1

Frank Mohn AS

Bergen – Norway

TransRec System

COMPANY LOCATION NORWAY

Page 2: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

2

COMPANY PRODUCTION FACILITIES

Rotterdam

Singapore

Bergen

Tokyo

Shanghai

Pusan

Rio de Janeiro

Houston

Luanda

COMPANY WORLD LOCATIONS

Page 3: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

3

Our Technology background;

Framo Cargo pumping system

Cargo pump Complete Cargo pumping system for chemical

Products and product tankers

Cargo pumps

Ballast pumps

Hydraulic power pack

Piping

Control System

Oil &Gas Products

Water Injection pump / Systems Fire Water Pump Systems Electric Submersible Pumps

Multiphase Pumps &Meters Swivel stack Various Sub sea Equipment

Oil Spill Control

Products

TransRec Oil Spill recovery Systems

Portable Pumping Systems Special Pumping Systems

Page 4: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

4

The BRAVO Blowout North Sea 1977

Page 5: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

5

The Development

Page 6: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

6

Cost effective Oil recovery

systems

-Minimize the number of units

High seas – High capacity

Page 7: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

7

Worst case

-Uncontrolled leak from the reservoir

Development

-Norway 1986 – from 3 to 2 vessel

system

-Today 1 vessel systems with working

boat from supply vessel

Page 8: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

8

Page 9: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

9

TransRec 150

Page 10: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

10

Page 11: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

11

- Bunker fuels for commercial vessels will normally; HFO 380

- Some refineries will also export HFO with higher viscosities; HFO 680

Oil property

When these bunker fuels form an emulsion,

we will experience the extreme viscosities

Oil property

Weathering of HFO 680

Page 12: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

12

- Crude oils may change into high viscous oils as the oil ”weathers”

and start to form an emulsion. Lighter fractions of crudes evaporate

- Weathering test of relevant crude oils should be performed

Summer Conditions (15°C)

1

10

100

1000

10000

100000

1000000

Vis

co

sit

y (

cP

)

Norne

Åsgard

Gullfaks

Grane

Prestige

IFO 180

Property: Viscosity of Emulsion

Wind Speed (m/s): 102.0 © 2002

Pred. Dato: Oktober 10, 2003

0,50,25 1 2 3 6 9 12 1 2 3 4 5

Hours Days

Oil property

TransRec 150 Weir Skimmer

– Oil on water excercise 2003

TransRec 150

Page 13: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

13

Skimmer principles 1

WEIR Skimmer (overflow principle)

High capasity 400 m3/hr – Low viscosity <15.000 Cp

2

HiVisc Skimmer (drum –shovel principle)

Capacity 120 m3/hr - High viscosity >15.000 Cp

3

Polaris skimmer – for ice infested water

(drum /brush principle)

Capacity 120 m3/hr.

Different tools

for different

oil spills

Page 14: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

14

Page 15: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

15

Oil-cut / water-cut monitoring

locally on skimmerhead – to

get a feedback as close to the

pump as possible

Oil thickness meter on

skimmerhead for low visibility

operation

Solution – TransRec

Page 16: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

16

Page 17: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

17

Solution – TransRec

Challenges – working conditions

Page 18: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

18

Manual deployment of oil boom

Handling of equipment on deck

Challenges – safe operation

Page 19: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

19

Oil property

Challenges – oil properties

Page 20: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

20

Day & night operation

Wind 30 m/s

Waves 4.0 m

Towing Speed 5 knots

Temp range (air) -40°C to +50°C

(sea) -2°C to +40°C

• If we can ”see” and measure what we are doing

during operation, we may increase the overall

efficiency by a factor of 2

To operate ”blindfolded”, the equipment should have:

- oil thickness meter in the oil boom

- oil/water phase meter in discharge line

- oil slick positions from surveillance helicopter

Page 21: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

21

STATUS OF THE

TRANSREC SYSTEM

The TransRec is designed for:

• Oil recovery in heavy sea

• High pump capacity

• Transfer of recovered oil in open seas

• Emergency off loading of grounded vessels

• Can be used for shoreline clean up.

• To be operated by one person

• Designed for 24 hours operation

- In field maintenance

- All equipment remote controlled

- No people on deck

Handling of equipment on deck

Page 22: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

22

Challenges – Loading Discharge of emulsion into ship tanks

Page 23: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

23

Developement

Mezzanine deck

Page 24: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

24

Solution – TransRec

Handling of equipment on deck

Grating around equipment.

Washwater direct to oil rec tank

Example from ”Stril Poseidon”

Page 25: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

25

TransRec installation

TransRec installation

Page 26: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

26

Radio remote control

Oil recovery from sea surface

Page 27: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

27

Page 28: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

28

Page 29: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

29

Emergency offloading

Emergency offloading

Page 30: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

30

The ROLS

Remote Off Loading of sunken

vessels

CARGO

Page 31: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

31

ROLS X0

Page 32: Frank Mohn AS Bergen Norway - Norwegian Energy … Cargo pumping system ... Washwater direct to oil rec tank ... • Cleaning of beaches 3000 - 6000 . Title: PowerPoint

32

Cost comparsion operations

Cost in US$/ton

• Emergency transfer 20 - 200

• Oil skimming from sea 40 - 400

• Dispersant 400 - 500

• Offloading of sunken vessel 500 - 1000

• Cleaning of beaches 3000 - 6000