Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
FENCING PERMIT
APPLICATON NO. FP NO. BUILDING PERMIT NO.
BOX 1 ( TO BE ACCOMPLISHED BY THE OWNER / APPLICANT )
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIPBY ENTERPRISEADDRESS NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TEL. NO.
LOCATION OF CONSTRUCTION LOT NO._____ BLK. NO._____ TCT NO. __________ TAX DEC NO. _____________
STREET ______________ BARANGAY _______________ CITY/MUNICIPALITY OF ________________
SCOPE OF WORK :( ) NEW CONSTRUCTION ( ) REPAIR ( ) OTHERS (specify) ________________( ) ERECTION ( ) DEMOLITION ______________________________________( ) ADDITION
BOX 2 BOX 3DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS FULL-TIME INSPECTOR & SUPERVISOR OF CONSTRUCTION WORKS
__________________________ Date __________ ____________________________ Date ____________ARCHITECT/CIVIL ENGINEER ARCHITECT/CIVIL ENGINEER(Signed & Seal Ove Printed Name) (Signed & Seal Ove Printed Name)
Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date IssuedIssued at TIN Issued at TIN
BOX 4 ( TO BE ACCOMPLISHED Y THE APPLICANT )APPLICANT : WITH MY CONSENT : LOT OWNER
____________________________________ ____________________________________( Signature Over Printed Name ) ( Signature Over Printed Name )
Date _______________ Date _______________Address AddressCTC NO. Date Issued Place Issued CTC NO. Date Issued Place Issued
BOX 5REPUBLIC OF THE PHILIPPINES ) S.S.CITY / MUNICIPALITY OF ______________)
BEFORE ME, at the City / Municipality of ___________________________ on _____________________appeared the following :
__________________________ _____________ ____________________ ____________________APPLICANT CTC NO. Date Issued Place Issued
__________________________ _____________ ____________________ ____________________LICENSED ARCHITECT OR CIVIL ENGINEER CTC NO. Date Issued Place Issued
whose signatures appear herein above, known to me to be the same persons who executed this standard prescribed form andacknowledged to me that same is their free and voluntary act and deed.
WITNESS MY HAND AND SEAL on the date and place above written.
Doc. No. __________ ____________________________________Page No. __________ NOTARY PUBLIC (UNTIL December ______Book No. __________
Series No. __________
Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
CERTIFICATE OF COMPLETION
___________________DATE
This is to certify that the building/structure covered by Building Permit No. ______________ issued on __________has been constructed and completed under our supervision, conforms with the plans and specifications submitted and onfile with the Office of the Building Official, and complies with the provisions of the National Building Code and AccessibilityLaw (BP Blg. 344)NAME OF OWNER ______________________________________________________________________________________________________________________
(Last Name) First Name M.I.ADDRESS OF THE OWNER _______________________________________________ ZIP CODE ______ TEL. NO._____________
LOCATION OF THE CONSTRUCTION: LOT NO. _____ BLK. NO. _____ BARANGAY ________________ CITY/MUNICIPALITY _______________________
USE OR CHARACTER OF OCCUPANCY ______________________________________________ GROUP _____________________________
PLANNED ACTUAL
DATE OF START OF CONSTRUCTION
DATE OF COMPLETION
TOTAL FLOOR AREA (SQM)
NO. OF STOREY (S)
NO. OF UNITS
SUMMARY OF ACTUAL COSTS
1. TOTAL COST OF MATERIALS: P __________________
1.1 CEMENT (bags) __________________________
1.2 LUMBER (bd.ft.) __________________________
1.3 REINFORCEMENT BARS (kg.) _______________
1.4 G.I. SHEETS (shts. ________________________
1.5 PREFAB STRUCTURAL STEEL (kg ___________
1.6 OTHERS materials ________________________
2. TOTAL COST OF DIRECT LABOR P __________________
This includes compensation whether by salary or contract for project architect or engineer down to laborers.
3. TOTAL COST OF EQUIPMENT UTILIZATION: P __________________
4. OTHER COST: P __________________
This includes professional services fees, permits and othe fees
TOTAL COST OF BUILDING / STRUCTURE P _________________
FULL TIME SUPERVISOR OR INSPECTOR OF CONSTRUCTION IF CONSTRUCTION WAS UNDERTAKEN BY CONTRACTContrctor PCAB Lic. No. _____________
____________________________________ Validity ___________________ARCHITECT OR CIVIL ENGINEER TIN ______________________
(Signed and Sealed Over Printed Name) Address Tel. No.Date _______________
PRC No. ValidityPTR No. Date Issued __________________________ Date ______________Issued at TIN AUTHORIZED MANAGING OFFICERCTC No. Date Issued Issued at (Signature Over Printed Name)
CTC No. Date Issued Place IssuedCONFORME:
_________________________________ Date _______________ CTC No.OWNER / APPLICANT Date Issued
(Signature Over Printed Name) Place IssuedREPUBLIC OF THE PHILIPPINES ) S.S.CITY / MUNICIPALITY OF ______________)
BEFORE ME, at the City / Municipality of ___________________________ on _____________________ personally appeared the personwhose signatures appear herein above, known to me to be the same persons who executed this standard prescribed form andacknowledged to me that same is their free and voluntary act and deed.
WITNESS MY HAND AND SEAL on the date and place above written.
Doc. No. __________ ____________________________________Page No. __________ NOTARY PUBLIC (UNTIL December ______Book No. __________Series No. __________
Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
CERTIFICATE OF COMPLETION
___________________
This is to certify that the building/structure covered by Building Permit No. ______________ issued on __________
NAME OF OWNER ______________________________________________________________________________________________________________________
CITY/MUNICIPALITY _______________________
PCAB Lic. No. _____________Validity ___________________TIN ______________________
Date ______________
personally appeared the person
Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
APPLICATION FOR BUILDING PERMIT
NEW RENEWAL AMENDATORY
APPLICATON NO. AREA NO.
BOX 1 ( TO BE ACCOMPLISHED BY THE OWNER / APPLICANT )
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN DO NOT FILL-UP
(NSO USE ONLY)
FOR CONSTRUCTION OWNED FORM OF OWNERSHIP
BY ENTERPRISE
ADDRESS NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TEL. NO.
LOCATION OF CONSTRUCTION FERNANDO S. SU BLK. NO._____ TCT NO. __________ TAX DEC NO. ____________
Engineer I
STREET ______________ BARANGAY _______________ CITY/MUNICIPALITY OF ________________
SCOPE OF WORK :[ NEW CONSTRUCTION [ REPAIR____________ [ RAISING ______________________________
[ ERECTION [ MOVING ___________ [ DEMOLITION __________________________
[ ADDITION [ CONVERSION_______ [ ACCESORY BUILDING STRUCTURE ______
[ ALTERATION [ RENOVATION ______ [ OTHERS (specify _______________________
USE OR CHARACTER OF OCCUPANCY
[ ] GR. A: RESIDENTIAL,DWELLINGS [ ] GR. F: INDUSTRIAL [ ] OTHERS (Specify) ____________
[ ] GR. B: RES., HOTEL, APARTMENT [ ] GR. G: INDUSTRIAL STORAGE & HAZARDOUS
[ ] GR. C: EDUCATIONAL, RECREATIONAL [ ] GR. H: RECREATIONAL,ASSEMBLY OCCUPANT LOAD LESS THAN 1000
[ ] GR. D: INSTITUTIONAL [ ] GR. I: RECREATIONAL,ASSEMBLY OCCUPANT LOAD 1000 OR MORE
[ ] GR. E: BUSINESS & MERCANTILE [ ] GR. J: AGRICULTURAL, ACCESORY
OCCUPANCY CLASSIFIED _________________ TOTAL ESTIMATED COST P __________________________________________
NUMBER OF UNITS _______________________ PROPOSED DATE OF CONSTRUCTION ________________________________
TOTAL FLOOR AREA__________________ SQM. EXPECTED DATE OF COMPLETION ___________________________________
BOX 2FULL-TIME INSPECTOR AND SUPERVISE OF CONSTRUCTION WORKS (REPRESENTING THE OWNER)
Address
PRC No. ValidityPTR No. Date IssuedIssued at TIN
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION
BOX 7
RECEIVED BY: DATE :
FIVE (5) SETS OF MECHANICAL DOCUMENTS
( ) MECHANICAL PLANS AND SPECIFICATIONS ( ) COST ESTIMATE( ) BILL OF MATERIALS ( ) OTHERS (Specify) _______________________
BOX 8
PROGRESS FLOW
IN OUTPROCESSED BYDATE TIME DATE TIME
MECHANICALOTHERS (Specify) FERNANDO S. SURQUIAAMOUNT DUE OR NO. Engineer I
BOX 9
ACTION TAKEN:
PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years of completion of the building/structure, the same should collapse due to defect in the plans or specifications or defect sin the ground. The engineer or architect who supervises the construction shall be solidarily liable with the contractor should the edifice collapse due to defect in the construction or the use of interior materials.2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the latest National Structural Code of the Philippines, the National Building Code and its IRR.
Building Code.4. That upon completion of the construction, the licensed full-time inspector and supervisor/in-charge of construction works shall submit the entry to the logbook duly signed and sealed to the Building Official including as-built plans and other documents and shall also accomplish and submit a certificate of completion stating that the civil/structural works conform to the provision of the National Structural Code of the Philippines, the National Building Code and its IRR.5. That this permit is null and void unless accompanied by the building permit.
PERMIT ISSUED BY:
AMAURY M. POLINTAN, JR.BUILDING OFFICIAL
(Signature Over Printed Name)Date ______________
3. That prior to any construction activity, a duly accomplished prescribed "Notice of Construction" shall be submitted to the Office of the
collapse due to defect in the plans or specifications or defect sin the ground. The engineer or architect who supervises the construction
2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the
4. That upon completion of the construction, the licensed full-time inspector and supervisor/in-charge of construction works shall submit the
accomplish and submit a certificate of completion stating that the civil/structural works conform to the provision of the National Structural
Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
CIVIL / STRUCTURAL PERMIT
APPLICATON NO. C/SP NO. BUILDING PERMIT NO.
BOX 1 ( TO BE ACCOMPLISHED BY THE OWNER / APPLICANT )
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIPBY ENTERPRISEADDRESS NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TEL. NO.
LOCATION OF CONSTRUCTION FERNANDO S. SURQUIA BLK. NO._____ TCT NO. __________ TAX DEC NO. _____________Engineer I
STREET ______________ BARANGAY _______________ CITY/MUNICIPALITY OF ________________SCOPE OF WORK :
( ) NEW CONSTRUCTION ( ) REPAIR_____________ ( ) RAISING ____________________________________( ) ERECTION ( ) MOVING ____________ ( ) DEMOLITION ________________________________( ) ADDITION ( ) CONVERSION________ ( ) ACCESORY BUILDING STRUCTURE _________( ) ALTERATION ( ) RENOVATION _______ ( ) OTHERS (specify) ____________________________
BOX 2 (TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL)
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years of completion of the building/structure, the same should ( ) STAKING ( ) ERECTION/LIFTING ( ) PRESTRESS WORKS ( ) EXCAVATION ( ) CONCRETE FRAMING ( ) MATERIAL TESTING2. Th( ) SOIL STABILIZATION ( ) STRUCTURAL STEEL FRAMING ( ) STEEL TOWERS ( ) PILING WORKS ( ) SLABS ( ) TANKS
( ) FOUNDATION ( ) WALLS ( ) OTHERS (Specify) ___________________ Building Code.4. That upPREPARED BY ____________________________________________________________________________________ entry to the logbook duly signed and sealed to the Building Official including as-built plans and other documents and shall also accomplish and submit a certificate of completion stating that the civil/structural works conform to the provision of the National Structural Code of the Philippines, the National Building Code and its IRR.5. That this permit is null and void unless accompanied by the building permit.DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS SUPERVISOR/IN-CHARGE OF MECHANICAL WORKS
PER____________________________________ _______________________________________CIVI/STRUCTURAL ENGINEER CIVI/STRUCTURAL ENGINEER
(Signed and /or Sealed Over Printed Name) (Signed and /or Sealed Over Printed Name)
Date _____________________Address BUILDING OFFICIAL AddressPRC No. (Signature Over Printed Name) PRC No. ValidityPTR No. Date _______ Date Issued PTR No. Date IssuedIssued at TIN Issued at TIN
BOX 5 BOX 4
BUILDING OWNER
____________________________________ ____________________________________( Signature Over Printed Name ) ( Signature Over Printed Name )
Date _______________ Date _______________Address AddressCTC NO. Date Issued Place Issued CTC NO. Date Issued Place Issued
3. That prior to any construction activity, a duly accomplished prescribed "Notice of Construction" shall be submitted to the Office of the
WITH MY CONSENT : LOT OWNER
TCT NO. __________ TAX DEC NO. _____________
CITY/MUNICIPALITY OF ________________
RAISING ____________________________________DEMOLITION ________________________________ACCESORY BUILDING STRUCTURE _________OTHERS (specify) ____________________________
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the
_______________________________________
Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CITY OF LUCENAAREA CODE ___________
APPLICATION NO. DATE APPLICATION FILED
DATE __________________________ DATE FILED __________________PAID UNDER O.R. NO. __________AMOUNT ______________DATE _________________
ELECTRICAL PERMIT
BOX 1OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
ADDRESS NO. STREET FERNANDO S. SU BARANGAY CITY/MUNICIPALITY ZIP CODE TEL. NO.Engineer I
LOCATION OF INSTALLATION NO. STREET BARANGAY CITY
BOX 2ASSESSED FEES
AMOUNT DUE ASSESSED BY O.R. NUMBER DATE PAID
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans andREVIEWED BY: building/structure is responsible for damages if within fifteen (15) years of completion of the building/structure, the same should collapse due to defect in the plans or specifications or defect sin the ground. The engineer or architect who su ESTELITO M. RAMOS, JR. shall be solidarily liable with the contractor should the edifice collapse due to defect in the construction or the use of Electrical Engineer2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the latest National Structural Code of the Philippines, the National Building Code and its IRR.
Building Code.
4. T 1. THAT THE PROPOSED INSTALLATIONS BE IN ACCORDANCE WITH THE APPROVED PLANS FILED WITH THIS OFFICE AND IN COMFORMITY
WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE
2. THAT A DULY LICENSED ELECTRICAL PRACTITIONER BE IN-CHARGE OF THE INSTALLATION/CONSTRUCTION
3. THAT A CERTIFICATE OF COMPLETION DULY SIGNED BY THE ELECTRICAL PRACTITIONER IN-CHARGE OF THE INSTALLATION BE
5. T SUBMITTED NOT LATER THAN SEVEN (7) DAYS AFTER COMPLETION OF THE INSTALLATION
4. THAT A CERTIFICATE OF FINAL INSPECTION BE SECURED PRIOR TO THE ACTUAL OCCUPANCY OF THE BUILDING
5. THIS PERMIT SHALL BE POSTED AT THE DOOR OR SITE OF WORK.
PERMIT ISSUED BY:RECOMMENDED:
AMAURY M. POLINTAN, JR.BUILDING OFFICIAL __________________________
(Signature Over Printed Name) DATEDat Engineer IV
Electrical Engineer
PERMIT GRANTED:
__________________________ __________________________AMAURY M. POLINTAN, JR. DATE
City Building Official
NOTE 1. This permit may be cancelled or revoked pursuant to Section 305 and 306 of the National Building Code.
NOTE 2. Alterations on this form are not allowed.
3. That prior to any construction activity, a duly accomplished prescribed "Notice of Construction" shall be submitted to the Office of the
Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CITY OF LUCENAAREA CODE ___________
DATE FILED __________________
ELECTRICAL PERMIT
TEL. NO.
ASSESSED FEES
ESTELITO M. RAMOS, JR.
Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CITY OF LUCENAAREA CODE ___________
APPLICATION NO. DATE APPLICATION FILED
_______________________ _____________________________Date of proposed Start of installation Expected Date of Completion
APPLICATION FOR ELECTRICAL PERMIT
BOX 1 (TO BE ACCOMPLISHED BY A DULY QUALIFIED ELECTRICAL PRACTITIONER)OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
ADDRESS NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TEL. NO.FERNANDO S. SURQUIA
LOCATION OF INSTALLATION NO. EnginSTREET BARANGAY CITY
SCOPE OF WORK: ( ) ADDITION OF _______________ ( ) OTHERS (SPECIFY)( ) NEW INSTALLATION ( ) REPAIR OF _________________ _______________________( ) ANNUAL INSPECTION ( ) REMOVAL OF ______________ _______________________TYPE OF OCCUPANCY OR USE:( ) RESIDENTIAL DWELLING ( ) BUSINESS & MERCANTILE ( ) ASSEMBLY OCCUPANT LOAD( ) RESIDENTIAL, HOTEL, APARTMENT ( ) INDUSTRIAL 1,000 OR MORE( ) EDUCATION & RECREATION ( ) STORAGE & HAZARDOUS ( ) ACCESORY( ) INSTITUTIONAL ( )ASSEMBLY OTHER THAN GROUP I ( ) OTHERS (SPECIFY) _________________1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years of completio NUMBER OF EQUIPMENT: WIRING DEVICES: collapse due to defect in the plans or specifications or defect sin the ground. The engineer or architect who supervises the construction LIGHTS SPO, COOKING UNIT TOGGLE SWITCH FA DETECTORS
2. Th CONVENIENCE/RECEPTACLE SPO, WATER HEATER BELLS/BUZZERS OTHERS (see attach list)
SPO, AIRCON SPO, WATER PUMP PUSH BOTTONS ___________________
Building Code.4. That upon completion of the construction, the licensed full-time inspector and supervisor/in-charg PRC REG. NO. VALIDITY entry to the logbook duly signed and sealed to the Building Official including as-built plans and other documents and shall also accomplish and submit a certificate of completion stating that the civil/structural works conform t TEL. NO./FAX NO. Code of the Philippines, the National Building Code and its IRR.5. That this permit is null and void unl DATE ISSUED PLACE ISSUEDSIGNATURE DATE ISSUED TIN
BOX 3 (ELECTRICAL CONTRACTOR - 200 AMPERE MAIN AND ABOVE)
PERMIT ISSUED BY: PCAB LIC. NO. SPECIALTY ELECTRICALVALIDITY
ADDRESS TEL. NO./FAX NO.
AMAURY M. POLINTAN, JR.BUILDING OFFICIAL
BOX 4 (PE(Signature Over Printed Name)( ) PROFESSIONA Date ______________ ( ) REGISTERED ELECT. ENGINEER ( ) REG. MASTER ELECTRICIAN
(not exceeding 600 volts & 500 KVA)NAME PRC REG. NO. VALIDITY
ADDRESS TEL. NO./FAX NO.
PTR NO. DATE ISSUED PLACE ISSUEDSIGNATURE DATE ISSUED TIN
BOX 5 (OWNER / AUTHORIZED REPRESENTATIVE)NAME SIGNATURE TIN CTC NO.______________________
DATE ISSUED ________________PLACE ISSUED _______________
BOX 6RECEIVED BY _________________________________
DESIGN PLANS & SPECIFICATIONS (5sets) Signature Over Printed NameDATE RECEIVED ______________________________
3. That prior to any construction activity, a duly accomplished prescribed "Notice of Construction" shall be submitted to the Office of the
Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CITY OF LUCENAAREA CODE ___________
_____________________________
APPLICATION FOR ELECTRICAL PERMIT
TEL. NO.
( ) OTHERS (SPECIFY) _________________
OTHERS (see attach list)
___________________
CTC NO.______________________DATE ISSUED ________________PLACE ISSUED _______________
RECEIVED BY _________________________________
DATE RECEIVED ______________________________
Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
ARCHITECTURAL PERMIT
APPLICATON NO. FP NO. BUILDING PERMIT NO.
BOX 1 ( TO BE ACCOMPLISHED BY THE OWNER / APPLICANT )
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIPBY ENTERPRISEADDRESS NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TEL. NO.
LOCATION OF CONSTRUCTION FERNANDO S. SURQUIA BLK. NO._____ TCT NO. __________ TAX DEC NO. _____________Engineer I
STREET ______________ BARANGAY _______________ CITY/MUNICIPALITY OF ________________SCOPE OF WORK :
( ) NEW CONSTRUCTION ( ) REPAIR_____________ ( ) RAISING ____________________________________( ) ERECTION ( ) MOVING ____________ ( ) DEMOLITION ________________________________( ) ADDITION ( ) CONVERSION________ ( ) ACCESORY BUILDING STRUCTURE _________( ) ALTERATION ( ) RENOVATION _______ ( ) OTHERS (specify) ____________________________
BOX 2 (TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL)
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years of completion of the building/structure, the same should collapse due to defect in the plans or specifications or defect sin the ground. The engineer or architect who supervises the construction ( ) STARS ( ) WASH ROOMS & TOILETS ( ) SWITCHES CONTROLS BUZZERS ( ) DRINKING FOUNTAINS2. Th( ) WALKWAYS ( ) LIFTS ELEVATORS ( ) HANDRILLS ( ) PUBLIC TELEPHONES ( ) CORRIDORS ( ) PUMPS ( ) THRESHOLDS ( ) SEATING ACCOMODATIONS
( ) STARS ( ) PARKING AREAS ( ) FLOOR FINISH ( ) OTHERS (specify) ___________ Building Code.4. That upon completion of the construction, the licensed full-time inspector and supervisor/in-charge of construction works shall submit the entry to the logbook duly signed and sealed to the Building Offici 3. CONFORNANCE TO PRE CODE OF THE PHILIPPINES (PD 1155 accomplish and submit a certificate of completion stating that the civil/structural works conform to the provision of the National Structural Code of the Philippines, the National Building Code and its IRR. ( ) NUMBER & WIDTH OF EXIT DOOR ( ) FIRE WALLS
5. That this permit is null and void unless accompanied by the building permit. ( ) WIDTH OF CORRIDORS ( ) FIRE FIGHTING & SAFETY FACILITIES
PERCENTAGE OF UNPAVED SURFACE AREA __________% ( ) DISTANCE TO FIRE EXIT ( ) SMOKE DETECTORS
OTHERS (Specify) ___________________________________ ( ) ACCESS TO PUBLIC STREET ( ) EMERGENCY EXIT( ) OTHERS (specify) _______________
PERMIT ISSUED BY:BOX 3
DESIGN PROFAMAURY M. POLINTAN, JR. SUPERVISOR/IN-CHARGE OF MECHANICAL WORKSBUILDING OFFICIAL ( ) PROFESSIONAL MECHANICAL ENGINEER
(Signature Over Printed Name) ( ) MECHANICAL ENGINEER__________Date ______________
PROFESSIONAL MECHANICAL ENGINEER _______________________________________ (Signed and /or Sealed Over Printed Name) (Signed and /or Sealed Over Printed Name)
Date _____________________ Date _____________________Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date IssuedIssued at TIN Issued at TIN
BOX 5 BOX 4
BUILDING OWNER WITH MY CONSENT : LOT OWNER
____________________________________ ____________________________________( Signature Over Printed Name ) ( Signature Over Printed Name )
Date _______________ Date _______________Address AddressCTC NO. Date Issued Place Issued CTC NO. Date Issued Place Issued
3. That prior to any construction activity, a duly accomplished prescribed "Notice of Construction" shall be submitted to the Office of the
DESIGN PROFESSIONALS, PLANS AND SPECIFICATIONS
ARCHITECTURAL CIVIL / STRUCTURAL
______________________________ DATE _________ ______________________________ DATE _________(Signature Over Printed Name) (Signature Over Printed Name)
Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date IssuedIssue at TIN Issue at TIN
ELECTRICAL MECHANICAL
______________________________ DATE _________ ______________________________ DATE _________(Signature Over Printed Name) (Signature Over Printed Name)
Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date IssuedIssue at TIN Issue at FERNANDO S. SURQUIA
Engineer I
SANITARY PLUMBING
______________________________ DATE _________ ______________________________ DATE _________(Signature Over Printed Name) (Signature Over Printed Name)
Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date IssuedIssue at TIN Issue at TIN1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years of completion of the building/structure, the same should collapse due to defect in the plans or specifications or defect sin t INTERIOR DESIGN shall be solidarily liable with the contractor should the edifice collapse due to defect in the construction or the use of interior materials.2. That the proposed civil/structural works shall be in accordance with the ______________________________ DATE _________
latest National Structural Code of the Philippines, the National Building Code and its IRR. (Signature Over Printed Name)Address
Building Code. Validity PRC No. Validity4. That upon completion of Date Issued PTR No. Date Issued entry to the logbook du TIN Issue at TIN accomplish and submit a certificate of completion stating that the civil/structural works conform to the provision of the National Structural Code of the Philippines, the National Building Code and its IRR.
5. That this permit is null and void unless accompanied by the building permit.
ELECTRICAL WORKS MECHANICAL WORKS
PERMIT ISSUED BY: ______________________________ DATE _________(Signature Over Printed Name) (Signature Over Printed Name)
_____________________________________________ _____________________________________________
Address AMAURY M. POLINTAN, JR.PRC No. Validity BUILDING OFPRC No. ValidityPTR No. Date Issue (Signature Over Printed Name) Date IssuedIssue at TIN Date _______Issue at TIN
SANITARY WORKS PLUMBING WORKS
______________________________ DATE _________ ______________________________ DATE _________(Signature Over Printed Name) (Signature Over Printed Name)
_____________________________________________ _____________________________________________Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date IssuedIssue at TIN Issue at TIN
ELECTRONICS WORKS INTERIOR DESIGN WORKS
______________________________ DATE _________ ______________________________ DATE _________(Signature Over Printed Name) (Signature Over Printed Name)
_____________________________________________ _____________________________________________Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date Issued
3. That prior to any construction activity, a duly accomplished prescribed
Issue at TIN Issue at TIN
BOX 3 (TO BE ACCOMPLISHED BY DIVISION / SECTION CONCERNED)_____________________________________________________________________________________________________________
ASSESSED FEES_____________________________________________________________________________________________________________Amount Due Assessed By: O.R. No. Date
PEDRITO F. ABADILLA_____________________________________________________________________________________________________________
BOX 4 (TO BE ACCOMPLISHED BY DIVISION / SECTION CONCERNED)
Progress Flow_____________________________________________________________________________________________________________
In Out Action RemarksProcessed By_____________________________________________________________________________________________________________Noted Time Date Time Date_____________________________________________________________________________________________________________Chief Processing________________________________________________________________________FERNANDO S. SURQUIADivison / Section Engineer I_____________________________________________________________________________________________________________Receiving & Releasing_____________________________________________________________________________________________________________Geodetic Line & Grade_____________________________________________________________________________________________________________Sanitary_____________________________________________________________________________________________________________WE AFFIX OUR HANDS SIGNIFYING OUR CONFORMITY TO THE INFORMATION HEREIN ABOVE SETFORTH
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years of completion of the building/structure, the same should collapse due to defect in the plans or specificatio P.R.C. REG. NO. SANITARY ENGINEER/MASTER PLUMBER shall be solidarily liable with the contractor should the edifice collapse due to defect in the construction or the use of interior materials.2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the latest National Structural Code of the Philippines, the National Building Code and its IRR.
PRINT NAME Building Code.4. That upon completion of the construction, the licensed full-time inspector and s ADDRESS entry to the logbook duly signed and sealed to the Building Official including as-built plans and other documents and shall also accomplish and submit a certificate of completion stating that the civil/structur PRC NO. Code of the Philippines, the National Building Code and its IRR.5. That this permit is null and void unle TAN SIGNATURE TAN_____________________________________________________________________________________________________________
BOX 6
PERMIT ISSUED BY:SIGNATURE ___________________________
Applicant
___________________________ AMAURY M. POLINTAN, JR.Res. Cert.No. Date Issue BUILDING Place Issued
(Signature Over Printed Name)____________________________________Date _______________________________________________________________________________________
BOX 7 (TO BE ACCOMPLISHED BY BUILDING OFFICIAL)
ACTION TAKENPERMIT IS HEREBY GRANTED TO INSTALL THE SANITARY, PLUMBING FIXTURE
Enumerated herein subject to the following conditions:
1. That the proposed installation shall be in
accordance with approved plans filed with
this office and in conformity with the National
Building Code.
2.That the duly licensed to undertake the
installation
3 That a certificate of completion duly signed AMAURY M. POLINTAN, JR. by aSanitary Engineer, Master Plumber in- City Building Official charge of installation shall be submitted not
later than (7) days completion of the
installation.
3. That prior to any construction activity, a duly accomplished prescribed "Notice of Construction"
4 That a certificate of final inspection and a
certificate of Occupancy by insured prior to
the actual occupancy of the building
NOTE :This permit may be cancelled or revoked pursuant to Section 305 & 306 of the National Building Code.
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
FERNANDO S. SURQUIA
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the
P.R.C. REG. NO.
2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the
_____________________________________________________________________________________________________________
AMAURY M. POLINTAN, JR.
This permit may be cancelled or revoked pursuant to Section 305 & 306 of the National Building Code.
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION
BOX 7
RECEIVED BY: DATE :
FIVE (5) SETS OF MECHANICAL DOCUMENTS
( ) MECHANICAL PLANS AND SPECIFICATIONS ( ) COST ESTIMATE( ) BILL OF MATERIALS ( ) OTHERS (Specify) _______________________
BOX 8
PROGRESS FLOW
IN OUTPROCESSED BYDATE TIME DATE TIME
MECHANICAL
OTHERS (Specify) FERNANDO S. SURQUIAAMOUNT DUE OR NO. Engineer I
BOX 9
ACTION TAKEN:
PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:
1. That under Article 1723 of the Civil code of the Philippines, the engineer (or architect) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years of completion of the building/structure, the same should collapse due to defect in the plans or specifications or defect sin the ground. The engineer or architect who supervises the construction shall be solidarily liable with the contractor should the edifice collapse due to defect in the construction or the use of interior materials.2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the latest National Structural Code of the Philippines, the National Building Code and its IRR.
Building Code.4. That upon completion of the construction, the licensed full-time inspector and supervisor/in-charge of construction works shall submit the entry to the logbook duly signed and sealed to the Building Official including as-built plans and other documents and shall also accomplish and submit a certificate of completion stating that the civil/structural works conform to the provision of the National Structural Code of the Philippines, the National Building Code and its IRR.5. That this permit is null and void unless accompanied by the building permit.5. That a Certificate of Operation shall be issued for the continuous use of mechanical installations.
PERMIT ISSUED BY:PERMIT ISSUED BY:
AMAURY M. POLINTAN, JR.BUILDING OFFICIAL
(Signature Over Printed Name)BUILDING OFFICIAL
(Signature Over Printed Name)Date _________________
3. That prior to any construction activity, a duly accomplished prescribed "Notice of Construction" shall be submitted to the Office of the
collapse due to defect in the plans or specifications or defect sin the ground. The engineer or architect who supervises the construction
2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the
4. That upon completion of the construction, the licensed full-time inspector and supervisor/in-charge of construction works shall submit the
accomplish and submit a certificate of completion stating that the civil/structural works conform to the provision of the National Structural
Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
MECHANICAL PERMIT
APPLICATON NO. FP NO. BUILDING PERMIT NO.
BOX 1 ( TO BE ACCOMPLISHED BY THE OWNER / APPLICANT )
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIPBY ENTERPRISEADDRESS NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TEL. NO.
LOCATION OF CONSTRUCTION LOT NO._____ BLK. NO._____ TCT NO. __________ TAX DEC NO. _____________
STREET ______________ BARANGAY _______________ CITY/MUNICIPALITY OF ________________SCOPE OF WORK :
( ) NEW CONSTRUCTION ( ) REPAIR_____________ ( ) RAISING ____________________________________( ) ERECTION ( ) MOVING ____________ ( ) DEMOLITION ________________________________( ) ADDITION ( ) CONVERSION________ ( ) ACCESORY BUILDING STRUCTURE _________( ) ALTERATION ( ) RENOVATION _______ ( ) OTHERS (specify) ____________________________
BOX 2 ( TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL )
INSTALLATION AND OPERATION OF:
( ) BOILER ( ) CENTRAL AIRCONDITIONING ( ) DUMBWAITER
( ) PRESSURE VESSEL ( ) MECHANICAL VENTILLATION ( ) PUMPS
( ) INTERNAL CONBUSTION ENGINE ( ) ESCALATOR ( ) COMPRESSED AIR, VCUUM, INSTI-
( ) REFRIGERATION AND ICE MAKING ( ) MOVING SIDEWALK TUTIONAL and/or INDUSTRIAL GAS
( ) WINDOW TYPE AIRCONDITIONING ( ) FREIGHT ELEVATOR ( ) PNEUMATIC TUBES, CONVEYORS
( ) PACKAGE SPLIT TYPE AIRCONDITIONING ( ) PASSENGER ELEVATOR and/or MONORAILS
( ) OTHER (specify) ( ) CABLE CAR ( ) FUNICULAR
PREPARED BY : _________________________________________________________________________
BOX 3
DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS SUPERVISOR/IN-CHARGE OF MECHANICAL WORKS( ) PROFESSIONAL MECHANICAL ENGINEER( ) MECHANICAL ENGINEER
____________________________________PROFESSIONAL MECHANICAL ENGINEER _______________________________________
(Signed and /or Sealed Over Printed Name) (Signed and /or Sealed Over Printed Name)Date _____________________ Date _____________________
Address AddressPRC No. Validity PRC No. ValidityPTR No. Date Issued PTR No. Date IssuedIssued at TIN Issued at TIN
BOX 5
BUILDING OWNER WITH MY CONSENT : LOT OWNER
____________________________________ ____________________________________( Signature Over Printed Name ) ( Signature Over Printed Name )
Date _______________ Date _______________Address AddressCTC NO. Date Issued Place Issued CTC NO. Date Issued Place Issued
Republic of the PhilippinesLucena City
Quezon Province
OFFICE OF THE BUILDING OFFICIAL
MECHANICAL PERMIT