FY 2016 Obligated List of Federal Funded Projects November 9, 2016 Atlanta Regional Commission Annual Listing of Projects with Federal Funding Obligated for Federal Fiscal Year 2016 On December 4 th , 2015, President Obama signed into law the Fixing America’s Surface Transportation Act (FAST Act) which allocates federal funding for surface transportation programs over fiscal years 2016 through 2020. Per 23 U.S.C. § 134(j)(7)(B) of FAST Act, states and Metropolitan Planning Organizations (such as the Atlanta Regional Commission) must publish annual lists of projects where federal funds were obligated. Specifically, states and MPOs must produce: An annual listing of projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds have been obligated in the preceding year shall be published or otherwise made available by the cooperative effort of the State, transit operator, and metropolitan planning organization for public review.” 1 To address this requirement, this report lists all transportation projects in the Metro Atlanta MPO boundary that were obligated during Federal Fiscal Year 2016 (October 1, 2015 ‐ September 30, 2016). One of the requirements of FAST Act is that government spending on transportation must become more transparent to State and Local Officials, as well as the public. The obligated list of projects must be developed through a cooperative effort with the metropolitan planning organization (MPO), state and public transportation operators responsible for tracking project authorizations and obligations spent during the immediately preceding fiscal year. Obligation is defined as the Federal government’s legal commitment to pay the Federal share of a project’s cost. An obligated project is one that has been authorized by the federal agency and funds have been obligated. Projects for which funds have been obligated are not necessarily initiated or completed in the program year, and the amount of the obligation will not necessarily equal the total cost of the project. For FTA projects, obligation occurs when the FTA grant is awarded. For FHWA projects, obligation occurs when a project agreement is executed and the State/grantee requests that the funds be obligated. Please contact Patrick Bradshaw at [email protected]. www.atlantaregional.com 40 Courtland St NE, Atlanta, GA 30303 1 23 U.S.C. § 134(j)(7)(B)

FY 2016 Obligated List of Federal Funded Projectsdocuments.atlantaregional.com/transportation/ObligatedProjectsFY16.pdf · FY 2016 Obligated List of Federal Funded Projects November

  • Upload
    lythuy

  • View
    220

  • Download
    2

Embed Size (px)

Citation preview

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

Atlanta Regional Commission

Annual Listing of Projects with Federal Funding Obligated for Federal Fiscal Year 2016

On December 4th, 2015, President Obama signed into law the Fixing America’s Surface Transportation Act (FAST Act) which allocates federal funding for surface transportation programs over fiscal years 2016 through 2020. Per 23 U.S.C. § 134(j)(7)(B) of FAST Act, states and Metropolitan Planning Organizations (such as the Atlanta Regional Commission) must publish annual lists of projects where federal funds were obligated. Specifically, states and MPOs must produce:

“An annual listing of projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds have been obligated in the preceding year shall be published or otherwise made available by the cooperative effort of the State, transit operator, and metropolitan planning organization for public review.”1

To address this requirement, this report lists all transportation projects in the Metro Atlanta MPO boundary that were obligated during Federal Fiscal Year 2016 (October 1, 2015 ‐ September 30, 2016).

One of the requirements of FAST Act is that government spending on transportation must become more transparent to State and Local Officials, as well as the public. The obligated list of projects must be developed through a cooperative effort with the metropolitan planning organization (MPO), state and public transportation operators responsible for tracking project authorizations and obligations spent during the immediately preceding fiscal year.

Obligation is defined as the Federal government’s legal commitment to pay the Federal share of a project’s cost. An obligated project is one that has been authorized by the federal agency and funds have been obligated. Projects for which funds have been obligated are not necessarily initiated or completed in the program year, and the amount of the obligation will not necessarily equal the total cost of the project. For FTA projects, obligation occurs when the FTA grant is awarded. For FHWA projects, obligation occurs when a project agreement is executed and the State/grantee requests that the funds be obligated.

Please contact Patrick Bradshaw at [email protected].

www.atlantaregional.com

40 Courtland St NE, Atlanta, GA 30303

1 23 U.S.C. § 134(j)(7)(B)

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

AR-001-2016 0010462 LIVABLE CENTERS INITIATIVE (LCI)

STUDIES - FY 2016 Special Studies

Atlanta Regional Commission

PE M230 $1,000,000

AR-004-2016 0010466 COUNTY COMPREHENSIVE

TRANSPORTATION PLAN ASST PROG - FY 2016

Planning GDOT PE M230 $2,250,000

AR-010-2016 0010935 TRANSPORTATION DEMAND MGT EMPLOYER SERVICES PROG - FY

2016

Preliminary Engineering

Atlanta Regional Commission

PE L400 $3,463,783

AR-011-2016 0010500 RIDESHARING & REGIONAL TDM

PROGRAMS - FY 2016-2018 Miscellaneous Improvements

Atlanta Regional Commission

PE L400F $4,100,000

AR-074-2016 0012583 LUMP SUM REGIONWIDE SIGNAL

UPGRADE PROGRAM - 2016 Signals GDOT CST Z400S $10,240,800

AR-101-2016 0007718 INCIDENT MANAGEMENT & SUPPORT

PROGRAM STATEWIDE - FY 2016 ATMS/ITS GDOT CST Z001 $8,000,000

AR-105-2016 0009549 LUMP SUM REGIONAL TRAFFIC SIGNAL OPTIMIZATION - 2016

Signals GDOT CST Z240 $18,800,000

AR-137-2016 0010503 TOWING & RECOVERY INCENTIVE

PROGRAM (TRIP) - FY 2016 Miscellaneous Improvements

GDOT CST L400S $400,000

AR-313 0013975 ADVANCED TRAFFIC INCIDENT MANAGEMENT (TIM) - FY 2016

Preliminary Engineering

GDOT PE L240 $360,000

AR-450A 0009395 BELT LINE CORRIDOR FM

LINDBERGH CENTER TO 10TH ST/MONROE DR

Bicycle/Ped. Facility

Atlanta Development

Authority PE M301 $856,374

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

AR-450C 0009397 BELT LINE CORRIDOR FROM

GLENWOOD AVE TO UNIVERSITY AVE Bicycle/Ped.

Facility

Atlanta Development

Authority PE M230 $740,000

AR-450C 0009397 BELT LINE CORRIDOR FROM

GLENWOOD AVE TO UNIVERSITY AVE Bicycle/Ped.

Facility

Atlanta Development

Authority PE Z301 $1,500,000

AR-490A 0014991 ATLANTA STREETCAR EAST

EXTENSION FROM JACKSON ST TO IRWIN ST

Transit Facilities Atlanta PE Z230 $2,800,000

AR-502 0014992 REGIONAL TRANSIT VISION UPDATE Planning Atlanta Regional

Commission SCP Z230 $500,000

AR-550 0015135 GRTA - XPRESS BUS MAINTENANCE

& REHABILITATION Transit Projects

Atlanta Regional Commission

CST Z230 $1,391,263

AR-957 0000784 I-285 @ SR 400; INC CD LNS FM

ROSWELL RD TO ASHFORD DUNWOODY

Interchange GDOT ROW M001 $42,520,000

AR-957 0000784 I-285 @ SR 400; INC CD LNS FM

ROSWELL RD TO ASHFORD DUNWOODY

Interchange GDOT ROW M230S $40,000,000

AR-957A 0013546 I-285 @ SR 400; INC CD LANES &

ABERNATHY ROAD INTERCHANGE Interchange GDOT CST M001 $17,568,160

AR-ML-930 0008256 I-75/I-575 MANAGED LANES IN COBB &

CHEROKEE Managed Lanes GDOT CST Z001 $40,000,000

AT-269 0012586 SR 8/US 29 FROM CS

520/BOULEVARD DR/MONROE DR TO SR 10 - LCI

Bicycle/Ped. Facility

Atlanta Development

Authority ROW Z230 $1,720,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

AT-270 0006684 SR 141/PTREE RD CORR IMP FM

SHADOWLWN AVE TO MAPLE DR - LCI Median Work Buckhead CID ROW M230 $1,252,800

AT-291 0013134 TRANSIT REAL TIME ARRIVAL

INFORMATION PILOT PROGRAM Miscellaneous Improvements

Atlanta CST L400 $300,000

AT-295 0013810 SR 14 @ ABANDONED CSX RAILROAD

IN WEST ATLANTA Bridges GDOT PE Z240 $640,000

AT-302 0014999 UNIVERSITY AVE SCOPING STUDY Special Studies Atlanta SCP Z230 $160,000

AT-304 0015005 LENOX ROAD CORRIDOR SCOPING

STUDY Special Studies Atlanta SCP L230 $200,000

AT-305 0015018 MIDTOWN ATL COMMUNICATIONS &

DETECTION REHAB @ VARIOUS LOCS

Signals GDOT CST Z230 $752,000

AT-306 0015019 15TH STREET EXTENSION FROM SR 9

TO CS 673/WILLIAMS STREET Roadway Project Atlanta PE Z230 $188,625

BA-001 0009405 SR 8 @ CR 97/ED HOGAN ROAD Intersection

Improvement Barrow County CST M230 $1,082,400

BA-026 0008429 SR 316/US 29 @ SR 81 Interchange GDOT ROW M001 $6,536,000

BA-032 0013819 SR 82 @ MIDDLE OCONEE RIVER 5 MI

NE OF STATHAM Bridges GDOT PE M240 $200,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

CH-020A2 0007836 SR 20 FROM I-75/BARTOW TO I-

575/CHEROKEE Widening GDOT PE Z001 $3,809,067

CH-225 0007028 SR 369 @ BOARD TREE CREEK Bridges GDOT PE L1C0 $180,722

CH-225 0007028 SR 369 @ BOARD TREE CREEK Bridges GDOT PE M240 $75,917

CH-228 0013135 CHEROKEE COUNTY COUNTYWIDE

SIGNAL TIMING PROJECT Signals Cherokee County CST M400 $700,000

CH-229 0015030 HOLLY SPRINGS INDUSTRIAL DRIVE

EXTENSION STUDY Special Studies Holly Springs SCP L230 $160,000

CH-230 0015036 NOONDAY CREEK TRAIL

CONNECTOR FEASIBILITY STUDY-SCOPING ONLY

Special Studies Cherokee County SCP M301 $96,000

CL-020A 751810- CR 1337/FLINT RIVER RD FM

GLENWOOD DR TO KENDRICK RD - GRTA

Widening Clayton County CST M230 $930,088

CL-020A 751810- CR 1337/FLINT RIVER RD FM

GLENWOOD DR TO KENDRICK RD - GRTA

Widening Clayton County CST M230S $2,860,000

CL-238 0006860 GODBY ROAD FROM CR 246/SOUTH

HAMPTON ROAD TO SR 314 Widening Clayton County CST Z230 $3,233,914

CL-264 0012602 CONLEY ROAD EXTENSION

FEASIBILITY STUDY Special Studies Clayton County PE L230 $280,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

CL-AR-181 713210- I-75 NB CD SYSTEM FROM SR 331 TO

I-285 Ramp GDOT ROW Z001 $1,480,000

CO-442 0012606 SR 5 @ SR 120 ALT Intersection

Improvement Marietta CST M400 $1,084,679

CO-443 0012607 SR 3/US 41 @ SR 120 ALT Intersection

Improvement Marietta ROW L400 $798,800

CO-460 0011738 SR 3 @ CS 4538/WINDY HILL ROAD Operational

Improvement Cobb County CST Z240 $1,581,920

CO-462 0015042 ROTTENWOOD CREEK TRAIL FM

ALUMNI DR TO FRANKLIN RD - PHASE I

Bicycle/Ped. Facility

Marietta PE M301 $400,000

CO-465 0014483 SR 280 FROM WINDY HILL ROAD TO

CONCORD ROAD - CORRIDOR STUDY Special Studies Smyrna SCP Q23 $120,000

CO-550 0015134 CCT - FIXED ROUTE BUS

REPLACEMENT Transit Projects Cobb County CST Z230 $1,391,263

CW-075 0012610 SR 16 @ CR 74/PYLANT ST & CR

74/PYLANT ST @ DEAD OAK CREEK Intersection

Improvement Senoia PE M230 $120,000

CW-077 0012879 SENOIA MULTI-USE PATH FM IVY TO SEAVY - PATH FORWARD PROGRAM

Bicycle/Ped. Facility

Senoia PE M301 $140,000

CW-078 0013717 SR 54 @ BEAR CREEK 3.5 MI SE OF

MORELAND Bridges GDOT PE Z240 $400,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

CW-080 0015053 SR 34 FROM I-85 SB RAMP TO SR 34

BYPASS Roadway Project GDOT PE L230 $320,000

CW-081 0015054 JACKSON; JEFFERSON; CLARK & BULLSBORO TRAFFIC SEGMENT

STUDY Special Studies Newnan SCP 33C $75,000

CW-AR-003 0009323 I-85 @ CR 103/POPLAR ROAD - NEW

INTERCHANGE Interchange Coweta County CST M001 $24,037,641

DK-274 0013971 SR 236 @ SR 42 Intersection

Improvement GDOT PE M240 $800,000

DK-408 0012613 CR 5149/KEY RD & CR

78/CONSTITUTION RD @ ENTRENCHMENT CREEK

Bridges Dekalb County CST Z230 $1,287,999

DK-412 0012617 1ST AVE; 2ND ST; 4TH ST & LYNBURN

DR IN TUCKER - PH II - LCI Bicycle/Ped.

Facility Dekalb County ROW Z230 $575,000

DK-413 0008121 CS 796/ROCKBRIDGE ROAD FROM

ALLGOOD ROAD TO ROWLAND ROAD Widening Dekalb County ROW LY20 $296,000

DK-438 0015068 WESTSIDE CONNECTOR STUDY Special Studies Dunwoody SCP L230 $200,000

DK-440 0015070 MEDICAL CTR TO DUNWOODY

MARTA BIKE/PED &TRANSIT CONNECTIVITY

Bicycle/Ped. Facility

Dekalb County CST Z230 $3,300,000

DK-440 0015070 MEDICAL CTR TO DUNWOODY

MARTA BIKE/PED &TRANSIT CONNECTIVITY

Bicycle/Ped. Facility

Dekalb County ROW Z230 $541,985

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

DO-022 0013563 CR 817/LEE ROAD/SOUTH

SWEETWATER RD - PHASE I - GRTA Widening Douglas County PE L230 $453,600

DO-290 0012618 SR 5 FROM CS 736/STEWART PKWY

TO CS 857/CONCOURSE PKWY Roadway Project Douglas County PE L230 $81,114

DO-295 0012620 SR 6/US 278 FROM I-20/DOUGLAS TO

GARRETT ROAD/COBB Roadway Project Douglas County CST L400 $1,504,590

FA-267 331650- CR 360/MCINTOSH RD @ FLINT RIVER

@ FAYETTE/SPALDING CO LINE Bridges Fayette County CST Z230 $2,559,327

FA-351 0012623 CR 875/SR 85 CONN; CR 359/BROOKS

ROAD & CR 364/EBENEZER ROAD Resurface & Maintenance

Fayette County CST L230 $745,600

FA-353 0012878 WEST FAYETTEVILLE PATH FROM SR

54 TO CS 894/LESTER ROAD Bicycle/Ped.

Facility Fayette County PE M301 $320,000

FA-355 0013734 SR 85 @ WHITEWATER CREEK Bridges GDOT PE Z240 $400,000

FA-357 0015076 SR 74 FROM SR 14/US 29 TO SR 54 -

CORRIDOR STUDY Special Studies Fayette County SCP L230 $312,000

FN-232B 721308- SR 140 @ LITTLE RIVER @

FULTON/CHEROKEE COUNTY LINE Bridges GDOT ROW L1C0 $936,000

FN-269 721010- SR 9 FROM SR 120 TO

CHATTAHOOCHEE RIVER IN ROSWELL

Widening Roswell PE Z001 $400,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

FN-269 721010- SR 9 FROM SR 120 TO

CHATTAHOOCHEE RIVER IN ROSWELL

Widening Roswell PE Z230 $800,000

FN-275 0010385 CS 243/SANDY SPRINGS CIR FM

HAMMOND TO MT VERNON - PH II-LCI Bicycle/Ped.

Facility Sandy Springs ROW Z230 $2,160,000

FN-281A 0012626 SR 120; MCGINNIS FERRY RD &STATE

BRIDGE RD-ITS SYS EXPANSION ITS Johns Creek CST Q92 $468,320

FN-282 0012629 SR 9 FROM VERNON WOODS DRIVE

TO CHASTAIN DRIVE ITS Sandy Springs CST L400 $1,241,474

FN-288A 0013947 CS 107/BARNWELL ROAD FROM SR

140 TO CS 2511/NIBLICK DRIVE Turn Lanes Johns Creek PE Q92 $166,680

FN-288A 0013947 CS 107/BARNWELL ROAD FROM SR

140 TO CS 2511/NIBLICK DRIVE Turn Lanes Johns Creek PE Z230 $80,000

FN-290 0007310 SR 120 FM CS 65/JONES BRIDGE RD

TO CS 79/PARSON RD-PHASE II Multi-use Trail Johns Creek CST M230 $2,640,000

FN-290 0007310 SR 120 FM CS 65/JONES BRIDGE RD

TO CS 79/PARSON RD-PHASE II Multi-use Trail Johns Creek CST Q92 $2,724,028

FN-297 0013140 JOHNS CREEK CITYWIDE ITS SYSTEM

EXPANSION ITS Johns Creek CST M400 $1,416,847

FN-301 0015077 CS 9284/WINDWARD PKWY FROM SR

400 TO SR 9 IN ALPHARETTA Widening Alpharetta PE Z230 $800,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

FN-303 0015079 CS 262/HAMMOND DR FM SR 9 TO

BARFIELD RD - FEASIBLITIY STUDY Special Studies Sandy Springs SCP L230 $240,000

FN-304 0015023 PATH 400 TRAIL EXT FROM

LORIDANS DR TO SANDY SPRINGS CL

Bicycle/Ped. Facility

Sandy Springs PE Z230 $144,000

FN-304 0015023 PATH 400 TRAIL EXT FROM

LORIDANS DR TO SANDY SPRINGS CL

Bicycle/Ped. Facility

Sandy Springs PE Z301 $496,000

FS-208 0007533 CR 1374/BUTNER ROAD @ CR 1386/STONEWALL TELL ROAD

Roundabout Fulton County ROW LY10 $35,400

FS-220 0010329 SR 3 FM CS 8028/SOUTH CENTRAL AVE TO CS 3118/NORTH AVE - LCI

Bicycle/Ped. Facility

Hapeville CST Z230 $1,365,247

FS-233 0012635 CLEVELAND AVE; SYLVAN RD;

VIRGINIA AVE & NORMAN BERRY DRIVE

Resurface & Maintenance

East Point CST Z230 $1,828,000

FS-280 0015080 GLOBAL GATEWAY CONNECTOR Multi-use Trail College Park PE M301 $535,626

FS-283 0013809 SR 14/US 29 @ CSX #638610Y 2.6 MI

NE OF UNION CITY Bridges GDOT PE L050 $400,000

FS-AR-182 0007841 I-85 @ SR 74/SENOIA ROAD Interchange Fairburn PE Z230 $681,600

FT-060 0013627 SR 369 @ SETTINGDOWN CREEK 6 MI

N OF CUMMING Bridges GDOT PE M240 $240,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

FT-086 0013552 SR 369 FM CHEROKEE COUNTY LINE TO HIGHTOWER CIRCLE-TRUCK LNS

Passing Lanes Forsyth County PE HY20S $113,170

FT-086 0013552 SR 369 FM CHEROKEE COUNTY LINE TO HIGHTOWER CIRCLE-TRUCK LNS

Passing Lanes Forsyth County PE LY20S $126,830

FT-086 0013552 SR 369 FM CHEROKEE COUNTY LINE TO HIGHTOWER CIRCLE-TRUCK LNS

Passing Lanes Forsyth County PE M230 $800,000

GW-099C 132950- SR 13 FROM CS 1120/SAWNEE

AVE/GWINNETT TO SR 347/HALL Widening Buford CST Z240 $8,093,014

GW-331 0007535 CONNECTOR ST FROM HEWATT RD TO BRITT DR; INC PARKWOOD RD

Roadway Project Highway 78 CID ROW Z230 $2,000,000

GW-356 0010242 CS 1178/SOUTH LEE ST FM SR 13 TO

CS 1086/WEST MORENO STREET Bicycle/Ped.

Facility Buford CST M230 $3,116,784

GW-383 0012641 SR 13 FROM CR 613/SIMPSON CIR TO

CR 9010/N BERKELEY LAKE RD Bicycle/Ped.

Facility Gwinnett County ROW L230 $368,000

GW-386 110610- I-85 FM N OF CR 134/HAMILTON MILL

ROAD TO N OF SR 211 Widening GDOT PE L050 $3,028,480

GW-387 0010877 SR 141 @ PEACHTREE INDUSTRIAL

BLVD Operational

Improvement GDOT CST Z001 $367,200

GW-387 0010877 SR 141 @ PEACHTREE INDUSTRIAL

BLVD Operational

Improvement GDOT CST Z230 $840,420

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

GW-402 0014160 ROGERS BRIDGE @

CHATTAHOOCHEE RIVER - PEDESTRIAN BRIDGE

Bridges Duluth PE M301 $400,000

GW-404 0015086 SR 141 FM CHATTAHOOCHEE RIVER

TO HOLCOMB BRIDGE RD STUDY Special Studies

Peachtree Corners

SCP Q23 $200,000

GW-405 0015087 INNOVATION DISTRICT MULTI-USE

TRAIL STUDY Special Studies

Peachtree Corners

SCP M301 $120,000

GW-550 0015133 GCT - PURCHASE PARATRANSIT

VEHICLES Equip. Purchase Gwinnett County CST Z230 $427,563

GW-AR-242 0006276 HOSPITAL DRIVE CONNNECTOR

ROAD - LCI PROJECT Roadway Project Duluth CST M230 $1,182,370

HE-194 0012642 CR 824/JODECO ROAD @ CR

661/BLACKHALL ROAD Intersection

Improvement Henry County ROW L400 $208,000

LUMP 0002882 SR 155 FM HAMPTON-LOCUST

GROVE/BILL GARDNER TO STONEY BROOK

Turn Lanes GDOT ROW MS30 $1,944,000

M-AR-274B2 0015137 MARTA - BUS PROCUREMENT -

REPLACEMENT Equip. Purchase MARTA CST Z230 $1,391,263

M-AR-316 0015092 AVONDALE MARTA STATION

INTERMODAL FACILITY Transit Facilities MARTA CST Z230 $4,000,000

NE-099B 0012646 CR 653/COVINGTON BYPASS @ CR

181/FLAT SHOALS ROAD Intersection

Improvement Newton County ROW L400 $456,000

FY 2016 Obligated List of Federal Funded Projects November 9, 2016

ARC PROJECT ID

GDOT PROJECT ID

PROJECT DESCRIPTION PROJECT TYPE SPONSOR FY 16

PHASE FUND CODE

FEDERAL FUNDS OBLIGATED

NE-103 0013602 PR 1/FRONTAGE ROAD @ YELLOW

RIVER 2 MI W OF COVINGTON Bridges GDOT PE Z240 $400,000

NE-104 0013751 SR 81 @ DRIED INDIAN CREEK IN

COVINGTON Bridges GDOT SCP Z240 $200,000

NE-105 0015095 ACCESS RD @ I-20 FM E OF

CROWELL RD TO W OF HAROLD DOBBS RD

Realignment Newton County PE L230 $320,000

NE-107 0015097 CR 511/BROWN BRIDGE RD

@SNAPPING SHOALS CRK; INC REALIGNMENT

Bridges Newton County PE L230 $189,652

PA-100 0012885 DALLAS BATTLEFIELD TRAIL - PHASE

II Bicycle/Ped.

Facility Dallas PE M301 $300,000

PA-102 0015098 SR 61 FROM SR 6BU TO CS

811/COOPER PLACE SCOPING STUDY Special Studies Dallas SCP Q23 $60,000

RO-243 0006934 SALEM GATE EXT FROM OLD

COVINGTON HWY TO FLAT SHOALS ROAD

Roadway Project Rockdale County PE L230 $800,000

RO-258 0015099 I-20 @ CR 66/SIGMAN RD & @ SR 162 -

LIGHTING Lighting Rockdale County PE Z230 $560,000

RO-259 0015100 CR 505/HONEY CREEK ROAD @

SNAPPING SHOALS CREEK Bridges Rockdale County PE Z230 $240,000

RO-AR-138 731048- I-20 @ SR 138/SR 20 INTERCHANGE

RECONSTRUCTION & WIDENING Interchange GDOT PE Z001 $3,533,059