Flare Gas Recovery Project at TAKREER Ruwais Refinery The 31 st International symposium January 31, 2013 COSMO OIL CO., LTD.

Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

Embed Size (px)

Citation preview

Page 1: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

Flare Gas Recovery Projectat TAKREER Ruwais Refinery

The 31st International symposiumJanuary 31, 2013

COSMO OIL CO., LTD.

Page 2: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

Abu Dhabi National Oil Company(ADNOC) has been activelyengaging in environmental countermeasures.

→ Gas Conservation Task Force(1996)・ Instruct the group companies to eliminate or minimize

gas flaring.→ Launch a health, safety and environmental management

program(1997~)・ Reducing the flue gas and wasted materials.

Abu Dhabi Oil Refining Company(TAKREER) Tackle the environmental issues Making effort to reduce the flare gas

1. Background and Objectives of the Project1

We conducted joint implementation ofgas recovery project with JCCP

《 Reduce SOx and CO2 》

Page 3: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

TAKREER

Cosmo Oil Co., Ltd.

Cosmo Engineering Co.,Ltd.

Toyo EngineeringCorporation

Project management

Basic Design

EPC Project

I tem 2005FY 2006FY 2007FY 2008FY

BasicDesign

Contract of EPC

EPC

Performance test

Technical support

evaluat ion

2. Project Schedule2

Page 4: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

3. Ruwais Refinery3

Crude Distillation Unit 120,000BPD

Condensate Splitters 140,000BPD ×2 units

Naphtha, Kerosene, Gas oil Hydrodesulphurization Units

Vacuum Distillation Unit 46,000BPD

Hydrocracker 27,000BPD

Hydrogen Plant 60,000m3N/hr

Sulfur Recovery units 44/49 tons/day

Other

Our target is in theHydrocracker group

Page 5: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

Existing Units

NEW Flare gasrecovery unit

Gas treatingunit

BoilerFurnace

Reduce theFuel gas

Flare Stack

Fuel gasRecovery

the flare gas

The some units emitted a part of the gas to the flare gas header. And theyburn the flare gas in the flare stack.In this project, we executed the introduction of the flare gas recovery unitin the hydrocracker group.And we can recovery the flare gas and reduce the fuel gas.

Remove the H2S

CNG

4. Project Overview4

Page 6: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

We have the following facilities for the flare gas recovery.

This system requires a large land by a Gas holder.

We have a lot of equipment for this system , so the operation is complex.

5. Conventional gas recovery system - 15

FlareStack

FlareGas

RecoveredFlare Gas

ReciprocatingGas Compressor

Conventional Flare gas recovery unit

M

Gas Holder

Page 7: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

5. Conventional gas recovery system - 26

Page 8: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

M

FlareStack

FlareGas

RecoveredFlare Gas

Gas Compressor

Spill Back control valve

New Flare gas recovery unit

Introduce the Liquid-Ring compressor and Spill Back Control.

a) Stable against fluctuations of flare header.

b) The unit configuration is simple and easy to operation

C) Operating range is wide.( 0 – 1,000m3N/h)

6. Introduced gas recovery system - 17

Page 9: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

6. Introduced gas recovery system - 28

Page 10: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

Conventional system

50m × 30m

7. FGR Plant Area9

New system area

25m × 10m

New flare gas recovery unit is a very compact compared to the

conventional unit.

※ Image Figure

Page 11: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

Recovered Flare gas(m3N/h)

SOx reduction(ton/y)

CO2 reduction(ton/y) About 7,000

Operation

About 400

About 40

This project is the one greatly contributing to the environmental

improvement. Especially, it is the one to achieve the result to the

CO2 reduction greatly.

0

200

400

600

Feb-09 Mar-09 Apr-09 Jun-09 Jul-09 Aug-09

Operating result (m3N/h)

8. Project Result - 110

Page 12: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

This project is covered ADNOC News and TAKREER News.

8. Project Result - 211

Page 13: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

8. Project Result - 312

This project wins The Japan Petroleum Institute ’s Award for

International cooperation.

This news is also covered the Japanese newspapers.

Page 14: Flare Gas Recovery Project at TAKREER Ruwais · PDF fileFlare Gas Recovery Project at TAKREER Ruwais Refinery ... Background and Objectives ... We have the following facilities for

We not only achieved through this environmental

project, we were able to build a good relationship.

We will continue the good relationship as partners

in the future.