H E AT F U S I O N J O I N I N G P R O C E D U R E S

Page 2: FUSION MANUAL_Rev Illustrations [1]
Page 3: FUSION MANUAL_Rev Illustrations [1]

TA B L E O F C O N T E N T S

INTRODUCTION.............................................................................................................................................1

FEDERAL REGULATIONS...........................................................................................................................1

HEAT FUSION..................................................................................................................................................2

INCLEMENT WEATHER...............................................................................................................................3

NOTES ON FUSION CONFIDENCE..........................................................................................................3

FUSION CHECKLIST.....................................................................................................................................4

BUTT FUSION.................................................................................................................................................5 Procedure..........................................................................................................................................................6 Qualification.................................................................................................................................................. 10

SADDLE FUSION........................................................................................................................................ 15 Definitions...................................................................................................................................................... 15 Procedure....................................................................................................................................................... 17 Qualification.................................................................................................................................................. 18 SOCKET FUSION......................................................................................................................................... 22 EquipmentRequirements........................................................................................................................ 22 HeaterTemperature.................................................................................................................................... 22 Procedure....................................................................................................................................................... 23 Qualification.................................................................................................................................................. 25

APPENDIX A................................................................................................................................................. 29 HydraulicFusionMachineGaugePressure........................................................................................ 29

REFERENCES................................................................................................................................................ 30

FIGURES FIGUREI–ButtFusionBentStrapTestSpecimen............................................................................ 10 FIGUREII–SaddleFusionBentStrapTestSpecimen..................................................................... 18 FIGUREIII–SocketFusionBentStrapTestSpecimen.................................................................... 25 TABLES TABLEI–ButtFusion:ApproximateMeltBeadSize.........................................................................7 TABLEII–ButtFusion:MaximumHeaterPlateRemovalTime......................................................8 TABLEIII–ButtFusion:BeadWidthsPerWallThickness.................................................................9 TABLEIV–ButtFusion:TroubleshootingGuide............................................................................ 14 TABLEV–SaddleFusion:MaximumHeating/MinimumCoolingTimes................................ 16 TABLEVI–SaddleFusion:TroubleshootingGuide......................................................................... 21 TABLEVII–SocketFusion:TimeCycles............................................................................................... 24 TABLEVIII–SocketFusion:TroubleshootingGuide....................................................................... 28

Thestatementsandtechnicaldatagiveninthisbrochureweredevelopedonthebasisofconservativetestmeasuresandarebelievedtobeaccurate.Theinformationismeanttoserveonlyasageneralguide;andtheoperatorand/oranyindividualusermustverifythespecificparametersofeachapplicationfortheirintendeduseandspecificsystem.Duetowidevariationsinserviceconditions,installationtechniques,fieldconditions,weatherconditions,andotherfactors,NOWARRANTYORGUARANTEE,EXPRESSORIMPLIED,ISGIVENINCONJUNCTIONWITHTHEUSEOFTHESEPROCEDURES.

Inaddition,thisproceduredoesnotpurporttoaddressallofthesafetyconcerns,ifany,associatedwithitsuse.Itistheresponsibilityoftheuserofthisproceduretoestablishanyandallappropriatesafetyandhealthpracticesandtodeterminetheapplicabilityofregulatoryrequirementspriortouse.

Page 4: FUSION MANUAL_Rev Illustrations [1]

INTRODUCTION

Anintegralpartofanypipesystemisthemethodusedtojointhesystemcomponents.Properengineeringdesignofasystemwilltakeintoconsiderationthetypeandeffectivenessofthetechniquesusedtojointhepipeandappurtenances,aswellasthedurabilityoftheresultingjoints.Theintegrityandversatilityofthejoiningtechniquesusedforpolyethylene(PE)pipeallowthedesignertotakeadvantageoftheperformancebenefitsofPEinawidevarietyofapplications.

Therearethreetypesofheatfusionjointscurrentlyusedintheindustry:butt,saddleandsocketfusion.Additionally,therearetwomethodsforproducingthesocketandsaddlefusionjoints.Inadditiontothefusion

proceduresthatfollow,electrofusionisrecognizedasanacceptablemethodofproducingsocketandsaddlefusionsbutisnotaddressedinthisdocument.Theuserofelectrofusionproductsshouldcontacttheproviderofthoseproductsfordetailsonuseinjoiningpipe.

ThefusionproceduresthatfollowhavebeenproventoconsistentlyproducesoundfusionjointsinbenchtrialswhenusedcorrectlyandarerecommendedforthejoiningofPolyPipe®products.TherecommendedproceduresforbuttandsaddlefusionsareconsistentwiththePlasticsPipeInstitute(PPI)TechnicalReports(TR)TR-33, Generic Butt Fusion Procedures and TR-41, Generic Saddle Fusion Procedures.

FEDERAL REGULATIONS

Federalregulationsrequirethatalloperatorsqualifyboththeirjoiningproceduresandthepersonnelinstallingpipe.ThePipelineSafetyRegulations,issuedbytheU.S.DepartmentofTransportation(DOT)PipelineandHazardousMaterialsSafetyAdministration,arefoundat49CFRPart192.Pursuantto49CFR192.283(a),anoperatorisrequiredtoqualifyheatfusionjoiningproceduresbeforetheprocedureisusedinthefield.Further,49CFRPart192.285requiresthatanoperatorqualifythepersonnelwhowillbemakingheatfusionjointsinthefield.AdditionalFederalregulationsmayapply,andStateregulationsthatarecorollariestothePipelineSafetyRegulationsalsoapply,asmayadditional,morestringent,stateregulations.

Theoperatorisresponsibleforensuringthatallaspectsoftheirfusionjoiningprocessesandproceduresareincompliancewiththerequirementsof49CFR,Part192andASTMstandards.

Federalregulationsrequirethatalloperatorsqualifyboththeirjoiningproceduresandthepersonnelinstallingpipe.ThePipelineSafetyRegulations,issuedbytheU.S.DepartmentofTransportation(DOT)PipelineandHazardousMaterialsSafetyAdministration,arefoundat49CFRPart192.Pursuantto49CFR192.283(a),anoperatorisrequiredtoqualifyheatfusionjoiningproceduresbeforetheprocedureisusedinthefield.Further,49CFRPart192.285requiresthatanoperatorqualifythepersonnelwhowillbemakingheatfusionjointsinthefield.AdditionalFederalregulationsmayapply,andStateregulationsthatarecorollariestothePipelineSafetyRegulationsalsoapply,asmayadditional,morestringent,stateregulations.

Theoperatorisresponsibleforensuringthatallaspectsoftheirfusionjoiningprocessesandproceduresareincompliancewiththerequirementsof49CFR,Part192andASTMstandards.

POLYPIPE® PRODUCTS

GAS DISTRIBUTION/OILFIELD M&I, WATER AND SPECIALTY

PolyPipe®PolyTough1TM PolyPipe®EHMWPLUS PolyPipe®GDY20 PolyPipe®POLYPLUS PolyPipe®GDB50/GB50 PolypipE®LIGHTVIEWPLUSTM

POLYPIPE®ENVIROPIPETM

1

Page 5: FUSION MANUAL_Rev Illustrations [1]

HEAT FUSION

Theprinciplebehindheatfusionistoheattwosurfacestoadesignatedtemperature,andthenfusethemtogetherbyapplicationoftherequiredforce.Thisappliedforcejoinsthemeltedsurfacesresultinginapermanent,monolithicfusionjoint.PolyPipe®fusionproceduresrequirespecifictoolsandequipmentforthefusiontypeandforthesizesofpipeandfittingstobejoined.

Butt Fusion –Thistechniqueconsistsofheatingthesquaredendsoftwopipes,apipeandfitting,ortwofittingsbyholdingthemagainstaheatedplate,removingtheplatewhenthepropermeltisobtained,promptlybringingtheendstogetherandallowingthejointtocoolwhilemaintainingtheappropriateappliedforce.

Saddle Fusion –Thistechniqueinvolvesmeltingtheconcavesurfaceofthebaseofasaddlefitting,whilesimultaneouslymeltingamatchingpatternonthesurfaceofthepipe,bringingthetwomeltedsurfacestogetherandallowingthejointtocoolwhilemaintainingtheappropriateappliedforce.

Socket Fusion –Thistechniqueinvolvessimultaneouslyheatingtheoutsidesurfaceofapipeendandtheinsidesurfaceofafittingsocket,whichissizedtobesmallerthanthesmallestoutsidediameterofthepipe.Afterthepropermelthasbeengeneratedateachfacetobemated,thetwocomponentsarejoinedbyinsertingthepipeintothefitting.Thefusionisformedattheinterfaceresultingfromtheinterferencefit.Themeltsfromthetwocomponentsflowtogetherandfuseasthejointcools.

ProperlyfusedPEjointsdonotleak.Ifaleakisdetectedduringpneumaticorhydrostatictesting,itispossibleforasystemfailuretooccur.Cautionshouldbeexercisedinapproachingapressurizedpipelineandanyattemptstocorrecttheleakshouldnotbemadeuntilthesystemhasbeendepressurized.

Note: PE cannot be joined by solvent bonding or threading. Extrusion welding or hot air welding is not recommended for pressure applications.

Butt Fusion

Saddle Fusion

Socket Fusion

2

Page 6: FUSION MANUAL_Rev Illustrations [1]

INCLEMENT WEATHER

PE has reducedimpactresistanceinsub-freezingconditions.Additionalcareshouldbeexercisedwhilehandlinginsub-freezingconditions.Inaddition,PEpipewillbehardertobendand/oruncoil.

Forrecommendedguidelineswhenfusingininclementweather,refertothePlasticsPipeInstitute,PPI,TechnicalNoteTN-42: Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects. http://plasticpipe.org/pdf/tn-42-min-training-guide-pe-butt-fusion.pdfTheseguidelinesapplytoallapplications.

AdditionalinformationconcerningcoldweatherproceduresisavailableinASTMF2620,StandardPracticeforHeatFusionJoiningofPolyolefinPipeandFittings, AnnexA1.

Theoperatorshouldensurethatitsqualifiedfusionprocedurestakeintoaccountandareadaptedforallpotentialinclementweatherconditionsinwhichtheoperatormaybefusingpolyethylenepipe.

NOTES ON FUSION CONFIDENCE

ReliablefusionjointsofPEpipingsystemscanbeaccomplishedunderreasonablelatitudeofconditions.Theoperatorshouldqualifyitsownproceduresforeveryconditionunderwhichitwillbefusingpolyethylenepipe.Additionally,theoperatorshouldqualifyallpersonnelwhowillresponsibleforperformingfusionsofpolyethylenepipe.

Thefollowingisalistingofgeneralnotestohelpensureproperequipmentandtechniquesareutilized:

1. The fusion operator must have adequate training and understanding of the equipment and tools and the fusion procedure.

Improperunderstandingoftheoperationoftheequipmentandtoolscanproduceafusionofpoorquality.Theoperatormustunderstandthoroughlyhowtousetheequipmentandtools,theirfunctionandoperation.Theoperatorshouldadheretotheequipmentmanufacturer’sinstructions.

Fusionpressuresandheating/coolingcyclesmayvarydramaticallyaccordingtopipesizeandwallthickness.Operatorsshouldnotrelyexclusivelyonautomated

fusionequipmentforjointqualification.Inaddition,visualinspectionandqualificationshouldalwaysbemade.Ifnecessary,testfusionsshouldbemadetodeterminecorrectpressuresandheat/coolcycletimes.Destructivetestmethods,suchasbendbacktests,maybenecessarytoformulatecorrectpressuresandheat/coolcycletimes(refertoQualificationProcedures).2. Pipe and fitting surfaces must be clean and properly prepared.

Anycontaminantspresentonthesurfacesorpoorpreparationofthesurfacescanproduceapoorqualityfusionjoint.Ensurethatallpipeandfittingsurfacesareclean.Ifsurfacesarereintroducedtocontaminants,theyshouldbecleanedagain.3. Heater plates must be clean, undamaged and the correct surface temperature.

Heatersurfacesareusuallycoatedwithanon-stickmaterial.Cleaningtechniquesshouldbeusedaccordingly.Ifasolventisdeemednecessary,donotusegasolineorotherpetroleumproducts.Refertotheequipmentmanufacturer’sinstructionsforpropercleaningproducts.ItisimportanttoregularlycleantheheatersurfacetoremoveanybuildupofPEmaterialthatwilldegradeduetoextendedcontactwiththeheater.

Recommendedheatingtooltemperaturesarespecifiedforeachprocedure.Thistemperatureisindicativeofthesurfacetemperature,nottheheatingtoolthermometer.Thesurfacetemperatureshouldbeverifieddailybyusingasurfacepyrometer.Ifacrayonindicator(meltstick)isused,itshouldnotbeusedinanareathatwillbeincontactwiththepipeorfitting.

Iftheheaterplateisnotinuse,itisrecommendedthatitbestoredinaninsulatedholder.Thisnotonlyprotectstheheatersurfacesfromcontaminants,butitcanalsopreventinadvertentcontact,whichcanresultinseriousinjuries.

4. Proper equipment and condition of tools and equipment for the job

Eachtypeoffusionrequiresspecialtoolsandequipment.Fusionsperformedwiththeincorrectfusionequipment,materialsortoolsand/orwithfusionequipmentthathasnotbeenproperlymaintainedcanresultinapoorfusion.Anynon-workingequipmentcomponentsshouldbereplacedorrepairedpriortofusingpipe.

3

Page 7: FUSION MANUAL_Rev Illustrations [1]

FUSION CHECKLIST

Inspectpipelengthsandfittingsforunacceptablecuts,gouges,deepscratchesorotherdefects.Damaged

productsshouldnotbeused.RefertoPolyPipe®InfoBriefNo.2forallowablesurfacedamageaccordingtothe

PlasticsPipeInstitute(PPI)andtheAmericanGasAssociation(AGA).

Thefusioncontactareamustbefreeofanydefectsorsurfacedisruption.

Besureallrequiredtoolsandequipmentareonsiteandinproperworkingorder.

Pipeandfittingsurfaceswheretoolsandequipmentarefittedmustbecleananddry.Useclean,dry,non-

synthetic(cotton)clothsorpapertowelstoremovedirt,snow,waterandothercontaminants.Ifalcohol

isused,99%reagentgradeisopropylalcoholisrecommended.Thestandard“drugstorevariety”contains

impuritiesthatcanactasacontaminanttothefusionprocess.

Shieldand/orcoverfusionequipmentandsurfacesfrominclementweatherandwinds.Atemporaryshelter

overfusionequipmentandthefusionoperationmayberequired.

Relievetensioninthelinebeforemakingconnections.

Whenjoiningcoiledpipe,makinganS-curvebetweenpipecoilscanrelievetension.Insomecases,itmay

benecessarytoallowpipetoequalizetothetemperatureofitssurroundings.Allowpulled-inpipesto

relaxforseveralhourstorecoverfromtensilestresses.

Pipesmustbecorrectlyalignedbeforemakingconnections.

Trialfusions.

Atrialfusion,preferablyatthebeginningoftheday,canverifythefusionprocedureandequipment

settingsfortheactualjobsiteconditions.RefertoQualificationProceduresfordetailedinformationonthe

bendbacktestprocedure.

4

Page 8: FUSION MANUAL_Rev Illustrations [1]

BUTT FUSION

Heater Surface Temperature: Minimum 400oF – Maximum 450oF

Heatingtoolsurfacesmustbetotemperaturebeforeyoubegin.Allpointsonbothheatingtoolsurfaceswheretheheatingtoolsurfaceswillcontactthepipeorfittingendsmustbewithintheprescribedminimumandmaximumtemperaturesandthemaximumtemperaturedifferencebetweenanytwopointsontheheatingtoolfusionsurfacesmustnotexceed20oFforequipmentforpipesmallerthan18”diameter,or35oFforlargerequipment.Itisagoodpracticetosettheheaterplateto425oFwhichcanhelpkeepnormalfluctuationsbetween400oFand450oF.Heatingtoolsurfacesmustbeclean.

Interfacial pressure: Minimum 60 psi – Maximum 90 psi

Interfacialpressureisusedtocalculateafusionjoininggaugepressurevalueforhydraulicbuttfusionmachinesormanualmachinesequippedwithforcereadingcapability.Theinterfacialpressureisconstantforallpipesizesandallbuttfusionmachines.However,fusionjoininggaugepressuresettingsarecalculatedforeachbuttfusionmachine,whicharedependentupontheoutsidediameter(OD)anddimensionratio(DR)andthepistonareaofthefusionmachine.

Forhydraulicmachines,theinterfacialpressure,thefusionsurfacearea,themachine’seffectivepistonareaandfrictionalresistance,andifnecessary,thepressureneededtoovercomeexternaldragresistance,areusedtocalculatehydraulicfusionjoiningpressuregaugesettings(refertoAppendixA).Theequipmentmanufacturer’sinstructionsareusedtocalculatethisvalue.Theproperamountofforceshouldbeverifiedbyvisualinspectionofthejoint.

NOTE: The interfacial pressure and the hydraulic gauge pressure are not the same.

Formanualmachineswithoutforcereadingcapability,thecorrectfusionjoiningforceistheforcerequiredtorollthemeltbeadsoveruntiltheycontactthepipesurfaceasrequiredbythejoiningprocedure.

Whenjoiningpipeswithdifferentmeltproperties,suchasbimodalMDPEtounimodalMDPE,applysufficientforcetomakethebimodalpipefusionbeadrollbackandcontactthepipesurface.BimodalMDPEhasalowermeltflowratiothanunimodalpipe.

5

Page 9: FUSION MANUAL_Rev Illustrations [1]

PROCEDURE

1. SecureCleantheinsideandoutsideofthepipeorfitting(components)endsbywipingwithaclean,dry,lint-freeclothorpapertowel.Removeallforeignmatter.Alignthecomponentsinthemachine,placethemintheclamps,andthenclosetheclamps.Do not force pipes into alignment against open fusion clamps.Componentendsshouldprotrudepasttheclampsenoughsothatfacingwillbecomplete.Bringtheendstogetherandcheckhigh-lowalignment.Adjustalignmentasnecessarybytighteningthehighsidedown.

2. FacePlacethefacingtoolbetweenthecomponentends,andfacethemtoestablishsmooth,clean,parallelmatingsurfaces.Completefacingproducescontinuouscircumferentialshavingsfrombothends.Faceuntilthereisminimaldistancebetweenthefixedandmoveableclamps.Ifthemachineisequippedwithfacingstops,facedowntothestops.Stopthefacerbeforemovingthepipeendsawayfromthefacer.Removethefacingtool,andclearallshavingsandpipechipsfromthecomponentends.Do not touch the component ends with your hands after facing.

3. AlignBringthecomponentendstogether,checkalignmentandcheckforslippageagainstfusionpressure.Lookforcompletecontactallaroundbothendswithnodetectablegaps,andODsinhigh-lowalignment.Ifnecessary,adjustthehighsidebytighteningthehighsideclamp.Donotloosenthelowsideclampbecausecomponentsmayslipduringfusion.Re-face if high-low alignment is adjusted.

4. MeltVerifythatthecontactsurfaceoftheheatingtoolismaintainingthecorrecttemperature.Placetheheatingtoolbetweenthecomponentends,andmovetheendsagainsttheheatingtool.Bringthecomponentendstogetherunderpressuretoensurefullcontact.Theinitialcontactpressureshouldbeheldverybrieflyandreleasedwithoutbreakingcontact.Pressureshouldbereducedwhenevidenceofmeltappearsonthecircumferenceofthepipe.Holdtheendsagainsttheheatingtoolwithout force(dragforcemaybenecessarytoensurecontact).BeadsofmeltedPEwillformagainsttheheatingtoolatthecomponentends.Whenthepropermeltbeadsizeisformed,quicklyseparatetheendsandremovethe

6

Page 10: FUSION MANUAL_Rev Illustrations [1]

heatingtool.Theproperbeadsizeisdependentuponthesizeofthecomponent.ApproximatevaluesareshowninTableI.

Duringheating,themeltbeadwillexpandoutflushtotheheatingtoolsurface,ormaycurlslightlyawayfromthesurface.Ifthemeltbeadcurlssignificantlyawayfromtheheatingtoolsurface,unacceptablepressureduringheatingmayhaveoccurred.

5. JoinImmediatelyaftertheheatingtoolisremoved,quicklyinspectthemeltedends,whichshouldbeflat,smoothandcompletelymelted.Ifthemeltsurfacesareacceptable,immediatelyandinacontinuousmotion,bringtheendstogetherandapplythecorrectjoiningforce(orfusionpressure).Thecorrectfusionpressurewillformadoublebeadthatisrolledoverandcontactsthepipesurface.thesurfaceonbothends.

A concave melt surface is unacceptable; it indicates pressure during heating. Do not continue. Allow the component ends to cool and start over with Step 1.

ThemaximumrecommendedtimeallowedforheaterplateremovalisindicatedinTableII.

TABLE IAPPROXIMATE MELT BEAD SIZE

Approximate Wall Thickness, inches Melt Bead Size* (Approximate)

≤0.15 1/32”–1/16” 0.15–0.30 1/16” Above0.30–0.75 1/8”–3/16” Above0.75–1.15 3/16”–1/4” Above1.15–1.60 1/4”–5/16” Above1.60–2.20 5/16”–7/16” Above2.20–3.00 7/16”–9/16”

*The appearance of the melt swell zone may vary depending on the pipe material. The melt bead width is to be determined by measuring the distance from the heater plate to the melt swell origin.

7

Page 11: FUSION MANUAL_Rev Illustrations [1]

6. HoldMaintainfusiongaugepressureuntilthejointiscool.Thejointiscoolenoughforgentlehandlingwhenthedoublebeadiscooltothetouch.Coolforaminimumof11minutesperinchofpipewall.Donottrytodecreasethecoolingtimebyapplyingwater,ice,wetclothsorthelike.

Avoidpulling,installation,pressuretestingandroughhandlingforatleastanadditional30minutes.

Forambienttemperaturesabove100oF,longercoolingtimesmayberequired.

7. InspectionOnbothsides,thedoublebeadshouldberolledovertothesurface,andbeuniformlyroundedandconsistentinsizeallaroundthejoint.

1.Thegap(A)betweenthetwosinglebeadsmustnotbebelowthefusionsurfacethroughouttheentirecircumferenceofthebuttjoint.

2.Thedisplacement(V)betweenthefusedendsmustnotexceed10%ofthepipe/fittingminimumwallthickness.

3.RefertoTableIIIforgeneralguidelinesforbeadwidth,B,foreachrespectivewallthickness.

TABLE IIMAXIMUM HEATER PLATE REMOVAL TIMES

Pipe Wall Thickness, in Max. Heater Removal Time, sec 0.20to0.36 8 >0.36to0.55 10 >0.55to1.18 15 >1.18to2.5 20 >2.5to4.5 25

8

Page 12: FUSION MANUAL_Rev Illustrations [1]

4.Thesizedifferential(Smax–Smin)betweentwosinglebeadsshallnotexceedX%ofthecombinedbeadwidth(B).

Where:X =Percentdifferenceofbeadwidth,% Pipetopipe,maximumX=10% Pipetofitting,maximumX=20% Fittingtofitting,maximumX=20% ∆S =Smax-Smin,inchesB =Combinedwidthofbothfusionbeads,inches

Minimum Wall

Thickness, in.

Approximate Bead Width (B), in.

Approximate Bead Width (B), in.

Minimum Wall Thickness, in.

TABLE IIIBEAD WIDTHS PER WALL THICKNESS

Minimum Maximum Minimum Maximum .118 5/32 1/4 1.06 19/32 25/32 .157 5/32 9/32 1.18 5/8 13/16 .197 3/16 5/16 1.34 21/32 7/8 .246 1/4 11/32 1.57 11/16 29/32 .315 9/32 3/8 1.77 25/32 1 .354 5/16 7/16 1.97 7/8 1-1/16 .433 11/32 1/2 2.16 15/16 1-3/16 .512 3/8 9/16 2.36 1 1-1/4 .630 7/16 19/32 2.56 1-1/8 1-7/16 .710 1/2 5/8 2.76 1-3/16 1-1/2 .750 1/2 11/16 2.95 1-1/4 1-9/16 .870 1/2 11/16 3.15 1-5/16 1-11/16 .940 9/16 3/4 3.35 1-3/8 1-3/4 3.54 1-1/2 1-13/16

Instructions: Determine the wall thickness of the pipe/fitting. Find the wall thickness above. If the exact wall thickness is not shown, use the next lowest wall thickness for determination of bead width.

NOTE: 1. Whenbuttfusingpipetomoldedfittings,thefittingsidebeadmayhaveanirregularappearance. Thedifferentmanufacturingprocessesused(extrusionvsmolding)willcausethebeadappearancetobe differentwhenitrollsback.Thisisacceptable,providedthepipesidebeadiscorrect.(SeeImages1&2.) 2. WhenfusingunimodalMDPEpipetobimodalMDPEpipeorHDPEpipe,theunimodalMDPEpipebeadmay beslightlylargerthanthebimodalMDPEorHDPEpipebead.Thisoccursbecauseofthedifferentmelt propertiesoftheresins.(SeeImages3&4) 3. PolyPipePolyTough1™hasbeensuccessfullyfusedtoavarietyofpipesthatmaybeinuseinexistinggaspipe systems.Photosofthesefusionsareprovidedforvisualreference.(SeeImages5thru16)

9

Page 13: FUSION MANUAL_Rev Illustrations [1]

QUALIFICATION

The following summarizes the ASTM methods to which the operator and/or user should refer for specific qualification requirements

1.Prepareasamplejoint.Samplelengthsshouldbeatleast6”or15timestheminimumwallthickness(seeFigureI).

2.Observethefusionprocessandverifytherecommendedprocedureforbuttfusionisbeingfollowed.

3.Visuallyinspectthesamplejointforquality.

4.Allowthejointtocoolcompletely.

5.PreparethesampleasshowninFigureI.Thesampleshouldbecutlengthwiseintoatleastthreelongitudinalstrapswithaminimumof1”or1.5timesthewallthicknessinwidth.Itisrecommendedthatfourequallyspacedstripsbecut,onefromeachquadrantofthepipe.

6.Visuallyinspectthecutjointforanyindicationsofvoids,gaps,misalignmentorsurfacesthathavenotbeenproperlybonded.

7.Bendeachsampleattheweldwiththeinsideofthepipefacingoutuntiltheendstouch.Theinsidebendradiusshouldbelessthantheminimumwallthicknessofthepipe.Inordertosuccessfullycompletethebendback,avisemaybeneeded.Forthick(>1”)wallpipe,contactPolyPipe®Engineeringforrecommendedproceduresandtestapparatus.

8.Thesamplemustbefreeofcracksandseparationswithintheweldlocation.Iffailuredoesoccurattheweldinanyofthesamples,cutanothersampleadjacenttothepositionthefailedsamplecamefromandretest.Ifthesecondsamplefails,thenthefusionprocedureshouldbereviewedandcorrected.Aftercorrection,anothersamplefusionshouldbemadeperthenewprocedureandre-tested.

Figure IButt Fusion Bent Strap Test Specimen

(Reference ASTM F2620)

BEND BACK TESTING - NO GAPS OR VOIDS(SeeFigure1)

10

Page 14: FUSION MANUAL_Rev Illustrations [1]

ACCEPTABLE FUSIONS

BUTT FUSION

PROPER ALIGNMENT AND DOUBLE ROLL-BACK BEAD

Unimodal HDPE fused to molded fitting

Unimodal MDPE fused to PolyTough1TM bimodal MDPE

Unimodal MDPE fused to HDPE

PolyTough1TM fused to molded fitting

11

Page 15: FUSION MANUAL_Rev Illustrations [1]

PolyTough1tm BIMODAL MDPE JOINED TO VINTAGE AND CURRENT MATERIALS

Unimodal MDPE fused to PolyTough1TM PolyTough1TM fused to PolyTough1TM

PolyTough1TM fused to PLEXCO PE2306 PolyTough1TM fused to PE3408

PE4710 fused to PolyTough1TM DRISCO M8000 fused to PolyTough1TM

DUPONT ALDYL A PE2306 fused to PolyTough1TM

12

Page 16: FUSION MANUAL_Rev Illustrations [1]

UNACCEPTABLE FUSIONS

BUTT FUSION

Meltbeadtoosmallduetoinsufficientheattime Meltbeadtoolargeduetoexcessiveheatingand/oroverpressurizationofjoint

Misalignment IncompleteFacing

Pressurefluctuation,misalignmentoverpressurization13

Page 17: FUSION MANUAL_Rev Illustrations [1]

TABLE IVBUTT FUSION TROUBLESHOOTING GUIDE

Observed Condition Possible Cause

•Excessivedoublebeadwidth •Overheating •Excessivejoiningforce •Doublebeadv-groovetoodeep •Excessivejoiningforce •Insufficientheating •Pressureduringheating •Flattoponbead •Excessivejoiningforce •Overheating •Non-uniformbeadsizearoundpipe •Misalignment •Defectiveheatingtool •Wornequipment •Incompletefacing •Onebeadlargerthantheother •Misalignment •Componentslippedinclamp •Wornequipment •Heatingirondoesnotmovefreelyinthe axialdirection •Defectiveheatingtool •Incompletefacing •Alsopossiblewhenfusingbimodalpipesto unimodalpipes

•Beadstoosmall •Insufficientheating •Insufficientjoiningforce

•Beadnotrolledovertosurface •Shallowv-groove–Insufficientheating& insufficientjoiningforce •Deepv-groove–Insufficientheating& excessivejoiningforce •Beadonbimodalpipemayhaveslightgap tothepipesurface

•Beadstoolarge •Excessiveheatingtime

•Squaretypeouterbeadedge •Pressureduringheating •Rough,sandpaper-like,bubbly, •Hydrocarbon(gasolinevapors,spray orpockmarkedmeltbeadsurface paintfumes,etc.)contamination

14

Page 18: FUSION MANUAL_Rev Illustrations [1]

SADDLE FUSION

Heater Surface Temperature:500oF ± 10oF(Minimum490oF-Maximum510oF)

Heatertoolsurfacesmustbeuptotemperaturebeforeyoubegin.Allpointsonbothheatingtoolsurfaceswheretheheatingtoolsurfaceswillcontactthepipeandfittingmustbewithintheprescribedminimumandmaximumtemperatures.Heatertoolsurfacesmustbeclean.

DEFINITIONS

Initial Heat (Bead-up)Theheatingstepusedtodevelopameltbeadonthepipe.

Initial Heat Force (Bead-up Force)Theforce(pounds)appliedtoestablishameltpatternonthepipe.TheInitialheatforceisdeterminedbymultiplyingthefittingbasearea(in2)bytheinitialheatinterfacialpressure(psi).

Heat Soak ForceTheforce(pounds)appliedafteraninitialmeltpatternisestablishedonthepipe.Theheatsoakforceistheminimumforce(essentiallyzero)thatensuresthefitting,heaterandpipestayincontactwitheachother.

Fusion ForceTheforce(pounds)appliedtoestablishthefusionbondbetweenthefittingandthepipe.Thefusionforceisdeterminedbymultiplyingthefittingbasearea(in2)bythefusioninterfacialpressure(psi).

Interface Pressure:Minimum54psi–Maximum66psi

Total Heat TimeAtimethatbeginswhentheheaterisplacedonthepipeandinitialheatforceisappliedandstopswhentheheaterisremoved.MaximumheatingtimesareshowninTableIVforbothpressure(hottapping)andnon-pressurefusionapplications.Cool TimeThetimerequiredtocoolthejointtoapproximately120oF±10oF.TheFusionForcemustbemaintainedfor5minuteson1-1/4”IPSor10minutesforallotherpipesizes,afterwhichthesaddlefusionequipmentcanberemoved.Thejointmustbeallowedtocoolforanadditional30minutesbeforetappingthepipeorjoiningtothebranchoutlet.RecommendedminimumcoolingtimesareshowninTableIV.

15

Page 19: FUSION MANUAL_Rev Illustrations [1]

INTERFACIAL AREA

Rectangularbasefittings

Themajorwidthtimesthemajorlengthofthesaddlebase,withouttakingintoaccountthecurvatureofthebaseorsides,minustheareaofholeinthecenterofthebase.

Roundbasefittings

Theradiusofthesaddlebasesquaredtimesπ(3.1416),withouttakingintoaccountthecurvatureofthebaseorsides,minustheareaoftheholeinthecenterofthebase.

TABLE VMAXIMUM HEATING/MINIMUM COOLING TIMES

Pipe Size Maximum Heating Time Minimum Cooling Time 1-1/4”IPS 1/16”meltpatternvisiblearoundthebaseofthefitting. 5min+30min Do not exceed 15 seconds when hot tapping. 2”IPS 1/16”meltpatternvisiblearoundthebaseofthefitting. 10min+30min Do not exceed 35 seconds when hot tapping. 3”IPS&larger 1/16”meltpatternvisiblearoundthebaseofthefitting. 10min+30min

FITTING LABELS

Theinitialheatforce,heatsoakforceandfusionforcewillbelistedinthelowerright-handcornerofthefittinglabelforthemajorityofsaddlefusionfittings.Thiseliminatestheneedtocalculatetheinformationinthefield.Forexample,80/0/40representstheinitialheatforce,heatsoakforceandfusionforce,respectively.Ifthisinformationisnotlocatedonthefitting,pleasecontactthefittingmanufacturerforthecorrectfusionparameters.

16

Page 20: FUSION MANUAL_Rev Illustrations [1]

PROCEDURE

1. Preparation

Thisprocedurerequirestheuseofasaddlefusiontool.Thistoolmustbecapableofholdingandsupportingthepipe,roundingthepipeforproperalignmentbetweenthepipeandfitting,holdingthefitting,andapplyingandindicatingtheproperforceduringthefusionprocess.

A.Installthesaddlefusiontoolonthepipeaccordingtothemanufacturer’sinstructions.Thetoolshouldbecenteredoveraclean,drylocationwherethefittingwillbefused.Securethetooltothepipe.Asupportisrecommendedunderthepipeon6”IPSandsmallerpipesizes.

B.Abradethesurfaceofthepipe,wherethefittingwillbejoined,witha50–60gritutilityclothuntilathinlayerofmaterialisremovedfromthepipesurface.Theabradedareamustbelargerthantheareacoveredbythefittingbase.Afterabrading,cleantheresidueawaywithaclean,drycloth.

C.Abradethefusionsurfaceofthefittingwith50-60gritutilitycloth.Removealldustandresiduewithaclean,drycloth.Insertthefittinginthesaddlefusiontoolloosely.Usingthesaddlefusiontool,movethefittingbaseagainstthepipeandapplyabout100pounds-forcetoseatthefitting.Securethefittinginthesaddlefusiontool.

2. Heating

Theheatingandfusingprocessmustbeperformedwithaccuracyandefficiency,especiallywhenfusingtoapressurizedmainpipe.

WARNING: Overheatingorexcessivetimebetweenthesetwoprocessescanhavedetrimentaleffects,includingpipelinerupture.

Theheatermustbefittedwiththecorrectheateradapters.

Theheateradapterfusionsurfacemustbebetween490oFto510oF.

Ensuretheheatingsurfacesareclean.

Determinethesaddlefusionforcefromthefittinglabelorbycalculation.

A.Placetheheatingtoolonthepipecenteredbeneaththefittingbase.Immediatelymovethefittingagainsttheheaterfaces,applytheinitialheatforce(seefittinglabel)andstarttheheattime.Applytheinitialheatforceuntilmeltisfirstobservedonthecrownofthepipemain.“Initialheat”isthetermusedtodescribetheinitialheating(bead-up)steptodevelopameltbeadonthepipeandisusually3-5seconds,andthenreducetheforcetotheheatsoakforce(bead-upforce)(seefittinglabel).Maintaintheheatsoakforceuntilthetotalheattimeiscomplete.

B.Attheendofthetotalheattime,removethefittingfromtheheaterandtheheaterfromthepipewithaquick,snappingaction.Quicklycheckforanevenmeltpatternonthepipeandheatedfittingsurfaces(nounheatedareas).Thetotalheattimeendswhenoneofthefollowingconditionsaremet:

i. Totalheattimeexpiresforapressurized 1-1/4”IPSor2”IPSpipe,or

ii.Ameltbeadofapproximately1/16”isvisible aroundthefittingbasefora11/4”IPSor2”IPS non-pressurizedpipe,oralargerpressurizedor non-pressurizedpipe.

17

Page 21: FUSION MANUAL_Rev Illustrations [1]

3. Fusion and Cooling

Pressthefittingontothepipe(within3seconds)afterremovingtheheaterandapplytheFusionForce(seethefittinglabel).Maintainthefusionforceontheassemblyfor5minuteson1-1/4”IPSandfor10minutesforlargersizes.Whenthisinitialcoolingtimehasexpired,thesaddlefusionequipmentmayberemoved.Allowtheassemblytocoolforanadditional30minutesbeforehandlingorTapping.

Ifthemeltpatternwasnotsatisfactoryorifthefusionbeadisunacceptable,cutoffthesaddlefittingabovethebasetopreventuse,relocatetoanewsectionofmain,andmakeanewsaddlefusionusinganewfitting.

NOTE: The fusion force may need to be adjusted during the initial cooling period; however, the fusion force should never be reduced.

4. Inspection

Visuallyinspectthefusionbeadaroundtheentirebaseofthefittingatthepipe.Thefusionbeadshouldbeofuniformsize.Thefusionshouldhavea“three-bead”shape,whichischaracteristicofthistypeoffusion.Thefirstbeadisthefittingbasemeltbead.Thesecondoroutermostbeadistheresultoftheheatertoolfaceonthepipe.Thethirdbead,orcenterbead,isthepipemeltbead.Allbeadsshouldbeofuniformsizewiththefirstandthirdbeadsapproximately1/8”andthesecondbeadbeinggenerallysmaller.

QUALIFICATION

The following summarizes the ASTM methods to which the operator and/or user should refer for specific qualification requirements

1.Prepareatleasttwosamplejoints.Thepipelengthshouldbeaminimumof2’orseventimesthemaximumsaddlefittingbasedimension,whicheverisgreater.

2.Observethefusionprocessandverifytherecommendedprocedureforsaddlefusionisbeingfollowed.

3.Visuallyinspectthesamplejointforquality.

4.Allowthejointtocoolcompletely(minimumofonehour).Thepipesampleshouldnotbetappedforthisqualificationprocess.

Figure IISaddle Fusion Bent Strap Test Specimen

18

5.PrepareteststrapsasshowninFigureII.Cutthejointlengthwisealongthemainpipeandthroughthesaddlefitting.

6.Visuallyinspectthejointforanyvoids,gaps,misalignmentorsurfacesthathavenotbeenproperlybonded.

7.Bendeachteststrap180owiththeinsidefacingout.

8.Thefusionjointmustbefreeofcracks,voids,gapsandseparations.

9.Testtheothersamplejointbyimpactagainstthesaddlefitting.Thefailuremustoccurbyeithertearingthefitting,bendingthefittingatleast45oorbyremovingasectionofthepipe.Failureatthefusionisnotacceptable.ThistestisaFederalrequirementforqualificationoffusionprocedures.

10.Iffailuredoesoccurattheweldinanyofthesamples,thenthefusionprocedureshouldbereviewedandcorrected.Aftercorrection,anothersamplefusionshouldbemadeperthenewprocedureandretested.

Page 22: FUSION MANUAL_Rev Illustrations [1]

ACCEPTABLE FUSIONS

ProperAlignment,MeltandForce

BendBackTesting-NoGapsorVoids(SeeFigureII)

Areawherelikelygapsandvoids

mightoccur

Areawherelikelygapsandvoids

mightoccur

19

Page 23: FUSION MANUAL_Rev Illustrations [1]

UNACCEPTABLE FUSIONS

ExcessiveHeatingand/orOverpressurizationofjoint

ExcessiveForce

FittingMisalignmentonpipe

InsufficientMelt

20

Page 24: FUSION MANUAL_Rev Illustrations [1]

TABLE VISADDLE FUSION TROUBLESHOOTING GUIDE

Observed Condition Possible Cause

•Non-uniformbeadsizearoundfittingbase •Misalignment •Defectiveheatingtool •Fittingnotsecuredinheatingtool •Heatingtemperaturenotwithinspecifiedrange •Onebeadlargerthantheother •Misalignment •Heatingtemperaturenotwithinspecifiedrange •Fittingslippedinclamp •Defectiveorwornequipment •Beadstoosmall •Insufficientheating •Insufficientjoiningforce •Beadstoolarge •Excessiveheatingtime •Excessivejoiningforce •Absenceofthirdbead,orthirdbead •Incorrectpipemainheatingtool widelyseparatedfromcenterbead Insufficientjoiningforce •Pressurizedmainblowout •Excessiveheating (besidebaseorthroughfittingbase) •Heatingtemperaturenotwithinspecifiedrange •Incorrectheatingtoolfaces •Excessivetimetostartheatingorinjoiningthe fittingtothemainpipeafterheatingtimecycle •Rough,sandpaper-like,bubbly, •Hydrocarbon(gasolinevapors,spraypaint orpockmarkedmeltbeadsurface fumes,etc.)contamination

21

Page 25: FUSION MANUAL_Rev Illustrations [1]

SOCKET FUSION

Equipment Requirements

Inordertoproduceaqualitysocketfusion,thefollowingequipmentisrequiredforthisprocedure:

Apparatus –SocketfusiontoolsmanufacturedinaccordancewithASTMF1056.

Heating tool faces –Consistingoftwoparts,amaleendfortheinteriorsocketsurfaceandafemaleendfortheexteriorpipesurface.

Rounding clamps (cold ring) -Devicetomaintaintheroundnessofthepipeandcontrolthedepthofpipeinsertionintothesocketduringthejoiningoperation.

Depth gauge –Properpositioningoftheroundingclamp.

Chamfering tool –Devicetobeveltheendofthepipe.Thedepthgaugeandchamferingtoolmaybecombinedintoasingletool.

Holding tools –Recommendedforsocketfusionof2”IPSandlargerpipeandfittings.

Heater Temperature

Heater Surface Temperature:Minimum490oF–Maximum510oF

Inordertoobtainapropermelt,auniformtemperaturemustbemaintainedacrosstheheatingsurface.Allpointsonbothheatingsurfaceswheretheheatingsurfaceswillcontactthepipeandfittingmustbewithintheprescribedminimumandmaximumtemperatures.Heatingtoolsurfacesmustbeclean.

22

Page 26: FUSION MANUAL_Rev Illustrations [1]

Procedure

1. Preparation

A.Verifyheatingtemperatureiswithinthespecifiedtemperaturerange(490oF–510oF).

B.Cutthepipeendsquarely,andcleanthepipeendandfitting,bothinsideandoutwithaclean,dry,lint-freecloth.Donottouchcleanedsurfaceswithyourhands.

C.Chamfertheoutsideedgeofthepipeendslightly.Thepipeshouldbefreeofdebrisandburrs.

D.Placethecoldringonthepipeasdeterminedbythedepthgauge–Placethedepthgaugeoverthechamferedendofthepipe.Clampthecoldringimmediatelybehindthedepthgauge.

2. Heating

A.ReviewtherecommendedheatingtimesinTableVI.TheheatingtimebeginsafterStepChasbeencompleted.

B.Insertthefittingontothemaleheatingface.Thefittingshouldbeheldagainstthebacksurfaceofthemaleheaterface.

C.Insertthepipeintothefemaleheatingface.Thefemalesocketheatingfaceshouldbeagainstthecoldringclamp.

D.HoldthepipeandfittinginplaceagainsttheheaterfacesfortherecommendedheatingtimeasshowninTableVI.

23

Page 27: FUSION MANUAL_Rev Illustrations [1]

3. Fusion and Cooling

A.Attheendoftheheatingtime,simultaneouslyremovethepipeandfittingstraightoutfromthetoolusinga“snap”action.Donottorqueortwistthepipeorfittingduringremoval.

B.AQUICKinspectionshouldbemadeofthemeltpatternonthepipeendandfittingsocket.Ifthereisevidenceofanincompletemeltpattern,donotcontinuewiththefusionprocedure.C.Immediatelyinsertthepipestraightintothesocketofthefittingsothatthecoldringisflushagainsttheendofthefittingsocket.Whilecooling,pressureshouldbemaintainedonthefusionpertherecommendedcoolingtimeshowninTableVI.

TABLE VIISOCKET FUSION TIME CYCLES

PE2708 PE4710 PolyPipe® GDY20 & PolyTough1™ & PolyPipe® Pipe Size fusedtounimodalMDPEfittings PolyTough1™ PE27081 fusedtoHDPEfittings

Heating Time Cooling Time Heating Time Cooling Time seconds seconds seconds seconds

1/2”CTS 5–6 30 8–10 30 3/4”CTS 7–8 30 10–12 30 1”CTS 9–10 30 12–14 30 1/2”IPS 5–6 30 8–10 30 3/4”IPS 8–10 30 12–14 30 1”IPS 10–12 30 14–16 30 1-1/4”IPS 12–14 45 18–20 60 1-1/2”IPS 12–14 45 18–20 60 2”IPS 16–20 45 22–26 60 3”IPS 20–25 60 25–30 75 4”IPS 25–30 60 30-35 75

Notes: If an incomplete bead rollout is noticed when joining PolyTough1 to unimodal socket fittings, PolyPipe® recommends the use of bimodal MDPE fittings HDPE fittings or other means of joining the pipe.

D.Allowthejointtocoolanadditionalfive(5)minutesbeforeremovingthecoldring.Anadditional10minutesofcoolingtimeisrecommendedbeforeexposingthejointtoanytypeofstresses(i.e.,burialortesting).

4. Inspection

Visuallyinspecttheweld.Acompleteimpressionoftheroundingclampshouldbevisibleinthemeltpatternattheendofthesocket.Thereshouldbenogaps,voidsorunbondedareas.

24

Page 28: FUSION MANUAL_Rev Illustrations [1]

Qualification

The following summarizes the ASTM methods to which the operator and/or user should refer for specific qualification requirements

1.Prepareasamplejointsuchasacouplingwithpipesocketfusedtobothends.Thepipeshouldbeatleast6”or15timesthewallthicknessinlength.

2.Observethefusionprocessandverifytherecommendedprocedureforsocketfusionisbeingfollowed.

3.Visuallyinspectthesamplejointsforquality.

4.Allowthesampletocoolcompletely(minimumofonehour).

Figure IIISocket Fusion Bent Strap Test Specimen

6.Visuallyinspectthecutjointforanyindicationsofvoids,gaps,misalignmentorsurfacesthathavenotbeenfused.

7.Bendeachteststrap180owiththeinsideofthepipefacingout.

8.Thefusionjointmustbefreeofcracks,voids,gapsandseparations.Iffailuredoesoccurattheweldinanyofthesamples,thenthefusionprocedureshouldbereviewedandcorrected.Aftercorrection,anothersampleweldshouldbemadeperthenewprocedureandretested.

5.PrepareteststrapsasshowninFigureIII.Cutthejointslengthwiseintoatleastthreelongitudinalstrapswithaminimumof1”or1.5timesthewallthicknessinwidth.

25

Page 29: FUSION MANUAL_Rev Illustrations [1]

ACCEPTABLE FUSIONS

ProperAlignmentandStabDepthMeltBeadFlattenedDuetoColdRing-Nogapsorvoids

BendBackTesting-NoGapsorVoids(SeeFigureIII)

SOCKET FUSION

Areawherelikelygapsandvoids

mightoccur

Areawherelikelygapsandvoids

mightoccur

26

Page 30: FUSION MANUAL_Rev Illustrations [1]

SocketFusion

ExcessiveStabDepthCausedbyFailuretoUseaColdRing

ShortStabDepthCausedbyFailuretoUseaDepthGauge

UNACCEPTABLE FUSIONS

SOCKET FUSION

27

Page 31: FUSION MANUAL_Rev Illustrations [1]

TABLE VIIISOCKET FUSION TROUBLESHOOTING GUIDE

Observed Condition Possible Cause •Noevidenceofcold-ringimpression •Insufficientheatingtime insocketfittingmeltbead •Depthgaugenotused •Coldringnotused •Coldringsetatincorrectdepth •Gapsorvoidsaroundthepipeat •Pipeorfittingnotremovedstraight thesocketfittingedge fromheaterface •Componentsnotjoinedtogetherstraight whenfusing •Coldringnotused •Coldringsetatincorrectdepth •Wrinkledorcollapsedpipeend •Coldringnotutilized •Coldringsetatincorrectdepth •Incorrectheatingsequence •Voidsinfusionbondarea •Pipeorfittingnotremovedstraightfromheaterface •Componentsnotjoinedtogetherstraight whenfusing •Coldringnotused •Coldringsetatincorrectdepth •Unbondedareaonpipeatendofpipe •Coldringnotused •Coldringsettoodeep •Socketmeltextendspastendofpipe •Coldringsettooshallow •Rough,sandpaper-like,bubbly,or •Hydrocarbon(gasolinevapors,spraypaint pockmarkedmeltbeadsurface fumes,etc.)contamination

28

Page 32: FUSION MANUAL_Rev Illustrations [1]

APPENDIX A

HYDRAULIC FUSION MACHINE GAUGE PRESSURE

ThemanufacturerofthefusionmachineshouldbeconsultedforguidanceindeterminingtheproperconversionofPolyPipe®’srecommendedinterfacialpressuretothegaugepressure.Theeffectivehydraulicpistonareamustbeavailableinordertocalculatetherequiredhydraulicgaugepressure.Thecalculationforhydraulicgaugepressureisasfollows:

Where PG = Hydraulicgaugepressure,psi OD = Pipeoutsidediameter,inches ID = Pipeinsidediameter,inches PI = Requiredinterfacialpressure,psi AP = Totalhydraulicpistonarea,in2 DF = Hydraulicfusionpressurerequiredtomovethecarriageholdingthepipe (generallyacceptedminimumis30psi).

*Thedragfactorisanimportantparametereasilyoverlooked.Iftwolongpiecesofpipearebeingfused,thedragfactorcaneasilyreachseveralhundredpoundspersquareinch(psi).

ExampleCalculations

FusionMachine:McElroyManufacturing28HighForceMachine Hydraulicpistonareaisprovidedbythefusionequipmentmanufacturer. Totalhydraulicpistonareaforthismachineis4.71in2

DesiredInterfacialPressure:75psi

For2”IPSSDR11:

29

Page 33: FUSION MANUAL_Rev Illustrations [1]

REFERENCES

1. PlasticsPipeInstituteTechnicalReport-33.GenericButtFusionJoiningProcedureforPolyethyleneGasPipe,2006. www.plasticpipe.org

2. PlasticsPipeInstituteTechnicalReport-41.GenericSaddleFusionJoiningProcedureforPolyethyleneGasPiping, 2002.www.plasticpipe.org

3. PlasticsPipeInstituteTechnicalNote–42.RecommendedMinimumTrainingGuidelinesforPEPipeButtFusionJ oiningOperatorsforMunicipalandIndustrialProjects,2009.www.plasticpipe.org

4. ASTMF2620-11.StandardPracticeforHeatFusionJoiningofPolyolefinPipeandFittings.www.astm.org

5. ASTMF1056-11.StandardSpecificationforSocketFusionToolsforUseinSocketFusionJoiningPolyethylenePipe orTubingandFittings.www.astm.org

6. PipelineSafetyRegulations.U.S.DepartmentofTransportation.CFR49.Washington,June2011.http://ecfr. gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Title49/49cfr192_main_02.tpl

30

Page 34: FUSION MANUAL_Rev Illustrations [1]

NOTES

Page 35: FUSION MANUAL_Rev Illustrations [1]

NOTES NOTES

Page 36: FUSION MANUAL_Rev Illustrations [1]

polypipeinc.com•polytough1.com

P O LY P I P E ® I S A N A C T I V E M E M B E R O F T H E P L A S T I C S P I P E I N S T I T U T E , AW WA , A G A , A S T M© 2 0 1 2 P O LY P I P E ® , I N C . A L L R I G H T S R E S E R V E D

1-800.433.5632940.665.1721Fax:940.668.8612

Corporate Headquarters, Gainesville, Tx Gainesville, Tx Plant

Midland, Tx Plant

Sandersville, GA Plant

Erwin, TN Plant

Evansville, WY Plant

2406N.1-35Gainesville,TX76240

Physical:2406N.1-35Gainesville,TX76240

995WacoMillRoadTennille,GA31089

To preview the innovative production technologies that provide world-class products to support our customers’ business, download the video here.

Snapthistag(DownloadtheRedlaser-barcodescannerandQRcodereaderonyoursmartphone),orgotowww.polypipeinc.com

(Revised04/30/2012)