated with Route 12 Sanitary Force Main Replacement 480,000 DCEO Village of Libertyville For all costs associated with construction and/or reconstruction of the driveway

and parking lot at Fire Station 1 200,000 DCEO Village of Long Grove For all costs associated with Route 53 pathway construction 100,000 DCEO City of McHenry For all costs associated with Huntersville Sewer Project 700,000 DCEO Village of Mundelein For all costs associated with Community Park access, safety improvements,

including, but not limited to, a pedestrian crossing signal 350,000 DCEO Village of Round Lake For all costs associated with the purchase and installation of a wireless system

30,000 DCEO Village of Wauconda For all costs associated with replacement of Sanitary Sewer Pumping Station 1

100,000 DCEO Stark County For all costs associated with installation and construction of a new elevator 200,000 DCEO Stark County For all costs associated with the purchase of safety equipment 50,000 DCEO Bureau County For all costs associated with Courthouse rehabilitation, renovation, and electrical

upgrades. 250,000 DCEO City of Princeton For all costs associated with st improvements 250,000 DCEO Heartland Foundation For all costs associated with construction of the Peoria Cancer Research Center

1,000,000 DCEO City of Peoria For all costs associated with construction of turn lanes on Radnor Road and Alta

Lane 150,000 DCEO Easter Seals of Peoria For all costs associated with IT system infrastructure for electronic medical

records 250,000 DCEO Woodford County For all costs associated with reconstruction of County Highway 23 250,000 DCEO City of Eureka For all costs associated with construction of turn lanes on US 24 500,000 DCEO Marshall County For all costs associated with highway and bridge maintenance 250,000 DCEO Henry County For all costs associated with highway and bridge maintenance 250,000 DCEO City of Galesburg For all costs associated with construction of the National Railroad Hall of Fame

100,000 DCEO City of Galesburg For all costs associated with st improvements 250,000 DCEO Knox County For all costs associated with rehabilitation and renovation of the Courthouse 250,000 DCEO City of Peoria For all costs associated with intersection improvements at University Street and

entrance to Illinois Central College 130,000 DCEO City of Kewanee For all costs associated with st improvements 100,000 DCEO Midwest Museum of Natural

History For all costs associated with renovation and construction including all prior incurred costs 170,000

DCEO Kishwaukee Community College

For all costs associated with construction of an early childhood center classroom, HVAC replacement, and parking reconstruction 150,000

DCEO City of Sycamore For all costs with milling and resurfacing of State st and other street improvements 450,000

DCEO City of Dekalb For all costs associated with Gurler Road reconstruction 450,000 DCEO City of Rochelle For all costs associated with removal of Treatment Plant rd and construction of

new access roads and intersections 450,000 DCEO City of Belvidere For all costs associated with land acquisition for downtown transportation center

310,000 DCEO Boone County For all costs associated with renovation of County Administration Center 200,000 DCEO Village of Poplar Grove For all costs with construction of low flow channels 100,000 DCEO Village of Capron For all costs associated with construction costs related to a new well and well

house 100,000 DCEO Rockford Mass Transit

Authority For all costs associated with roof replacement

200,000 DCEO City of Rockford For all costs associated with infrastructure improvements and/or the purchase of a

fire rescue pumper truck 150,000 DCEO Winnebago County For all costs associated with construction of an emergency vehicle storage facility

50,000 DCEO Rockford Park District For all costs associated with purchase and construction at Sportscore II 100,000 DCEO Roscoe Township For all costs associated with grading and infrastructure for the sports complex 50,000 DCEO City of Sandwich For all costs associated with extension of Fairwind Boulevard 300,000 DCEO Village of Kirkland For all costs associated with street reconstruction 200,000 DCEO City of Genoa For all costs associated with street reconstruction 300,000 DCEO Village of Kingston For all costs associated with new waterlines and meters 100,000 DCEO Village of Shabbona For all costs associated with water, sewer, and stormwater system replacement

100,000 DCEO Village of Somonauk For all costs associated with construction of a new water treatment plant 100,000 DCEO Village of Stillman Valley For all costs associated with construction of a new waste water treatment plant

100,000 DCEO Village of Waterman For all costs associated with water system arsenic remediation project 100,000 DCEO Rome Township For all costs associated with purchase of a building of construction of a new facility

for the Township Building 100,000 DCEO Waltonville Community Unit

School District 1For all costs associated with roof replacement on the high school

100,000 DCEO Grand Prairie Township For all costs associated with remodeling of the existing Township Building or

construction of a new building 75,000 DCEO Blissville Township For all costs associated with construction of a new township building 60,000 DCEO Farrington Township For all costs associated with construction of a township/equipment building 100,000

Page 47: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Raccoon Community School

DistrictFor all costs associated with roof replacement and/or repair, electrical rehabilitation and plumbing for the elementary school 300,000

DCEO Kinmundy Fire Department For all costs associated with infrastructure improvements and/or the purchase of a fire truck 100,000

DCEO Geff Community Consolidated School District 14

For all costs associated with roof replacement and/or repair and kitchen repairs at the elementary school

100,000 DCEO City of Flora For all costs associated with the construction of a new fire station 600,000 DCEO Effingham County Dive

RescueFor all costs associated with the construction of a new building

200,000 DCEO Breese School District 12 For all costs associated with window replacement at the elementary school 250,000 DCEO City of Carlye For all costs associated with land acquisition for a city park 250,000 DCEO City of Breese For all costs associated with construction of a new sewer line entering into the

new lift station 450,000 DCEO City of Centralia For all costs associated with construction of a water main on East McCord Street

250,000 DCEO City of Salem For all costs associated with water line replacement 250,000 DCEO City of Mt. Vernon For all costs associated with engineering and construction on Veterans and

Davidson Drive 495,000 DCEO City of Fairfield For all costs associated with reconstruction and/or remodeling of the Armory

Building, purchase of a generator for the Police Station, and the purchase of 911 equipment 250,000

DCEO City of Olney For all costs associated with water line extension 300,000 DCEO Village of Inverness For all costs associated with road stabilization 75,000 DCEO Northwest Special

Recreation AssociationFor all costs associated with building renovations

50,000 DCEO Alexian Brothers Mental

Health CenterFor all costs associated with building renovations

100,000 DCEO Jewish United Fund/Jewish

Federation of Metropolitan Chicago

For all costs associated with building renovations

50,000 DCEO Bridge Youth and Family

Services For all costs associated with building renovation

25,000 DCEO Clearbrook For all costs associated with building rehabilitation and renovation 25,000 DCEO Village of Wheeling For all costs associated with infrastructure improvements 50,000 DCEO WINGS For all costs associated with purchase of a resale store 200,000 DCEO Community Consolidated

School District 21For all costs associated with technology upgrades and Wi-Fi installation

200,000 DCEO Palatine Township For all costs associated with building renovation 40,000 DCEO Palatine Township

Children's Care CenterFor all costs associated with renovation expansion

50,000 DCEO Palatine Township Senior

CenterFor all costs associated with renovation and expansion

50,000 DCEO Wheeling Township For all costs associated with renovation and construction of a dental clinic 140,000 DCEO Preservation of Human

DignityFor all costs associated with renovation of a building

200,000 DCEO Access to Care For all costs associated with purchase and installation of a phone system,

computer software, and computer system 130,000 DCEO Village of Arlington Heights For all costs associated with road resurfacing 400,000 DCEO City of Rolling Meadows For all costs associated with construction engineering 255,000 DCEO Village of Hoffman Estates For all costs associated with construction of a new police department/911 dispatch

center 300,000 DCEO Village of Palatine For all costs associated with construction of a new fire station 500,000 DCEO Journeys from Pads to

Hope For all costs associated with renovations and resurfacing

65,000 DCEO Countryside Association For all costs associated with renovation and expansion 300,000 DCEO Little City Foundation For all costs associated with equipment and construction 150,000 DCEO Indian Trails Public Library For all costs associated with lobby renovations 150,000 DCEO City of Prospect Heights For all costs associated with road resurfacing 325,000 DCEO Village of Buffalo Grove For all costs associated with resurfacing commuter parking lot and streambank

erosion protection 400,000 DCEO Reformers Unanimous For all costs associated with reconstruction of the Women's Rehabilitation Center

150,000 DCEO Rockford Park District For all costs associated with the purchase and/or construction of a facility for

Sportscore II 175,000 DCEO Rockford Park District For all costs associated with installation, construction, and replacements at Park

District facilities and neighborhood parks 1,200,000 DCEO Anderson Japanese

GardensFor all costs associated with construction of a new pavilion

100,000 DCEO Shirland Township For all costs associated with infrastructure improvements and/or the purchase of a

five yard truck and snow plow 50,000 DCEO Winnebago County For all costs associated with renovations and related work on the old County

Courthouse 150,000 DCEO Winnebago County For all costs associated with construction of a facility to house emergency vehicles

50,000 DCEO Village of Machesney Park For all costs associated with roadway improvements on Highway 251 100,000 DCEO City of South Beloit For all costs associated with purchase/installation of the Fire Department

overhead doors plus apron and pavement 40,000 DCEO Village of Rockton For all costs associated with infrastructure improvements at an athletic field 100,000 DCEO Roscoe Township For all costs associated with infrastructure improvements at the township athletic

field 100,000

Page 48: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Owen Township For all costs associated with the purchase of highway construction equipment 50,000 DCEO Nicholas Consevatory For all costs associated with a construction of a conservatory 100,000 DCEO Village of Roscoe For all costs associated with construction of a new city hall 100,000 DCEO City of Rockford For all costs associated with infrastructure improvements and/or the purchase of a

fire rescue truck 200,000 DCEO Rockford Boys and Girls

ClubFor all costs associated with construction, replacement and upgrades to the physical plant at the Carlson Boys and Girls Club 100,000

DCEO Harlem Community Center For all costs associated with construction, replacement and upgrades to the physical plant 50,000

DCEO Rock Valley College For all costs associated with reconstruction of Stenstrom Center 200,000 DCEO Rockford Metro Centre For all costs associated with a pedestrian accessibility escalator and entrance

improvements 450,000 DCEO City of Loves Park For all costs associated with a water main extension 150,000 DCEO Forest Preserve For all costs associated with construction of a new shelter 50,000 DCEO City of Rockford For all costs associated with infrastructure improvements and/or the purchase of a

fire rescue pumper truck 100,000 DCEO Village of New Milford For all costs associated with village lighting and signage 45,000 DCEO Goldie Floberg Center For all costs associated with building remodeling 50,000 DCEO SIGMA Beta Leadership

Club Leadership SchoolFor all costs associated with buildouts at the organization campus

130,000 DCEO Patriots Gateway For all costs associated with construction, replacement and upgrades to the

physical plant 100,000 DCEO Crusader Clinic For all costs associated with construction, replacement and upgrades to the

physical plant 100,000 DCEO West Suburban Fire

Protection District For all costs associated with construction and/or reconstruction of a parking lot, driveway, and apron. 40,000

DCEO Village of Heyworth For all costs associated with infrastructure and security improvements 50,000 DCEO Heyworth Fire Protection

DistrictFor all costs associated with renovation of the Fire Station

30,000 DCEO Austin Township For all costs associated with bridge replacement 30,000 DCEO City of Farmer City For all costs associated with construction of a walking path 30,000 DCEO Village of Spaulding For all costs associated with the purchase and installation of tornado sirens 30,000 DCEO Village of Hopedale For all costs associated with culvert replacement 50,000 DCEO Farmer City Fire Protection

DistrictFor all costs associated with infrastructure and security improvements

50,000 DCEO Argenta-Oreana Fire

Protection DistrictFor all costs associated with the purchase and/or renovation of a building for a fire station. 50,000

DCEO South Macon Fire Protection District

For all costs associated with infrastructure improvements 50,000

DCEO Beason Fire Protection District

For all costs associated with infrastructure improvements 50,000

DCEO Tazewell County Coroner For all costs associated with renovations to Pekin Hospital Morgue 50,000 DCEO Village of Mount Auburn For all costs associated with sidewalk repair 25,000 DCEO Village of Edinburg For all costs associated with improvements at the Police Department 25,000 DCEO Atlanta Fire Protection

DistrictFor all costs associated with infrastructure improvements

25,000 DCEO Macon County World War II

Memorial CommitteeFor all costs associated with construction of a monument

100,000 DCEO Hopedale Medical

FoundationFor all costs associated with construction of a heliport

100,000 DCEO Village of Mt Pulaski For all costs associated with construction of a lift station 100,000 DCEO Village of Forsyth For all costs associated with construction of a community center 100,000 DCEO City of Bloomington For all costs associated with the enhancement to parks and trails 750,000 DCEO Town of Normal Enhancement of parks and trails 500,000

DCEODavid Davis Mansion Foundation

Construction and/or improvements at Visitor's Center, including, but not limited to, handicap accessibility 60,000

DCEO The Baby Fold HVAC equipment and installation at Hamitt Elementary School 110,000 DCEO Project OZ Parking lot construction and/or reconstruction and a room addition 60,000 DCEO Village of Buffalo Infrastructure improvements and/or purchase of new dump truck 30,000

DCEO Ilinois Wesleyan Univerisity Construction of a new building 200,000

DCEOCommunity Cancer Center, LLC Construction of a new building 400,000

DCEOTimber Point Outdoor Center Bldg construction and lighting 75,000

DCEO Stonington American Legion Bldg renovations 25,000

DCEOChristian County Senior Center Bldg renovations 50,000

DCEO Illinois State Unviersity Construction of ROTC bldg 250,000 DCEO City of Clinton Infrastructure improvements and/or purchase of new fire truck 125,000 DCEO DeWitt County Marina construction 75,000 DCEO Decatur Memorial Hospital Bldg improvements 150,000

DCEOSt. Robert Bellarmine Catholic Student Services Bldg at Illinois State Universities 200,000

DCEO St. Mary's Hospital Construction or new Emergency room 100,000

DCEOHeartland Community College Challenger Learning Center facilities 125,000

DCEO Village of Bartlett Construction and/or infrastructure improvements 360,000 DCEO Villlage of Schaumburg New construction and /or infrastructure improvement 275,000 DCEO Village of Carol Stream New construction and /or infrastructure improvement 350,000

Page 49: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Hoffman Estates New construction and /or infrastructure improvement 200,000 DCEO Village of Elk Grove New construction and /or infrastructure improvement 175,000 DCEO City of West Chicago New construction and /or infrastructure improvement 200,000 DCEO City of St Charles New construction and /or infrastructure improvement 245,000 DCEO Village of Roselle New construction and /or infrastructure improvement 200,000 DCEO Village of South Elgin New construction and /or infrastructure improvement 150,000 DCEO Village of Bloomingdale New construction and /or infrastructure improvement 200,000 DCEO Village of Hanover Park New construction and /or infrastructure improvement 150,000 DCEO Village of Wayne New construction and /or infrastructure improvement 100,000 DCEO City of Rolling Meadows New construction and /or infrastructure improvement 100,000 DCEO Ray Grahm Association Patio construction 15,000 DCEO Carol Stream Park District New construction and /or infrastructure improvement 100,000

DCEONortheast DuPage Special Recreation Association New construction and /or infrastructure improvement 25,000

DCEOWestern DuPage Special Recreation Association Parking lot renovation and/or reconstruction 50,000

DCEOChildren's Home and Aid Society Infrastructure improvements 25,000

DCEO Children's Advocacy Center New construction and /or infrastructure improvement 200,000 DCEO Hanover Park District Infrastructure improvements including but not limited to handicap accessibility 100,000 DCEO Northern Illinois Food Bank Construction costs for a new facility for a nutrition and distribution center 252,000

DCEODuPage County Area Project Costs associated with acquisition of a new building 60,000

DCEO Bartlett Fire Department Construction of a training tower 200,000

DCEOWayne Township Highway Department Flood control project 150,000

DCEO EduCare Construction of a new facility 100,000

DCEOKane County Sheriff's Department Infrastructure improvements 100,000

DCEO Schaumburg Township Highway and/or road reconstruction and improvements 100,000 DCEO Schaumburg YMCA Infrastructure improvements 50,000

DCEOWestern DuPage Special Recreation Association Infrastructure improvements 50,000

DCEO Northern Illinois Food Bank Costs associated with the construction of a new facility 200,000 DCEO EduCare Construction of a new facility 150,000 DCEO Naper Settlement Road construction and building repair and restoration 150,000

DCEO Dupage Children's Museum Infrastructure improvements and bond payment including all prior incurred costs 600,000 DCEO Kiwanis Club of Wheaton Safety Development infrastructure improvements 50,000

DCEOMetropolitan Family Services DuPage Roof repair, HVAC, and building repair 250,000

DCEO Gateway Foundation Costs associated with infrastructure improvements 50,000 DCEO Wayside Cross Costs associated with infrastructure improvements 50,000 DCEO Serenity House Costs associated with infrastructure improvements 50,000 DCEO Outreach Ministries Costs associated with the purchase of a new facility and repair 400,000 DCEO Outreach Ministries Costs associated with building repair and handicap accessibility 40,000

DCEOEaster Seals DuPage and Fox Valley Costs associated with building repair and infrastructure improvements 40,000

DCEO City of Wheaton Costs associated with storm water infrastructure improvements 250,000 DCEO City of Warrensville Costs associated with infrastructure improvements 150,000 DCEO City of West Chicago Costs associated with infrastructure improvements 200,000 DCEO City of Batavia Costs associated with infrastructure improvements 75,000 DCEO City of Geneva Costs associated with infrastructure improvements 75,000 DCEO Village of Winfield Costs associated with infrastructure improvements 60,000 DCEO City of Aurora Costs associated with parking lot resurfacing and infrastructure improvements 160,000 DCEO City of North Aurora Costs associated with infrastructure improvements 60,000

DCEOWest Chicago Fire Department Costs associated with construction of a new facility 100,000

DCEO Winfield Park District Costs associated with parking lot construction 120,000 DCEO Wheaton Park District Costs associated with building and park construction and repair 150,000 DCEO Warrenville Park District Costs associated with building and park construction and repair 100,000 DCEO Batavia Park District Costs associated with building and park construction and repair 100,000

DCEO West Chicago Park District Costs associated with building and park construction and repair 100,000 DCEO Geneva Park District Costs associated with building and park construction and repair 100,000 DCEO Fox Valley Park District Costs associated with building and park construction and repair 100,000 DCEO Naperville Park District Costs associated with building and park construction and repair 100,000

DCEODuPage County Convalescent Center Costs associated with kitchen building and repair 50,000

DCEOForest Preserve District of DuPage County Costs associated with west branch infrastructure improvements 100,000

DCEOForest Preserve District of DuPage County Costs associated with infrastructure improvements Ben Fuller historic home 125,000

DCEO Village of Hinsdale Costs associated with Oak st bridge replacement project 825,000 DCEO Village of Downers Grove Costs associated with parking building construction 500,000 DCEO Village of Westmont Costs associated with downtown infrastructure improvements 200,000 DCEO Village of Clarendon Hills Costs associated with a metra station improvement project 250,000 DCEO Naperville Heritage Society Costs associated with a roadway project 450,000

DCEO Chicago Zoological Society Costs associated with Brookfield Zoo infrastructure improvements 100,000

Page 50: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Bowlingbrook Costs associated with the Riverwood Subdivision erosion control project 200,000 DCEO Village of Willowbrook Costs associated with stlight installation 92,000 DCEO Western Illinois University Costs associated with alumni house window and door replacement 42,500 DCEO Village of Lisle Costs associated with infrastructure improvements 150,000

DCEO Dupage Children's Museum Costs associated with infrastructure improvements 500,000 DCEO Wheaton Park District Costs associated with infrastructure improvements for arrowhead 175,000

DCEOForest Preserve District of DuPage County Costs associated with greene farm barn rehabilitation 250,000

DCEORobert Crown Center for Health Education Costs associated with infrastructure improvements 100,000

DCEO Woodridge Park District Costs associated with Lake Harriet infrastructure improvements 200,000

DCEO Hinsdale Adventist Hospital Costs associated with infrastructure improvements 35,000

DCEOAdvocate Good Samaritan Hospital Costs associated with infrastructure improvements 35,000

DCEO Delnor Community HospitalCosts associated with capital investment and equipment and building including but not limited to the emergency room 200,000

DCEO Provena Mercy HospitalCosts associated with capital investment and equipment and building restricted to Aurora and Elgin locations only 250,000

DCEOWaubonsee Community College

Costs associated with capital investment and equipment and building at Sugar Grove Campus 250,000

DCEO Elgin Community CollegeCosts associated with capital investment in library and textbook purchases, campus security, and for the radiological technology program 250,000

DCEOAurora West School District 129

Costs associated with Washington Middle School and West Aurora High School asbestos abatement projects 300,000

DCEOFox Valley Medical Health Foundation

Costs associated with construction of a second six-unit apartment building for persons with disabilities 500,000

DCEO Gateway FoundationCosts associated with construction of a 128-bed youth residential substance abuse treatment center for Kane, Kendall, Dekalb, and Western DuPage Counties 500,000

DCEO Village of GilbertsCosts associated with reconstruction of the bridge over Tyler Creek Crossing at Hennessy Court 350,000

DCEO Mutual Ground Inc.Costs associated with capital investment in equipment and structural protection at shelter residence in Aurora 150,000

DCEO Tri-City family Services Inc.Costs associated with capital investment for replacement of management information systems 100,000

DCEOFamily Counseling Service of Aurora Costs associated with capital needs for reconstruction and structural protection 50,000

DCEO Hesed House Inc. Costs associated with construction of an expanded Homeless Shelter 100,000

DCEOPrestbury Citizen's Association

Costs associated with environmental remediation of 3 lakes in Prestbury Community 50,000

DCEOFamily Service Association of Greater Elgin Area

Costs associated with capital investment for replacement of medical records system and billing data processing 100,000

DCEO Village of Newark Costs associated with a sewer system construction project 100,000 DCEO Village of Hampshire Costs associated with a water-treatment construction project 100,000

DCEOAssociation for Individual Development

Costs associated with capital investment for housing persons with developmental disabilities 250,000

DCEOElgin Ecker Center for Mental Health

Costs associated with equipment, capital, purchase to include but not limited to medical records, scanning, and retrieval systems 30,000

DCEO Elburn Blackberry TownshipCosts associated with bridge reconstruction, construction, repair, and or rehabilitation 200,000

DCEOGilbert Family Branch of Greater Elgin YMCA

Costs associated with capital investment in equipment and building restricted to Gilberts branch 100,000

DCEO Kane County Costs associated with construction of a railroad crossing and or safety and noise mitigation of railway horns 250,000

DCEO Village of Campton Hills Costs associated with capital investment in storm water, sewer, and flood control 50,000 DCEO Village of Alhambra Costs associated with drainage infrastructure improvements 50,000 DCEO Village of Altamont Costs associated with water line replacement 35,000 DCEO City of Arthur Costs associated with Palmer st Bridge replacement 112,500 DCEO Village of Aviston Costs associated with park improvements 25,000

DCEO Decatur Memorial HospitalCosts associated with construction of a new all-weather pedestrian corridor joining General Services building and main hospital 120,000

DCEO St. Mary's Hospital Costs associated with expansion of the fire sprinkler system 250,000

DCEO City of GreenvilleCosts associated with bridge culvert and road extension from IL Route 127 into Buckite Development 375,000

DCEO City of Highland Costs associated with construction of multi-use trail 60,000

DCEO City of LebanonCosts associated with the purchase and installation of pedestrian signals on Madison st 75,000

DCEO Village of Lovington Costs associated with drainage infrastructure improvements 600,000 DCEO City of Mascoutah Costs associated with land acquisition off Route 177 100,000

DCEO Village of Mt. ZionCosts associated with the Henderson Phase 2 Project, including but not limited to, road construction 250,000

DCEO City of O'Fallon Costs associated with reconstruction of manholes 92,000 DCEO City of O'Fallon Costs associated with stormwater infrastructure improvements 89,000

DCEO Village of OreanaCosts associated with renovation and or rehabilitation of the Argenta-Oreana firehouse 50,000

DCEO City of Shelbyville Costs associated with north 9th st drainage project 100,000 DCEO Village of Sorento Costs associated with renovations of the community building 25,000

Page 51: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of St. Jacob Costs associated with drainage project at 6th and Napoleon St 45,000 DCEO Village of St. Peter Costs associated with design and engineering costs for a sewer upgrade 37,000 DCEO City of Sullivan Costs associated with construction and or reconstruction of south Route 32 100,000 DCEO Village of Troy Costs associated with downtown stscape-mainst 30,000

DCEO City of VandaliaCosts associated with water main extension project at Main Street and Vansant Avenue 200,000

DCEO City of Decatur Costs associated with widening and repaving of Lost Bridge Road north to U.S. 36 1,250,000

DCEO Shelby TownshipCosts associated with construction and or reconstruction of the Okaw-Windsor Bridge 160,000

DCEOSouthern Illinois Regional Social Services Costs associated with construction of a new building 50,000

DCEOBoys and Girls Club of Carbondale Costs associated with building infrastructure 50,000

DCEORandolph County Road District 2 Costs associated with roads and infrastructure 20,000

DCEO Pierre Menard Home Costs associated with repairs to the facility 50,000 DCEO Beck Vocational Center Costs associated with construction of a building 25,000

DCEO

Shawnee Health Center (Murphysboro Campus Center) Costs associated with construction of a new building 50,000

DCEO Village of AddievilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 30,000

DCEO City of AvaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of AlversInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of Alto PassInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO City of AshleyInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 70,000

DCEO Village of BaldwinInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of Campbell HillInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of CahokiaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 150,000

DCEO City of ChesterInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 90,000

DCEO Village of CobdenInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of CoultervilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO City of ColumbiaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO Village of CutlerInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of DamiensvilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of DuboisInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 30,000

DCEO City of DuquoinInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO Village of DesotoInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 35,000

DCEO Village of DowellInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 35,000

DCEO Village of DupoInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO Village of ElkvilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of Ellis GroveInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of EvansvilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of FreeburgInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO City of Grand TowerInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of HeckerInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of HoyletonInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of IrvingtonInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO City of JonesboroInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 80,000

DCEO Village of MakandaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 30,000

DCEO Village of MarissaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 80,000

Page 52: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO Village of MaeystownInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of MillstadtInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 80,000

DCEO City of MurphysboroInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO City of NashvilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 110,000

DCEO Village of New AthensInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 80,000

DCEO Village of New BadenInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 80,000

DCEO Village of New MindenInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 30,000

DCEO Village of OakdaleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 35,000

DCEO Village of OkawvilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO Village of PercyInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO City of PinckneyvilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO Village of Prairie du RocherInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO City of Red BudInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 80,000

DCEO Village of RichviewInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 30,000

DCEO Village of RumaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of St. LiboryInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 60,000

DCEO Village of SmithtonInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 80,000

DCEO City of SpartaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO Village of SteelevilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 60,000

DCEO Village of TamaroaInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 60,000

DCEO Village of TildenInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of ValmeyerInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of VergennesInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO City of WaterlooInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 100,000

DCEO Village of WillisvilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of FayettevilleInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 50,000

DCEO Village of RadomInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of GorhamInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 30,000

DCEO Village of RockwoodInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 20,000

DCEO Village of LenzburgInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 40,000

DCEO Village of FultsInfrastructure improvements, roads, sewer, and water improvements, and/or sidewalks 25,000

DCEO Village of Okawville Costs associated with construction of a new water tower 150,000

DCEO Village of VenedyCosts associated with the purchase of a tractor and loader and/or infrastructure improvements 25,000

DCEO City of CarbondaleCosts associated with the purchase of generators and/or water and sewer infrastructure improvements 220,000

DCEO AspireCosts associated with repairs and improvements to residential and therapeutic facilities 100,000

DCEOCoordinating Action for Children's Health

Costs associated with renovation and/or improvements of Children's Respite Care Center including but limited to improving handicap accessibility 100,000

DCEO Cornerstone Services Costs associated with construction of a new facility 100,000

DCEOCommunity Support Services Costs associated with roof-replacement and energy conservation upgrades 87,000

DCEO Helping Hands

Costs associated with remodeling the adult services portion of the headquarters and/or construction of a new community integrated living arrangement facility in LaGrange Highlands 100,000

DCEO LaGrange Hospital Costs associated with infrastructure improvements 100,000

DCEOLincolnway Special Recreation Association Costs associated with construction of a new facility 100,000

DCEO Pillars Costs associated with repairs and enhancements to Constance Morris House 55,000

Page 53: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Pillars Costs associated with roof replacement at the Hickory Hills Childcare Facility 35,000

DCEO Ray Graham AssociationCosts associated with infrastructure improvements at headquarters and Hanson center 100,000

DCEO Seguin ServicesCosts associated with renovation of the LaGrange Community Integrated Living Arrangement 50,000

DCEOSouthwest Suburban Center on Aging Costs associated with facility building renovations 200,000

DCEO Trinity Services

Costs associated with remodeling and/or renovation at the Family Autism Center, the Nebraska Community Integrated Living Arrangement and other residential facilities 175,000

DCEO Chicago Zoological Society Costs associated with infrastructure improvements at Brookfield Zoo 100,000

DCEODuPage County Convalescence Center Costs associated with renovations and improvements 100,000

DCEOForest Preserve District of DuPage County

Costs associated with infrastructure improvements to Waterfall Glen Sawmill Creek overlook 150,000

DCEO Lamonte Township Costs associated with infrastructure improvements 100,000 DCEO Lyons Township Costs associated with pavement repair and resurfacing 39,000

DCEOWill County Forest Preserve District

Costs associated with Bruce Road Access infrastructure improvements at the Hadley Valley Preserve 100,000

DCEO Village of Burr Ridge Costs associated with infrastructure improvements and/or 91st Street resurfacing 100,000

DCEO City of DarienCosts associated with storm water drainage system improvements and infrastructure improvements 150,000

DCEO Village of FrankfurtCosts associated with construction of turn lanes intersection widening and infrastructure improvements at 80th Avenue between Laraway Road and Sauk trail 350,000

DCEO Village of FrankfurtCosts associated with construction and/or reconstruction of sidewalks on route 45 and infrastructure improvements 180,000

DCEO Village of Homer Glencosts associated with Meadowcrest drainage project and infrastructure improvements 150,000

DCEO Village of Indian Head Park costs associated with Wolf Road and Acacia Well infrastructure improvements 30,000

DCEO Village of Indian Head ParkCosts associated with construction and/or reconstruction of sidewalk and infrastructure improvements 80,000

DCEO Village of LaGrange Costs associated with signalization and infrastructure improvements 90,000

DCEO Village of LaMonte Costs associated with Warner ave storm relief sewer infrastructure improvements 200,000 DCEO Village of Mokena Costs associated with construction of a salt storage facility 210,000 DCEO Village of New Lenox costs associated with improvements to the village sewer system 200,000 DCEO Village of Tinley Park Costs associated with infrastructure improvements 100,000 DCEO Village of Western Springs Costs associated with construction of a new fire station 300,000 DCEO Village of Willowbrook Costs associated with infrastructure improvements 46,000 DCEO Village of Willowbrook Costs associated with Knolls Lake drainage improvement project 60,000 DCEO Village of Woodridge Costs associated with infrastructure improvements 100,000

DCEONortheast DuPage Special Recreation Association

Costs associated with adaptive fitness equipment and accessibility for the veterans initiative 200,000

DCEORidgewood High School District 234 Costs associated with capital improvements 100,000

DCEO Village of Harwood Heights Costs associated with capital improvements 100,000

DCEOSchorsch Village Improvement Association Costs associated with capital improvements 100,000

DCEO Norridge Park District Costs associated with capital improvements 100,000

DCEONew Horizons Center for the Developmentally Disabled Costs associated with capital improvements 100,000

DCEO Misericordia Home Costs associated with capital improvements 100,000 DCEO Chicago Park District Costs associated with capital improvements in various 20th district parks 300,000 DCEO Village of Norridge Costs associated with capital improvements 100,000 DCEO Village of Niles Costs associated with capital improvements 100,000 DCEO Triton Community College Costs associated with making all campus restroom facilities ADA accessible 100,000

DCEO DuPage Children's Museum Costs associated with a building purchase 500,000 DCEO Fox Valley Park District Costs associated with utility and infrastructure improvements 50,000 DCEO St. Patrick's Residence infrastructure, public safety and security improvements 20,000 DCEO DuPage County

Convalescentinfrastructure, public safety and security improvements

20,000 DCEO Loaves and Fishes Construction of a community food pantry 50,000 DCEO Heritage YMCA infrastructure, public safety and security improvements 40,000 DCEO Little Friends infrastructure, public safety and security improvements 50,000 DCEO DuPage PADS infrastructure, public safety and security improvements 40,000 DCEO Hessed House infrastructure, public safety and security improvements 50,000 DCEO Indian Prairie School District

204infrastructure, public safety and security improvements

40,000 DCEO Naperville Community

School District 203infrastructure, public safety and security improvements

40,000 DCEO Naperville Park District Construction of new park amenities 50,000 DCEO Turning Point capital improvements 40,000 DCEO Naper Settlement infrastructure, public safety, security improvements 40,000 DCEO AID Constructing a disability work center 40,000 DCEO City of Batavia Fire Department Attack Squad improvements 50,000

Page 54: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Batavia Township Road construction improvements 25,000 DCEO Blackberry Township Construction of a township building 40,000 DCEO Blackberry Township Seavy Road Bridge repairs and capital improvements 10,000 DCEO Big Grove Township Road signs and capital improvements 10,000 DCEO Big Rock Township Township Hall improvements 35,000 DCEO Village of Big Rock Design and construction of a waste water facility 40,000 DCEO Campton Township Community center expansion 45,000 DCEO Village of Campton Hills sewer replacement 35,000 DCEO Village of Elburn sidewalk repairs 40,000 DCEO Geneva Township Wentworth Road Bridge repairs 50,000 DCEO Kane County Blackberry Creek stormwater improvement and flood control 100,000 DCEO Kaneville Township Road repair improvements 35,000 DCEO Kendall County Land purchase 100,000 DCEO Village of Maple Park Construction of a community center restroom and storage facility 40,000 DCEO Village of Montgomery Construction of a water main 40,000 DCEO Village of Newark Construction of a village hall 40,000 DCEO Northern Illinois Food

DepositoryConstruction of a community nutrition center

40,000 DCEO Village of North Aurora Construction of a village hall 40,000 DCEO Village of Oswego Construction of a road 40,000 DCEO Senior Services Assoc. Inc Construction of a storage facility 15,000 DCEO Seward Township Construction of a township building 40,000 DCEO Village of Sheridan Sewer and stormwater improvement 60,000 DCEO Southern Kane County

Training AssociationConstruction of a regional training facility

50,000 DCEO Village of Sugar Grove Road improvements 40,000 DCEO United City of Yorkville Construction of a materials storage facility 40,000 DCEO Village of Virgil Roadway improvements 40,000 DCEO Fox Township infrastructure improvements 30,000 DCEO Virgil Township Construction of a fabric salt storage building 7,500 DCEO City of Plano infrastructure improvements 40,000 DCEO Village of Heyworth infrastructure, public safety, security improvements 50,000 DCEO Heyworth Fire Protection

Districtfire station renovation improvements

30,000 DCEO Village of Spaulding infrastructure improvements for emergency purposes 30,000 DCEO Village of Buffalo Road improvements 50,000 DCEO Holy Family School infrastructure, public safety, security improvements 50,000 DCEO Our Lady of Lourdes School infrastructure, public safety, security improvements

50,000 DCEO Lutheran School

Associationinfrastructure, public safety, security improvements

50,000 DCEO Decatur Chiristian School infrastructure, public safety, security improvements 50,000 DCEO Latham Fire Protection

Districtinfrastructure, public safety, security improvements

50,000 DCEO Clinton American Legion infrastructure, public safety, security improvements 100,000 DCEO American Legion Post #382 infrastructure, public safety, security improvements

50,000 DCEO Stonington American Legion

Post #257infrastructure, public service, safety improvements

50,000 DCEO Atlanta Fire Protection

Districtinfrastructure, public service, safety improvements

50,000 DCEO South Macon Fire

Protection Districtfire station construction

50,000 DCEO City of Farmer City Construction of a walking path 30,000 DCEO St. Theresa High School all costs associtated with construction 20,000 DCEO Austin Township township bridge replacement 30,000 DCEO Village of Hopedale culvert replacement 50,000 DCEO Farmer City Fire Protection

Districtinfrastructure, public safety, security improvements

50,000 DCEO Argenta Fire Department purchase and renovation of a fire station 50,000 DCEO Mt. Pulaski fire Protection

Districtinfrastructure, public safety, security improvements

70,000 DCEO Riverton Fire Protection

Districtinfrastructure, public safety, security improvements

100,000 DCEO Hickory Point Fire

Departmentinfrastructure, public safety, security improvements

70,000 DCEO Maroa Fire Protection

Districtinfrastructure, public safety, security improvements

50,000 DCEO Little Mackinaw Township

Fire Protection Districtinfrastructure, public safety, security improvements

25,000 DCEO Mackinaw Fire Protection

Districtinfrastructure, public safety, security improvements

50,000 DCEO Wapella Fire Protection

Districtinfrastructure, public safety, security improvements

50,000 DCEO Kinney Fire Protection

Districtfire station repairs

50,000 DCEO Macon County World War II

Monumentconstruction of a World War II veterans memorial

150,000 DCEO Tazwell County coroner all costs associated with capital improvements 50,000 DCEO Village of Forsyth infrastructure, public safety, security improvements 200,000

Page 55: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Lincoln Rural Fire

Protection Districtall costs associated with construction

50,000 DCEO McLean fire Protection

Districtinfrastructure, public safety, security improvements

10,000 DCEO Village of Mt. Auburn repair and replacement of sidewalks 25,000 DCEO Village of Edinburg purchase and renovation of a police department 25,000 DCEO Village of Mechanicsburg rebuilding Water Tower Road 50,000 DCEO Village of Woodridge construction of a pedestrian bridge 200,000 DCEO DuPage County remodeling the DuPage county Convalescent Center kitchen 25,000 DCEO Village of Lemont storm sewer construction 250,000 DCEO Gower School District 62 purchase of technology equipment 250,000 DCEO Village of LaGrange construction of a pedestrian bridge 400,000 DCEO Village of Willowbrook design and construction of st lights 50,000 DCEO Village of Indian Head Park watermain repairs 285,000 DCEO City of Darien street repairs 340,000 DCEO Helping Hand Rehabilitation

Centerall costs associated with capital improvements

50,000 DCEO Western Springs School

District 101construction of an elevator

250,000 DCEO Village of Western Springs construction of a new fire house 400,000 DCEO Village of Panola all costs associated with infrastructure improvements 10,000 DCEO Tazwell County all costs associated with infrastructure improvements 20,000 DCEO Village of Congerville all costs associated with infrastructure improvements 30,000 DCEO City of Pontiac all costs associated with infrastructure improvements 30,000 DCEO Village of Morton all costs associated with infrastructure improvements 30,000 DCEO City of Leroy all costs associated with infrastructure improvements 30,000 DCEO Empire Township all costs associated with infrastructure improvements 30,000 DCEO Village of Long Point all costs associated with infrastructure improvements 30,000 DCEO Village of Downs all costs associated with infrastructure improvements 30,000 DCEO City of Lexington all costs associated with infrastructure improvements 30,000 DCEO City of Washington all costs associated with infrastructure improvements 30,000 DCEO Village of Flanagan all costs associated with infrastructure improvements 30,000 DCEO Village of Stanford all costs associated with infrastructure improvements 30,000 DCEO Village of Gridley all costs associated with infrastructure improvements 30,000 DCEO City on Minonk all costs associated with infrastructure improvements 30,000 DCEO Village of Hudson all costs associated with infrastructure improvements 30,000 DCEO City of El Paso all costs associated with infrastructure improvements 30,000 DCEO Village of Leonore all costs associated with infrastructure improvements 30,000 DCEO Village of Rutland all costs associated with infrastructure improvements 30,000 DCEO Village of Goodfield all costs associated with infrastructure improvements 30,000 DCEO Village of Secor all costs associated with infrastructure improvements 30,000 DCEO City of East Peoria all costs associated with infrastructure improvements 30,000 DCEO Village of Cornell all costs associated with infrastructure improvements 30,000 DCEO Village of Dana all costs associated with infrastructure improvements 30,000 DCEO Village of Ellsworth all costs associated with infrastructure improvements 30,000 DCEO City of Eureka all costs associated with infrastructure improvements 30,000 DCEO Village of Deer Creek all costs associated with infrastructure improvements 30,000 DCEO Village of Danvers all costs associated with infrastructure improvements 30,000 DCEO City of Chenoa all costs associated with infrastructure improvements 30,000 DCEO Village of Cooksville all costs associated with infrastructure improvements 30,000 DCEO Villlage of Towanda all costs associated with infrastructure improvements 30,000 DCEO Village of Carlock all costs associated with infrastructure improvements 30,000 DCEO Village of Lostant all costs associated with infrastructure improvements 30,000 DCEO Village of Kappa all costs associated with infrastructure improvements 30,000 DCEO Township of Morton all costs associated with infrastructure improvements 20,000 DCEO Washington Township all costs associated with infrastructure improvements 20,000 DCEO Fondulac Township all costs associated with infrastructure improvements 20,000 DCEO Deer Creek Township all costs associated with infrastructure improvements 20,000 DCEO Eureka-Goodfield Fire

Departmentall costs associated with infrastructure improvements

15,000 DCEO Allin Township all costs associated with infrastructure improvements 15,000 DCEO Decker Township all costs associated with infrastructure improvements 50,000 DCEO Fairfield Community High

Schoolall costs associated with infrastructure improvements

25,000 DCEO Harter/Stanford Fire District new fire hydrants

150,000 DCEO Village of Claremont water tower infrastructure improvements 35,000 DCEO Edwards County E-911 infrastructure, public safety, security improvements 25,000 DCEO Wayne County ETSB infrastructure, public safety, security improvements 50,000 DCEO Jasper County Board infrastructure, public safety, security improvements 200,000 DCEO Wabash County Board infrastructure, public safety, security improvements 75,000 DCEO City of Albion fire station improvements 245,000 DCEO White County Government purchase of a bondable vehicle and/or capital improvements 95,000 DCEO Noble Fire Protection

Districtfire station improvements

75,000 DCEO Village of Maunie fire station improvements 25,000 DCEO Claremont Township all costs associated with infrastructure improvements 50,000 DCEO Madison Township all costs associated with infrastructure improvements 50,000 DCEO Hope Institute all costs associated with capital improvements 150,000 DCEO Children's Museum

Foundation Corp.construction of a new building

1,000,000

Page 56: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Lincoln's New Salem Park all costs associated with infrastructure improvements 98,000 DCEO Boys and Girls Club of

Springfieldall costs associated with infrastructure improvements

75,000 DCEO City of Springfield costs associated with capital impovements to the water system 50,000 DCEO Downtown Springfield, Inc all costs associated with infrastructure improvements 75,000 DCEO G.R.O.W.T.H. International all costs associated with infrastructure improvements 50,000 DCEO United Cerebral Palsy Land

of Lincolnall costs associated with infrastructure improvements

100,000 DCEO Central Illinois Foodbank all costs associated with infrastructure improvements 50,000 DCEO Kumler Outreach Ministries all costs associated with infrastructure improvements

50,000 DCEO Historic West Side

Neighborhood Assocationall costs associated with community and capital improvements

25,000 DCEO Enos Park Neighborhood

Associationall costs associated with park improvements

50,000 DCEO Harvard Park Neighborhood

Associationall costs associated with infrastructure improvements

25,000 DCEO Salvation Army all costs associated with infrastructure improvements 75,000 DCEO Free Mason Central Lodge

#3all costs associated with capital improvements

50,000 DCEO Iles Park Neighborhood

Associationall costs associated with infrastructure improvements

25,000 DCEO Lincoln Park Neighborhood

Associationall costs associated with infrastructure improvements

25,000 DCEO Oak Ridge Neighborhood

Associationall costs associated with infrastructure improvements

50,000 DCEO Twin Lake Homeowners

Assocationall costs associated with infrastructure improvements

25,000 DCEO Vinegar Hill Neighborhood

Associationall costs associated with sidewalk and lighting improvements

25,000 DCEO Oakhill Cemetery of

Clearlakeall costs associated with infrastructure improvements

25,000 DCEO Illinois State Fair Museum

Foundationall costs associated with infrastructure improvements

25,000 DCEO Illinois State Police Heritage

Foundationall costs associated with infrastructure improvements

100,000 DCEO Senior Services of Central

Illinoisall costs associated with infrastructure improvements

50,000 DCEO City of Springfield Monument ave infrastructure improvements 25,000 DCEO Springfield Muni Opera all costs associated with infrastructure improvements 50,000 DCEO Cuba Township Rod District new construction on township property

250,000 DCEO Cuba Township Road

Districtall costs associated with road improvements

185,000 DCEO Algonquin Township Road

Districtconstruction and roof repair on township property

75,000 DCEO Algonquin Township Road

Districtall costs associated with township road improvements

170,000 DCEO Wauconda Township Road

Districtall costs associated with township road improvements

350,000 DCEO Grant Township Road

Districtall costs associated with township road improvements

200,000 DCEO Nunda Township Road

Districtall costs associated with township road improvements

285,000 DCEO Avon Township Road

Districtall costs associated with township road improvements

100,000 DCEO Barrington Township all costs associated with township road improvements 200,000 DCEO Hospice of Northeastern

Illinoisconstruct 16-bed hospice home in Lake County

900,000 DCEO McHenry Township construct food pantry building 85,000 DCEO Mano a Mano Family

Resource Center Foundation

all costs associated with capital construction improvements

200,000 DCEO DuPage PADS infrastructure, public safety, security improvements 60,000 DCEO City of Naperville infrastructure, public safety, security improvements 175,000 DCEO Village of Lisle infrastructure, public safety, security improvements 75,000 DCEO Village of Woodridge infrastructure, public safety, security improvements 50,000 DCEO City of Wheaton infrastructure, public safety, security improvements 15,000 DCEO Village of Bolingbrook all costs associated with infrastructure, public security, and security improvements

10,000 DCEO Naperville Park District all costs associated with infrastructure, public security, and security improvements

20,000 DCEO Lisle Park District all costs associated with infrastructure, public security, and security improvements

15,000 DCEO Wheaton Park District all costs associated with infrastructure, public security, and security improvements

10,000 DCEO DuPage Convalescent

Centerall costs associated with infrastructure, public safety, and security improvements

25,000 DCEO DuPage Children's Museum all costs associated with infrastructure, public safety, and security improvements

300,000

Page 57: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO North Central College all costs associated with infrastructure, public safety, and security improvements

150,000 DCEO Benedictine University all costs associated with infrastructure, public safety, and security improvements

150,000 DCEO Lisle Woodridge Fire District all costs associated with infrastructure, public safety, and security improvements

100,000 DCEO Lisle Township all costs associated with infrastructure, public safety, and security improvements

25,000 DCEO Coach Care Center all costs associated with infrastructure, public safety, and security improvements

25,000 DCEO Little Friends all costs associated with infrastructure, public safety, and security improvements

40,000 DCEO Heritage YMCA all costs associated with infrastructure, public safety, and security improvements

and flooring improvements 40,000 DCEO St. Patrick's Residence all costs associated with infrastructure, public safety, and security improvements

and flooring improvements 20,000 DCEO Loaves and Fishes all costs associated with the contstruction of a new community food pantry 50,000 DCEO City of Casey all costs associated with drain improvements 75,000 DCEO Casey-Westfield Community

Unit School District 4Call costs associated with capital improvements

50,000 DCEO City of Marshall all costs associated with a city-wide broadband project 80,000 DCEO Marshall Community Unit

School District No. 2Call costs associated with capital improvements

50,000 DCEO Lake Land College Forsyth

Centerall costs associated expansion of automotive technology center

10,000 DCEO Martinsville Community Unit

School District No. 3Call costs associated with capital improvements

25,000 DCEO Village of Westfield all costs associated with infrastructure, public safety, and security improvements

15,000 DCEO West Union Park District all costs associated with playground improvements 10,000 DCEO Village of Flat Rock all costs associated with infrastructure, public safety, and security improvements

20,000 DCEO Hutsonville Community Unit

School District No. 1all costs associated with capital improvements

50,000 DCEO Hutsonville Township Park

Districtall costs associated with the Wabash River boat ramp project

25,000 DCEO Village of Hutsonville all costs associated with infrastructure, public safety, and security improvements

25,000 DCEO Hutsonville Township all costs associated with early warning system improvements 30,000 DCEO Oblong Community Unit

School District No. 4all costs associated with capital improvements

50,000 DCEO Illinois Oil Field Museum all costs associated with capital improvements 15,000 DCEO Village of Oblong all costs associated with infrastructure, public safety, and security improvements

50,000 DCEO Oblong Children's Christian

Homeall costs associated with capital improvements

20,000 DCEO Palestine Community Unit

School District No. 3all costs associated with capital improvements

50,000 DCEO Village of Palestine all costs associated with infrastructure, public safety, and security improvements

50,000 DCEO Robinson Community Unit

School District No. 2all costs associated with infrastructure, public safety, and security improvements

50,000 DCEO City of Robinson all costs associated with Main Street and square improvements 25,000 DCEO City of Robinson all costs associated with road improvements 50,000

DCEO Lincoln Trail Collegeall costs associated with the welding program, building expansion and/or capital improvements 25,000

DCEO Crawford County all costs associated with broadband project expansion 20,000

DCEO Village of Greenup all costs associated with infrastructure, public safety, and security improvements 50,000

DCEO Village of Jewett all costs associated with infrastructure, public safety, and security improvements 25,000

DCEONeoga Community Unit School District No. 3 all costs associated with capital improvements 50,000

DCEOCumberland Community Unit School District No. 77 all costs associated with capital improvements 50,000

DCEO Village of Toledo all costs associated with infrastructure, public safety, and security improvements 50,000

DCEOEdgar County Community Unit School District No. 6 all costs associated with capital improvements 50,000

DCEOKansas Community Unit School District No. 3 all costs associated with capital improvements 25,000

DCEOParis Community Unit School District No. 4 all costs associated with capital improvements 50,000

DCEOParis Union School District No. 95 all costs associated with capital improvements 50,000

DCEO City of Paris all costs associated with capital improvements 100,000 DCEO Paul Warner Rescue all costs associated with structural expansions and/or capital improvements 15,000

DCEOAltamont Community Unit School District No. 10 all costs associated with capital improvements 20,000

Page 58: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO City of Altamont all costs associated with infrastructure, public safety, and security improvements 25,000

DCEOBeecher City Community Unit School District No. 20 all costs associated with capital improvements 25,000

DCEO Village of Beecher City all costs associated with infrastructure, public safety, and security improvements 25,000

DCEORed Hill Community Unit School District No. 10 all costs associated with capital improvements 50,000

DCEO Lanterman Park District all costs associated with capital improvements 25,000

DCEO

Lawrence County Community Unit School District No. 20 all costs associated with capital improvements 50,000

DCEO City of Lawrenceville all costs associated with infrastructure, public safety, and security improvements 50,000

DCEO Village of St. Francisville all costs associated with infrastructure, public security, and security improvements 25,000

DCEO Village of Sumner all costs associated with infrastructure, public security, and security improvements 50,000

DCEO

Stewardson-Strasburg Community Unit School District No. 5A all costs associated with capital improvements 50,000

DCEO Village of Stewardson all costs associated with infrastructure, public security, and security improvements 100,000

DCEOShelbyville Community Unit School District No. 4 all costs associated with capital improvements for schools 20,000

DCEO City of Shelbyville all costs associated with infrastructure, public security, and security improvements 25,000

DCEOAllendale Community Unit School District No. 17 all costs associated with capital improvements to schools 25,000

DCEO Wabash CUSD 348 all costs associated with capital improvements to schools 50,000 DCEO City of Salem all costs associated with water and sewer line construction 150,000

DCEO City of Wamac all costs associated with infrastructure, public security, and security improvements 25,000 DCEO City of Nason all costs associated with wastewater improvements 25,000 DCEO Village of Dix all costs associated with capital improvements 20,000 DCEO Village of Belle Rive all costs associated with water project improvements 20,000 DCEO Village of Bonnie all costs associated with infrastructure improvements 20,000 DCEO Village of Bluford all costs associated with infrastructure improvements 20,000

DCEO Village of Ina all costs associated with infrastructure, public security, and security improvements 40,000

DCEO Village of Woodlawn all costs associated with infrastructure, public security, and security improvements 25,000

DCEOJefferson County Sheriff's Department all costs associated with infrastructure, public security, and security improvements 25,000

DCEOMt. Vernon Police Department all costs associated with infrastructure, public security, and security improvements 20,000

DCEO Village of Waltonville all costs associated with infrastructure, public security, and security improvements 20,000

DCEO Village of Patoka all costs associated with infrastructure, public security, and security improvements 20,000

DCEO Village of Walnut Hill all costs associated with infrastructure, public security, and security improvements 20,000

DCEOSalem Community Activities Center all costs associated with infrastructure improvements 25,000

DCEOMarion County Fair Association all costs associated with infrastructure improvements 25,000

DCEOCentralia City Fire Department all costs associated with fire station construction 30,000

DCEO Salem Police Department all costs associated with infrastructure improvements 20,000

DCEOMarion County Sheriff's Department all costs associated with infrastructure improvements 25,000

DCEO City of Sandoval all costs associated with infrastructure improvements 20,000 DCEO Illinois Theater all costs associated with infrastructure improvements 25,000 DCEO Village of Bartelso all costs associated with capital improvements 20,000 DCEO Village of Beckemeyer all costs associated with capital improvements 20,000

DCEOClinton County Sheriff's Department all costs associated with infrastructure improvements 25,000

DCEO Village of Hoffman all costs associated with infrastructure improvements 20,000

DCEOCarlyle Fire Protection District all costs associated with infrastructure improvements 20,000

DCEOSalem Fire Protection District all costs associated with infrastructure, public security, and security improvements 20,000

DCEO City of Almaall costs associated with infrastructure, public service, and safety improvements and the construction of a new community center 25,000

DCEO Village of Odin all costs associated with infrastructure, public service, and safety improvements 20,000

DCEO Village of Iuka all costs associated with infrastructure, public service, and safety improvements 20,000

DCEO City of Mt. Vernonall costs associated with infrastructure, public service, and safety improvements, and the purchase of a new fire truck and/or capital improvements 125,000

Page 59: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEO Breese Fire Departmentall costs associated with the purchase of a new fire truck and/or capital improvements 20,000

DCEO City of Centralia all costs associated with water and sewer infrastructure improvement projects 150,000 DCEO Kaskaskia College all costs associated with new construction of a training building on campus 45,000

DCEO City of Germantownall costs associated with the extension of utilities to development (retail) project and sewer improvements 30,000

DCEO City of Carlyleall costs associated with infrastructure, public service, and safety improvements, and purchase of property 65,000

DCEOSalem Area Aquatics Foundation all costs associated with construction of an indoor center and pool 20,000

DCEOSalem Community Theatre and Cultural Center

all costs associated with construction of ADA accessible restroom facilities and new entrance 40,000

DCEO Carlyle Police Department all costs associated with a construction project for the safe transport of prisoners 20,000

DCEO Breese Police Department all costs associated with infrastructure, public service, and safety improvements 10,000 DCEO City of Breese all costs associated with the construction of a sanitary sewer main 65,000 DCEO Village of Palatine all costs associated with the construction of a new fire station 75,000 DCEO City of Rollling Meadows all costs associated with Salt Creek stabilization 75,000 DCEO Village of Hoffman Estates all costs associated with construction of a water main 75,000 DCEO Village of Inverness all costs associated with village hall rehabilitation 75,000 DCEO Palatine Park District all costs associated with construction of Falcon Park Recreation Center 75,000

DCEORolling Meadows Park District all costs associated with parking lot repairs 75,000

DCEOCommunity Consolidated School District 15 all costs associated with plumbing renovations and/or capital improvements 75,000

DCEOTownship High School District 211 all costs associated with water and sewer pipe replacement 75,000

DCEOPalatine Township Senior Center all costs associated with building renovations and a parking lot 50,000

DCEO Palatine Township all costs associated with building renovations and parking lot repairs 42,000

DCEONorthwest Special Recreation Association all costs associated with roof and HVAC repairs and/or capital improvements 80,000

DCEO Little City all costs associated with asbestos removal and rehab 80,000 DCEO Clearbrook Building Renovations 80,000 DCEO Countryside Association Building construction and renovation 80,000

DCEOAlexian Brothers Center for Mental Health Roofing, water, and sewer improvements 48,000

DCEO WINGS Building purchase 20,000 DCEO Shelter, Inc. Roof renovation and/or capital improvements 20,000

DCEOKane County Division of Transportation Roadway, sanitary, sewer, storm sewer, and water main improvements 1,000,000

DCEO Village of Carpentersville Roadway, sanitary, sewer, storm sewer, and water main improvements 190,000 DCEO Village of South Elgin Roadway, sanitary, sewer, storm sewer, and water main improvements 225,000 DCEO Village of Sleepy Hollow Roadway, sanitary, sewer, storm sewer, and water main improvements 200,000 DCEO Village of Gilberts Roadway, sanitary, sewer, storm sewer, and water main improvements 225,000 DCEO Village of Hampshire Roadway, sanitary, sewer, storm sewer, and water main improvements 225,000 DCEO Pingree Grove Roadway, sanitary, sewer, storm sewer, and water main improvements 120,000 DCEO City of Algonquin Roadway, sanitary, sewer, storm sewer, and water main improvements 100,000

DCEO City of Bataviardway, sanitary, sewer, storm sewer, and water main improvements and a fire aparatus 100,000

DCEO Village of West Dundee Roadway, sanitary, sewer, storm sewer, and water main improvements 190,000

DCEO City of GenevaRoadway, sanitary, sewer, storm sewer, and water main improvements and electric utility upgrades 225,000

DCEO City of st CharlesRoadway, sanitary, sewer, storm sewer, and water main improvements and electric utility upgrades 225,000

DCEO City of Elgin Roadway, sanitary, sewer, storm sewer, and water main improvements 225,000 DCEO Village of Burlington Roadway, sanitary, sewer, storm sewer, and water main improvements 150,000 DCEO Rutland Township Roadway, sanitary, sewer, storm sewer, and water main improvements 225,000

DCEO Plato TownshipConstruction of a bike path/trail, highway maintenance building, and rdway improvements 100,000

DCEO Geneva Township Roadway improvements and bridge construction 50,000 DCEO Batavia Park Park improvements and land purchases 100,000

DCEOForest preservation district of Kane County Park improvements and land purchases and building construction 275,000

DCEO Geneva Park District Park improvements and land purchases 100,000

DCEO st Charles Park District park improvements, land purchases, and development of a new community park 100,000

DCEO Hampshire Park DistrictConstruction and completion of Dorothy Schmitt Memorial Park, park improvements, and land purchases 150,000

DCEO Dundee Park DistrictBrunner property accessible for public use, park improvements, and land purchases 100,000

DCEO Village of Anchor Infrastructure improvements 6,200 DCEO Village of Crescent City Infrastructure improvements 50,000 DCEO Village of Rossville costs associated with infrastructure improvements 50,000 DCEO Village of Roberts costs associated with infrastructure improvements 50,000 DCEO Village of Cissna Park costs associated with infrastructure improvements 30,000 DCEO Village of Gibson City costs associated with infrastructure improvements 50,000 DCEO Village of Strawn costs associated with infrastructure improvements 40,800

DCEOIroquois County Agriculture and 4-H Club Fair costs associated with infrastructure improvements 100,000

Page 60: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Piper City costs associated with infrastructure improvements 50,000 DCEO Village of Cullom costs associated with infrastructure improvements 50,000 DCEO Village Elliot costs associated with infrastructure improvements 50,000 DCEO Village of Buckley costs associated with infrastructure improvements 50,000 DCEO Village of Danforth costs associated with infrastructure improvements 22,000 DCEO Stockland Township costs associated with infrastructure improvements 20,000 DCEO Village of Melvin costs associated with infrastructure improvements 16,000 DCEO Village of Iroquois costs associated with infrastructure improvements 20,000 DCEO Iroquois County costs associated with infrastructure improvements 75,000 DCEO Village of Foosland costs associated with infrastructure improvements 35,000 DCEO Village of Bellflower costs associated with infrastructure improvements 20,000 DCEO Village of Woodland costs associated with infrastructure improvements 50,000 DCEO Village of Forrest costs associated with infrastructure improvements 50,000

DCEOIroqouis-Ford Fire Protection District costs associated with infrastructure improvements 50,000

DCEO Village of Emington costs associated with infrastructure improvements 15,000 DCEO Village of Milford costs associated with infrastructure improvements 50,000 DCEO Village of Clifton costs associated with infrastructure improvements 50,000 DCEO Village of Thawville costs associated with infrastructure improvements 50,000

DCEODixon Community Fire Protection District costs associated with light installation 20,000

DCEO PADS Homeless Shelter costs associated with building construction 100,000 DCEO City of Sterling costs associated with purchase of a building for environmental remediation 150,000

DCEO Self Help Enterprises, Inc.costs associated with the replacement of sidewalks and concrete pads at entrance and all exterior doors 65,000

DCEO Phenix Township costs associated with building of new Phenix township Building 32,000

DCEOAmboy Fire Protection District Construction of a training/storage building 30,000

DCEO City of Dixon Capital improvement 150,000 DCEO City of Rock Falls costs associated with capital improvements 37,600 DCEO Village of Atkinson costs associated with sewer improvements 120,000 DCEO Polo Park Board costs associated with bath house renovations and improvements 38,000 DCEO Phenix Township costs associated with capital improvements 30,000 DCEO City of Rock Falls costs associated with capital improvements 28,000 DCEO Rock River City, Inc costs associated with construction of senior center building 250,000

DCEO Polo Fire Protection District costs associated with fire station improvements 50,000 DCEO Village of Perry costs associated with water system and emergency siren improvements 50,000 DCEO Village of Golden costs associated with storm sewer replacement 50,000

DCEO Mid River Port Commission costs associated with road construction and improvements 100,000 DCEO Quincy Family YMCA costs associated with capital improvements 205,000 DCEO City of Winchester costs associated with st improvements 50,000

DCEOJohn Wood Community College

costs associated with Workforce development center truck and emergency vehicle driver track 500,000

DCEO Village of Versailles costs associated with capital improvements 20,000 DCEO Village of Alsey costs associated with water system improvements 50,000 DCEO Village of Beardstown costs associated with water system improvements 30,000

DCEO Village of Bluffscosts associated with purchase of new water storage tank and water system improvements 50,000

DCEO City of Rushville costs associated with the water distribution improvements 50,000

DCEOScott County Rural Water Cooperative costs associated with construction of a water main 10,000

DCEO Village of Manchester costs associated with fire department improvements 10,000 DCEO Village of Ashland costs associated with surface water and flood control improvements 25,000 DCEO Village of Kirkwood costs associated with water and sewer improvements 150,000 DCEO Village of Warsaw costs associated with infrastructure improvements 50,000 DCEO City of Hamilton costs associated with sewer improvements 100,000 DCEO Village of Roseville costs associated with sewer improvements 50,000

DCEOR.S.P.andE Fire Protection District costs associated with land purchase and construction of fire department 75,000

DCEO Village of Tennessee costs associated with sewer improvements 100,000 DCEO Village of Industry costs associated with sewer improvements 100,000 DCEO Village of Blandinsville costs associated with water supply improvements 100,000

DCEOMason County Highway Department costs associated with construction of a county highway building 100,000

DCEOFarview Fire Protection District costs associated with expansion 75,000

DCEO Village of Alexis costs associated with sewer improvements 100,000 DCEO Village of London Mills costs associated with water main improvements 50,000

DCEOHancock McDonough ROE 26 costs associated with a building purchase for a co-op 25,000

DCEOLittle York Fire Protection District costs associated with fire fighting equipment and/or capital improvements 25,000

DCEO Boone County costs associated with capital improvements 150,000 DCEO Winnebego County costs associated with capital improvements 50,000 DCEO City of Belvidere costs associated with purchase of st sweeper and capital improvements 150,000 DCEO City of Genoa costs associated with capital improvements 70,000 DCEO City of Rockford costs associated with purchase of fire truck and/or capital improvements 50,000 DCEO City of South Beliot Capital improvements 40,000 DCEO Village of Caledonia Capital improvements 30,000

Page 61: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Capron Capital improvements 30,000 DCEO Village of Cherry Vally Capital improvements 70,000 DCEO Village of Kingston Capital improvements 40,000 DCEO Village of Kirkland Capital improvements 40,000 DCEO Village of Poplar Grove Capital improvements 60,000 DCEO Village of Roscoe Capital improvements 40,000 DCEO Village of Timberlane Capital improvements 30,000 DCEO Belvidere Township Capital improvements 40,000 DCEO Bonus Township Capital improvements 30,000 DCEO Boone Township Capital improvements 30,000 DCEO Leroy Township Capital improvements 30,000 DCEO Manchester Township Capital improvements 40,000 DCEO Poplar Grove Township Capital improvements 30,000 DCEO Spring Township Capital improvements 50,000 DCEO Discovery Center Museum Capital improvements 50,000 DCEO Belvidere Park District Capital improvements 100,000 DCEO Rockford Park District Capital improvements 100,000

DCEOBlackhawk Area Council of Boy Scouts of America Program and administration building 25,000

DCEORiver Rock Council Girls Scouts all costs associated with a program and Admin Building 25,000

DCEOBoone County Council on Aging Capital improvements 50,000

DCEOCandlewick Lake Association Capital improvements 50,000

DCEO City of Batavia all costs associated with fiber optic pilot program construction 100,000 DCEO City of West Chicago all costs associated with water system infrastructure improvements 150,000

DCEOWest Chicago Fire Protection District

all costs associated with the Southside station construction and infrastructure improvements 200,000

DCEO City of Wheatonall costs associated with storm water infrastructure improvements and land acquisition 150,000

DCEO Wheaton Park District all costs associated with improvements for Lincoln Interpretive Area 50,000 DCEO City of Warrenville Demolition and property remediation and other capital improvements 50,000 DCEO Winfield Park District all costs associated with parking lot construction 50,000

DCEO Dupage County all costs associated with construction of new facilities for the convalescent center 50,000

DCEODupage County Forest Preservation District all costs associated with West Branch-Winfield Mounds construction 100,000

DCEO Geneva Township all costs associated with bridge replacement 50,000 DCEO Northern Illinois Food Bank all costs associated with warehouse construction 50,000

DCEOWestern Dupage Special Recreation Association all costs associated with construction of ADA-compliant facilities in West Chicago 50,000

DCEO Dupage PADS all costs associated with land acquisition to increase agency space 50,000 DCEO Triton College ADA door operator and other capital improvements 192,500 DCEO Village of Rosemont Ruby Street Flood Control and other capital improvements 500,000

DCEO Leyden Townshipall costs associated with water distribution modernization and other capital improvements 180,000

DCEO Leyden Township Modernization of Pump House and other capital improvements 120,000

DCEO Leyden Townshipall costs associated with a security system for Pump House and Water Tank and other capital improvements 15,000

DCEO Leyden Township new street lighting and other capital improvements 50,000

DCEOLeyden High School District #212 renovation of the science lab at East Leyden and other capital improvements 418,000

DCEO City of Northlake Renovation of City Hall and other capital improvements 500,000 DCEO Village of Schiller Park Irving Park Road viaduct and capital improvements 300,000

DCEO Village of Schiller Park Irving Park Road and 25th Avenue reconfiguration and other capital improvements 300,000 DCEO Village of River Grove Relocation of the public works facility and other capital improvements 1,000,000 DCEO Village of Elmwood Park Harlem Avenue lighting project and other capital improvements 100,000 DCEO Village of Bensenville New road improvements (no resurfacing) and other capital improvements 400,000 DCEO Village of Franklin Park Franklin ave water main/capital improvements 275,000 DCEO Village of Franklin Park Elm Street water main replacement 300,000 DCEO Village of Elmwood Park North Avenue decorative lighting project and other capital improvements 125,000 DCEO Village of Elmwood Park Belmont Ave streetscape and other capital improvements 300,000

DCEO Downers Grove Park District all costs associated with infrastructure improvements 35,000 DCEO Woodridge Park District all costs associated with building a park for youth 35,000 DCEO Downers Grove Township` Capital improvements 75,000

DCEO American Legion Post #250all costs associated with restoration of the veterans meeting room with new furniture and equipment 5,000

DCEOWestmont American Legion Post #338

all costs associated with wheelchairs and equipment for veterans meeting room restoration 5,000

DCEOSeaspar Special Recreation District

all costs associated with infrastructure improvements for a park for disabled children 20,000

DCEO Westmont Park District all costs associated with infrastructure improvements to parks 20,000

DCEO DuPage Childrens Museum all costs associated with infrastructure improvements for the museum 40,000

DCEO Lane School District 181all costs associated with infrastructure improvements for special education teaching spaces 60,000

DCEONortheast DuPage Special Recreation Association

Infrastructure and safety improvements for a wheelchair gym in the Special Recreation District 14,500

Page 62: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEODupage Convalescent Center infrastructure improvements in the county nursing home 50,000

DCEO Indian Boundary YMCA renovation of the Early Childhood after school learning room 50,000

DCEO Clarendon Hills Park District Kruml Park Development Project 35,000 DCEO Almost Home Kids nursing office for respite care for medically fragile children 50,000 DCEO Giant Steps expansion of a community outreach autism program 50,000

DCEOEaster Seals of DuPage-Fox Valley construction of a parking lot at Villa Park Center 20,000

DCEO Village of Downers Grove replacement of the roof at the civic center 120,000

DCEO Village of Downers Grove Maple ave and Burlington Northern Santa Fe Railway intersection improvements 75,000 DCEO Village of Downers Grove downtown business sidewalk repair and replacement 130,000

DCEO Village of Westmont Village Hall Police Dept, commuter train, station security and safety equipment 125,000 DCEO Village of Westmont Improvements to the downtown village emergency siren system 15,000 DCEO Village of Hinsdale Washington st infrastructure improvements 340,000

DCEO Village of Clarendon Hillscentral business district sidewalks and crosswalk replacements in the downtown economic development project 176,800

DCEO City of Darien flood project improvements 13,500 DCEO City of Darien Juniper ave infrastructure improvements 40,000 DCEO Village of Willowbrook construction of a gazebo at Prairie Trail Park and infrastructure improvements 50,000 DCEO Village of Woodridge construction of a municipal salt storage building 150,000 DCEO Village of Woodridge 63rd Street storm water inlet improvements 50,000

DCEO Village of Bolingbrook community center furniture and equipment for the new center for youth programs 100,000 DCEO Serenity House infrastructure, public safety, and security improvements 10,000 DCEO Family Shelter infrastructure improvements for victims of domestic violence 15,000 DCEO Ray Graham exterior work on CILA Home for Disabled Children 25,000

DCEO City of BloomingtonPurchase of a single stream line recycling truck and related equipment and 65 gallon single recycling carts 270,000

DCEO University High School renovation of boys/girls' locker rooms 400,000

DCEOMcLean County District Unit #5 remodeling elementary schools, playground equipment, and construction projects 300,000

DCEOBloomington School District 87 replacement of roofs for elementary schools and construction costs 300,000

DCEOBloomington Fire Department construction of a burn building and tower training complex 405,000

DCEOBloomington Township Fire Department construction for the expansion of the fire department 20,000

DCEOBloomington Township Fire Department Purchase of a new pumper fire truck and/or capital improvements 180,000

DCEO Town of Normal Connie Link Amphitheater/Construction Trail restroom constr. Project 175,000 DCEO Normal Fire Department Purchase of a snorkel fire engine and/or capital improvements 450,000 DCEO Bloomingdale Park District Construction of a concession/restroom/storage facility 250,000 DCEO Medinah Park District Infrastructure, public safety, and safety improvements 25,000 DCEO Wheaton Park District Infrastructure, public safety, and safety improv. At Northside Park 75,000 DCEO Roselle Park District Infrastructure, public safety, and safety improvements 25,000 DCEO Carol Stream Park District Infrastructure, public safety, and safety improvements 25,000

DCEOGlendale Heights Park District Infrastructure, public safety, and safety improvements 25,000

DCEODuPage County Area Project Real estate acquisition and purchase 100,000

DCEO Village of Addison Infrastructure, public security, and safety improvements 25,000 DCEO Village of Bloomingdale Infrastructure, public security, and safety improvements 100,000 DCEO Village of Roselle Infrastructure, public security, and safety improvements 100,000 DCEO Village of Carol Stream Infrastructure, public security, and safety improvements 100,000 DCEO Village of Glendale Heights Infrastructure, public security, and safety improvements 100,000 DCEO City of Wheaton Infrastructure, public safety, and safety improvements 100,000 DCEO Bloomingdale Township Infrastructure, public safety, and safety improvements 50,000

DCEOMilton Township Highway Department Infrastructure, public safety, and safety improvements 50,000

DCEO DuPage County Infrastructure, public safety, and safety improvements 100,000 DCEO Serenity House Infrastructure, public safety, and safety improvements 25,000 DCEO Ray Graham Association Infrastructure, public safety, and safety improvements 11,000

DCEOWestern Dupage Recreation Association Infrastructure, public safety, and safety improvements 25,000

DCEO Easter Seals of DuPage Infrastructure, public safety, and safety improvements 14,000

DCEOOutreach Community Center in Carol Stream Infrastructure, public safety, and safety improvements 25,000

DCEOCarl Sandburg Community College Capital improv. At the Galesburg campus 100,000

DCEOCity of Galesburg Fire Department Capital improv. And equipment 75,000

DCEO City of Princeton Capital improvements 50,000 DCEO Freedom House Capital improvements 25,000

DCEOCity of Galesburg Police Department New building for the police gun firing range 75,000

DCEO City of Knoxville Capital improvements 65,000 DCEO City of Oneida Capital improvements for water, sewer, or sts 65,000 DCEO Village of Altona Capital improvements for water, sewer, or sts 65,000

Page 63: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO City of Abingdon Capital improvements 65,000

DCEOVictoria-Copley Fire Protection District Purchase of a new fire truck and/or capital improvements 100,000

DCEO Knox County Board Capital improvements 50,000 DCEO Elba-Salem Fire District Purchase of a new fire truck and/or capital improvements 40,000 DCEO City of Wyoming Capital improvements 40,000 DCEO Village of Toulon Capital improvements 20,000

DCEOAunt Martha's Youth Services Center Capital improvements for a dentistry room and permanent equipment 20,000

DCEO Abilities Plus Capital improvements for a new group home 25,000

DCEOToulon Fire Protection District Purchase of a new fire truck and/or capital improvements 100,000

DCEOBlack Hawk College-East Campus Capital improvements to Kewanee Park 100,000

DCEO Kewanee Rural Fire District Purchase of a new fire truck and/or capital improvements 120,000 DCEO Village of Cambridge Capital improvements 100,000 DCEO City of Galva Capital improvements 100,000 DCEO Village of Woodhull Capital improvements 65,000 DCEO Village of Alpha Capital improvements 65,000 DCEO Village of Annawan Capital improvements 70,000 DCEO City of Kewanee Capital improvements 75,000 DCEO City of Princeton Capital improvements 75,000 DCEO Village of Wyanet Capital improvements 50,000 DCEO Village of Walnut Capital improvements 50,000 DCEO Village of Ohio Capital improvements 50,000 DCEO Buda Fire District Capital improvements 25,000

DCEOManlius Fire Protection District Storm siren for New Bedford 25,000

DCEO Village of Sheffield Capital improvements 50,000 DCEO Village of Manlius Capital improvements 50,000

DCEOBartlett Fire Protection District Fire tower and training center 200,000

DCEO City of West Chicago Infrastructure, security and public safety improvements 150,000

DCEODuPage County Area Project costs associated w/real estate acquisition and purchase 100,000

DCEOWayne Township Road District Powis Road Flood Control project 100,000

DCEO Village of Carol Stream Costs associated w/infrastructure, security, and public safety improvements 100,000 DCEO Village of Bartlett Costs associated w/infrastructure, security, and public safety improvements 100,000 DCEO City of St. Charles Costs associated w/infrastructure, security, and public safety improvements 100,000 DCEO Village of South Elgin Costs associated w/infrastructure, security, and public safety improvements 50,000 DCEO Village of Hanover Park Costs associated w/infrastructure, security, and public safety improvements 50,000 DCEO Village of Wayne Costs associated w/infrastructure, security, and public safety improvements 50,000

DCEOWestern DuPage Special Recreation Association Costs associated w/infrastructure, security, and public safety improvements 15,000

DCEOArlington Heights School District 25 costs associated w/ capital improvements 50,000

DCEOProspect Heights School District 23 costs associated w/ reroofing and roofing repairs 50,000

DCEOCommunity Consolidated School District 21 costs associated w/ the construction of a data center 100,000

DCEO Clearbrook costs associated w/ kitchen remodeling in CILA group homes 25,000

DCEOWheeling Township Road District costs associated w/ road and flood improvements 75,000

DCEOIndian Trails Public Library District costs associated w/ capital improvements 50,000

DCEOArlington Heights Memorial Library costs associated w/ renovation of the children's department 50,000

DCEO Wheeling Park District costs associated w/ improvements to Malibu Park 100,000

DCEOMount Prospect Park District costs associated w/ Prospect Meadows park improvements 50,000

DCEO Buffalo Grove Park District costs associated w/ the construction of a parking lot at Twin Creek Park 125,000

DCEOArlington Heights Park District costs associated w/ Lake Arlington playground improvements 55,000

DCEOArlington Heights Park District costs associated w/ the replacement of the Camelot Park pedestrian bridge 90,000

DCEO Village of Wheeling costs associated w/ the phase one Buffalo Creek Streambank stabilization project 150,000 DCEO City of Prospect Heights costs associated w/ the public works garage addition 100,000 DCEO Village of Arlington Heights costs associated w/ flood control improvements 200,000 DCEO Village of Buffalo Grove costs associated w/ storm water and flooding management programs 150,000 DCEO Addison School District #4 costs associated w/ building improvements 100,000 DCEO Bensonville Park District costs associated w/ fischer farm infrastructure improvements 25,000

DCEOItasca Unit School District #10 costs associated w/ building improvements 100,000

DCEO Itasca Park District lightning detection system and waterpark upgrades 25,000 DCEO Elmhurst Park District Marjorie Davis Park upgrades and Wagner Center improvements 25,000 DCEO City of Wooddale Capital improvements 100,000 DCEO Village of Addison Street repair and water main replacement 100,000 DCEO VFW Post new parking lot 10,000

Page 64: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Addison Fire Protection fire station improvements 50,000 DCEO Addison Fire Protection Capital improvements 50,000 DCEO Serenity House building repairs, security fencing, and parking lot repairs 25,000

DCEO American Legion Post 1205 roof and parking lot repairs 10,000 DCEO Wooddale Park District Construction of a new maintenance facility and new lighting for park district 25,000

DCEO Addison School District #4Renovation of the library resource center at Wesley Elementary and light replacement for gyms district-wide 100,000

DCEO Addison Park District infrastructure improvements to Army Trail Nature Center 50,000

DCEOEaster Seals of DuPage and Fox Valley New parking lot and parking lot repairs 10,000

DCEO Lombard Park DistrictNew roof for Lombard Lagoon Building; making cemetery stairs and ramping at Washington Park ADA compliant 25,000

DCEO VFW Addison Post parking lot improvements 10,000 DCEO Addison Township parking lot improvements 10,000

DCEODuPage County Area Project land acquisition and building purchases 50,000

DCEOFenton Community High School District 100 building and parking lot improvements 100,000

DCEO Village of Itasca Street and drainage improvements 100,000 DCEO Village of Villa Park building and improvements at Jefferson and lufkin swimming pools 20,000 DCEO Elmhurst YMCA building repairs 20,000 DCEO City of Elmhurst rebuilding West Avenue and restoring Fischer Farm 100,000 DCEO Elmhurst CUSD 205 building additional classrooms at Emerson School 250,000 DCEO Ray Graham Association Bensenville CILA improvements 10,000

DCEONorthest DuPage Special Recreation Association Infrastructure and safety upgrades 10,000

DCEO Wooddale Public Library Bldg a teen room, parking lot repairs, bldg an ADA ramp and bldg improvements 50,000 DCEO Village of Lombard Infrastructure projects including but not limited to road improvements 150,000 DCEO Village of Hamel Capital improvements 85,000 DCEO VFW Post 1377 Capital improvements 50,000 DCEO Mulberry Grover Fire Dept Gear extractor system 14,000 DCEO FAYCO Enterprises Purchase of lot for community living building 23,000 DCEO City of Troy Sidewalks along North Staunton Road 30,000 DCEO Mascoutah Fire Dept Firehouse Improvements and upgrades 32,500 DCEO Village of Troy Fire Dept Indoor exhaust ventilation system 17,000 DCEO City of O'Fallon Improvements to Rock Springs Park 200,000 DCEO Madison County Capital improvements 25,000 DCEO Village of Alhambra Storm water improvements 50,000

DCEOBond County Humane Society Capital Improvements for an animal shelter 75,000

DCEO Bond County Senior Center New senior center 200,000 DCEO FAYCO Enterprises Residence for severely disabled persons 70,000 DCEO Village of Pocahontas Water treatment systems upgrades 40,000

DCEO St. Elmo Historical Society Renovation of Elmo movie theatre 75,000 DCEO Village of Sorento Community bldg renovations 42,000 DCEO City of Vandalia Cemetery maintenance bldg 100,000 DCEO City of Trenton Drainage improvements at city park 40,000 DCEO Villlage of Tower Hill Replacing water meters 25,000 DCEO Village of Summerville New city hall 95,000 DCEO Village of Smithboro Storm water drainage improvements 50,000 DCEO Village of St. Peter Design and engineering of sewer upgrade 37,000 DCEO Village of St. Peter Purchase and/or construction of a new community bldg 100,000 DCEO Village of St. Jacob Purchase and/or construction of a new public works bldg 100,000 DCEO Village of St. Elmo Sanitary sewer improvements 100,000 DCEO Village of Panama Sidewalk replacement 75,000 DCEO City of O'Fallon Water line replacement 96,000 DCEO City of Lebanon Replacement of roof on police station 25,000 DCEO Village of Keyesport New sidewalks 40,000 DCEO City of Highland Construction including incurred costs 100,000 DCEO City of Highland sidewalk and handicap ramp improvements along Rt 143 30,000 DCEO City of Greenville Infrastructure improvements for sewers, roads and steets 325,000 DCEO Village of Aviston Purchase of and/or construction of new maintenance bldg 60,000 DCEO Village of Brownstown Severe weather warning system 100,000 DCEO Village of Cowden Park improvements 40,000

DCEOIllinois Women's Military and Civilian Memorial Inc

Building a military and civilian memorial for women who have served in times of war 400,000

DCEO Trinity Services Inc Capital improvements for street improvements 30,000 DCEO Village of Mulberry Grove Purchase of bondable equipment and capital improvements 36,000 DCEO Grafton Township Road improvements 125,000 DCEO Village of Lakewood Road improvements 200,000 DCEO City of Crystal Lake Water and sewer improvements 100,000 DCEO Nunda Township Road improvements 175,000 DCEO Algonquin Township Road improvements 250,000 DCEO Village of Lake in the Hills Capital improvements for Sunset Park 100,000 DCEO Cary Park District Park improvements 75,000 DCEO Lakeside Legacy Restorations and infrastructure improvements 75,000 DCEO Village of Fox River Grove Infrastructure improvements 50,000

Page 65: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Danville Art League Moving an existing building and other infrastructure improvements 75,000 DCEO City of Danville Capital road construction and improvements 1,175,000

DCEOVermilion County Highway Department Lyons Road reconstruction and connection to Indianola Road 1,500,000

DCEO

Ludlow Community Consolidated School District #142 Construction of a lunch room addition and other infrastructure improvements 100,000

DCEOSt. Joseph-Stanton Fire Protection District Construction of a fire station 125,000

DCEOVermilion County Conservation District

Infrastructure improvements to Kennekuk County Park, including the construction of an environmental education center 500,000

DCEO Danville Family YMCA Energy efficiency upgrades and other infrastructure improvements 450,000 DCEO Village of Catlin Purchase and improvements to playground equipment for disabled children 40,000 DCEO Village of Potomac Replacement of a water main and related repairs to a water tower 160,000 DCEO Village of Tilton Infrastructure improvements associated with flood prevention 75,000 DCEO Village of Ogden Infrastructure improvements 200,000 DCEO Generations of Hope Construction of apartments and other capital improvements 500,000 DCEO Danville Township Road and culvert improvements 110,000

DCEOWashburn Interpretive Center Capital improvements to the Grant Washburn Home 50,000

DCEO Jo Daviess County Infrastructure improvements 100,000 DCEO Village of Elizabeth Capital improvements 50,000 DCEO Village of Leaf River Infrastructure improvements 50,000 DCEO Village of Winnebago Infrastructure improvements 50,000 DCEO Village of Durand Infrastructure improvements 50,000 DCEO Village of Dakota Capital improvements to Main st 50,000 DCEO Village of Scales Mound Infrastructure improvements to the Village Hall 70,000 DCEO Village of Shannon Water and sewer improvements 50,000 DCEO Village of Nora Water and sewer improvements 50,000

DCEOHighland Community College

Construction of a wind turbine technician training center and other infrastructure improvements 50,000

DCEO City of Freeport Capital improvements 100,000 DCEO Stephenson County Rail track to an industrial park and other infrastructure improvements 100,000 DCEO Village of Orangeville Construction on Main st and High st, including sidewalks and lighting 50,000 DCEO Village of Warren Demolition of a water tower and other infrastructure improvements 50,000 DCEO Township of Seward Water and sewer infrastructure improvements 50,000 DCEO Village of Winslow Water and sewer infrastructure improvements 50,000 DCEO Village of Hanover Replacement of a water tower and other infrastructure improvements 50,000 DCEO City of Lanark Sewer lift station replacement and other infrastructure improvements 50,000 DCEO City of Galena Infrastructure improvements 50,000 DCEO Village of Davis Infrastructure improvements 50,000 DCEO Village of Menomonie Infrastructure improvements 50,000

DCEO

Galena - Jo Davies County Historical Society and Museum Capital improvements 50,000

DCEO Village of Rock City Capital improv. To the water and sewer infrastructure 50,000 DCEO Township of Proviso Construction of an addition to a building 125,000

DCEOFullersburg Historic Foundations Capital improvements 10,000

DCEO Village of Berkeley Infrastructure improvements 40,000

DCEO Chicago Zoological Society Infra. Improv. For Brookfield Zoo 100,000 DCEO Village of North Riverside Capital improv. To the municipal building 150,000 DCEO Village of Westchester Road improvements 100,000 DCEO Village of Lombard Infrastructure improvements include road construction 115,000 DCEO Village of LaGrange Park Infrastructure improvements 75,000 DCEO City of Elmhurst Infrastructure improvements 100,000 DCEO Village of Villa Park Infrastructure improvements 50,000 DCEO Ray Graham Association Capital improvements 20,000 DCEO Village of Oakbrook Infrastructure improvements 75,000 DCEO Village of Brookfield Infrastructure improvements 50,000 DCEO Oakbrook Terrace Infrastructure improvements 40,000 DCEO Village of Riverside Infrastructure improvements 40,000 DCEO N/A Infrastructure improvements - DCEO Riverside Township Infrastructure improvements 30,000

DCEOYork Township Highway Authority Road and bridge improvements 50,000

DCEO Cat Nap from the Heart Capital improvements 5,000 DCEO York Township Infrastructure improvements 25,000 DCEO Way Back Inn, Inc. Capital improvements 25,000 DCEO Aspire Capital improvements 15,000 DCEO Village of Machesney Park Capital road improvements 50,000

DCEOWinnebago County Forest Preserve District Capital improv. To the Macktown Historic District Barn and other capital improv. 50,000

DCEO Rockford Park District Land acquisition 100,000 DCEO Rockford Park District Park development 100,000

DCEO Rockford Park DistrictInfra. Improv. and Construction of the Manny Mansion education wing of the Burpee Museum of Natural History 100,000

DCEO Rockford Park District Capital improv. To the Discovery Center Museum 100,000 DCEO Village of Rockton Development of the Rockton Athletic Field 50,000

Page 66: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOOwen Township Road District Road construction including construction equipment 50,000

DCEO Winnebago County Construction of an emergency vehicle garage and other capital improvements 50,000 DCEO City of Loves Park Improvements to fire station 65,000 DCEO City of Rockford Purchase of a fire truck and/or infrastructure improvements 250,000

DCEO La Voz LatinaClassroom improvements and the purchase and installation of a fire sprinkler system 35,000

DCEORock River Valley Council Girl Scouts Construction and capital improvements of the program and administration building 25,000

DCEOBlackhawk Area Council Boys Scouts of America Construction and capital improvements of the program and administration building 25,000

DCEO Rockford Memorial Hospital Expansion of the Neo-Natal Intensive Care Unit and other capital improvements 50,000

DCEO Swedish American HospitalImprovements to the x-ray and emergency room facilities and other capital improvements 50,000

DCEO Camargo Township Construction of a new facility 100,000 DCEO City of Arcola Infrastructure improvements 75,000 DCEO City of Oakland Infrastructure improvements 170,000 DCEO City of Villa Grove Infrastructure improvements 150,000

DCEOCharleston Transitional Facility Capital improvements 75,000

DCEODisabled Citizens Foundation Facility construction and capital improvements 100,000

DCEONewman Fire Protection District Construction of a new fire station 200,000

DCEO Village of Arthur Infrastructure improvements 125,000 DCEO Village of Atwood Infrastructure improvements 100,000 DCEO Village of Mahomet Infrastructure improvements 35,000 DCEO Town of Cortland Storm water management 75,000 DCEO Town of Cortland Detention pond reconstruction and other capital improvements 25,000 DCEO Village of Creston Water tower reconditioning and other capital improvements 100,000 DCEO Villge of Davis Junction Sewer and water infrastructure improvements 100,000 DCEO City of Earlville Sewer system improvements 100,000 DCEO Village of Hillcrest Construction of a new sewer system and other capital improvements 100,000 DCEO Village of Hinckley Storm water management 100,000 DCEO Village of Lee Water system improvements and other capital improvements 100,000 DCEO Village of Leland Storm sewer extension and other capital improvements 100,000 DCEO Village of Malta Water main replacement and other capital improvements 100,000 DCEO Village of Maple Park Storm water management 100,000 DCEO Vilage of Monroe Center st construction 100,000

DCEOKishwaukee Community Hospital

Construction of an addition to the radiation oncology center and other infrastructure improvements 100,000

DCEO Village of Deer Park Storm water drainage and other capital improvements 125,000 DCEO Village of Kildeer Storm sewer drainage and other capital improvements 125,000 DCEO Village of Long Grove Sidewalk and st reconstruction and capital improvements 175,000

DCEOVillage of Hawthorne Woods Construction of and capital improvements to the water treatment facility 175,000

DCEO Village of Lake Zurich Water treatment plant expansion and other capital improvements 350,000 DCEO Village of Libertyville Sidewalk and st construction and capital improvements 425,000 DCEO Village of Mundelein st and sidewalk construction projects and other capital improvements 625,000

DCEOPeoria Metropolitan Exposition Authority Capital and infrastructure improvements 600,000

DCEO Marshall County Capital and infrastructure improvements 100,000 DCEO City of Peoria Capital and infrastructure improvements 700,000 DCEO Woodford County Capital and infrastructure improvements 100,000 DCEO County of Peoria Capital and infrastructure improvements 300,000

DCEOMethodist Medical Center of Illinois Construction and capital improvement projects 200,000

DCEO Heartland FoundationConstruction of the Cancer Research Center at the University of Illinois College of Medicine at Peoria 500,000

DCEO Antioch TownshipPurchase of sirens for the emergency operations center and other capital and infrastructure improvements 50,000

DCEO Antioch Township Road construction and other infrastructure projects 250,000 DCEO Antioch Township Construction of a sports complex 100,000 DCEO Village of Antioch Construction of a sports complex 100,000 DCEO Village of Antioch Upgrade of the lift station and other capital improvements 250,000 DCEO Village of Beach Park Water main extension and other capital improvements 200,000

DCEO Grant Township HighwayDrainage and restructuring of roadways damaged by flooding and other capital infrastructure improvements 150,000

DCEO Village of Lake Villa Road construction and other infrastructure projects 200,000 DCEO Lake Villa Township Intersection improvements at Route 59 and Fairfield Road 100,000 DCEO Village of Lindenhurst Road and infrastructure improvements 100,000

DCEOVillage of Lindenhurst Park District Pre-school capital renovations and improvements 150,000

DCEONorthwest Lake County Fire Training Company Construction of a training facility for fire and rescue personnel 100,000

DCEO Village of Winthrop Harbor Construction of a water tower and other infrastructure improvements 150,000 DCEO City of Zion Trumpet Park North Water main Loop and other infrastructure improvements 300,000

DCEO Zion Park DistrictInfrastructure and capital improvements including for the Leisure Center roof and HVAC completion 300,000

DCEO Pike County Construction of a Public Safety Building and other infrastructure improvements 350,000

Page 67: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Morgan County Repairs to the courthouse and other capital and infrastructure improvements 150,000 DCEO City of Jacksonville Road construction and repairs and other capital improvements 350,000

DCEOGreen County Sheriff's Department Construction of a new evidence room and other capital improvements 75,000

DCEOGreene County Highway Department Reconstruction of Pin Oak Road and other infrastructure improvements 350,000

DCEO City of Jerseyville Upgrade of the wastewater plant and other infrastructure improvements 300,000 DCEO Jacksonville YMCA Capital facility improvements 50,000

DCEOVillage of South Jacksonville Road construction, repairs, and other infrastructure improvements 250,000

DCEO Four Counties for Kids Capital improvements including roof repair 50,000 DCEO Village of Roodhouse Purchase and installation of emergency warning sirens 30,000

DCEO Grayslake Park DistrictInstallation of the storm water project for Alleghany Park and other capital improvements 65,000

DCEO Village of LindenhurstConstruction of a pedestrian walkway to connect Engle Memorial Park to the Lake Villa Library 250,000

DCEO Grandwood Park District Expansion and renovation of the community center 400,000 DCEO Lake Villa Township Road construction projects and other infrastructure improvements 100,000

DCEO Lake Villa Township

Infrastructure and capital improvements including but not limited to shoreline stabilization, Lake Villa Township Waterfront Park renovations, and the purchase of handicapped equipment 40,000

DCEORound Lake Area Park District Capital improvements including the construction of an event shelter 40,000

DCEORound Lake Area Park District Construction of an addition to the child development center classroom 48,000

DCEOVillage of Round Lake Beach

Capital and infrastructure improvements including for the purchase of an elevated tank generator 100,000

DCEO Wildwood Park District Shore stabilization and sea wall construction 58,000 DCEO Bridge Communities Infrastructure upgrades and capital improvements 40,000 DCEO Butler School District 45 Purchase of student lockers and other capital improvements 20,000 DCEO Butterfield Park District Infrastructure and capital improvements 14,000 DCEO Village of Lombard Infrastructure projects including but not limited to road improvements 150,000

DCEODuPage Center for Independent Living Infrastructure and capital improvements 10,000

DCEO City of Oak Terrace Purchase signage for city entrance and other capital improvements 40,000

DCEOCommunity Consolidated School District 89

Art room upgrades at Glen Crest Middle School and other infrastructure and capital improvements 50,000

DCEOCommunity Consolidated School District 99

Installation of a parking lot and other infrastructure repairs and capital improvements 40,000

DCEOCommunity Housing Association of DuPage Roof replacement and other improvements 15,000

DCEODowners Grove School District 58 Capital improvements 20,000

DCEO Downers Grove Park District Phase 1 of the Blodgett House renovation and other capital improvements 15,000

DCEODuPage Convalescent Center Infrastructure improvements to the Alzheimer's Dementia Care Unit 40,000

DCEO DuPage P.A.D.S Purchase of land in conjunction with the purchase of a building 40,000

DCEOEaster Seals of DuPage and the Fox Valley Region Purchase and installation of three HVAC units and other capital improvements 30,000

DCEO Glen Ellyn Historical Society Purchase and installation of an irrigation system for the Glen Ellyn History Park Development Project 33,000

DCEO Glen Ellyn Park District Purchase or capital improvements to the Safety Village 40,000 DCEO Glen Ellyn Public Library Infrastructure and capital improvements 30,000

DCEOGlen Ellyn School District #41

Infrastructure and capital improvements to the Courtyard classroom and the Performing Arts Center 45,000

DCEOGlenbard Township High School District 87 Capital improvements 42,000

IDOTHelen M. Plum Memorial Library Infrastructure improvements including an air conditioner upgrade 15,000

DCEO Lisle Park District Construction of a boat launch and other capital improvements 30,000

DCEOLisle Township Highway Department Curb replacement and infrastructure improvements 15,000

DCEOLombard Elementary District 44 Infrastructure improvements to the kitchen and other capital improvements 15,000

DCEO Lombard Park District Construction of a picnic shelter and other capital improvements 30,000

DCEOMilton Township Highway Department

Sidewalk and curb installation for ADA compliance and other infrastructure improvements 45,000

DCEONortheast DuPage Special Recreation Association Infrastructure upgrades and capital improvements 40,000

DCEOOakbrook Terrace Park District Capital improvements 10,000

DCEO People's Resource Center Capital improvements 25,000 DCEO Ray Graham Association Roof replacement 20,000

DCEOSchool District 45, DuPage County Schools Infrastructure improvements to science lab 30,000

DCEOTownship of Downers Grove Highway Department Graceland Street Road Improvement Project 40,000

DCEOVillage of Villa Park Public Library Land Purchase 10,000

Page 68: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221 DCEO Village of Downers Grove Downtown pedestrian crossing system and other capital improvements 35,000 DCEO Village of Glen Ellyn Storm sewer installation 45,000 DCEO Village of Glen Ellyn Establishing a school zone warning system at Parkview School 16,000 DCEO Village of Lisle Purchase and placement of directional signage in downtown Lisle 30,000 DCEO Village of Villa Park Infrastructure improvements 20,000

DCEOWestern DuPage Special Recreation Association Capital improvements 40,000

DCEO Wheaton Park District Purchase and placement of playground equipment at Sunnyside Playground 40,000 DCEO City of Wheaton Roof replacement of the City of Wheaton Police Department building 40,000

DCEOYork Center Fire Protection District Capital improvements 40,000

DCEO York Township Sidewalk installation 15,000

DCEOYork Township Highway Department st improvements 30,000

DCEOMidwest Shelter for Homeless Veterans Facility expansion 20,000

DCEO Glen Ellyn Park District Construction of a safety village 40,000 DCEO Joliet Junior College Infrastructure improvements to the Veterans Center 100,000 DCEO Village of New Lenox Purchase and development of a historic site 50,000 DCEO Village of New Lenox Road improvements 300,000 DCEO Village of Mokena Road improvements 300,000 DCEO Village of Orland Park Capital improvements 175,000 DCEO Village of Tinley Park Infrastructure, safety and security improvements 50,000 DCEO Village of Frankfort Capital improvements for downtown redevelopment 400,000

DCEOForest Preserve District of Will County Capital improvements to the Hickory Creek bicycle trail 100,000

DCEO Trinity Services Inc Capital improvements 200,000

DCEOChrist Hospital and Medical Center Capital improvements including the purchase of radiation equipment 400,000

DCEOHomer Township Fire Protection Capital improvements to the Capital Life Safety Building 60,000

DCEOOrland Fire Protection District Capital construction and improvements 50,000

DCEO Village of Homer Glen Infrastructure, safety and security improvements 175,000

DCEOMokena Fire Protection District Infrastructure, safety and security improvements 45,000

DCEOFrankfort Fire Protection District Infrastructure, safety and security improvements 45,000

DCEONew Lenox Fire Protection District Purchase of a fire engine truck and/or capital improvements 50,000

DCEO Village of Glenview Capital improvements to the sewer system 200,000

DCEO Village of GlenviewCapital improvements for storm water detention and other infrastructure improvements 150,000

DCEO Village of Wilmette Capital improvements to the sewer system 200,000 DCEO Village of Skokie Capital improvements and replacement of the sewer system 200,000

DCEO Village of NorthfieldInfrastructure improvements, including but no limited to storm sewer improvements 200,000

DCEO Village of Golf Capital sewer improvements 50,000 DCEO Village of Morton Grove Capital improvements 25,000

DCEO Shore Community Services Capital improvements to facilities 35,000

DCEOJewish Federation of Metropolitan Chicago Capital improvements to an education center 10,000

DCEOMetropolitan Family Services Capital improvements to building 10,000

DCEOMidwest Palliative and Hospice Care Center Construction of an addition to the building and other capital improvements 50,000

DCEO North Shore Senior Center Capital improvements 40,000 DCEO Chicago Botanic Garden Shoreline stabilization 50,000

DCEORainbow Hospice and Palliative Care Purchase of bondable equipment and other capital equipment 40,000

DCEO Park Ridge Fire Department Construction and capital costs related to a fire department training tower 40,000 DCEO City of Des Plaines Sewer improvements 300,000 DCEO City of Park Ridge Sewer improvements 300,000

DCEO

Park Ridge Community Consolidated School District #64 Capital improvements, including but not limited to roof replacement 50,000

DCEO

Des Plaines Community Consolidated School District #62

Capital improvements including But not limited to costs associated with the replacement of bathrooms 50,000

DCEO Avenues to IndependenceCapital improvements including but not limited to those related to sewer, plumbing, and roof replacement 50,000

DCEOMaine Township High School District #207 Infrastructure improvements 50,000

DCEODes Plaines Fire Department Purchase of a fire truck and/or infrastructure improvements 40,000

DCEODes Plaines Police Department Purchase of bondable equipment, vehicles and/or capital improvements 40,000

DCEOPark Ridge Police Department Purchase of bondable equipment, vehicles and/or capital improvements 40,000

Page 69: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOMaine Township Highway Department Purchase of bondable equipment and vehicles 50,000

DCEO

Advocate Lutheren General Hospital Adult Down Syndrome Center Capital improvements and expansion of the Center 50,000

DCEO Village of Addieville Road and sidewalk improvements 15,000 DCEO Village of Alto Pass Purchase of a fire truck 25,000 DCEO City of Ashley Purchase of a dump truck 20,000 DCEO City of Ava Road and sidewalk improvements 15,000 DCEO Village of Campbell Hill Road and sidewalk improvements 15,000 DCEO City of Carbondale Purchase of bondable equipment 350,000 DCEO Village of Cobden Purchase of bondable equipment and infrastructure improvements 26,500 DCEO Village Damiansville Road and sidewalk improvements 15,000 DCEO Village of Dowell Road and sidewalk improvements 15,000 DCEO Village of Dubois Road and sidewalk improvements 15,000

DCEO City of DuQuoinCapital improvements including but not limited to st improvements, sewer improvements, and the purchase of storm warning sirens 170,000

DCEO Village of Hoyleton Infrastructure improvements including curbs, sidewalks, and other improvements 15,000 DCEO Village of Elkville Infrastructure improvements and bondable equipment 20,000 DCEO Village Irvington st and sidewalk improvements 15,000 DCEO City of Jonesboro Infrastructure improvements 100,000 DCEO Village of Makanda Construction or purchase of a storage facility 20,000 DCEO City of Murphysboro Infrastructure improvements and purchase of bondable equipment 284,000

DCEO Murphysboro Health Center Construction of the facility 200,000 DCEO City of Nashville Sewer improvements 150,000 DCEO Village of New Baden Road improvements to Hillside Drive 125,000 DCEO Village of Oakdale st and sidewalk improvements 15,000 DCEO Village of Okawville Construction of a water tower 150,000 DCEO City of Pickneyville Infrastructure improvements 150,000 DCEO Village of Radom Drainage sewer improvements 20,000 DCEO Village of Richview st and sidewalk improvements 15,000 DCEO Village of Tamaroa Capital improvements to a high school 25,000 DCEO Village of Venedy st improvements 15,000 DCEO Village of Vergennes Infrastructure improvements and the purchase of bondable equipment 17,000

DCEO Village of DeSotoCapital improvements including but not limited to the construction of st curbs and a walking track 85,000

DCEO Ready Set Ride Purchase of a bondable vehicle and/or capital improvements 25,000

DCEO Village of Romeoville Capital improvements including but not limited to the construction of a bike path 350,000 DCEO Plainfield American Legion Land acquisition 150,000 DCEO Village of Plainfield Construction of a pedestrian bridge 1,000,000

DCEO

Plainfield Community Consolidated School District 202 Infrastructure improvements and the purchase of bondable equipment 740,000

DCEO Plainfield Township Capital improvements to the Senior Center 100,000

DCEO Plainfield Police Department Building expansion and other capital improvements 100,000

DCEOPlainfield Fire Protection District Purchase of a fire truck and/or infrastructure improvements 200,000

DCEO Plainfield Food Pantry Building expansion and other capital improvements 100,000 DCEO Plainfield Public Library Land Purchase 200,000 DCEO Conservation Plainfield New Building Construction 100,000 DCEO Plainfield Park District Infrastructure Improvements 600,000 DCEO Oswego Township Infrastructure Improvements 100,000 DCEO Village of Oswego Infrastructure Improvements 1,000,000

DCEOOswego Fire Protection District Fire Truck/Capital Improvements 200,000

DCEO Oswego Public Library Parking Lot and other Capital 200,000

DCEOOswego Community Unit School District 308 Capital improvements 675,000

DCEO Oswego Park District Land Purchase 600,000

DCEO Oswego Police Department Bondable Equipment / Capital Improvements 100,000 DCEO Village of Shorewood Sewer Improvements 1,000,000

DCEOShorewood Police Department Bondable Equipment / Capital Improvements 100,000

DCEOShorewood Public Library District Land Purchase 200,000

DCEO Troy Township Construction of Storage Facility 100,000

DCEO

Troy Community Consolidated Unit School District 30C Capital improvements 500,000

DCEO Troy Baseball League Install Lighting and other Capital 150,000 DCEO Wheatland Township New Township Building 100,000

DCEOKendall County Fair Association Fairgrounds to Capital Improvements 200,000

DCEOKendall County Historical Society Roof Replacement 120,000

DCEO Fox Valley Family YMCA Capital improvements 100,000

Page 70: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Grantee Appropriation Name FY10 HB0312 and

SB1221

DCEOKendall County Forest Preserve District Capital improvements 650,000

DCEOKendall County Senior Services Construction of Storage Facility 10,000

DCEOWill County Forest Preserve District Capital improvements 500,000

DCEO st Mary's Immaculate Parish Roof Replacement 250,000 DCEO C.W. avery YMCA Capital improvements 200,000 DCEO Heritage YMCA Capital improvements 25,000 DCEO Yorkville Legion Capital improvements 50,000 DCEO Joliet Easter Seals New Building Construction 300,000 DCEO Misericordia Capital improvements 300,000 DCEO Chicago Zoologial Society Infrastructure for Brookfield Zoo 1,000,000

DCEOMcDermott Center dba Haymarket Center Capital improvements 600,000

DCEO Village of Westchester Infrastructure Improvements 150,000 DCEO Village of Forest Park Parking Lot and other Capital 125,000

DCEOHolocaust Musem and Education Center Capital improvements 250,000

DCEODupage County Convalescent Center Capital improvements 500,000

DCEO Village of Glendale Heights Infrastructure Improvements 275,000 DCEO Proviso Township Infrastructure Improvements 25,000

DCEOKishwaukee Community Hospital Capital improvements 150,000

DCEO City of Effingham Capital improvements 250,000

DCEOSchauburg Township Highway Commission Infrastructure Improvements 75,000

DCEOIllinois Conservation Foundation Infrastructure Improvements 100,000

DCEO Bartlett Park District Infrastructure Improvements 35,000 DCEO Hanover Park District Infrastructure Improvements 25,000 DCEO Carol Stream Park District Infrastructure Improvements 25,000 DCEO KESHET Bondable Equipment / Capital Improvements 40,000 DCEO Village of Northbrook install traffic Signal 25,000 DCEO Rock Valley College Remodel Science Lab 100,000 DCEO Village of Huntley Road and other Capital 150,000 DCEO Allendale Association Capital improvements 25,000

DCEOFamily Friendly Community Development Corp Land Purchase and other Capital 75,000

DCEO Aurora Township Storm water Improvement 35,000 DCEO Quincy Salvation Army Emergency Shelter Renovation 100,000 DCEO Joliet Easter Seals New Building Construction 50,000 DCEO Cornerstone Services Bondable Equipment / Capital Improvements 300,000

DCEOChildren's Memorial Hospital Construction 1,000,000

DCEO Goodman Theatre Capital improvements 500,000 DCEO Village of Pawnee Infrastructure Improvements 100,000 DCEO Weaton Park District Capital improvements 40,000

DCEOEaster Seals of DuPage and the Fox Valley Region Capital improvements 10,000

DCEO Village of Lake Barrington Infrastructure improvements 100,000

Page 71: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

OACCapitol Complex- Springfield- Sangamon County- Fees associated with construction, for remodeling of office space and other support areas 553,641

OAC Capitol Building- Springfield- Sangamon County- Misc Improvements 3,883

CMS Statewide- CMS- IT Infrastructure 8,094,074

DCEO Argonne National Laboratory - Argonne - For the Rare Isotope Accelerator 13,000,000

DCEOFermi National Accelerator Laboratory - Batavia - For the Illinois Accelerator Research Center 3,000,000

DCEOArgonne National Laboratory - Argonne - Grant for the Advanced Protein Crystallization Facility 7,000,000

DCEO Illinois Science and Technology Park - Skokie - Expansion and site redevelopment 15,000,000

DCEO Statewide- River Edge - Brownfield Redevelopment Program 15,000,000

DCEOStatewide - Grants and loans pursuant, but not limited to, Article 8, Article 9 or Article 10 of the Build Illinois Act 3,130,040

DCEOStatewide - Grants and loans pursuant, but not limited to, Article 8, Article 9 or Article 10 of the Build Illinois Act 2,600,251

DCEOStatewide - Grants and loans pursuant, but not limited to, Article 8, Article 9 or Article 10 of the Build Illinois Act 5,567,122

DCEOStatewide - Grants and loans pursuant, but not limited to, Article 8, Article 9 or Article 10 of the Build Illinois Act 4,524,172

DCEOStatewide - Grants and loans pursuant, but not limited to, Article 8, Article 9 or Article 10 of the Build Illinois Act 4,580,704

DCEOStatewide - Prime Sites grants and loans pursuant, but not limited to, Article 8, Article 9 or Article 10 of the Build Illinois Act 25,000,000

DCEO Statewide - Coal Demonstration Grants 5,000,000

DCEOSecure Energy; Coal Revival Program - Statewide - For grants pursuant to 20 ILCS 605/605-332 50,000,000

DCEO Coal Demonstration Program grants 17,000,000

DCEO Coal Development Facility Cost Reporting 35,000,000

DCEO Statewide - Illinois Rural HealthNet 2,000,000

DCEO Statewide - Renewable Fuels Development Program 20,000,000

DCEO Statewide - Grants to companies to expand or construct ethanol plants in Illinois 1,975,000

DCEO

Acquisition, financing, planning, development, and construction of capital facilities including buildings, structures, durable equipment, and land as authorized by subsection (l), Section 3 of GO Bond Act or grants to State agencies for such purposes 36,743,496

DCEO

Acquisition, financing, planning, development, and construction of capital facilities including buildings, structures, durable equipment, and land as authorized by subsection (l), Section 3 of GO Bond Act or grants to State agencies for such purposes 10,000,000

DCEO

Open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Fund as authorized by subsection (c) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 30,000,000

DCEO

Statewide - For construction, grants and project assistance to local governments, non-profit organizations, and all costs associated with economic development programs and community service programs

13,801,931

DCEO

Fostering economic development and increased employment and the well being of the citizens of Illinois, and for any other purposes authorized in subsection (b) of Section 4 of the BIBF Act and for grants to State agencies for such purposes 47,500,000

DCEO

Grants and loans to local governments for planning, engineering, acquisition, construction, and improvement of public infrastructure, and other purposes authorized in subsection (a), Section 4 of BIBF Act, and grants to State agencies for such purposes 208,908,598

DCEO

Development of educational, scientific, and technical programs and facilities and expansion of health and human services, and other purposes authorized in subsection (c) of Section 4 of the BIBF Act and grants to State agencies for such purposes 30,646,616

FY2010 Capital Re-appropriations - HB0312 and SB1221

Page 72: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

DNR

Statewide-Boat Access Area Development Grants - assist. to local government agencies for public boat and canoe access areas; reimbursement up to 100% of construction costs 90% of land acquisition 4,198,641

DNR

Statewide-Snowmobile Trails (Local Government) Grants - up to 50% reimbursement of approved facility development/rehabilitation costs and 90% of approved trail corridor land acquisition costs for public snowmobile trails and areas in the state 405,158

DNR Statewide-Maintenance of sites 1,529,436

DNRStatewide - Multiple use facilities and projects including repair and maintenance, rehabilitation and construction on sites managed by the Department 686,826

DNR

Statewide-Program for acquisition, development and maintenance of public bike paths on state lands and provide portion of cost share for federal SAFETEA-LU related projects 4,643,738

DNR

Statewide-Recreational Trails Program - Develop and maintain recreational trails and related projects and issue grants for similar projects per the federal Intermodal Surface Transportation Act 7,618,254

DNR Statewide-Attracting waterfowl and improve public migratory waterfowl areas 2,791,528

DNR

Statewide-Bicycle Path Grant Program to local units of government to assist in acquisition, construction, and rehabilitation of public nonmotorized bicycle paths; provides up to 50% funding assistance of approved project costs 17,782,121

DNRStatewide - Multiple use facilities and projects including repair and maintenance, rehabilitation and construction on sites managed by the Department 1,307,357

DNR Statewide-Rural Community Fire Protection Programs 1,033,568

DNR

Statewide-Snowmobile Trails (Nonprofit Clubs/Organizations) - grants to construct, maintain and rehabilitate snowmobile trails and facilities on public lands, road right-of-ways, or private lands open to public use 143,498

DNR

Statewide-Federal 50% reimbursement grant-in-aid program for state outdoor recreation planning, acquisition and development initiatives and grants to local units of government for land acquisition projects for public outdoor recreation purposes 21,081,481

DNR

Statewide-Grants for Off-Highway Vehicle Trails - Grants to government agencies, not-for-profit organizations, and other eligible groups or individuals to develop, operate, maintain, and acquire land for OHV facilities that are open to the public 1,886,668

DNRDNR-Statewide-Land acquisition, long-term easements and cost-shared management practices through the Partners for Conservation program 2,314,763

DNRDNR-Statewide-Land acquisition, long-term easements and cost-shared management practices through the Partners for Conservation program 1,486,809

DNR Statewide-Conservation of pheasants per Section 5/1.31 of the Wildlife Code 883,412 DNR Statewide-Preservation and maintenance of High Quality Habitat Lands 3,192,250

DNR

Statewide-Preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series License Plates 1,220,489

DNRStatewide-Conservation of furbearing mammals per Section 5/1.32 of the Wildlife Code 238,020

DNR Statewide-Acquisition, preservation and stewardship of natural areas 20,792,069

DNR

Statewide - Open Space Lands Acquisition and Development (OSLAD) grants to local governments for acquisition and/or development of land for public parks and open space; funding assistance up to 50% of approved project 109,943,523

DNR

Statewide-State Match for Corps Projects - Projects under Federal Water Resources Development Act authorities for CORPS ecosystem restoration projects require a 25% to 35% non-federal match 2,678,269

DNR

Statewide-State Match for Corps Projects - Projects under Federal Water Resources Development Act authorities for CORPS ecosystem restoration projects require a 25% to 35% non-federal match 735,997

DNRSugar Loaf/Fox Mound Complex or other Properties within the Cahokia Mounds National Historic Landmark Boundary for support facilities 143,000

DNR Statewide-Illinois Open Land Trust Program 16,825,331

DNR Statewide-Illinois Open Land Trust Program 4,535,000

DNR

For the Illinois Open Land Trust Program as defined by the Illinois Open Land Trust Act as authorized by subsection (m) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 25,000,000

Page 73: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

DNRStatewide-Construction and renovation of waste reception facilities for recreational boaters and grants per Clean Vessel Act 726,672

DNRStatewide-To increase hunting/recreational opportunities per the Governor's Hunting Heritage Protection Act 1,319,251

DNR

Acquisition, financing, planning, development, and construction of capital facilities including buildings, structures, durable equipment, and land as authorized by subsection (l), Section 3 of GO Bond Act or grants to State agencies for such purposes 10,077,064

DNR

Statewide-Boating Infrastructure Grant Program (Big-P) - federally supported program provides up to 75% funding for approved cost of developing transient boater storm shelters, way stations or fishing and recreational facilities 1,188,900

DNR

Statewide - Development of Boating Access Facilities on state-owned bodies of water and at state-owned properties along the major rivers; program receives 75% federal reimbursement of costs for projects 5,238,507

DNRSparta-World Shooting Complex-Randolph County-donations, sponsorships, pre-paid vendors, campsites, etc. 1,563,081

DNR Statewide-Multiple Use Facilities - Park Maintenance 244,857

DNR Statewide-Wildlife Conservation and Restoration (federal) 6,882,757

DNR Statewide-Illinois River Basin Conservation Reserve Enhancement Program 1,918,701

DNR

Statewide-Timber Growers Forestry Management Practices - cost-sharing grants to forest owners for management practices, including reforestation, vegetation control, thinning, pruning, and fencing to exclude livestock 2,482,184

DNR Statewide-Forest Stewardship Technical Assistance 642,780

DNRStatewide-Multiple Use Facilities (park and trail purposes) - provides state match for federal Recreational Trails Program projects on Department sites 1,162,721

DNRLake County-Rehabilitation, Reconstruction, Repair, Replace Fixed Assets and Improve Facilities at North Point Marina 1,135,535

DNRStatewide-Grants and contract to conduct research, planning and construction to eliminate hazards of abandoned mines 16,993,585

DNR Statewide-Lands, buildings, structures-100 Year Floodplain Project 503,341

DNR Statewide-Various waterway improvement projects 13,771,873

DNR Statewide-Various waterway improvement projects 8,145,019

DNRWater resource management projects as authorized by subsection (g) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 20,000,000

DNR Statewide-Flood Hazard Mitigation Plans 31,340

DNR Federal Recovery - For the Purpose of Advancing Forestry Resources in Illinois 5,000,000

DNR Statewide - Grants to public museums for permanent improvements 25,098

DNR Statewide - Grants to public museums for permanent improvements 1,314,656

DMA Statewide-Land and Construct Parking Lots 238,800

IDOT Statewide - Permanent Improvements to IDOT facilities 27,520,862

IDOT Statewide - Consultant and Preliminary Engineering 22,678,442

IDOT Statewide - Disposal of Hazardous Materials 7,678,411

IDOT Statewide - Maintenance, Traffic and Physical Research/Formal Contract (A) 34,698,338

IDOT Statewide - Motorist Damage To Highway Structures 7,633,493

IDOT Statewide - Consultant and Preliminary Engineering 17,755,985 IDOT Statewide - Township Bridge 19,133,342 IDOT Statewide - Transportation and Related construction 211,133,362

IDOT Statewide - Transportation and Related construction 638,890,295

IDOT Legislative add on - I-57/294 IDOT District 1 14,027,206 IDOT Local Earmarks- Local Match of Federal Earmarks 1,517,100

Page 74: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

IDOT Statewide - Transportation and Related construction 76,944,001

IDOT Statewide - Transportation and Related construction 57,879,296

IDOT Statewide - Transportation and Related construction 40,392,607

IDOT Statewide - Transportation and Related construction 304,010,982 IDOT Statewide - Transportation and Related construction 599,153,832 IDOT State Wide Road Improvements- Local Share of Road fund/Road Program 203,803,237 IDOT State Wide Road Improvements- Local Share of Road fund/Road Program 356,432,186 IDOT State Wide Road Improvements- Local Share of Road fund/Road Program 542,236,818 IDOT Local Earmarks- Local Pass through 67,063,715

IDOTFederal Earmarks- Lake County- US 41/I-176 Interchange Improvements, Phase I Study 800,000

IDOT Federal Earmarks- DuPage County- Winfield Pedestrian Tunnel 1,000,000 IDOT Statewide - Transportation and Related construction 16,542,586 IDOT Statewide - Transportation and Related construction 157,852,612 IDOT Statewide - Transportation and Related construction 236,155,772 IDOT Federal Earmarks- Cook County- Evanston- Sheridan Road Improvements 500,000 IDOT Federal Earmarks- Cook County- Sidewalks near Ford Heights 200,000

IDOT Federal Earmarks- Cook County- Lynwood- Street Improvements and Streetlights 2,792 IDOT Federal Earmarks- Peoria County- Bartonville- Street Improvements 143,835 IDOT Federal Earmarks- Tazewell County- Village of Armington- Street Improvements 42,567 IDOT Federal Earmarks- Cook County- Markham- Streetlights and Salt Dome 300,000 IDOT Federal Earmarks- Cook County- Oak Park- I-290 Cap 1,000,000 IDOT Federal Earmarks- Kankakee County- KBS Railroad Hazard Elimination 300,000

IDOT Federal Earmarks- Sangamon County- Springfield- MacArthur Boulevard Extension 381,805 IDOT Federal Earmarks- McHenry County- Crystal Lake Road 1,000,000

IDOTFederal Earmarks- Cook County- City of Chicago- Milwaukee Avenue, Grand to Gale 972,872

IDOT Federal Earmarks- LaSalle County- Route 178 Relocation, Phase II Engineering 827,373

IDOTFederal Earmarks- Cook County- Chicago Lakefront- 67th Street Pedestrian Underpass 400,000

IDOT Federal Earmarks- Tazewell County- East Peoria- Camp Street, Upgrade 1,820,370 IDOT Federal Earmarks- Cook County- Cermak and Kenton Avenues 835,058 IDOT Federal Earmarks- Cook County- University Park- Cicero Avenue Lighting 200,000

IDOT Federal Earmarks- Cook County- Des Plaines- Alley and Sidewalk Improvements 16,073 IDOT Federal Earmarks- Fulton County- Highway 6 729,300

IDOTFederal Earmarks- Kane County- St. Charles- Fox River Crossing at Red Gate Corridor 662,586

IDOT Federal Earmarks- Christian and Shelby Counties- US 51 1,235,962

IDOTFederal Earmarks- Cook County- West Grand Avenue (from North Western to North California Ave) 800,000

IDOTFederal Earmarks- Cook County- City of Chicago- North-South Wacker Drive Reconstruction 1,916,666

IDOT Federal Earmarks- DuPage County- Darien, I-55 South Barrier 1,400,000

IDOT Federal Earmarks- Cook County- East Hazel Crest- 171st Street reconstruction 6,429

IDOTFederal Earmarks- Kane County- Long Meadow Parkway Fox River Bridge Crossing, Bolz Road 2,820,000

IDOT Federal Earmarks- Cook County- Milwaukee Avenue Rehabilitation 200,000 IDOT Federal Earmarks- Rock Island County- Illinois Milan Beltway Construction 500,000

IDOTFederal Earmarks- Cook County- Park Forest, Sauk Trail Reconstruction Improvements 330,000

IDOT Federal Earmarks- Cook County- Sauk Village Industrial Park Access Road 472,494 IDOT Federal Earmarks- Cook County- Evanston -Sheridan Road 800,000 IDOT Federal Earmarks- DeKalb County- Annie Glidden Road 178,291 IDOT Federal Earmarks- DeKalb County- Convocation Center Roadway 151,655 IDOT Federal Earmarks- Mercer County- Great River Road 14,882

IDOTFederal Earmarks- DuPage County- Illinois Route 38 at Union Pacific- Railroad Grade Seperation 250,000

IDOTFederal Earmarks- Peoria and Tazewell Counties- I-74 in Peoria- Intelligent Transportations System (ITS) 750,000

IDOTFederal Earmarks- St. Clair County- Kaskaskia Regional Port District- Access Roads 9,586

IDOT Local Earmarks - Federal Pass Through 15,207,100 IDOT Federal Earmarks- Macon County- City of Forsyth Frontage Road 11,917

IDOTFederal Earmarks- LaSalle County- Canal Corridor Association - Port of LaSalle Project 400,000

Page 75: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

IDOTFederal Earmarks- Cook County- Homewood- Railroad Station/Platform Acquisition and Improvement 191,311

IDOTFederal Earmarks- Cook County- Village of Glencoe, Green Bay Trail- North Branch Trail Connection 110,262

IDOT Federal Earmarks- Cook County- 168th and State Street Intersection Improvements 32,834 IDOT Statewide - Transportation and Related construction 92,078,416 IDOT Statewide - Transportation and Related Construction 81,321,817 IDOT Statewide - Pavement Preservation Projects 746,777 IDOT Statewide - Intergovernmental Agreement contracts 700,458 IDOT Federal Earmarks- Cook County- City of Chicago- North Avenue Bridge 1,188,885 IDOT Local Earmarks - Federal Pass Through 257,186,953

IDOT Statewide - Transportation and Related Construction 9,702,759

IDOT Statewide - Transportation and Related Construction 100,000,000

IDOT Statewide - Installation of Grade Crossing Protection or Grade Separations 73,345,214

IDOT Statewide - Financial Assistance to Airports (Federal and Local share) 460,035,190

IDOT Statewide - Grants for Air Navigation 19,025,378

IDOT Will County - 3rd Chicago Airport 14,800,686

IDOT Northeastern Illinois - Federal Pass Through Funding for C.R.E.A.T.E Program 75,904,023

IDOT Statewide - Grants per Section 4(B)(1) of the General Obligation Bond Act 40,680,044

IDOTCook and Contiguous Counties - Grants per Section 4(B)(1) of the General Obligation Bond Act 18,025

IDOTStatewide - Grant for the Federal Share of Capital, Operating, Consultant Services, and Technical Assistance 46,450,773

IDOTCook and Contiguous Counties - Grants per Section 4(B)(1) of the General Obligation Bond Act 553,724

IDOTOutside Cook County - Grants per Section 4(B)(1) of the General Obligation Bond Act 3,195,300

IDOTOutside Cook County - Grants per Section 4(B)(1) of the General Obligation Bond Act 28,014

IDOT Cook and Contiguous Counties - Operation Greenlight Program 12,496,695

IDOT St. Clair County - Metrolink Rail to Mid-America Airport 5,000,002

IDOT

Construction, Grants and Project Assistance to Municipalities, Transportation Districts, Private Non-Profit Carriers, Mass Transportation Carriers and the Intercity Rail Program and Other Uses Pursuant to 21 Section 4 (b)(1) of the GO Bond Act 73,603,178

IDOT Statewide - Rail Freight Loan Repayment Program (State) 15,480,074

IDOT Statewide - High Speed Rail - Federal Share 10,000,000

IDOT Statewide - Rail Freight Services 28,737,923

IDOT Statewide - Rail Freight Loan Repayment Program (Federal) 4,472,573

IDOTFederal Recovery - Northeastern Illinois - Federal Pass Through Funding for C.R.E.A.T.E Program 300,000,000

IDOT Federal Recovery - Statewide - Rail Passenger Improvements 285,000,000 IDOT Federal Recovery - Statewide - Rail Freight Improvements 6,000,000 IDOT Federal Recovery - Statewide - Transportation and Related Construction 900,000,000

IDOTFederal Recovery - State Wide Road Improvements- Local Share of Road fund/Road Program 325,000,000

IDOT Federal Recovery - Local Earmarks- Local Pass through 50,000,000

IDOTFederal Recovery - Statewide - Financial Assistance to Airports (Federal and Local share) 150,000,000

Page 76: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

IDOT Federal Recovery - Statewide - High Speed Rail - Federal Share 500,000,000

IDOTFederal Recovery - Statewide - Grant for the Federal Share of Capital, Operating, Consultant Services, and Technical Assistance 40,000,000

CDB Statewide - For Energy Efficiency Pilot Projects 82,228

CDB Statewide - Survey Asbestos Containing Materials 36,455

CDB Statewide - Abatement of Hazardous Materials 67,658

CDB Statewide - Survey Asbestos Containing Materials 2,015

CDB Statewide - Retrofit or Upgrade Mechanized Refrigeration Equipment (CFCs) 650,000

CDB Statewide - Surveys and Modifications to Meet Requirements of the Federal ADA 136,536

CDBNorthwestern Illinois University - Cook County - For Nanofabrication and Molecular Center 3,000,000

CDBStatewide - Miscellaneous Capital Improvements to State Facilities, including all expenses required to complete the work. 16,741

CDB

Development of educational, scientific, and technical programs and facilities and expansion of health and human services, and other purposes authorized in subsection (c) of Section 4 of the BIBF Act and grants to State agencies for such purposes 69,083,113

CDBGrants to school districts for school improvement projects authorized by the School Construction Law 18,000,000

CDB Statewide - School Construction Grants 3,535,520

CDBAsbestos Surveys and Emergency Abatement of Government Offices or Higher Education Residential and Auxiliary Enterprise Buildings 807,093

CDBAsbestos Surveys and Emergency Abatement of Government Offices or Higher Education Residential and Auxiliary Enterprise Buildings 478,102

CDB Statewide - School Construction Grants 145,888

CDB Statewide - School Construction Grants 1,872,926

CDB Statewide - School Construction Grants 7,404,907

CDB Statewide - School Construction Grants 2,724,785

CDB

Child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 6,790,503

CDB

Use by the State, its departments, authorities, public corporations, commissions and agencies as authorized by subsection (e) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 97,297,389

CDB

For water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State Agencies for such purposes 475,000

CDB Capital Planning and Condition Assessment and Analysis 189,167

CDB New Emergency Management Center - state share 336,056

CDB

Education at State universities, the ICCB and grants to public community colleges as authorized by Sections 5-11 and 5-12 of Public Community College Act and subsection (a), Section 3 of GO Bond Act or grants to State agencies for such purposes 118,682,832

CDB

FY07 Child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 2,585,800

CDB Statewide - Emergency Repairs and Hazardous Material Abatement 14,351,747

CDB

Open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Fund as authorized by subsection (c) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 24,224,289

CDBArchives Building - Springfield - Sangamon County - Upgrade Environmental Equipment and HVAC 35,833

CDB Statewide - Surveys and Modifications to Meet Requirements of the Federal ADA 200,755

CDB Statewide - Abatement of Hazardous Materials 7,284

Page 77: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDB Statewide - Demolish Buildings 74,066

CDB Statewide - Retrofit - Upgrade Refrigeration Equipment 3,866,523

CDB Statewide - Retrofit - Upgrade Refrigeration Equipment 30,551

CDB Statewide - Underground Storage Tank 8,979

CDB Statewide - Retrofit or Upgrade Mechanized Refrigeration Equipment 2,207,568

CDB Statewide - Refrigeration Equipment 47,547

CDB Statewide - Retrofit or Upgrade Mechanized Refrigeration Equipment 423,603

CDB Statewide - Upgrade and Remediate Underground Storage Tanks 1,540,497

CDB Statewide - Surveys and Modifications to Meet Requirements of the Federal ADA 986,432

CDB Statewide - Surveys and Modifications to Meet ADA Requirements 44,004

CDB Statewide - Surveys and Modifications to Meet Requirements of the Federal ADA 115,979

CDBUnits of Local Government and Other Eligible Entities for Land Acquisition, Construction and Rehabilitation Projects 2,476,501

CDB Chicago State University - Cook County - For Convocation Center 14,687

CDB Statewide - Miscellaneous Capital Improvements 13,568

CDB East St. Louis College Center - St. Clair County - For Renovation of facility 2,146,323

CDBJames R. Thompson Center - Chicago - Cook County - For Rehabilitating Exterior Columns 1,000,000

CDB James R. Thompson Center - Chicago - Cook County - Upgrade Building Security 655,000

CDBMichael A. Bilandic Building - Cook County - Upgrade HVAC and Domestic Water System 1,540,474

CDBSpringfield Regional Office Building - Sangamon County - Emergency Cooling Tower Replacement 56,864

CDBSpringfield Computer Facility - Sangamon County - Upgrade the Computer Room and the Electrical System 23,421

CDB James R. Thompson Center - Chicago - Cook County - Emergency Generator 3,545,000

CDB James R. Thompson Center - Chicago - Cook County - Exterior Columns 48,157

CDBIllinois Center for Rehabilitation and Education (Roosevelt) Chicago - Cook County - Upgrade Kitchen and Plumbing 185,838

CDB Statewide - CMS - Rennovations for Restacking Consolidated State Buildings 2,000,000

CDB Statewide - Renovation of State-Owned Space for Office Use 1,847,310

CDBChicago Medical Center - Cook County - Office and Lab Building For Planning And Beginning Renovation Of The Facility 474,164

CDBIllinois Center For Rehabilitation And Education (Wood Road) -Chicago - Cook County - For Upgrading Fire and Safety Systems 27,113

CDBMedical Center (DCFS District Office) - Chicago - Cook County - For Replacing Roof and Upgrading Mechanical and Electrical Systems 321,956

CDBResearch and Collection Center - Springfield - Sangamon County - Expanding Surplus Warehouse 73,584

CDB James R. Thompson Center - Chicago - Cook County - Upgrade Mechanical 27,341

CDBSuburban North Regional Office Building - Des Plaines - Cook County - Renovate for Office Space 382,716

CDB Rockford - Lee County - Replace Halon and Upgrade Air Conditioning 162,614

CDBKenneth Hall Regional Office Building - East St. Louis - St. Clair County - Emergency Parapet Wall Repairs 47,456

CDB Evelyn Edwards Center- Chicago - Cook County - Renovate for Office Space 3,150,000

CDBCollinsville Regional Office Building - Madison County - Replace Emergency Generator 372,000

CDB DuQuoin Fairgrounds - Perry County - Electrical Distribution System Upgrade 100,759

CDBIllinois State Fairgrounds - Sangamon County - Replace Water Service/Sewers - Various Buildings 205,475

Page 78: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDB Illinois State Fairgrounds - Sangamon County - Install Airlock - Meterology Lab 127,508

CDB Illinois State Fairgrounds - Sangamon County - Renovating Emerson Building 57,578

CDB DuQuoin Fairgrounds - Perry County - Emergency Roof Replacement 19,061

CDB Illinois State Fairgrounds - Sangamon County - Asbestos Abatement 85,000

CDB DuQuoin Fairgrounds - Perry County - Constructing a Multi-Purpose Building 61,710

CDB Illinois State Fairgrounds - Sangamon County - Renovate Comfort Stations 47,650

CDB Chicago State University - Cook County - Remodel Building K and Improve Site 1,000,474

CDB Chicago State University - Cook County - Remodel Building K and Improve Site 8,473,432

CDBChicago State University - Cook County - Renovating Buildings and Upgrading Mechanical Systems 61,412

CDB Chicago State University - Cook County - Capital Renewal 30,849

CDB Chicago State University - Cook County - Construct Conference Center 4,860,186

CDB Chicago State University - Cook County - Install Primary Electrical Feeder Cable 115,049

CDB Chicago State University - Cook County - Capital Renewal 7,549

CDB Chicago State University - Cook County - Capital Renewal 1,002

CDB Chicago State University - Cook County - Capital Renewal 161,000

CDB Chicago State University - Cook County - Capital Renewal 140,767

CDB Chicago State University - Cook County - Capital Renewal 260,819

CDB Chicago State University - Cook County - Capital Renewal 322,100

CDB Chicago State University - Cook County - Capital Renewal 17,768

CDB Chicago State University - Cook County - Construct library 1,007,921

CDB Chicago State University - Cook County - Construct Day Care 4,888,875

CDBChicago State University - Cook County - Technology Improvements and Deferred Maintenance 1,171,770

CDBChicago State University - Cook County - Construct Student Financial Outreach Building 4,719,982

CDB Chicago State University - Cook County - Capital Renewal 124,987

CDB Chicago State University - Cook County - Upgrading Campus Infrastructure 573,846

CDBEastern Illinois University - Coles County - Plan and Begin to Renovate and Expand the Fine Arts Center, Phase I 133,604

CDB Eastern Illinois University - Coles County - Capital Renewal 477,768

CDB Eastern Illinois University - Coles County - Capital Renewal 515,500

CDBEastern Illinois University - Coles County - Upgrading the Electrical Distribution System 2,031,880

CDB Eastern Illinois University - Coles County - Renovate and Expand Fine Arts Center 113,408

CDB Eastern Illinois University - Coles County - Capital Renewal 42,140

CDB Eastern Illinois University - Coles County - Capital Renewal 134,474

CDB Eastern Illinois University - Coles County - Capital Renewal 21,618

CDB Eastern Illinois University - Coles County - Capital Renewal 185,800

CDB Eastern Illinois University - Coles County - Capital Renewal 255,993

CDB Eastern Illinois University - Coles County - Capital Renewal 257,800

CDBEastern Illinois University - Coles County - Upgrade Campus Buildings for Health, Safety and Environmental Improvements 360,718

Page 79: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDB Eastern Illinois University - Coles County - Capital Renewal 515,500

CDB Eastern Illinois University - Coles County - Capital Renewal 515,500

CDB Eastern Illinois University - Coles County - Capital Renewal 150,380

CDB Eastern Illinois University - Coles County - Capital Renewal 261,412

CDBGovernors State University - Will County - Addition and Remodel Teaching and Learning Complex 14,557,170

CDB Governors State University - Will County - Capital Renewal 1,001

CDB Governors State University - Will County - Capital Renewal 2,533

CDB Governors State University - Will County - Capital Renewal 71,798

CDB Governors State University - Will County - Capital Renewal 26,826

CDB Governors State University - Will County - Capital Renewal 45,618

CDB Governors State University - Will County - Capital Renewal 21,306

CDB Governors State University - Will County - Capital Renewal 94,900

CDB Northeastern Illinois University - Cook County - Remodel Buildings A, B and E 212,743

CDBNortheastern Illinois University - Cook County - Remodel the Science Building to Upgrade HVAC 2,021,400

CDB Northeastern Illinois University - Cook County - Renovate Buildings C, E and F 6,233,200

CDB Northeastern Illinois University - Cook County - Capital Renewal 32,560

CDBNortheastern Illinois University - Cook County - Replace Fire Alarm Systems, Lighting and Ceilings 120,812

CDB Northeastern Illinois University - Cook County - Capital Renewal 383,700

CDB Northeastern Illinois University - Cook County - Capital Renewal 191,800

CDB Northeastern Illinois University - Cook County - Capital Renewal 191,800

CDB Northeastern Illinois University - Cook County - Capital Renewal 383,700

CDB Northeastern Illinois University - Cook County - Capital Renewal 36,177

CDB Northeastern Illinois University - Cook County - Capital Renewal 3,449

CDB Northeastern Illinois University - Cook County - Capital Renewal 32,547

CDB Northeastern Illinois University - Cook County - Capital Renewal 87,701

CDBStatewide - Expenses Necessary for Various Capital Improvements at Facilities Under the Jurisdiction of Department of Natural Resources 581,794

CDB Statewide - Roofing Systems 115,267

CDB Statewide - Replace/Repair Roofing Systems 245,000

CDB Buffalo Rock State Park - LaSalle County - Replace Septic System 4,125

CDBBabe Woodyard State Natural Area - Vermillion County - Develop Site and Associated Land Acquisition 244,604

CDB Statewide - Renovate Lodge and Concession Buildings 1,488,014

CDBGoose Lake Prairie Natural Area - Grundy County - Rehabilitate Visitor's Center Exterior 23,345

CDB Statewide - For Replacing Vault Toilets 285,813

CDB Statewide - For Constructing Vault Toilets 137,897

CDB Statewide - Rehabilitate Dams 450,002

CDB Statewide - Replace Roofs 206,925

CDBSparta World Shooting Complex - Randolph County - Construct World Shooting Complex 57,580

Page 80: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDB Illinois Beach State Park - Lake County - Replace Sanitary Sewer Lines 311,922

CDBResearch And Collections Center - Springfield - Sangamon County - Renovate Interior 17,915

CDB Rock Cut State Park - Winnebago County - Upgrade Sewage System 675,104

CDBSpringfield - Sangamon County - For Constructing a New DNR Office Building and Interpretive Center 166,153

CDB Statewide - Construct Hazardous Material Storage Buildings 9,935

CDB Statewide - Replace and Construct Vault Toilets 167,772

CDB Red Hills - Lawrence County - Miscellaneous Improvements 44,740

CDBCarlyle Lake State Park - Clinton County - Road and Site Improvements at Carlyle Lake 1,477,424

CDB Siloam Springs - Adams County - Office/Service Area 1,119,114

CDBCarlyle Lake State Park - Clinton County - Infrastructure and Site Improvements at Carlyle Lake 765,485

CDBHorseshoe Lake Conservation Area - Alexander County - For Dam Rehabilitation and Land Acquisition 842,605

CDB Illinois Beach State Park - Lake County - Replace Sanitary Sewer Lines 79,748

CDBStephen A Forbes State Park - Marion County - Replace Dump & Fish Cleaning Stations 44,584

CDB Illiana Heights Swamp - DuPage River Spillway 35,035

CDB I&M Canal State Park - Grundy County - Remove Bridge at Lock 14 425,000

CDB I&M Canal - Channahon - Grundy County - Improve DuPage River Spillway 930,000

CDB Wildlife Prairie Park - Peoria County - Rehabilitate Sewer Treatment Plant 1,032,000

CDB White Pines Forest State Park - Ogle County - Replace Sewer System 11,557

CDBPere Marquette State Park - Jersey County- Emergency Replacement of a Sewage Treatment Plant 621,000

CDB Goose Lake - Prairie Natural Area - Grundy County - Floating Boardwalk 24,604

CDB Wildlife Prairie Park - Peoria County - Rehabilitate Sewer Treatment Plant 767,500

CDB Carlyle State Fish and Wildlife Area - Fayette County - Replace Cox Bridge 550,000

CDB Hennepin - Bureau County - Railroad Bridges 851,685

CDB Statewide - Dams and Bridges 120,754

CDBMoraine Hills State Park - McHenry County - Replace Yellow-Head Marsh Dam Culvert 400,000

CDB Eagle Creek - Moultrie County - Lake Access Boat Docks 248,793

CDB Ferne Clyffe - Johnson County - Replace Campground Sewage Treatment 365,054

CDB Pere Marquette State Park - Jersey County - Replace Lodge Pool Dehumidifier 63,279

CDB Statewide - Replace Roofs at Shabbona, Hennepin, Randolph and Dixon Springs 134,931

CDB Dwight Correctional Center - Livingston County - For Renovation of Buildings 30,261

CDBVandalia Correctional Center- Fayette County-Construct Multi-Purpose Program Building 90,656

CDBVandalia Correctional Center-Fayette County-Convert Admin. Building and Plan construction of Admin. Health Care Unit 308,406

CDBStatewide - Time Keeping and Payroll System for Public Safety Shared Services Cluster 10,000,000

CDB Statewide - Replacing Roofing Systems at Various Locations 94,315

CDB Centralia Correctional Center - Clinton County - Replace Cooling Tower 201,948

CDB Dwight Correctional Center - Livingston County - Repair/Replace Roofing System 52,463

CDB Sheridan Correctional Center - LaSalle County - Replace Roofing System 100,939

Page 81: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDBBig Muddy Correctional Center - Jefferson County - Replace Door Locking Controls and Intercom Systems 2,312,558

CDB Stateville Correctional Center - Joliet - Will County - Install Fire Alarm Systems 1,600,000

CDBIllinois Youth Center - Harrisburg - Saline County - Construct a Multi-Purpose Medical, Vocational and Confinement Building 375,000

CDB Menard Correctional Center - Randolph County - Replace Administration Building 310,244

CDB

Correctional purposes at State prison and correctional centers as authorized by subsection (b) of Section 3 of the GO Bond Act or for grants to State agencies for such purposes 77,778,276

CDBStatewide - For Replacing Roofing Systems at Vienna and Sheridan Correctional Centers 189,284

CDB Statewide - Replace Doors and Locks at Various Facilities 1,113,137

CDB Statewide - Replace Doors and Locks at 4 Centers 258,708

CDB Statewide - Upgrade Water Towers at Various Locations 1,651,849

CDBDixon Correctional Center - Lee County - Planning the Upgrade and Expansion of the Medical Care Facility 24,127

CDBGraham Correctional Center - Montgomery County - Upgrade Building Automation and Fire Alarm System 21,170

CDBStatewide - Replacing or Upgrading Security and Monitoring Systems at Various Locations 278,707

CDB Statewide - Planning And Replacing Windows at Various Locations 2,226,942

CDB Statewide - Replacing Security Fencing at Various Locations 306,251

CDB Illinois Youth Center - St. Charles - Kane County 1,957,557

CDBStatewide - Upgrade Fire and Safety Systems at Various Locations, in Addition to Funds Previously Appropriated 2,018,041

CDBStatewide - For Planning, Design, Construction, Equipment and all Other Necessary Costs for a Female Multi-Security Level Correctional Center 55,938,782

CDBLogan Correctional Center - Logan County - Construct Medical Building and Dietary Building 2,019,174

CDB Menard Correctional Center - Randolph County - Renovate Old Hospital 48,064

CDBMenard Correctional Center - Randolph County - Plan and Construct Administration Building (From Supplemental) 513,777

CDBMenard Correctional Center - Randolph County - Replacing Toilets and Waste Lines at E/W Cellhouse and Upgrade North Cellhouse Plumbing 364,351

CDBLawrence Correctional Center - Lawrenceville - Lawrence County - For Constructing Two Cellhouses, in Addition to Funds Previously Appropriated 9,915

CDB Statewide - Replacing Roofing Systems at Various Locations 154,609

CDB Stateville Correctional Center - Joliet - Will County - Replace Doors and Locks 580,000

CDBStateville Correctional Center - Joliet - Will County - Upgrade Electrical System and Elevator and Installing HVAC System 393,750

CDB Vienna Correctional Center - Johnson County - Replace Cooler and Freezer 356,663

CDBStateville Correctional Center - Joliet - Will County - For Replacing Windows in B House 126,480

CDB Vienna Correctional Center - Johnson County - Plan and Upgrade Power Plant 707,109

CDBHopkins Park - Infrastructure Improvements in Connection With Hopkins Park Correctional Center 5,858,444

CDBLogan Correctional Center - Logan County - Plan and Begin Upgrade of Power Plant 321,186

CDBLogan Correctional Center - Logan County - Renovate Electrical Distribution System 159,995

CDB Pontiac Correctional Center - Livingston County - Replace Doors and Frames 1,620,000

CDBVienna Correctional Center - Johnson County - Upgrade HVAC and Replace Water Lines 423,601

CDBStateville Correctional Center - Joliet - Will County - Replace Power Plant and Utility Distribution System 17,454

CDB Shawnee Correctional Center - Johnson County - Replace Emergency Generator 44,867

CDBIllinois Youth Center - Harrisburg - Saline County - Upgrade Utilities, including Gas and Sewer 4,695,721

Page 82: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDBLogan Correctional Center - Logan County - Plan and Begin Upgrade of Power Plant 5,737,445

CDB Dwight Correctional Center - Livingston County - Renovate Buildings 274,847

CDB Lincoln Correctional Center - Logan County - Replace Doors and Locks 31,592

CDB Centralia Correctional Center - Clinton County - Upgrade Sewage Treatment Plant 453,000

CDB Hardin Work Camp - Hardin County - Emergency Kitchen Repairs 177,000

CDB Graham Correctional Center - Montgomery County - Upgrade Cooling Towers 10,015

CDBTaylorville Correctional Center - Christian County - Replace Operators and Main Gates 27,195

CDB Graham Correctional Center - Montgomery County - Upgrade Mechanical Systems 35,990

CDB Hardin Work Camp - Jersey County - Upgrade Sewage Treatment Plant 342,929

CDB Dwight Correctional Center - Livingston County - Renovate Housing Unit C8 270,000

CDB Menard Correctional Center - Randolph County - Replace Administration Building 11,626,369

CDBVandalia Correctional Center - Fayette County - Replace roofing systems - 18 buildings 267,256

CDB Vienna Correctional Center - Johnson County - Replace Roofs on Various Buildings 330,679

CDB East Moline Correctional Center - Rock Island County - Replace Windows 42,450

CDB East Moline Correctional Center - Rock Island County - Upgrade Roofing 675,879

CDBIllinois River Correctional Center (Canton) - Fulton County - Replace Domestic Hot Water Heater 41,606

CDBStatewide - Expenses for Planning, Design, Construction, Equipment and all Other Necessary Costs for a Maximum Security Facility 77,469,151

CDB Statewide - Planning a Medium Security Facility and Land Acquisition 2,629,428

CDBIllinois Youth Center - Rushville - Schyuler County - Planning, Design, Construction, Equipment and all Other Necessary Costs to add Cellhouse 2,282,202

CDBWestern Illinois University - Mc Donough County - Construct Performing Arts Center 2,688,234

CDB Western Illinois University - Mc Donough County - Capital Renewal 138,442

CDB Western Illinois University - Mc Donough County - Improvements to Memorial Hall 9,487,227

CDB Western Illinois University - Mc Donough County - Capital Renewal 12,865

CDB Western Illinois University - Mc Donough County - Capital Renewal 219,551

CDB Western Illinois University - Mc Donough County - Capital Renewal 9,341

CDB Western Illinois University - Mc Donough County - Capital Renewal 96,101

CDBWilliam G. Stratton Office Building - Springfield - Sangamon County - Plan and Begin Renovation or Replacement of Building 7,379,119

CDBSpringfield Motor Vehicle Facility - Springfield - Sangamon County - Upgrade Fire Alarm Systems 16,809

CDBCapitol Building - Springfield - Sangamon County - Upgrade High Voltage Monitoring System 275,496

CDB Driver's Facility West - Chicago - Cook County - Renovate Facility 391,180

CDBDrivers Services Facilities West, North, and South - Chicago - Cook County - Upgrade Electrical Systems 418,681

CDBDriver's Facility West - Chicago - Cook County - Renovation and Improvement of Pedestrian Traffic Flow 206,761

CDBCapitol Complex - Springfield - Sangamon County - Upgrade Fire Alarm System in 2 Buildings 17,992

CDB Capitol Complex - Springfield - Sangamon County - Stone Restoration 323,373

CDB 222 South College Office Building - Springfield - Sagamon County - Demolition and Landscaping of Capitol Complex, in addition to funds previously appropriated 964,131

CDB222 South College - Springfield - Sangamon County - Demolition, or Renovation or Replacement of 222 South College Building and Landscaping of Capitol Complex 586,444

Page 83: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDB Capitol Building - Springfield - Sangamon County - HVAC Upgrade 180,516

CDBCapitol Building - Springfield - Sangamon County - Upgrade for Life Safety and Fire Protection 351,680

CDB Illinois State University - Mc Clean County - Capital Renewal 106,016

CDB Illinois State University - Mc Clean County - Capital Renewal 1,007

CDBIllinois State University - Mc Clean County - Improve Life/Safety on Stevenson and Turner Halls 8,786,380

CDB Illinois State University - Mc Clean County - Remodel Julian and Moulton Halls 376,727

CDB Illinois State University - Mc Clean County - Upgrade and Remodel Schroeder Hall 2,038,924

CDB Illinois State University - Mc Clean County - Capital Renewal 111,197

CDB Illinois State University - Mc Clean County - Capital Renewal 984,871

CDB Illinois State University - Mc Clean County - Capital Renewal 85,165

CDB Illinois State University - Mc Clean County - Capital Renewal 111,595

CDB Illinois State University - Mc Clean County - Capital Renewal 27,182

CDB Illinois State University - Mc Clean County - Capital Renewal 510,700

CDBAttorney General Building - Springfield - Sangamon County - Upgrade Snow Melt System 104,000

CDB Matching ISTEA Federal Grant Funds 143,310

CDB New Salem Historic Site - Menard County - Provide Electrical at Campgrounds 110,444

CDBBlack Hawk State Historic Site - Rock Island County - Renovate Retaining Wall & Two Shelters 250,292

CDB Statewide - ISTEA 21 Match 593,070

CDB Old State Capitol Historic Site - Springfield - Sangamon County- Repair Elevators 387,464

CDB Cahokia Mounds Historic Site - St. Clair County - Replace Entry Doors 166,782

CDBCahokia Mounds Historic Site - St. Clair County - Purchase Private Land Within Site Boundary 189,979

CDB Cahokia Mounds Historic Site - St. Clair County - Restore Monk's Mound 631,531

CDB Pullman Historic Sites - Cook County - For Remodel of Facility 1,273,991

CDB Mt. Pulaski Courthouse - Logan County 24,118

CDB Jarrot Mansion - St. Clair County - Restoring the Mansion 1,447,021

CDBLincoln Presidential Center - Springfield - Sangamon County - Constructing a Lincoln Presidential Library 4,337

CDBLincoln's Tomb/Vietnam Memorial - Springfield - Sangamon County - For Rehabilitating Site and Providing Irrigation System 121,100

CDB Union Station - Springfield - Sangamon County - For Purchasing and Rehabilitating 21,721

CDB David Davis Mansion - McLean County - Acquire to Convert to Visitors' Center 7,962

CDB Cahokia Mounds Historic Site - St. Clair County - Replace Monk's Mound Stairs 211,080

CDBAbraham Lincoln Presidential Library - Springfield- Sangamon County- For Library and Museum 2,645,514

CDBDana Thomas House- Springfield- Sangamon County- Rehabilitate Interior & Exterior 3,100,000

CDB Bishop Hill Historic Site - Henry County- Restore Interior and Exterior 6,555

CDB David Davis Mansion - McClean County - Emergency Roof Repairs 4,450

CDB Lincoln Log Cabin - Coles County - Replace Sewer System 280,000

CDBLincoln-Herndon Law Office - Springfield - Sangamon County - Emergency Roof Repairs 25,200

CDB Statewide - Replace and Repair Roofing 398,899

Page 84: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDBChicago-Read Mental Health Center - Cook County - Renovate Unit J-East for Forensic Use 47,560

CDBFox Developmental Center - Dwight - Livingston County - Replace and Repair Interior Doors 249,122

CDB Statewide - Repair Roofs 244,866

CDB Elgin Mental Health Center - Kane County - Convert Read Building for Office Space 148,524

CDB Statewide - Replace and Repair Roofs 782,838

CDB Jacksonville Developmental Center - Morgan County - Upgrade Mechanicals 45,582

CDB Illinois School for the Deaf - Jacksonville - Morgan County - Replace Dorm Doors 1,945,671

CDBFox Developmental Center - Dwight - Livingston County - Renovate Water Treatment Plant 678,331

CDBSinger Mental Health Center - Rockford - Winnebago County - Repair and/or Replace Roofs 61,150

CDBStatewide - To Replace And Repair Roofing Systems At Choate, Chicago Read, Tinley Park, Illinois School/Visually Impaired, Shapiro, Kiley, And Ludeman 241,386

CDBSinger Mental Health Center - Rockford - Winnebago County - Renovate Mechanicals and Residential Areas 691,943

CDBHowe Developmental Center - Tinley Park - Cook County - For Renovating Residences, in addition to funds previously appropriated 99,182

CDBHowe Developmental Center - Tinley Park - Cook County - For Completing Upgrade of Tunnels, Phase II 366,920

CDBLudeman Developmental Center - Park Forest - Cook County - For Renovating Residential and Neighborhood Homes, in addition to funds previously appropriated 46,810

CDBIllinois School for the Visually Impaired - Jacksonville - Morgan County - Rennovation of the Power Plant and Associated Equipment 400,000

CDBIllinois School for the Visually Impaired - Jacksonville - Morgan County - Rennovation of the Power Plant and Associated Equipment 157,269

CDB Lincoln Developmental Center - Logan County - Four 10-Bed Homes 582,596

CDB Statewide - Repairing or Replacing Roofing 303,219

CDBKiley Developmental Center - Waukegan - Lake County - Renovate Homes, Phase II 77,343

CDBLudeman Developmental Center - Park Forest - Cook County - Replacing Plumbing, HVAC and Boiler Systems 629,184

CDBMadden Mental Health Center - Hines - Cook County - For Renovating Pavilions For Safety/Security, in addition to funds previously appropriated 621,882

CDB Madden Mental Health Center - Hines - Cook County - Renovate Dietary 729,885

CDBSinger Mental Health Center - Rockford - Winnebago - Renovate Dietary and Stores 55,334

CDBMurray Developmental Center - Centralia - Clinton County - Complete Renovation of Boiler House 2,991,120

CDB Elgin Mental Health Center - Kane County - Renovate Central Diet and Kitchen 3,704,073

CDBElgin Mental Health Center - Kane County - Replace Power Plant and Engineering Building 7,742,663

CDBSinger Mental Health Center - Rockford - Winnebago County - Upgrade Fire Alarm System 47,651

CDBTinley Park Mental Health Center - Cook County - Complete Life Safety Improvements 600,000

CDBShapiro Developmental Center - Kankakee - Kankakee County - Replace Sewer System in South Campus 2,056,004

CDBLudeman Developmental Center - Park Forest - Cook County - Upgrade Electrical Panel 338,114

CDBShapiro Developmental Center - Kankakee - Kankakee County - Replace Water Mains and Valves 210,015

CDBShapiro Developemental Center - Kankakee - Kankakee County - Plan and Begin Renovation of Dietary 203,263

CDBShapiro Developmental Center - Kankakee - Kankakee County - Remedy Fire Damper Deficiencies 118,922

CDB Chester Mental Health Center - Randolph County - Replace Smoke/Heat Detectors 65,032

CDBKiley Development Center - Waukegan - Lake County - Convert Facility to Natural Gas 112,391

CDBLudeman Developmental Center - Park Forest - Cook County - Repair and Replace Furnaces and Duct Work 141,615

Page 85: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDBMabley Developmental Center - Dixon - Ogle County - Replace Mechanicals and Upgrade Fire Alarm System 71,348

CDB Jacksonville Developmental Center - Morgan County - Renovate Power House 37,892

CDBIllinois School for the Visually Impaired - Jacksonville - Morgan County - Renovate Auditorium, Classroom and Administrative Buildings 2,103,306

CDBIllinois School for the Visually Impaired - Jacksonville - Morgan County - Renovate Classroom in Building 17 1,250,724

CDBAlton Mental Health Center - Madison County - Construct Two Buildings at Forensic Complex 6,780,876

CDBChicago Read Mental Health Center - Cook County - Rehabilitate Absorbers, Controls, Valves 86,160

CDBIllinois School for the Visually Impaired - Jacksonville - Morgan County - Renovate Power House 2,088,000

CDBFox Developmental Center - Dwight - Livingston County - Replace Doors and Flooring and Repair Walls in Main and Admin. Buildings 35,888

CDB Choate Mental Health Center - Anna - Union County - Renovate Sycamore Hall 94,930

CDB Illinois School for the Deaf - Jacksonville - Morgan County - Renovate High School 96,859

CDBIllinois School for the Deaf - Jacksonville - Morgan County - Renovate the High School Building Phase II 169,442

CDBChester Mental Health Center - Randolph County - Complete Replacement of Smoke and Heat Detectors 440,000

CDB Choate Mental Health Center - Anna - Union County - Renovate Sycamore Hall 4,385,000

CDBAlton Mental Health Center - Madison County - Renovate Forensic and Construct 2 Building Additions 3,900,000

CDB Chester Mental Health Center - Randolph County - Upgrade HVAC Systems 144,664

CDBChoate Mental Health Center - Anna - Union County - Emergency Boiler Control Replacement 20,569

CDBNorthern Illinois University - De Kalb County - Planning a Classroom Building and Developing Site in Hoffman Estates 1,314,500

CDBNorthern Illinois University - De Kalb County - Renovate Founders Library Basement 626,578

CDBNorthern Illinois University - De Kalb County - Renovate Altgeld Hall and Purchase Equipment 219,777

CDB Northern Illinois University - De Kalb County - Capital Renewal 1,207,568

CDB Northern Illinois University - De Kalb County - Capital Renewal 573,953

CDB Northern Illinois University - DeKalb County - Capital Renewal 579,500

CDB Northern Illinois University - DeKalb County - Capital Renewal 579,500

CDB Northern Illinois University - DeKalb County - Capital Renewal 579,500

CDB Northern Illinois University - De Kalb County - Capital Renewal 17,454

CDB Northern Illinois University - De Kalb County - Capital Renewal 207,446

CDB Northern Illinois University - De Kalb County - Capital Renewal 58,820

CDB Northern Illinois University - DeKalb County - Capital Renewal 340,000

CDB Northern Illinois University - DeKalb County - Capital Renewal 335,923

CDB Northern Illinois University - De Kalb County - Capital Renewal 151,292

CDB Northern Illinois University - De Kalb County - Upgrade Storm Waterway Controls 217,884

CDB Northern Illinois University - De Kalb County - Complete Engineering Building 37,233

CDB Northern Illinois University - De Kalb County - Capital Renewal 690,260

CDB Northern Illinois University - De Kalb County - Capital Renewal 1,159,000

CDB Northern Illinois University - De Kalb County - Capital Renewal 1,159,000

CDB Capitol Complex - Springfield - Sangamon County - Architect of the Capitol for all costs related to Asbestos and Environmental Abatement in the Capitol 1,801,429

CDBCapitol Complex - Springfield - Sangamon County - Office of the Architect of the Capitol for all costs related to Maintenance, Renovation or Restoration 978,984

Page 86: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDBUniv. Center of Lake County - For Constructing Univ. Center and Purchasing Equipment 30,303

CDB Statewide - Capital Renewal 130,565

CDB Alton Mental Health Center - Madison County - Rehabilitate Central Dietary 9,179

CDBElgin Mental Health Center - Kane County- Construct Roads, Parking Lots and Street Lights 133,664

CDBLudeman Developmental Center - Park Forest - Cook County - Renovate Residential Buildings 74,252

CDB Madden Mental Health Center - Hines - Cook County - Renovate Pavilions 60,833

CDB Statewide - Replace Roofs at Various Facilities 118,670

CDB SIU - Carbondale - Jackson County - Expand and Renovate Morris Library 160,721

CDB SIU - Carbondale - Jackson County - Capital Renewal 71,189

CDB SIU - Carbondale - Jackson County - Capital Renewal 131,311

CDB SIU - Carbondale - Jackson County - Capital Renewal 22,188

CDBSIU School Of Medicine - Springfield - Sangamon County - Construct an Addition to Combined Laboratory 65,248

CDB SIU - Cancer Center (from Tobacco) 68,143

CDB SIU - Carbondale - Jackson County - Capital Renewal 560,973

CDB SIU - Edwardsville - Madison County - Capital Renewal 82,753

CDB SIU - Edwardsville - Madison County - Capital Renewal 381,500

CDB SIU - Edwardsville - Madison County - Capital Renewal 712

CDB SIU - Edwardsville - Madison County - Capital Renewal 763,100

CDB SIU - Carbondale - Jackson County - Capital Renewal 14,758

CDB SIU - Carbondale - Jackson County - Capital Renewal 22,934

CDB SIU - Edwardsville - Madison County - Capital Renewal 11,240

CDB SIU - Carbondale - Jackson County - Capital Renewal 31,277

CDB SIU - Carbondale - Jackson County - Capital Renewal 801,859

CDB SIU - Carbondale - Jackson County - Capital Renewal 118,119

CDBBloomington Armory - McLean County - Rehabilitate Mechanical/Electrical System and Renovate Interior 2,720,825

CDB Camp Lincoln - Springfield - Sangamon County - Construct Military Academy 153,719

CDB Elgin Armory - Kane County - Upgrade Interior and Exterior 757,368

CDBMacomb Armory - Mc Donough County - Complete Mechanical/Electrical Systems Upgrade, Renovate Interior, Install Kitchen 2,484,125

CDB Northwest Armory - Cook County - Upgrade Electrical System 2,815,000

CDBMacomb Armory - McDonough County - Replace Mechanical/Electrical and Install Kitchen 678,666

CDB North Riverside - Rehabilitate Interior and Exterior 14,648

CDBSycamore - Replace Electrical System, Renovate Interior and Install Air Conditioning 22,310

CDB Northwest Armory - Cook County - Replace Mechanical 46,187

CDBLawrenceville Armory - Lawrence County - Rehabilitate Exterior and Replace Roofing System 176,837

CDBIllinois Math and Science Academy - Aurora - Kane County - Space for Delivery of a Teacher Training and Development and Student Enrichment Program 108,843

CDBIllinois Medical District Commission - Cook County - Upgrade Utility and Infrastructure 412,685

CDBIllinois Medical District Commission - Cook County - Constructing a Lab and Research Biotech Grad Facililty 29,494

Page 87: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDB Illinois Medical District Commission - Cook County - Upgrade Core Utilities 126,364

CDB Illinois Medical District Commission - Cook County - Upgrade Research Center 346,714

CDBUniversity Of Illinois - Urbana/Champaign - Champaign County - Expand Microelectronics Lab 151,766

CDB University of Illinois - Chicago - Cook County - Capital Renewal 245,200

CDB University Of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 2,049,066

CDBUniversity of Illinois - Chicago - Cook County - Plan, Construct and Equip Chemical Sciences Building 57,600,000

CDBUniversity of Illinois - Chicago - Cook County - Renovate Court Area and Lecture Center 54,793

CDB University of Illinois - Chicago - Cook County - Remodel Clinical Sciences Building 854,132

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 1,539,425

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 1,891,423

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 2,075,100

CDB University of Illinois - Springfield - Sangamon County - Capital Renewal 30,052

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 65,946

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 258,177

CDB University of Illinois - Springfield - Sangamon County - Capital Renewal 76,866

CDB University of Illinois - Springfield - Sangamon County - Capital Renewal 114,600

CDB University of Illinois - Springfield - Sangamon County - Capital Renewal 114,600

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 103,101

CDB University of Illinois - Chicago - Cook County - Capital Renewal 974,174

CDB University of Illinois - Chicago - Cook County - Capital Renewal 1,388,600

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 1,388,600

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 73,780

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 4,150,300

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 4,131,963

CDB University of Illinois - Chicago - Cook County - Capital Renewal 2,777,300

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 89,723

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 194,607

CDB University of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 465,178

CDB University of Illinois - Springfield - Sangamon County - Capital Renewal 212,512

CDB University of Illinois - Springfield - Sangamon County - Capital Renewal 227,400

CDBUniversity of Illinois - Chicago - Cook County - Medical Imaging Research/Clinical Facility (to CDF from Tobacco) 49,753

CDBUniversity of Illinois - Chicago - Cook County - Chemical Sciences Building (From Tobacco) 3,549,048

CDBUniversity of Illinois - Champaign - Champaign County - Biotechnology Genomic Facility (from Tobacco) 959,838

CDBUniversity of Illinois - Champaign - Champaign County - Supercomputing Application Facility 247,984

CDBUniversity of Illinois - Urbana/Champaign - Champaign County - Planning, Analysis and Design of Lincoln Hall 2,000,000

CDB University of Illinois - Chicago - Cook County - Capital Renewal 2,777,300

CDBUniversity of Illinois - Springfield - Sangamon County - Capital Renewal to Plan and Begin Construction of a Supercomputing Application Facility 209,126

Page 88: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDBUniversity Of Illinois - Urbana/Champaign - Champaign County - To Plan and Begin Construction of a Technology Transfer Incubator Facility (from Tobacco) 548,084

CDB University Of Illinois - Urbana/Champaign - Champaign County - Capital Renewal 855,870

CDB University Center Of Lake County - All Costs Necessary to Construct a Facility 35,981

CDB University of Illinois - Champaign - Champaign County - Capital Renewal 716,399

CDB University of Illinois - Champaign - Champaign County - Capital Renewal 50,679

CDB Enhanced Bio Safety Lab - Chicago - Cook County - Mechanical System Upgrades 832,114

CDB Statewide - ICCB - Capital Renewal 3,683,848

CDB Statewide - ICCB - Capital Renewal 6,071,700

CDB Statewide - ICCB - Capital Renewal 5,297,481

CDB Statewide - Plan, Construct and Renovate Defects in Community College Facilities 36,622

CDB Statewide - ICCB - Capital Renewal 1,665,864

CDBCity Colleges Of Chicago - Cook County - Kennedy King - Remodel for a Culinary Arts Educational Facility 10,875,000

CDB Statewide - ICCB - Capital Renewal 2,888,562

CDB Statewide - ICCB - Capital Renewal 1,253,180

CDB Statewide - ICCB - Enhanced Construction Program 9,270,559

CDB Statewide - ICCB - Enhanced Construction Program 21,965,216

CDB Statewide - ICCB - Enhanced Construction Program 16,105,527

CDB Statewide - ICCB - Capital Renewal 400,281

CDB Statewide - ICCB - Capital Renewal 2,805,684

CDB Statewide - ICCB - Capital Renewal 1,598,774

CDBMcHenry Community College - McHenry County - Construct Classrooms and Student Services Building and Remodel Space 473,076

CDB South Suburban College - Cook County - Improve Flood Retention 437,000

CDB College Of Lake County - Lake County - Project Completion 668,166

CDB Statewide - ICCB - Capital Renewal 2,556,705

CDB City Colleges Of Chicago - Cook County- Bondable Capital Improvements 570,171

CDB Statewide - ICCB - Capital Renewal 1,328,332

CDB College of DuPage - DuPage County - Upgrade Instructional Center HVAC 90,937

CDBCity Colleges Of Chicago - Cook County - Remodel for Workforce Preparation Centers 3,575,930

CDBCity Colleges Of Chicago - Malcolm X College - Remodel the Allied Health Program Facilities 4,304,223

CDBCollege Of Lake County - Lake County - Plan and Begin Construction of Technology Building, Phase 1 7,364

CDBPrairie State College - Chicago Heights - Construction of Addition to Adult Training/Outreach Center, in Addition to Funds Previously Appropriated 811,858

CDBKankakee Community College - Kankakee County - Construct a Laboratory/Classroom Facility 244,893

CDB Statewide - ICCB - Capital Renewal 4,948,041

CDB Lakeland College - Mattoon - Coles County - Student Services Building Addition 6,498,007

CDB Triton College - River Grove - Cook County - Rehabilitating the Liberal Arts Building 1,536,546

CDBTriton College - River Grove - Cook County - Rehabilitating the Potable Water Distribution System 70,146

Page 89: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221

CDBMoraine Valley Community College - Cook County - Construct a Classroom/Admin Building, Provide Site Improvements and Purchase Equipment 41,635

CDB Statewide - ICCB - Capital Renewal 1,483,480

CDBWillard Ice Building - Springfield - Sangamon County - Complete Upgrade Management Controls 400,000

CDBWillard Ice Building - Springfield - Sangamon County - Upgrade Building Management Controls 3,495,466

CDBWillard Ice Building - Springfield - Sangamon County - Replace Dock Exhaust System 172,722

CDB Willard Ice Building - Springfield - Sangamon County - Upgrade Plumbing 908,359

CDBWillard Ice Building - Springfield - Sangamon County - Renovate Interior and Upgrade HVAC 2,847,517

CDBWillard Ice Building - Springfield - Sangamon County - Complete Upgrade Plumbing System 600,000

CDBChicago Forensics Lab - Cook County - Plan and Begin Construction of an Addition to Lab 1,129,393

CDB Effingham Firing Range - Effingham County - Upgrade Firing Range 433,535

CDB Springfield - Sangamon County - Plan and Begin an addition to CODIS Lab 277,750

CDB Ullin District 22 - Pulaski County - Emergency Roof & Interior/Exterior Repairs 78,268

CDB DuQuoin District 13 - Perry County - Upgrade Firing Range 563,636

CDB Springfield Armory - Sangamon County - Site Improvements 352,523

CDB DuQuoin District 13 - Perry County - Construct a District 13 Headquarters 6,951

CDBStatewide - Replace Communication Towers, Equipment, and Tower Buildings at Various Locations 539,398

CDBStatewide - Replace Radio Communications Towers, Equipment Buildings and Installing Emergency Power 250,000

CDBSpringfield Supreme Court Building - Sangamon County - Humidifier and Water Filtration 1,373,755

CDBSpringfield Supreme Court Building - Sangamon County - Renovate HVAC System on 3rd Floor 140,000

CDB Elgin Supreme Court Building - Kane County - Miscellaneous Improvements 60,520

CDB MCI 235,000

CDB Manteno Veterans Home - Kankakee County - Replace Condensing Units 122,241

CDBQuincy Veterans Home - Adams County - Replace Chimney Stack, Ash Handling System 2,300,000

CDB Manteno Veterans Home - Kankakee County - Upgrade Storm Sewer 97,768

CDB Manteno Veterans Home - Kankakee County - Roads and Parking Lots 28,785

CDBQuincy Veterans Home - Adams County - Improvements to Meet Licensure Standards 2,286,031

CDBManteno Veterans Home - Kankakee County - Additional Storage and Support Areas 73,248

CDB Manteno Veterans Home - Kankakee County - Complete Upgrade of Emergency Generators 8,555

CDB Manteno Veterans Home - Kankakee County - Replace Air Conditioner Chillers 1,094,873

CDB Quincy Veterans Home - Adams County - Construct Bus and Ambulance Garage 849,073

ICC Statewide - Train whistle abatement 57,423

IEPAIEPA-Statewide-Compliance grants to local governments for sewer systems and wastewater treatment facilities per the Anti-Pollution Act 46,234,397

IEPAIEPA-Statewide-Dep. into the Brownfields Redevelopment Fund for use pursuant to Sec. 58.15 and 58.13 2,000,000

IEPAIEPA-Statewide-Dep. into the Brownfields Redevelopment Fund for use pursuant to Sec. 58.15 and 58.13 2,000,000

IEPAIEPA-Statewide-Deposit into the Hazardous Waste Fund for use pursuant to Section 22.2 10,000,000

IEPA Statewide - IEPA - River Edge Municipal Brownfields Grant Program 4,995,121 IEPA IEPA-Statewide-Wastewater Loan Program 596,915,013

Page 90: FY2010 Capital New Appropriations - Illinois · Western Illinois University - Mc Donough County - Construct Performing Arts Center 67,835,768 CDB Capitol Complex - Springfield - Capital

Agency Name Appropriation Name FY10 HB0312 and

SB1221 IEPA IEPA-Statewide-Drinking Water Loan Program 236,430,498

IEPA

Protection, preservation and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and other purposes authorized in subsection (d) of Section 4 of the BIBF Act and grants to State agencies for such purposes 8,942,400

IEPA

Protection, preservation and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and other purposes authorized in subsection (d) of Section 4 of the BIBF Act and grants to State agencies for such purposes 1,827,595

IEPAIEPA-Statewide-Local governments to plan, design, construct and rehabilitate wastewater treatment facilities at various sites 4,402,121

IEPAIEPA-Statewide-Grants and contracts for Public Drinking Water Infrastructure, where private wells have been contaminated by a hazardous substance 471,885

IEPA

Protection, preservation and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and other purposes authorized in subsection (d) of Section 4 of the BIBF Act and grants to State agencies for such purposes 8,462,700

IEPA

Protection, preservation and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and other purposes authorized in subsection (d) of Section 4 of the BIBF Act and grants to State agencies for such purposes 16,600,000

IEPA Federal Recovery - Wastewater Infrastructure Program 180,000,000 IEPA Federal Recovery - Drinking Water Program 80,200,000

IFA

Statewide-Loans to Fire Departments, Fire Protection Districts, Township Fire Departments or Non-Profit Ambulance Services Pursant to the Rural Bond Bank Act, Section 3-27 4,000,000

IFAStatewide-Loans to Fire Departments, Fire Protection Districts and Township Fire Departments Pursant to the Rural Bond Bank Act, Section 3-27 10,630,807

EIU Eastern Illinois University- Coles County- For Renovation of Fine Arts Center 1,323,408

NEIU Northeastern Illinois University- Cook County- For Equipment, Buildings A, B and E 1,552,933

UofICosts associated with space needs of History and Water Survey on U of I campus (transferred from rea 4,210,698

UofI Digitalization Equipment for WILL-TV 106,727

ICCBStatewide - Grants to Colleges for ADA remodeling and improvements

1,606,823 IDOT Jump-start reapprop for roads 448,500,000IDOT Jump-start emergency repairs 150,000,000IDOT Jump-start reapprop for transit-downstate 100,000,000IDOT Jump-start reapprop for transit 900,000,000