Final Auction Results T-4 Capacity Market Auction for 2019/20

Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

Embed Size (px)

Citation preview

Page 1: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

Final Auction Results

T-4 Capacity Market Auction for 2019/20

Page 2: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

Contents

Final Auction Results

2

Page 3: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

Executive Summary National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014 (Rule 5.10.6), unless instructed to the contrary pursuant to the Regulations, to publish the results of the Capacity Market Auction and to make these results public. This report discharges that obligation. The T-4 Capacity Auction for delivery in 2019/20 concluded on 10th December 2015, 16:30 GMT. This report is to be published 8 Working Days following the conclusion of the Capacity Market Auction, the “Auction Results Day”, Tuesday 22nd December 2015. The results of the auction are as follows, where all prices are in 2014/15 prices and any capacity figure refers to de-rated capacity, unless otherwise stated. a) The Clearing Price is: £18.00 / kW / year b) The Aggregate Capacity of Capacity Market Units awarded Capacity Agreements is: 46,353.569 MW. c) The total forecast cost of Capacity Agreements awarded (being the product of the Clearing Price and the Aggregate Bidding Capacity of Capacity Agreements awarded) is: £ 834,364,242 d) The CMUs to which a Capacity Agreement has been awarded and the duration of those Capacity Agreements are listed in Appendix A. In addition to the results presented above, National Grid is required under Capacity Market Rule 5.10.3 to report any CMUs that were removed from the IT Auction System under Capacity Market Rule 5.3.3. The Auction concluded without any CMUs being removed from the system by National Grid. The results of the Capacity Auction have been added to the Capacity Market Register, available at www.emrdeliverybody.com The remainder of this report gives further detail on the Capacity Market Auction Clearing, how the Clearing Price was reached and what makes up the capacity that has been procured.

Final Auction Results

3

Page 4: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

The Auction Clearing Price

The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in Bidding Round 12 on the 10th December 2015, 16:30 GMT. The Auction did not clear with an exact match of Offered Capacity and target capacity (“Potential Clearing Capacity”) and so the Net Welfare Algorithm was used to determine price and volume. The Net Welfare Algorithm evaluates the integral specified in Rule 5.9.6 to determine whether to include the marginal unit. The algorithm subtracts the additional cost of procuring the marginal unit from the welfare gained by procuring the marginal unit. If the result is positive i.e. the welfare gained by procuring the additional unit outweighs the cost, the unit is included, and the Clearing Price is set to the Exit Bid Price of that unit. The result of the Net Welfare Algorithm was positive and the marginal unit has been procured. Figure 1 shows the Demand Curve and the supply curve. The supply curve is found by cumulatively adding the Bidding Capacities of CMUs, according to their Exit Ranking. The supply curve meets the Demand Curve at a Price of £18.00 / kW / year

Final Auction Results

Round 15

Round 14

Round 13

Round 12

Round 11

Round 10

Round 9

Round 8

Round 7

Round 6

Round 5

Round 4

Round 3

Round 2

Round 1

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

0 10,000 20,000 30,000 40,000 50,000 60,000 70,000

Price (£/kW/y)

Capacity (MW)

Demand Curve Remaining Capacity Capacity Procured/Clearing Price

Figure 1: Demand and Possible Supply Range

4

Page 5: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

0 10,000 20,000 30,000 40,000 50,000 60,000 70,000

Capacity Awarded Capacity Exited

Demand at £0 kW/y Demand at the Auction Price Cap

Target Demand

The Aggregate Bidding Capacity of CMUs Awarded Capacity Agreements

The Aggregate Bidding Capacity of CMUs awarded Capacity Agreements is: 46,353.569 MW. A total of 57,724.948 MW entered the Auction, of which 80.30% received Capacity Agreements for delivery in 2019/20.

209

2

74

2 1

21

309 CMUs

Figure 2: Breakdown of the Capacity Entering the Auction Provisionally Awarded Agreements

42,014 MW

1,862 MW

1,936 MW

8 MW 86 MW

448 MW

46.35 GW

Figure 3: Breakdown of Awarded Capacity by CMU Type

Figure 3 and Table 1 show the breakdown of the Total Awarded Capacity Agreements by CMU Type. A mixture of new and existing Capacity was procured. 2,470.169 MW of the volume of Capacity Agreements awarded is for new or refurbishing capacity. This is the sum of the capacity of CMUs that have been awarded agreements that are Refurbishing, Unproven DSR or New Build CMUs.

Final Auction Results

5

Page 6: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

% %

90.64 67.64

4.02 0.65

0.00 0.00

4.18 23.95

0.02 0.65

0.18 0.32

0.00 0.00

0.97 6.80

% %

47.05 12.87

9.07 11.53

10.11 6.43

1.03 6.43

1.50 8.85

16.34 4.29

5.24 45.04

5.65 4.02

4.02 0.54

4,684.196

Storage 2,617.481

Nuclear

694.843 33

Interconnector 1,861.760 2

Pre-Refurbishment 0.000

Unproven DSR 448.495

0

21

7,575.233 16

OCGT and Recip. Engines 2,430.184 168

CHP and autogeneration 4,205.500

24

15

CMU Type Capacity (MW) No. Components

CCGT 21,808.340 48

43

Coal/biomass

DSR 476.032 24

Hydro

No. of CMUs

209

2

CMU Type Capacity (MW)

Existing Generating 42,013.680

Existing Interconnector 1,861.760

Proven DSR 7.960

Refurbishing Generating 85.749

New Build Interconnector 0.000

New Build Generating 1,935.925

0

74

2

1

Table 1: Breakdown of Awarded Capacity by CMU Classification

Final Auction Results

Figure 4 shows the breakdown of CMUs awarded Capacity Agreements by Technology Type.

Figure 4: Capacity Awarded by Technology Type

48

43

24

24

33

16

168

15 2

373 Components

21,808 MW

4,206 MW

4,684 MW

476 MW

695 MW

7,575 MW

2,430 MW

2,617 MW 1,862 MW

46.35 GW

Table 2: Breakdown of Awarded Capacity by CMU Type

The largest share of the Capacity Agreements awarded, by capacity, are to CCGT components.

6

Page 7: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

Capacity

(MW)%

No. of

CMUs%

45,371.049 97.88 247 79.94

12.920 0.03 3 0.97

969.600 2.09 59 19.09

14 Years

Duration

1 Year

15 Years

The Total Forecast Cost of Capacity Agreements Awarded The total forecast cost of Capacity Agreements Awarded is: £ 834,364,242 This cost is the product of the Aggregate Bidding Capacity of CMUs awarded Capacity Agreements and the Clearing Price. This cost is in 2014/15 prices and applies to the Delivery Year 2019/20. This amount is in additon to the cost of Capacity Agreement s that were procured in the 2014 T-4 Auction for delivery year 2019/20. The cost of the agreements procured in the 2014 Auction for 2019/20, indexed to 2014/15 prices was: £109,658,987 Payments made to Capacity Providers will be indexed according to the methodology stated in the Electricity Capacity Regulations Schedule 1(3).

The CMUs to which Capacity Agreements have been Awarded A list of the CMUs and their final status has been included in Appendix A. In total there are 309 CMUs that have been awarded Capacity Agreements, from 100 Applicant Companies.

The Duration of Agreements Awarded The duration of the Capacity Agreement received for each CMU is listed in Appendix A. 97.88% of CMUs that received Capacity Agreements were for a duration of 1 Year whilst 2.09% received 15 year Capacity Agreements.

Final Auction Results

Table 3: Breakdown of Awarded Capacity by Duration

Capacity Agreements with duration of more than one year provide capacity in additional Delivery Years to 2019/20. The volume of Capacity Agreements awarded in this auction for Delivery Years 2019/20– 2033/2034 are shown in Figure 5 and Table 4.

7

Page 8: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

2032

49,258.938

5,524.317

5,524.317

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,391.004

2018

2019

2020

Delivery Year

2028

2029

2030

2031

982.520

2033 -

T-4 2014 (MW)

969.600

T-4 2015 (MW)

-

46,353.569

982.520

982.520

982.520

982.520

982.520

982.520

2,423.296

2,423.296

2021

2022

2023

2024

2025

2026

2027

982.520

982.520

982.520

982.520

982.520

982.520

Final Auction Results

0

10,000

20,000

30,000

40,000

50,000

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033

Capacity (MW)

Delivery Year

Volume of Capacity Procured in the2014 T-4 Auction

Volume of Capacity Procured in the2015 T-4 Auction

Figure 5: Volume of Capacity Procured by Delivery Year

Table 4: Capacity Procured by Delivery Year

8

Page 9: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

% %

44.89 37.50

0.00 0.00

4.75 1.39

45.09 47.22

0.00 0.00

3.37 6.94

1.91 6.94Unproven DSR 217.000 5

5,104.114 27

Refurbishing Generating 383.314

Existing Interconnector 0.000 0

New Build Interconnector 540.000 1

5

New Build Generating 5,126.951 34

CMU TYPE Capacity (MW) No. of CMUs

Existing Generating

Proven DSR 0.000 0

Final Auction Results

Capacity that Exited the Auction above the Clearing Price A total of 11,371.379 MW exited the auction above the clearing price. This Capacity is broken down by CMU Classification and Technology Type below.

27

1 34

5

5

72 CMUs

5,104 MW

540 MW

5,127 MW

383 MW 217 MW

11.37 GW

Figure 6: Breakdown of Exited Capacity by CMU Type

New Build Generating CMUs make up the largest group of Capacity that Exited the Auction by Classification.

Table 5: Capacity Exited by CMU Classification

9

Page 10: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

% %

47.24 10.00

0.56 13.75

27.19 10.00

1.91 6.25

0.00 0.00

0.00 0.00

17.16 56.25

1.19 2.50

4.75 1.25

Hydro 0.000 0

CHP and autogeneration 63.874 11

Coal/biomass 3,091.735 8

Storage 135.281 2

Interconnector 540.000 1

Nuclear 0.000 0

OCGT and Recip. Engines 1,951.711 45

CMU Type Capacity (MW) No. Components

CCGT 5,371.778 8

DSR 217.000 5

Final Auction Results

Figure 7: Breakdown of Exited Capacity by Technology Type

8

11

8

5

45

2 1

80 Components

5,372 MW

64 MW

3,092 MW

217 MW

1,952 MW

135 MW 540 MW

11.37 GW

Table 6: Capacity Exited by Technology Type

The Technology Type exiting the largest overall volume of capacity from the auction was CCGT (5,372 MW).

10

Page 11: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

ADL002 No N/A N/A

Aggr15 No N/A N/A

ARPPR1 Yes 4.302 1

AUKNN6 Yes 15.126 15

AUKNN7 Yes 7.563 15

AUKNN8 Yes 5.672 15

AUKPR1 Yes 8.197 1

AUKPR2 Yes 3.155 1

AUKPR3 Yes 6.305 1

AUKPR4 Yes 2.691 1

ASHFOR Yes 19.967 15

ERNES1 Yes 18.908 15

CRUMLN Yes 18.908 15

Beaufo Yes 19.778 15

BRECON Yes 19.778 15

BSBURY Yes 54.843 1

BRTNED Yes 828 1

BURY01 No N/A N/A

BUXT01 Yes 16 15

CADO01 Yes 15.126 15

BAGE-1 Yes 462.8 1

BAGE-2 Yes 28.728 1

SUTB-1 Yes 728.91 1

SVRP10 Yes 378.25 1

SVRP20 Yes 378.25 1

CARR-1 Yes 404.95 1

CARR-2 Yes 404.95 1

EBRYP1 No N/A N/A

EBRGG1 No N/A N/A

KLYNA1 No N/A N/A

TLAGA1 Yes 805.45 1

PETEM1 No N/A N/A

TSHBA1 Yes 729.8 1

TSHBA2 Yes 516.2 1

CMP-M1 No N/A N/A

CLYN01 No N/A N/A

CES001 No N/A N/A

CES002 No N/A N/A

CES003 No N/A N/A

CORB-1 No N/A N/A

IGCECL Yes 703.99 1

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

Refurbishing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Refurbishing Generating CMU

New Build Generating CMU

Cofely Industrial Energy Services Limited

Corby Power Limited

Coryton Energy Company Ltd

Applicant Company

Aegis Cloud Limited

Aggreko UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Ashford Power Ltd

Attune Energy Limited

Balance Power Limited

Centrica SHB Limited

Clifton Marsh Power Ltd

Clyne Power Limited

Cofely East London Energy Limited

Cofely East London Energy Limited

Centrica Langage Limited

Centrica PB Limited

Centrica SHB Limited

Beaufort Power Ltd

Brecon Power Ltd

British Sugar plc

BritNed Development Limited

Bury Power Limited

Calon Energy Limited

Calon Energy Limited

Capacity (MW)Duration

(Years)CMU ID Capacity AG

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Interconnector CMU

CMU Classification

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

New Build Generating CMU

Carrington Power Limited

Carrington Power Limited

Centrica Barry Limited

Buxton Power Limited

Cadoxton Reserve Power Limited

Calon Energy Limited

Calon Energy Limited

Calon Energy Limited

Centrica Brigg Limited

Centrica KL Limited

Final Auction Results

Appendix A – Results by CMU

11

Page 12: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

CULV01 No N/A N/A

CURZ01 Yes 18 15

DAFE01 Yes 9.454 1

ADPPR1 Yes 12.796 1

Dpeak1 No N/A N/A

DRAX05 Yes 562.486 1

DRAX06 Yes 561.789 1

DRAX09 Yes 28.626 1

DRAX10 Yes 28.735 1

DRAX12 Yes 29.06 1

CDCL01 Yes 391.6 1

CNQPS1 Yes 333.75 1

CNQPS2 Yes 333.75 1

CNQPS3 Yes 333.75 1

CNQPS4 Yes 333.75 1

EECL01 Yes 363.12 1

GRAGT1 Yes 26.944 1

GRAGT4 Yes 25.061 1

GRAI06 Yes 421.2 1

GRAI07 Yes 421.2 1

GRAI08 Yes 421.2 1

RATGT2 Yes 16.834 1

RATGT4 Yes 15.263 1

RATS01 Yes 452.479 1

RATS02 Yes 452.479 1

RATS03 Yes 452.479 1

RATS04 Yes 452.479 1

TAYL02 Yes 67.966 1

TAYL03 Yes 61.56 1

BRDCHP Yes 2.069 1

CAST01 Yes 44.499 1

SAND01 Yes 44.499 1

THRN01 Yes 44.5 1

DNGB21 Yes 445.249 1

DNGB22 Yes 451.059 1

HEYM11 Yes 468.614 1

HEYM12 Yes 474.929 1

HEYM27 Yes 532.405 1

HEYM28 Yes 532.899 1

HINB-7 Yes 409.904 1

HINB-8 Yes 404.142 1

E.ON UK Cogeneration Ltd Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

Drax Power Limited Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

Drax Power Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

E.ON Global Commodities SE Existing Generating CMU

Dafen Reserve Power Limited Existing Generating CMU

Darent Power Limited Existing Generating CMU

DRAX GENERATION (SELBY) LIMITED New Build Generating CMU

Duration

(Years)

Culvery Power Limited New Build Generating CMU

Curzon Lodge Energy Limited New Build Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Drax Power Limited Existing Generating CMU

Final Auction Results

12

Page 13: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

HRTL-1 Yes 503.039 1

HRTL-2 Yes 499.833 1

HUNB-7 Yes 413.196 1

HUNB-8 Yes 414.019 1

SIZB-1 Yes 507.03 1

SIZB-2 Yes 507.03 1

TORN-1 Yes 502.386 1

TORN-2 Yes 509.499 1

WBUGT1 Yes 18.421 1

WBUGT4 Yes 18.908 1

WBUPS3 No N/A N/A

WBURB1 Yes 410.735 1

WBURB2 Yes 410.735 1

WBURB3 Yes 410.735 1

EPO003 Yes 5.034 1

ECMU07 Yes 43.4 1

ECMU08 Yes 43.4 1

ECMU09 Yes 43.4 1

ECMU10 Yes 43.4 1

ECMU11 Yes 43.4 1

ECMU12 No N/A N/A

EPCMU5 Yes 126.049 1

BUCK01 Yes 23.898 1

FCC001 Yes 42.573 1

FMFEL2 No N/A N/A

FMFEL1 Yes 63.568 1

DINO-1 Yes 264.766 1

DINO-2 Yes 264.766 1

DINO-3 Yes 291.791 1

DINO-4 Yes 290.663 1

DINO-5 Yes 264.766 1

DINO-6 Yes 264.766 1

FFES-1 Yes 86.967 1

FFES-2 Yes 86.967 1

FFES-3 Yes 86.967 1

FFES-4 No N/A N/A

PEN123 Yes 17.017 15

KET123 Yes 18.908 15

FLEX01 Yes 8.1 1

FLEX02 Yes 4.843 1

FLEX03 Yes 4.73 1

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

First Hydro Company Existing Generating CMU

First Renewable Alpha Limited New Build Generating CMU

First Renewable Gamma Limited New Build Generating CMU

EnerNOC UK Limited Unproven DSR CMU

Esso Petroleum Company Limted Existing Generating CMU

FCC Buckinghamshire Ltd New Build Generating CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

FCC Recycling (UK) Ltd Existing Generating CMU

Ferrybridge MFE 2 Limited New Build Generating CMU

Ferrybridge MFE Limited New Build Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

Energy Pool UK limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

Duration

(Years)

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

EDF Energy plc Existing Generating CMU

Final Auction Results

13

Page 14: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

FLEX04 Yes 5.932 1

FLEX05 Yes 3.267 1

FLEX06 Yes 10.064 1

FLEX08 Yes 4.26 1

FLEX09 Yes 3.975 1

FLEX10 Yes 2.558 1

FLEX11 Yes 2.596 1

FLEX12 Yes 2.554 1

FLEX13 Yes 2.514 1

FLEX14 Yes 2.594 1

FLEX15 Yes 7.231 1

FLEX16 Yes 7.487 1

FLEX18 Yes 2.957 1

FLEX19 Yes 2.972 1

FLEX20 Yes 3.996 1

FLEX21 Yes 2.953 1

FLEX40 Yes 3.472 1

FLEX41 Yes 4.488 1

FLEX70 Yes 34.72 1

FLEX71 Yes 17.36 1

FLEX72 Yes 2.604 1

FLEX73 Yes 8.68 1

FLEX74 Yes 5.208 1

FLEX75 Yes 17.36 1

FLEX76 Yes 21.7 1

FLEX77 Yes 17.36 1

FLEX78 Yes 4.34 1

FLEX79 Yes 3.472 1

FLEX80 Yes 17.36 1

FLEX81 Yes 6.944 1

FLEX82 Yes 22.047 1

FLEX83 Yes 3.906 1

fulcru Yes 6.747 1

IGGECL No N/A N/A

PPBRIT Yes 6.24 1

PPFLAT Yes 2.723 1

PPHIDO Yes 3.328 1

PPHULL Yes 2.723 1

PPPLYM Yes 5.219 1

PPTIRJ Yes 7.336 1

PPTREG Yes 3.782 1

Fulcrum Power Ltd Existing Generating CMU

Gateway Energy Centre Limited New Build Generating CMU

GF Power Peaking Limited New Build Generating CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

GF Power Peaking Limited New Build Generating CMU

GF Power Peaking Limited New Build Generating CMU

GF Power Peaking Limited New Build Generating CMU

GF Power Peaking Limited New Build Generating CMU

GF Power Peaking Limited Existing Generating CMU

GF Power Peaking Limited New Build Generating CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Duration

(Years)

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Flexitricity Limited Existing Generating CMU

Final Auction Results

14

Page 15: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

PPWILL Yes 6.051 1

GCHPL1 Yes 128.316 1

BRISTO No N/A N/A

DOWSTO No N/A N/A

GIRSTO No N/A N/A

HIRSTO No N/A N/A

HULSTO No N/A N/A

NORSTO No N/A N/A

PLYSTO No N/A N/A

SWASTO No N/A N/A

TIRSTO No N/A N/A

TRESTO No N/A N/A

WILSTO No N/A N/A

Griffi No N/A N/A

HARB01 Yes 15.126 15

HPL_01 No N/A N/A

INDQ-1 Yes 132.356 1

INEOS1 Yes 46.033 1

BROST1 Yes 5.718 1

BROST2 Yes 5.683 1

FIDL-1 No N/A N/A

FIDL-2 No N/A N/A

FIDL-3 No N/A N/A

FIDL3G No N/A N/A

FIDL-4 No N/A N/A

KEAD-1 Yes 679.96 1

KEAD-3 Yes 23.1 1

Keysto Yes 19.577 1

LARI01 Yes 15.126 15

LEAFIE Yes 5.672 15

MEDP-1 Yes 623 1

MERC01 Yes 21.965 1

IFA_GB Yes 1033.76 1

NEMOGB No N/A N/A

TimetB No N/A N/A

TimetC No N/A N/A

WaterB No N/A N/A

YELLAA No N/A N/A

Northw Yes 5.672 15

NG1POW Yes 20 15

NRKP01 Yes 18.908 15

National Grid Interconnectors Limited Existing Interconnector CMU

NEMO LINK LIMITED New Build Interconnector CMU

New Power Generation N01 Limited New Build Generating CMU

Leafield Energy Limited New Build Generating CMU

Medway Power Limited Existing Generating CMU

Mercia Waste Management Ltd New Build Generating CMU

New Power Generation N04 Limited New Build Generating CMU

NG 1 Power Ltd New Build Generating CMU

Noriker Power Ltd New Build Generating CMU

New Power Generation N01 Limited New Build Generating CMU

New Power Generation N02 Limited New Build Generating CMU

New Power Generation N03 Limited New Build Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

INEOS Nitriles (UK) Ltd Existing Generating CMU

Infinis Alternative Energies Limited Existing Generating CMU

Infinis Alternative Energies Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keystone Power Limited Existing Generating CMU

Larigan Power Limited New Build Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Harbourne Power Limited New Build Generating CMU

Hirwaun Power Limited New Build Generating CMU

Indian Queens Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Griffith Generation Limited New Build Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Duration

(Years)

GF Power Peaking Limited New Build Generating CMU

Grangemouth CHP Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Green Frog Power Limited Existing Generating CMU

Final Auction Results

15

Page 16: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

NRKP02 Yes 18.908 15

NRKP04 Yes 14.181 15

NRKP05 Yes 18.908 15

HYTHE1 Yes 44.411 1

BDGW01 Yes 42.673 1

SEALS1 Yes 48.93 1

NDACHP Yes 97.66 1

NDAHYD Yes 24.008 1

OGMO01 No N/A N/A

CASQ14 Yes 3.039 1

BREH14 Yes 13.41 1

PGP10L No N/A N/A

PGP12L Yes 18.908 15

PGP15L Yes 18.908 15

PGP16L Yes 15.126 15

PGP17L No N/A N/A

PGP18L Yes 18.908 15

PGP21L Yes 18.908 15

PGP22L Yes 18.908 15

PGP24L No N/A N/A

PGP25L No N/A N/A

PGP4LD No N/A N/A

PGP8LD Yes 18.908 15

PGP9LD No N/A N/A

SELBY_ Yes 18.908 15

PBSGC2 Yes 5.553 14

PBSFR1 Yes 4.609 14

PBSSR1 Yes 2.758 14

PR_ALF Yes 18.908 15

PR_BEL Yes 18.908 15

PR_CEF Yes 18.908 15

PR_CHE Yes 18.908 15

PR_FOU Yes 18.908 15

PR_HIN Yes 18.908 15

PR_HYD Yes 18.908 15

PPL_01 No N/A N/A

RED001 Yes 15.126 15

ARPPR2 Yes 4.817 1

ARPPR3 Yes 5.161 1

ARPPR4 Yes 3.821 1

ARYPR1 Yes 9.314 1

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Regent Park Energy Limited Existing Generating CMU

Regent Park Energy Limited Existing Generating CMU

Rhymney Power Limited Existing Generating CMU

Progress Power Limited New Build Generating CMU

Redlake Power Limited New Build Generating CMU

Regent Park Energy Limited Existing Generating CMU

Peak Gen Power 25 Limited New Build Generating CMU

Peak Gen Power 4 Limited New Build Generating CMU

Peak Gen Power 8 Limited New Build Generating CMU

Peak Gen Power 21 Limited New Build Generating CMU

Peak Gen Power 22 Limited New Build Generating CMU

Peak Gen Power 24 Limited New Build Generating CMU

Power Balancing Services Limited New Build Generating CMU

Power Balancing Services Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Peak Gen Power 9 Limited New Build Generating CMU

Plutus Energy LTD New Build Generating CMU

Power Balancing Services (Garnham Close) Limited New Build Generating CMU

P3P Energy Management AE Limited Existing Generating CMU

P3P Energy Management Limited Existing Generating CMU

Npower Cogen Limited Existing Generating CMU

Nuclear Decommissioning Authority Existing Generating CMU

Nuclear Decommissioning Authority Existing Generating CMU

Peak Gen Power 16 Limited New Build Generating CMU

Peak Gen Power 17 Limited New Build Generating CMU

Peak Gen Power 18 Limited New Build Generating CMU

Peak Gen Power 10 Limited New Build Generating CMU

Peak Gen Power 12 Limited New Build Generating CMU

Peak Gen Power 15 Limited New Build Generating CMU

Noriker Power Ltd New Build Generating CMU

Npower Cogen (Hythe) Limited Existing Generating CMU

Npower Cogen Limited Existing Generating CMU

Duration

(Years)

Noriker Power Ltd New Build Generating CMU

Noriker Power Ltd New Build Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Ogmore Power Limited New Build Generating CMU

Final Auction Results

16

Page 17: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

IGRPCL Yes 738.7 1

BRIST1 Yes 40.498 1

CROYD1 Yes 46.81 1

DERBY1 Yes 52.184 1

EXETR1 Yes 46.705 1

HEART1 Yes 48.146 1

HEART2 Yes 47.201 1

VKING1 Yes 48.699 1

RUGE-B No N/A N/A

ABTHMC Yes 1490.4 1

COWE01 Yes 66.178 1

COWE02 No N/A N/A

DIDC1G Yes 23.635 1

DIDC2G Yes 23.635 1

DIDC3G Yes 23.635 1

DIDC4G Yes 23.635 1

DIDCB5 Yes 712 1

DIDCB6 Yes 667.5 1

GYAR01 Yes 364.9 1

LBAR01 Yes 691.135 1

PEMB11 Yes 422.75 1

PEMB21 Yes 422.75 1

PEMB31 Yes 422.75 1

PEMB41 Yes 422.75 1

PEMB51 Yes 422.75 1

STAY01 Yes 412.96 1

STAY02 Yes 412.96 1

STAY03 Yes 412.96 1

STAY04 Yes 412.96 1

SALTND Yes 1080 1

SP_DC2 No N/A N/A

SP-DCL Yes 716.45 1

SP-SHO Yes 378.25 1

SP-BLA Yes 53.736 1

SP-CRU Yes 425.172 1

SP-GLE Yes 20.478 1

SP-KEN Yes 20.51 1

SP-RYH Yes 636.35 1

SP-TON Yes 29.214 1

SEA1_2 Yes 1119.62 1

SELB01 Yes 15.126 15

ScottishPower (SCPL) Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

Saltend Cogeneration Company Limited Existing Generating CMU

ScottishPower (DCL) Limited New Build Generating CMU

ScottishPower (DCL) Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

Seabank Power Limited Existing Generating CMU

Selby Power Limited New Build Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Duration

(Years)

Rocksavage Power Company Ltd Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Rugeley Power Limited Existing Generating CMU

Final Auction Results

17

Page 18: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

S19G01 Yes 37.8 1

S19G02 No N/A N/A

S19S11 Yes 19.828 1

SITA01 Yes 9.295 1

SITA06 Yes 17.572 15

SITA05 Yes 20.689 1

SITA02 Yes 17.582 1

SITA07 Yes 28.906 15

SPHGR1 No N/A N/A

IGSECL Yes 803.67 1

IGSEEL No N/A N/A

IGSEEO No N/A N/A

MRWD-1 Yes 818.8 1

SSEDS1 Yes 43.4 1

SSEDS2 No N/A N/A

SSEDS3 No N/A N/A

SSEDS4 No N/A N/A

SSEDS5 No N/A N/A

CBEU01 Yes 16.125 1

CBEU02 Yes 16.125 1

CLAC-1 Yes 33.948 1

CLUNIE Yes 51.94 1

ERRO-1 Yes 21.218 1

ERRO-2 Yes 21.218 1

ERRO-3 Yes 21.218 1

FASN-1 Yes 19.52 1

FASN-2 Yes 19.52 1

FASN-3 Yes 19.52 1

FOYE-1 Yes 144.945 1

FOYE-2 Yes 144.945 1

GLENMS Yes 33.702 1

INAW-1 Yes 22.915 1

LCHART Yes 28.856 1

LOCHAY Yes 39.889 1

PEHE-1 No N/A N/A

RANN-1 Yes 13.579 1

RANN-2 Yes 13.579 1

RANN-3 Yes 13.579 1

SLOY-1 Yes 33.948 1

SLOY-2 Yes 33.948 1

SLOY-3 Yes 33.948 1

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Spalding Energy Company Ltd Existing Generating CMU

Spalding Energy Expansion Limited New Build Generating CMU

SITA Suffolk Limited Existing Generating CMU

SITA Tees Valley Limited Existing Generating CMU

SITA West London Limited New Build Generating CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Energy Supply Ltd. Unproven DSR CMU

Spalding Energy Expansion Limited New Build Generating CMU

SSE Energy Supply Ltd. Existing Generating CMU

SSE Energy Supply Ltd. Unproven DSR CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

SITA (Kirklees) Limited Existing Generating CMU

SITA Cornwall Limited New Build Generating CMU

Duration

(Years)

Sembcorp Utilities (UK) Limited Existing Generating CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Snowdonia Pumped Hydro Limited_ New Build Generating CMU

Final Auction Results

18

Page 19: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

SLOY-4 Yes 27.583 1

TUMB-1 Yes 14.428 1

TUMB-2 Yes 14.428 1

BURGH1 Yes 44.472 1

CHICK1 Yes 44.472 1

CHIPN1 Yes 9.454 1

THATM1 Yes 8.314 1

RHEIG2 Yes 18.116 1

RHEIG3 Yes 17.783 1

SudmeA Yes 19.152 15

SudmeB Yes 12.312 15

SudmeC Yes 5.472 15

THORMA No N/A N/A

TILL01 Yes 15.126 15

GLAS15 Yes 9.9 15

HARV15 Yes 9.9 15

TrafaA Yes 9.013 15

TrafaB Yes 3.863 15

UKPR01 Yes 10 1

UKPR02 Yes 9.65 1

UKPR03 Yes 9.953 1

UKPR04 Yes 10 1

UKPR05 Yes 9.513 1

UKPR06 Yes 9.955 1

UKPR07 Yes 3.782 1

UKPR08 Yes 9.17 1

UKPR09 Yes 9.487 1

UKPR10 Yes 8.646 1

UKPR11 Yes 7.5 1

UKPR12 No N/A N/A

UKPR14 No N/A N/A

UKPR15 No N/A N/A

UKSR10 No N/A N/A

UKSR11 Yes 18.908 15

UKSR12 Yes 18.908 15

UKSR16 No N/A N/A

UKSR18 No N/A N/A

UKSR20 Yes 18.908 15

UKSR23 Yes 18.908 15

UKSR24 Yes 18.908 15

UKSR25 No N/A N/A

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Power Reserve Limited Refurbishing Generating CMU

UK Power Reserve Limited Refurbishing Generating CMU

UK Power Reserve Limited Refurbishing Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

Trafalgar Park Power Limited New Build Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

Sudmeadow Limited New Build Generating CMU

Sudmeadow Limited New Build Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

Statkraft Markets GmbH Existing Generating CMU

TP LEASECO LIMITED New Build Generating CMU

TP LEASECO LIMITED New Build Generating CMU

Trafalgar Park Power Limited New Build Generating CMU

Sudmeadow Limited New Build Generating CMU

Thorpe Marsh Power Limited New Build Generating CMU

Tillingham Power Limited New Build Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

Duration

(Years)

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Statkraft Markets GmbH Existing Generating CMU

Final Auction Results

19

Page 20: Final Auction Results - EMR Portal - Home Markets Document...The Auction Clearing Price The Clearing Price is: £18.00 / kW / year (2014/15 Prices). The 2015 T-4 Auction Cleared in

UKSR26 Yes 18.908 15

UKSR27 Yes 18.908 15

UKSR28 Yes 18.908 15

DCPS01 Yes 3.285 1

HAMP01 Yes 29.3 1

NEWH01 Yes 13.443 1

STAF01 Yes 26.43 1

ICHP01 Yes 1188 1

water1 Yes 14 15

WEDNES Yes 19.778 15

WINCHP Yes 85.749 1

WOLV01 No N/A N/A

UK Strategic Reserve Limited New Build Generating CMU

VEOLIA UK Limited Existing Generating CMU

VEOLIA UK Limited Existing Generating CMU

Duration

(Years)

UK Strategic Reserve Limited New Build Generating CMU

UK Strategic Reserve Limited New Build Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Wolverhampton Power Limited New Build Generating CMU

Waterswallows Energy Limited New Build Generating CMU

Wednesbury Power Ltd New Build Generating CMU

Winnington CHP Limited Refurbishing Generating CMU

VEOLIA UK Limited Existing Generating CMU

VEOLIA UK Limited Existing Generating CMU

VPI Immingham LLP Existing Generating CMU