PURPOSE

Obtain public input for improving Town Hall

DURHAM TOWN HALL FORUM

Page 3: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM BACKGROUND

Existing Building Conditions Lack of Adequate Space Opportunity to Relocate to Bank Building

Why Improve Town Hall?

Page 4: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Lead Paint/ Peeling Paint

Page 5: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Roof Leaks

Page 6: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Code Issues ADA

Compliance Elevator

Page 7: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Code Issues ADA

Compliance Elevator Floor Levels

Page 8: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Code Issues ADA

Compliance Elevator Floor Levels Doors/

Hardware

Page 9: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Code Issues ADA

Compliance Elevator Floor Levels Doors/Hardware

Exit Stairs Enclosure and Pitch

Page 10: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Code Issues ADA Compliance

Elevator Floor Levels Doors/Hardware

Exit Stairs Enclosure and Pitch

No Sprinkler System, Assembly Limit 1-Story

Page 11: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Code Issues ADA Compliance

Elevator Floor Levels Doors/Hardware

Exit Stairs Enclosure and Pitch

No Sprinkler System, Assembly Limit 1-Story

Accessible Ramp at Exit

Page 12: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Air Quality No Ventilation

System

Page 13: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Air Quality No Ventilation

System Mold/Mildew

Page 14: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Basement Slab

Page 15: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Poor Energy Performance Lack of

Insulation/ Vapor Barrier

Page 16: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Poor Energy Performance Lack of

Insulation/ Vapor Barrier

Windows Not Working, Poor Quality

Page 17: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Poor Energy Performance Lack of

Insulation/ Vapor Barrier

Windows Not Working, Poor Quality

Window Air Conditioners

Page 18: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Poor Energy Performance Lack of

Insulation/ Vapor Barrier

Windows Not Working, Poor Quality

Window Air Conditioners

Light Fixtures

Page 19: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Electric Service 200 amps

Page 20: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Existing Building Conditions

BACKGROUND

Repair Porches

Page 21: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Lack of Adequate Space

BACKGROUND

Town Clerk/Tax Collector Vault

Page 22: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Lack of Adequate Space

BACKGROUND

Town Clerk/Tax Collector Vault Office

Page 23: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Lack of Adequate Space

BACKGROUND

Building/Planning/ Assessing Reception

Page 24: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Lack of Adequate Space

BACKGROUND

Building/Planning/ Assessing Reception Building

Inspector Office

Page 25: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Lack of Adequate Space

BACKGROUND

Building/Planning/ Assessing Reception Building

Inspector Office

Planner Office

Page 26: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Lack of Adequate Space

BACKGROUND

Meeting Rooms

Page 27: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Opportunity to Relocate

BACKGROUND

The Bank building became available for purchase.

The Town decided to relocate Town Hall to Bank site. Building Image Location Condition Health of Staff Energy Conservation Long Term Tax

Benefit

Page 28: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Reviewed Space Needs Developed Program (50-75 Year Solution) Prepared Design and Budget for 50-75 Year

Solution (Option A) Developed Smaller Program (10-25 Year

Solution) Prepared Design Options for 10-25 Year Solution

(Options B, C, D) Prepared 1-5 Year Design Option (Option E) Evaluated Alternative Options

Steps Taken

BACKGROUND

Page 29: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Option A: 50-75 Year Solution Option B: 10-25 Year Solution, Reduced Size Option C: 10-25 Year Solution (Town Clerk/Tax

Collector on Basement Level) Option D: 10-25 Year Solution (Town Clerk/ Tax

Collector on First Floor) Option E: 1-5 Year Solution, Minimize Size and Cost Alternative Options

Renovate Existing Building Construct New Building on New Site Construct New Building on Madbury Road at Library Redevelop Current Site/Town Hall in Commercial Complex Add Third Floor to Bank Building

OPTIONS

Page 30: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Existing Building

OPTIONS

5,689 SF Existing Floor

Plans

Page 31: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

First Floor Plan

Option A

OPTIONS

Page 32: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Second Floor Plan

Option A

OPTIONS

Page 33: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Basement Plan

Option A

OPTIONS

Page 34: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Site Plan

Option A

OPTIONS

Page 35: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Option A

OPTIONS

Cost Purchase Cost $ 745,000 Design and Construction Cost $

2,461,245 Sale of Town Hall Income ($1,200,000) Net Cost (to be bonded) $ 2,006,245

Tax Impact Year 1 22¢/$1,000 Value Year 10 6¢/$1,000 Value Year 21 -13¢/$1,000 Value

Page 36: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

First Floor Plan

Option B

OPTIONS

Page 37: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Second Floor Plan

Option B

OPTIONS

Page 38: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Basement Plan

Option B

OPTIONS

Page 39: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Site Plan

Option B

OPTIONS

Page 40: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Option B

OPTIONS

Cost Purchase Cost $ 745,000 Design and Construction Cost

$2,337,320 Sale of Town Hall Income

($1,200,000) Net Cost $1,882,320

Tax Impact Year 1 20¢/$1,000 Value Year 10 5¢/$1,000 Value Year 21 -13¢/$1,000 Value

Page 41: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

First Floor Plan

Option D

OPTIONS

Page 42: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Second Floor Plan

Option D

OPTIONS

Page 43: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Basement Plan

Option D

OPTIONS

Page 44: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Site Plan

Option D

OPTIONS

Page 45: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Option D

OPTIONS

Cost Purchase Cost $ 745,000 Design and Construction Cost

$2,188,015 Sale of Town Hall Income

($1,200,000) Net Cost $1,733,015

Tax Impact Year 1 20¢/$1,000 Value Year 10 4¢/$1,000 Value Year 21 -13¢/$1,000 Value

Page 46: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

First Floor Plan

Option E

OPTIONS

Page 47: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Second Floor Plan

Option E

OPTIONS

Page 48: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Basement Plan

Option E

OPTIONS

Page 49: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Site Plan

Option E

OPTIONS

Page 50: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Option E

OPTIONS

Cost Purchase Cost $ 745,000 Design and Construction Cost

$1,222,550 Sale of Town Hall Income

($1,200,000) Net Cost $ 767,500

Tax Impact Year 1 8¢/$1,000 Value Year 10 -5¢/$1,000 Value Year 21 -13¢/$1,000 Value

Page 51: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Alternative Options

OPTIONS

Renovate Existing Building Construct New Building on New Site

(Cost) Construct New Building on Madbury

Road at Library Redevelop Current Site/Town Hall in

Commercial Complex Add Third Floor to Bank Building

Page 52: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM DATA COLLECTION

Renovate Existing Building

OPTIONS

Replace Roof Replace Siding, Add

Insulation Replace Windows Repair Porches Install Basement Mud-

Slabs (mold/mildew) Structural Repairs Add Ramp at Council

Chambers Level Floors Code Compliant Stairs

ADA Compliant Doors and Hardware

Install Elevator Install Sprinkler System Install New HVAC System Upgrade Electric Service

(Existing 200 Amp) Lighting Improvements Install Emergency

Generator Expand Town Clerk/Tax

Collector and Building/Planning/Assessing

Improvements Required

Page 53: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Renovate Existing Building

OPTIONS

Cost Purchase Cost $ 0 Design and Construction Cost

$1,456,920 Sale of Town Hall Income $ 0 Net Cost $1,456,920

Tax Impact Year 1 14¢/$1,000 Value Year 10 10¢/$1,000 Value Year 21 -4¢/$1,000 Value

Page 54: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Construct New Building on New Site

OPTIONS

Cost Purchase Cost $ 300,000± Design and Construction Cost

$2,935,005 Sale of Town Hall Income

($1,200,000) Net Cost $2,035,005

Tax Impact Year 1 23¢/$1,000 Value Year 10 6¢/$1,000 Value Year 21 -13¢/$1,000 Value

New Site or Madbury Road

Page 55: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Redevelop Current Site

OPTIONS

Town Hall Located in Commercial Complex - Loss of Image and Character - Question of Ownership - Cost Similar to New Construction + Beneficial Tax Impact

Page 56: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Add Third Floor to Bank Building

OPTIONS

Issues - Structural Concerns, Earthquake

Reinforcing - Add 4-Stop Elevator - Add Two Code Compliant Exit Stairs - Concern with Scale of Taller Building - No Anticipated Cost Benefit

Page 57: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Comparison of Costs

OPTIONS

Net Cost Tax Impact Year 1

Tax ImpactYear 10

Tax ImpactYear 21

Option A $2,219,595

22¢/$1,000 value

06¢/$1,000 value

-13¢/$1,000 value

Option B $2,109,695

20¢/$1,000 value

05¢/$1,000 value

-13¢/$1,000 value

Options C, D

$1,972,765

20¢/$1,000 value

04¢/$1,000 value

-13¢/$1,000 value

Option E $767,550 08¢/$1,000 value

-05¢/$1,000 value

-13¢/$1,000 value

Renovation

$1,456,920

14¢/$1,000 value

10¢/$1,000 value

-04¢/$1,000 value

New Construction

$2,035,005

23¢/$1,000 value

06¢/$1,000 value

-13¢/$1,000 value

Page 58: FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL

DURHAM TOWN HALLFORUM

Public Input

?