8
First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division Croatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

Embed Size (px)

Citation preview

Page 1: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia

Jadran Jurković and Igor KosCroatia control Ltd, MET Division

Croatian-USA Workshop on Mesometeorology 18-20 June 2012

Croatia Control Ltd.

Page 2: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

2

Introduction

Part of Quality management system (ICAO Annex 3)

Forecasts Improvement Understand correct, miss, false alarm events Verification of special problems

• Convection (TS)

• Fog (reduced visibility)

• Wind (especially bora events)

Thunderstorm (TS) Mesoscale phenomenon (deep and moist convection) Month with max. frequency of days with TS has 12-25% Impact on aviation

First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012

Croatia Control Ltd.

04/11/23

Page 3: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

o METAR Surface wind

• Direction• Speed• Gusts

Visibility Runway visual range (RVR) Present weather Cloud

• Amount• Height of cloud base • [TCU/CB]

T i Td Atmospheric pressure Recent weather Wind shear State of the runway Trend forecast

o METAR ( 30min)∀ Surface wind

• Direction• Speed• Gusts

Visibility Runway visual range (RVR) Present weather Cloud

• Amount• Height of cloud base • [TCU/CB]

T i Td Atmospheric pressure Recent weather Wind shear State of the runway Trend forecast

o TAF (T=9/24 3/6h)∀ Surface wind

• Direction• Speed• Gusts

Visibility Present weather Cloud

• Amount• Height of cloud base• [TCU/CB]

Change groups-BECMG-FROM-TEMPO-PROBABILITY 30/40

o TAF Surface wind

• Direction• Speed• Gusts

Visibility Present weather Cloud

• Amount• Height of cloud base• [TCU/CB]

Change groups-BECMG-FROM-TEMPO-PROBABILITY 30/40

04/11/23First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012

3

Verification- a larger view

InputForecaster skill, experience, education Available tools and materialsModels quality, interpretation, availabilityObservation systemClimatologyTechnical details Criteria for weather elements, formatSystem supervisionEducation systemCustomer requirements

FORECASTER’S PICTURE

WEATHER FORECAST

OBSERVED WEATHER

REAL STATE OF

ATMOSPHERE

VERIFICATION

= ≠

Croatia Control Ltd.

Page 4: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

METAR

TAF

04/11/234

Approach Method similar to Austrocrontrol’s

Mahringer (2008) TAF, two basic principles

forecast for time periods contains a range of forecast conditions

Each hour Example for TS

TAF LDSP 230500Z 2306/2406 11010KT 9999 FEW050

TEMPO 2308/2320 RA

PROB30 TEMPO 2310/2406 TSRA FEW030CB BKN040

BECMG 2311/2313 18012KT

BECMG 2316/2318 VRB02KT=

UTC

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

00

01

02

03

04

05

00 30

METAR

+TS RA

TS RA

TS

+TS RA

-RA

RA

-TS RA

-TS RA

First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012

Croatia Control Ltd.

Page 5: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

04/11/235

Data Forecasts for 6 airport in Croatia

Inland: Zagreb (LDZA), Osijek (LDOS) Onshore: Pula (LDPL), Zadar (LDZD), Split (LDSP), Dubrovnik (LDDU)

Period 2009-2011 ~500,000 forecasted hours Contingency tables for each airport

aForecast Yes No Total b Fa lse a larm

Yes a b a+b cNo c d c+d d

Total a+c b+d n=a+b+c+d

Hit

Miss

Correct rejection

Observation

First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012

Croatia Control Ltd.

Page 6: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

04/11/236

Results Proportion correct (PC)

First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012

Bias

Croatia Control Ltd.

Page 7: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012

04/11/237

Results

PC - better for inland airports and LDPL Climatology

Bias similar results LDPL smallest bias-local characteristics

Season contribution of TS events and Daily distribution through seasonLDZAWinter Spring Summer Autumn

LDDUWinter Spring Summer Autumn

64,8%20,1% 13,6%1,4%

20,7% 18,0% 24,6% 36,7%

Croatia Control Ltd.

Page 8: First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division

04/11/238

Conclusions

Verification has been initiated Frequency of hours with TS ~1-1.5% Better scores when forecast TS period is shorter Less bias at inland airports due to pronounced daily and

yearly maxima Local features

Future work (in progress): Details for every miss and false alarm event Synoptic situations Lead time and duration

Croatia Control Ltd.

THANK YOU

First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012

Acknowledgement to Ms. Laurette Rako for helping with translation

[email protected], [email protected]