51
7166P02 February 2009 Feasibility Study for the Madian Hydropower Project Weir Axis Weir Madian Powerhouse Madain Town Bahrain Headrace Tunnel VOLUME IV HYDRO - METEOROLOGICAL DATA BASE Part 1 of 3

Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Embed Size (px)

Citation preview

Page 1: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

7166P02 February 2009

Feasibility Study for the Madian Hydropower Project

Weir Axis

Weir

Madian Powerhouse

Madain Town

Bahrain

Headrace Tunnel

VOLUME IV

HYDRO -METEOROLOGICAL

DATA BASE

Part 1 of 3

Page 2: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

7166P02

Table of Contents VOLUME I: EXECUTIVE SUMMARY VOLUME II: MAIN REPORT VOLUME III: GEOLOGY AND GEOTECHNICAL FIELD

INVESTIGATIONS VOLUME IV: HYDRO-METEOROLOGICAL DATA BASE VOLUME V: TOPOGRAPHIC SURVEY VOLUME VI 6a: ENVIRONMENTAL IMPACT ASSESSMENT VOLUME VI 6b: RESETTLEMENT ACTION PLAN VOLUME 7: DRAWING ALBUM

Page 3: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

7166P02

Sarweystrasse 3 70191 Stuttgart • Germany Phone: + 49 711 8995-0/311 Fax: + 49 711 8995-459 www.fichtner.de Please contact: Dr. Jörg Grossmann Extension: -732 E-mail: [email protected]

Page 4: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 I

Table of Contents

1 Hydrology 1

1.1 Available Information 1

1.1.1 Meteorological Data 1

1.1.1 Hydrological Data 2

1.2 Precipitation and Temperature Regime 3

1.2.1 Precipitation Regime 3

1.2.2 Maximum Precipitation 5

1.2.3 Temperature Regime 7

1.3 Estimation of Flows 11

1.3.1 Description of Stations 11

1.3.2 Processing of Water Stage Records 12

1.3.3 Rating Curves 13

1.3.4 Calculation of Daily Flows 16

1.3.5 Extension of Flow Records 16

1.3.6 Calculation of Flows at Weir and Power House 18

1.3.7 Discussion of Results 21

1.3.8 Calculation of Flows of Kedam Nullah and Bara Dar 22

1.3.9 Determination of Ecological Flow 24

1.4 Estimation of Maximum Floods 25

1.4.1 Origin of Maximum Floods 25

1.4.2 Snowmelt Generated Floods 26

1.4.3 Rainfall Generated Floods 30

1.4.4 Model Development 30

1.4.5 Simulation of Rainfall Generated Floods 34

1.4.6 Design Floods 39

1.5 Sediment Transport 40

1.5.1 Suspended Sediment Transport 41

1.5.2 Grain Size Characteristics 43

1.5.3 Estimation of Bed Load and Total Sediment Transport 43

1.6 References 45

Page 5: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 II

List of Annexes Climatological Data Temperature

Daily Precipitation Hourly Precipitation Flow Data Daily Flows - Kalam - Raimet - Kedam Nallah - Kedam - Chakdara

Flow Measurements - Kalam - Raimet - Kedam Nallah - Kedam Extended Flows - Weir - Power House Floods Results of Simulation Suspended Sediment - Kalam - Ramet - Kedam Gauge Readings (CD) - Kalam - Ramet - Kedam Nallah - Kedam

Part 1 of 3

Part 2 of 3

Part 3 of 3

Page 6: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

1 Hydrology

1.1 Available Information

1.1.1 Meteorological Data

Meteorological data of the Swat Catchment is limited to the station located at Kalam observed by Surface Water Hydrology. However, some stations installed at high altitude in the north of Pakistan provide valuable supplementary information of the meteorological conditions in the region, although not located in the Swat catchment. The location of the meteorological stations is shown on Figure 1.1. In Table 1.11 the relevant information of the meteorological stations used in this report is summarized. Figure 1.1 Location of Meteorological Stations

1 WAPDA, Meteorological Data Bank. Snow and Ice Hydrology Project, Lahore, July 2006

Page 7: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

2

Table 1.1 Meteorological Stations

Coordinates Record Nr Name Latitude Longitude

Elevation (m asl) Organization Initial Final

1 Kalam 35o 28' 10 72o 35' 40 2026 SWHP 1963 2003

2 Shangla 34o 52' 00 72o 36' 00 2100 SIHP 1994 20053 Shandur 36o 05' 00 72o 32' 00 3560 SIHP 1994 20054 Ushkor 36o 38' 00 73o 04' 00 2977 SIHP 1994 2005

Only one of the meteorological stations indicated in Table 1.1 and Figure 1.1 is located in the Swat catchment area above Kalam. This is especially critical for the estimation of floods based on precipitation run-off models. Precipitation run-off models need a precipitation-area distribution model that for an area like the Swat catchment is preferably be based on various meteorological stations.

1.1.1 Hydrological Data

Hydrologic information relevant for the hydropower project and available in the Swat valley includes Kalam and Chakdara on the Swat River. Both stations are operated by Surface Water Hydrology Project (SWHP). Two additional hydrological stations were installed by the Madian Hydropower Limited on the Swat River in 2006 at Kedam and Ramet on Swat River and one on the Kedam Nullah. The stations are located close to the weir site, and are currently being operated by the project. The relevant information about the hydrological stations is shown on Table 1.22. The location of the hydrological stations is depicted on Figure 1.2. The available records of the stations are summarized in Table 1.2.

Table 1.2 Hydrological Stations

Coordinates Record Code Station River Lat Long

Catchment Area (km2)

Elevation (m asl) Start End

35724502 Kalam Swat 352810 723540 2,012 1921 1961 200735722503 Ramet Swat 351640 723550 2,365 1585 2006 200835722504 Kedam Nullah Kedam 351505 723508 55 1541 2006 200835722505 Kedam Swat 351455 723505 2,529 1500 2006 200835726002 Chakdara Swat 352915 723545 5,776 1951 1991 2005

2 WAPDA. Meteorological Data Bank. Surface Water Hydrology Project. Lahore, July 2006.

Page 8: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

3

1.2 Precipitation and Temperature Regime

1.2.1 Precipitation Regime

The precipitation regime in the Swat Valley is dominated by the occurrence of eastward moving extra tropical zones of low pressure, also known locally as Western Disturbances. The Western Disturbances bring humidity to the region of the Swat River from the Atlantic Ocean and the Mediterranean See. The Western Disturbances are more frequently and intense, during the Winter Season and they provoke the largest amount of precipitation over the Swat catchment3. During the summer season the frequency and intensity of the Western Disturbances normally decrease, and the precipitation on the region also decreases. 3 Pakistan Meteorological Department, Report on Flood Activities 1992. Flood Forecasting and Warning Centre. Lahore, February 1993.

Figure 1.2 Location of Hydrological Stations

Page 9: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

4

Figure 1.3 shows the distribution of the monthly precipitation observed at Kalam. The monthly precipitation is given in Table 1.3.

Table 1.3 Kalam, Monthly Precipitation

(1963-2006)

PeriodPrecipitation

(mm) Jan 74.5Feb 136.6Mar 179.9Apr 173.6May 89.3Jun 24.9Jul 32.6Aug 37.4Sep 36.2Oct 45.6Nov 45.5Dec 51.3Annual 927.4

Figure 1.3 Kalam, Monthly Precipitation

0

50

100

150

200

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Prec

ipita

tion

(mm

)

Page 10: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

5

1.2.2 Maximum Precipitation

Similar to the occurrence of mean precipitation, maximum precipitation in the Swat Valley is normally due to the occurrence of eastward moving extra tropical depressions also known as Western Disturbances. As precipitation in the winter season is in the form of snow, no large flood is observed after the occurrence of large precipitation. Large amount of precipitation in winter is important to determine the base flow during the summer months. A combination of large precipitation in winter followed by high temperatures in summer, produce floods and large base flows. However, in September 1992, when a large flood was observed in the northern areas of Pakistan, a large and deep low pressure moved from the Indian Ocean into the sub continent and reached the north of the country. At the same time, a Western Disturbance was moving to the east, across the Swat, Gilgit and Upper Indus catchments, where it provoked large floods in the region. The effect in the Swat valley was mixed. The flood inundated the lower Swat valley, while the upper Swat valley was only affected by severe rains. The flood observed at Kalam was of no special magnitude, but the run-off provoked by the rains is the largest observed during the period of record at Kalam. Figure 1.4 shows the monthly maximum observed 1-day precipitation and the mean maximum 1-day precipitation recorded at Kalam. The data is included in Table 1.4. Figure 1.4 shows that the maximum precipitation follows a similar pattern as the mean maximum, although it can deviate significantly from the mean. This is especially evident in the case of the maximum precipitation observed in September. The maximum precipitation in September was observed during the events of September 1992, and is out of the general trend. The magnitude of the observed rainfall is comparable to the maximum values observed in the winter months, suggesting that maximum precipitation can be observed at any time of the year.

Page 11: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

6

Table 1.4 Kalam: Maximum 1-Day Precipitation

Maximum 1-Day Precipitation (mm) PeriodMean Maximum

Jan 27.9 71.3 Feb 36.8 68.2 Mar 48.1 123.6 Apr 45.6 102.4 May 28.8 117.2 Jun 10.3 42.2 Jul 12.3 30.4 Aug 12.8 32.9 Sep 14.4 101.8 Oct 19.3 80.0 Nov 20.3 61.0 Dec 19.8 49.2 Annual 24.7 123.6

0

20

40

60

80

100

120

140

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Max

imum

Pre

cipi

tatio

n (m

m)

MeanMaximum

Figure 1.4 Kalam: Maximum 1-Day Precipitation

Page 12: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

7

1.2.3 Temperature Regime

The temperature regime follows the temperature pattern in the northern hemisphere. Figure 1.5 shows the variation of the mean temperature during the year. The mean temperature and the mean maximum and minimum temperature values are given in Table 1.5. When the temperature is at its maximum in July, and the flows are mostly snowmelt generated, it can be expected that largest flows occur during this month. Therefore, for the estimation of maximum discharges the temperature is important. High temperatures in addition to high precipitation during the previous winter months result in high base flows.

-10

-5

0

5

10

15

20

25

30

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Tem

pera

ture

(o C)

MeanMean MaximumMean Minimum

Figure 1.5 Temperature Regime

Page 13: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

8

Table 1.5 Kalam: Temperature

Temperature (oC) Period Mean Maximum Minimum Jan 0.7 7.5 -6.1 Feb 1.7 8.4 -5.1 Mar 5.3 11.5 -1.0 Apr 10.7 17.1 4.4 May 15.1 22.0 8.1 Jun 19.0 26.3 11.6 Jul 20.2 25.8 14.7 Aug 19.4 24.6 14.3 Sep 16.0 22.5 9.5 Oct 11.8 19.4 4.3 Nov 7.1 14.5 -0.4 Dec 3.2 9.9 -3.4 Mean 10.8 17.4 4.2

Figure 1.6 shows the temperature regime observed at the stations Kalam, Shangla, Shandur and Ushkore. Figure 1.6 shows that the pattern of the mean monthly temperature in the region is very similar, with Shangla located the southernmost having its maximum temperature earlier in June, while the other stations located to the north, registered the maximum temperature in July. The data of Figure 1.6 is presented in Table 1.6.

-15

-10

-5

0

5

10

15

20

25

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Tem

pera

ture

(o C)

KalamShanglaShandurUshkore

Figure 1.6 Mean Monthly Temperature Distribution

Page 14: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

9

Table 1.6 Mean Monthly Temperature

Mean Temperature (oC) Station Elev (m asl) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual

Kalam 2026 0.7 1.7 5.3 10.7 15.1 19.0 20.2 19.4 16.0 11.8 7.1 3.2 10.8Shangla 2100 1.7 2.4 6.8 12.0 16.2 19.4 19.1 18.2 16.3 12.8 8.7 4.7 11.5

Shandur 3560 -10.6 -8.4 -3.3 2.2 7.1 11.9 14.6 14.3 10.2 3.4 -4.3 -8.0 2.4

Ushkore 2977 -6.9 -5.3 -1.0 4.8 10.0 14.9 18.2 17.9 13.4 6.9 0.7 -4.8 5.7 Figure 1.7 depicts the relationship between the mean annual temperature and the elevation of the points of observation. Figure 1.7 shows that in the region the mean temperature decreases at a rate of 5.9 oC per km in elevation, similarly as the maximum and minimum temperatures decrease. The relationship of temperature with elevation determines the status of water (solid or liquid) in the catchment and therefore, the possibility to develop runoff at a given elevations. For the month of September, when the 1992 flood occurred, the temperature-elevation relationship is presented on Figure 1.8. Figure 1.8 shows that the mean minimum temperature is cero, at about an elevation of 4,000 m asl. The snow line is assumed at this elevation. Similarly, Figure 1.9 shows the temperature-elevation relationship during July when the highest temperature is observed and the base flow is at its maximum.

Shandur

Shokore

ShanglaKalam

t = - 0.0066h + 20.3R2 = 0.8468

t = - 0.0059h + 23.4R2 = 0.989

y = - 0.0065h + 29.6R2 = 0.9669

2000

2500

3000

3500

4000

-5.0 0.0 5.0 10.0 15.0 20.0

Temperature (oC)

Ele

vatio

n (m

)

MeanMaximumMinimum

Figure 1.7 Relation Temperature Elevation

Page 15: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

10

t = -0.0038 * h + 24.1R2 = 0.9713

t = -0.0039 * h + 29.1R2 = 0.8517t = -0.0041 * h + 19.8

R2 = 0.7713

1500

2000

2500

3000

3500

4000

0 5 10 15 20 25

Temperature (oC)

Elev

atio

n (m

)

MeanMaximumMinimum

Figure 1.8 Temperature Elevation Relationship for September

t = -0.0037 * h + 22.952R2 = 0.937

t = -0.0031 * h + 26.217R2 = 0.8805

t = -0.0025 * h + 29.65R2 = 0.541

2000

2500

3000

3500

4000

5.0 10.0 15.0 20.0 25.0 30.0

Temperature (oC)

Elev

atio

n (m

asl)

MeanMaximumMinimum

Figure 1.9 Temperature Elevation Relationship for July

Page 16: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

11

1.3 Estimation of Flows

Available hydrological data relevant to the Madian HPP comprises the flows observed at the stations Kalam and Chakdara installed, maintained and processed by WAPDA’s Surface Water Hydrology Project. Hydrological stations on the Swat River at Ramet and Kedam and on Kedam Nullah were installed by the Project Sponsor Madian Hydro Power Ltd. close to the weir site to improve the basis for estimation of the available flows.

1.3.1 Description of Stations

Hydrological stations included in the hydrological investigations contained in this document, are described in the following paragraphs. The stations are mentioned in the downstream direction.

1.3.1.1 Swat River at Kalam

The station was installed by Surface Water Hydrology Project (SWHP) in 1961. Stage records are available from 01/01/1961 to 31/10/2007. Daily flow records calculated by SWHP are available for the period from 1961 to 2006. Calculation of 2007 flows was undertaken from gauge readings and flow measurements taken by SWHP.

1.3.1.2 Swat River at Kedam

The station was installed by the sponsor Madian Hydro Power Ltd. on 4. March 2006. Stage records are available from 4. March 2006 to 31. January 2008. A total of 131 flow measurements conducted at the site are available. The equipment installed at the site comprises staff gauge and a data logger with attached pressure sensor to record automatically water levels. The equipment was installed on the right bank of the river. A concrete bridge located some 450 m further downstream is used to take flow measurements at the site.

1.3.1.3 Kedam Nullah at Kedam

The station was installed by the sponsor Madian Hydro Power Ltd. on 9/04/2006. Stage records are available from 9. April 2006 to 27. July 2006. At the site a total of 23 flow measurements are available.

Page 17: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

12

The equipment installed at the site is similar to the one installed at the other automatic stations. The equipment was installed on the right bank of the river. Flow measurements at the site were taken by wadding.

1.3.1.4 Swat River at Ramet

The station was installed by the Project Sponsor Madian Hydro Power Ltd. on 19/02/2006. Stage records are available from 19/02/2006 to 31/01/2008. At the site a total of 54 flow measurements are available. The equipment installed at the site is similar to the one installed at the other stations. The housing was installed on the right bank of the river. A concrete bridge on the river was used to take flow measurements at the site.

1.3.1.5 Swat River at Chakdara

The station was installed by Surface Water Hydrology Project (SWHP) in 1961. At the site, the daily flow records estimated by SWHP are available for the period from 1961 to 2005.

1.3.2 Processing of Water Stage Records

Water stages recorded in the automatic equipment include 24 hours continuous data, while gauge readings were taken on an 8-hours basis. Consequently, the automatic water stages record was used for calculation of flows. To avoid the use of non-calibrated water stages from the automatic record, comparison of the records with gauge readings was performed. The automatic records were adjusted when required. 24 hour continuous records of stages ensure the acquisition of maximum and minimum levels of the river. Maximum and minimum water levels may occur during night hours, and consequently may not be observed by the gauge observer. Particularly in the case of the Swat River, almost every day, a small flood occurs at midnight, due to snow melt when the temperature is at its highest. The small flood is not recorded at the gauge observer file, but it is present in the files of the automatic station. During the preparation of the present report, processing of water stage records was undertaken for the following stations: Swat River at Kedam, Kedam Nallah at Kedam and Swat River at Ramet. The processing of water stages was undertaken using DBHYDRO program developed for processing and storage of hydrological data. The corresponding processed water stage data are given in the soft copy attached to the present report.

Page 18: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

13

1.3.3 Rating Curves

Rating curves are mathematical functions relating water stages and discharge at the sites of the hydrological stations. Rating curves can be adequately be established when sufficient (in number and quality) flow measurements are available. In the case of the stations in the Swat River sufficient number of flow measurements is available to represent the relation between stage and discharge at the sites. Processing of flow measurements and development of rating curves was undertaken using program DBHYDRO. The following paragraphs describe the analysis performed to establish the rating curves for the stations on Swat River at Kalam, Swat River at Kedam, Kedam Nullah at Kedam and Swat River at Ramet.

1.3.3.1 Swat River at Kalam

After a detailed analysis of the flow measurements taken at the station the years 2006 and 2007, no sensible change was found in the relation between gauge heights and discharge indicated by the measurements. Consequently, only one rating curve was used to calculate the mean daily flows. The rating curve of Swat River at Kalam is shown on Figure 1.9.

Figure 1.9 Swat River at Kalam. Rating Curve

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

0 50 100 150 200 250 300 350 400

Discharge (m3/s)

Gau

ge R

eadi

ng (m

)

Flow MeasurementsRating Curve

Q = 1.019 * (H + 0.738)3.732

Page 19: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

14

1.3.3.2 Swat River at Ramet

After a detailed analysis of the flow measurements taken at the station Swat River at Ramet, it has been concluded that the flow measurements only cover a limited range of the gauge readings and consequently the extrapolation of the rating curve was undertaken. The extrapolation of the rating curve is made following the formula by Manning extrapolating the value of (S1/2/n) obtained from the flow measurements. The area and hydraulic radius is taken from the survey of the cross section at the bridge taken in April 2006. A single rating curve representing the values of the flow measurements and the extrapolated points was obtained and is shown on Figure 1.10.

1.3.3.3 Kedam Nallah at Kedam

After the analysis of the measurements available of the station Kedam Nullah at Kedam, The rating curve depicted on Figure 1.11 was applied to calculate the daily flows. It has to point out that only few measurements are available at the site, however, the measurements cover a sufficient range of flows and stages to develop a rating curve.

Figure 1.10 Swat River at Ramet, Rating Curve

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0 50 100 150 200 250 300 350

Discharge (m3/s)

Gau

ge R

eadi

ng (m

)

Flow MeasurementsRating Curve

Q = 9.843 * (H + 0.6227)2.412

Extrapolated

Page 20: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

15

1.3.3.4 Swat River at Kedam

After a detailed analysis of the flow measurements taken at the station Kedam at Swat River, no sensible change was found in the relation between gauge heights and discharge indicated by the measurements. Consequently, only one rating curve was used to calculate the means daily flows. The rating curve of Swat River at Kedam is shown on Figure 1.12.

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

Discharge (m3/s)

Gau

ige

Hei

ght (

m)

Flow MeasurementRating Curve

Q = 3.803 * (H + 0.33)2.573

Figure 1.11 Kedam Nullah at Kedam, Rating Curve

Figure 1.12 Swat River at Kedam, Rating Curve

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0 50 100 150 200 250 300 350 400 450

Discharge (m3/s)

Gau

ge R

eadi

ng (m

)

Flow MeasurementsRating Curve

Q = 26.23 * (H + 0.7398)2.11

Page 21: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

16

1.3.4 Calculation of Daily Flows

Calculation of daily flows was undertaken applying the rating curves to the gauge heights. The gauge height data were processed earlier as explained above. To calculate the daily flows, it was considered that the observed dispersion of the flow measurements is due to the erosion/deposition of sediments in the river bed as well as variation of riverbed roughness and efficient energy gradient. Consequently, to account for the river bed changes, the calculation of the daily flows was made applying the method of “shifting” of the rating curve. The method consists of “shifting” the rating curve to the position of every flow measurement, however following restrictions are observed while calculating the daily flows: a) Large “shifting” of the rating curve are generally avoided. b) If a number of flow measurements indicate a shift in one

direction (positive or negative) of the rating curve during a large period, a new rating curve is required for the period.

c) Flow measurements indicating large shifting or modifying the flow pattern, are eliminated from the calculation of daily flows.

Results of the calculation of daily flows are included in Annex 2.

1.3.5 Extension of Flow Records

Extension of the flow records was undertaken to improve the available estimations of flows. To extend the period of records, correlation between the series of flow records of the stations in the Swat River was undertaken. Generally, an excellent correlation is obtained for the flow records of the stations. The excellent correlation between the flow series indicates the good quality of the records. The extension of the flow records was undertaken as follows: First the flows of the stations Ramet and Kedam were correlated with the flows recorded at Kalam. To estimate the flows at the weir site, the regression equation obtained from the series of flows of Kalam and Ramet was used; the values were then adjusted to the site of the weir according to the difference in the area of the catchments. In particular for the extension of the flow records, the correlation between the long term station (Kalam), and the short term stations (Ramet and Kedam) was found to be excellent. The correlation between Kalam and Ramet, is shown on Figure 1.13, the results of the correlation analysis as well as the regression equation are included in the same figure. Using the regression equation of Figure 1.13, the flows of the stations at Ramet were extended and adjusted to the weir site.

Page 22: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

17

To estimate the flows at the power house, the relationship between Kalam and Kedam was utilized; the values were then adjusted to the site of the power house according to the difference in area of the catchments. The correlation between Kalam and Kedam was made up of two curves as shown on Figure 1.14. The results of the correlation analysis as well as the regression equation are given in the same figure.

Figure 1.13 Correlation between Kalam and Ramet

y = 1.3988x1.0387

R2 = 0.9668

y = 7.5191x0.6665

R2 = 0.7126

10

100

1000

10 100 1000

Flows at Kalam (m3/s)

Flow

s at

Ram

et (m

3 /s)

Figure 1.14 Correlation between Kalam and Kedam

y = 1.8384x0.9953

R2 = 0.9748

10

100

1000

10 100 1000

Flows at Kalam (m3/s)

Flow

s at

Ked

am (m

3 /s)

Page 23: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

18

Using the regression equation of Figure 1.14, the flows of Kedam were extended and adjusted to the site of the power house. The results of the extension of flow records at the power house are included in Annex 2. To complete the analysis, the correlation

between Ramet and Kedam is depicted on Figure 1.15. The figure includes the regression equation and the correlation coefficient.

1.3.6 Calculation of Flows at Weir and Power House

The weir site is located downstream of the gauging station Ramet. The catchment area to the weir site is 2,403 km2, while at Ramet the catchment area is 2,365 km2. The difference in catchment area between both sites is only 1.6%. Therefore, to calculate the flows at the weir site, the flows at Kalam were converted to flows at Ramet according to the formula on Figure 1.13. An additional 1.6% was added to the resulting value to account for the difference in catchment area. On the other hand, the site of the Power House is located downstream of the station Kedam. The catchment area to the power house site is 2,842 km2, while at Kedam the catchment area is 2,529 km2. The difference in catchment area between both sites is 12%. Therefore, to calculate the flows at Power House, the flows at Kalam were converted to flows at Kedam applying the formula on Figure 1.14 and an additional 12% was added to account for the difference in catchment between Kedam and the power House site.

Figure 1.15 Correlation between Ramet and Kedam

y = 1.2006x0.9317

R2 = 0.9807

10

100

1000

10 100 1000

Flows at Kedam (m3/s)

Flow

s at

Rai

met

(m3 /s

)

Page 24: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

19

Estimated monthly flows at weir site are included in Table 1.7. The monthly flows are shown in graphical form on Figure 1.16. Similarly, the flow duration curve at the site of the weir can be seen on Table 1.8. The flow duration curve is depicted on Figure 1.17.

Table 1.7 Monthly Flows at

Weir Site Period Flows (m3/s)

Weir Power House Jan 23.566 28.524 Feb 21.611 26.259 Mar 27.173 32.399 Apr 78.716 88.347 May 191.704 234.138 Jun 298.382 431.686 Jul 302.924 440.336 Aug 227.325 291.515 Sep 128.836 143.362 Oct 57.446 65.067 Nov 36.401 42.559 Dec 27.807 33.212 Annual 118.491 154.784

0

50

100

150

200

250

300

350

400

450

500

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Mea

n M

onth

ly F

low

(m3 /s

)

WeirPower House

Figure 1.16 Weir Site and Power House, Mean Monthly Flows

Page 25: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

20

Table 1.8

Weir Site and Power House Flow Duration Curves

Flows (m3/s) % of Time Weir

Power House

100 12.803 16.159 95 19.862 24.324 90 21.510 26.197 80 25.241 30.405 70 30.007 35.719 60 39.320 45.944 50 59.331 67.393 40 106.390 116.091 30 178.723 202.492 20 232.433 296.501 10 294.980 419.015

5 340.769 516.630 4 353.717 545.364 3 364.883 570.526 2 379.671 604.387 1 400.820 653.857 0 650.000 969.596

Figure 1.17 Weir Site, Flow Duration Curves

0

200

400

600

800

0 20 40 60 80 100

% of Time

Dis

char

ge (m

3 /s)

Page 26: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

21

1.3.7 Discussion of Results

The results of the estimation of flows at the weir site give an increment of about 9% of the estimated flow compared to the pre-feasibility study phase. The discharge at the weir site is slightly larger than the discharge at Kalam. Due to the quality of the data obtained from the stations at Ramet and Kedam, the increment is considered acceptable and can be explained as below. The flows at the weir are calculated on basis of 24 hours recorded water stages, while the flows at Kalam are calculated on basis of 8 hours gauge readings. This is especially important in summer when a daily flood is observed at night and the difference of both flows calculated from 24 hours recorded water stages exceed by about 5% the flows calculated with the 8 hours readings. In winter the difference is less, but it increases when a flood occurs. The specific discharge in the Swat River catchment in the reach of the project increases with the area, due to the fact that at higher elevations most of the water remains frozen. The catchment of Batal Khwar at Utror, located upstream of Kalam, shows a specific discharge larger than the one at Kalam, because its catchment has a lower mean elevation than the Swat catchment at Kalam. Additionally, at lower elevation the influence of rainfall increases, this is observed at Bahrain where the specific discharge is larger than the one at Kalam and at the weir site. Specific discharges observed at other stations in the surrounding area, especially in the Indus catchment, show specific discharges with similar and even larger values as the one obtained for the weir site. In Table 1.9 a series of mean annual flows and specific discharges of various stations at various rivers is given. The Table 1.9 shows that the specific discharge calculated at weir site is within the limits of observed values in the area. The hydrological model developed by GTZ, including other hydrological stations in the upper Swat catchment shows that the mean annual flow at Kalam is underestimated by about 4%, with respect to the results of the simulation. The reason may be the adjustment of the rating curves by SWHP to ensure lower flows at the upstream stations, when compared with downstream stations.

Page 27: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

22

Table 1.9

Flows and Specific Discharges

Station River

Catchment Area (km2)

Mean Annual Flow

(m3/s)

Specific Discharge (lts/(s-km2)

Jildat Ushu 782 33.10 42.33Gulshanabad Gabral 704 30.32 43.07Utror Batal 189 10.13 53.60Swat Kalam 2012 87.56 43.52Bahrein Daral Khwar 268 14.05 52.43Weir Swat 2403 118.49 49.31Karora Gorband 614 34.72 56.55Duber Bela Duber Khwar 408 24.03 58.89Gosak Summar Gah 147 5.19 35.31Thautti Br Kandiah 1047 57.15 54.59Kayal Khwar Shimshal 154 12.03 78.10

As a consequence of the above discussion, it was concluded that the estimation of flows at the weir site is consistent with the limits of observed values in other catchments with similar regime and within the limits that ensure that good practices are applied while taking the measurements. Consequently, the flows can be used with confidence for the estimation of the design flows of the hydropower project.

1.3.8 Calculation of Flows of Kedam Nullah and Bara Dar

Calculation of mean daily flows of Kedam Nullah at Kedam was undertaken as described above. To estimate the flows of Kedam Nullah and Bara Dar, the calculated flows of Kedam Nallah at Kedam were compared with the flows of Daral Khwar at Bahrain. The mean monthly flows are included in Table 1.10 and shown on Figure 1.18. The specific discharges of both stations and the flow pattern are similar, with Bahrain being on the lower side during the low flow season. Bahrain has been operated since 1992 and, therefore, the series of flows of this station are more reliable. The specific discharges and flow pattern of Daral Khwar at Bahrain were adopted for the calculation of the flows of Kedam Nullah and Bara Dar. The flows of both rivers are used to calculate the ecological flow.

Page 28: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

23

Table 1.10 Kedam Nullah and Daral Khwar

Mean Monthly Flows Mean Monthly Flows

(m3/s) Specific Discharge

(lts/(s-km2) Period Kedam N Bahrain Kedam N Bahrain

Jan 0.57 1.66 10.37 6.21Feb 0.62 2.03 11.32 7.56Mar 1.27 5.13 23.08 19.13Apr 4.04 18.42 73.41 68.75May 6.17 42.07 112.27 156.99Jun 4.74 44.17 86.12 164.82Jul 4.44 24.57 80.81 91.70Aug 4.32 13.81 78.50 51.52Sep 2.21 6.07 40.22 22.66Oct 1.00 5.28 18.19 19.71Nov 1.01 3.31 18.43 12.36Dec 0.75 2.03 13.59 7.58Annual 2.60 14.05 47.19 52.42

0

20

40

60

80

100

120

140

160

180

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Spe

cific

Dis

char

ge (l

ts/(s

-km

2 )

KedamBahrein

Figure 1.18 Kedam Nallah-Daral Khwar. Mean Monthly Flows

Page 29: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

24

1.3.9 Determination of Ecological Flow

For the determination of the mean monthly ecological flow, a formula representing a function of the available mean monthly discharges and the mean annual discharges was used and as presented below: MQ eco = {(0.0651 * MQ mo + 2)/100} * MQ an Were MQ eco = mean monthly ecological flow in m3/s MQ mo = mean monthly flow in m3/s MQ an = mean annual flow in m3/s The formula was also used for the feasibility study of the Gabral-Kalam Hydropower Project and was developed by CEMAGREF, agricultural and Environmental Engineering Research, situated in Antony France. CEMAGREF is a public research institute that targets results directly useable in land and water management. The formula is also recommended by the International Association of Small Hydropower. The formula was used to calculate the minimum ecological flow downstream of the weir. The monthly average values are given in the table below. Together with the contribution from the Kedam Nullah and Bara Dar, which join the Swat River just downstream of the dam, the required releases from the reservoir are computed. All monthly average values are given in the Table 1.11.

Table 1.11 Ecological Discharge Downstream of the Madian Weir

Discharge (m3/s) Contribution of Tributaries

Period

Swat River

at Weir

Required Ecological

Flow Kedam Bara Dar Total Required Release

Jan 23.57 4.19 0.31 0.47 0.78 3.41Feb 21.61 4.04 0.38 0.57 0.95 3.09Mar 27.17 4.47 0.96 1.45 2.41 2.06Apr 78.72 8.44 3.44 5.19 8.63 Surplus Spill May 191.70 17.16 7.85 11.86 19.71 Surplus Spill Jun 298.38 25.39 8.24 12.45 20.69 Surplus Spill Jul 302.92 25.74 4.58 6.93 11.51 Surplus Spill Aug 227.33 19.91 2.58 3.89 6.47 Surplus Spill Sep 128.84 12.31 1.13 1.71 2.84 9.47Oct 57.45 6.80 0.99 1.49 2.48 4.32Nov 36.40 5.18 0.62 0.93 1.55 3.63Dec 27.81 4.51 0.38 0.57 0.95 3.56

Page 30: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

25

1.4 Estimation of Maximum Floods

1.4.1 Origin of Maximum Floods

Maximum annual floods in the Upper Swat catchment have been recorded for the last 46 years at Kalam (1961-2006). The recorded maximum floods have a regular pattern and occur between May and July, when the temperature is nearly or at its maximum, and when no significant amount of precipitation occurs in the catchment. Therefore, it has been concluded that the maximum floods recorded at Kalam are originated by snowmelt. Taking into consideration that the flood series is relatively long and that the station is well maintained and observed, the flood series at Kalam adequately represent the normal floods in the catchment. On the other hand, floods at Chakdara show a different pattern, with several flood values significantly exceeding the normal trend. Because precipitation becomes more important to the south as a flood generating process, this deviation of the normal trend is most probably due to a mixed population of floods. In September 1992 a large and deep low pressure front moved from the Indian Ocean into the sub continent and reached the north of the country. At the same time, a Western Disturbance was moving to the east, across the Swat, Gilgit and Upper Indus catchments, where it provoked large floods in the region. In the Swat catchment, the rains provoked the inundation of the lower Swat Valley and in Kalam heavy rainfall was reported. The flood observed at Kalam was not the largest observed flood because at the time of the flood the base flow has receded, however, the run-off was the largest recorded at Kalam. The event of 1992 demonstrated that rainfall can produce a significantly larger amount of run-off than snowmelt in the Upper Swat catchment and consequently may affect the site of the hydropower project. As observed in other catchments in northern areas of Pakistan, maximum floods are normally from snowmelt origin, but for larger periods of return, rainfall can be the predominant process originating maximum floods. Therefore, for a complete analysis of maximum floods in the Swat catchment, both floods of snowmelt and rainfall origin were analyzed.

Page 31: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

26

1.4.2 Snowmelt Generated Floods

Snowmelt generated floods were analyzed applying a frequency analysis to the floods recorded at Kalam and Chakdara. The corresponding results are presented in Table 1.31. The two maximum recorded floods of Swat at Chakdara were eliminated from the analysis, because they follow a different trend and are classified as outliers. Both values represent a different statistical population, most probably rainfall generated floods. As discussed previously, rainfall generated floods are analyzed separately. Various frequency distributions (see Table 1.31) were applied to estimate the maximum floods. After examination of the results, the distribution by Gumbel was selected. The analysis of both series give good results for various distributions, however, the Gumbel distribution was selected because the results for both stations are comparable and consistent. The Gumbel distribution is world wide applied and its use has shown good simulation results in Pakistan. The available series of floods of both stations are given in Tables 1.12 and 1.13 and the results of the frequency analysis of both series of floods are included in Table 1.14 and in Figure 1.19.

Table 1.12 Chakdara: Series of Maximum Floods

Date Discharge

(m³/s) Date Discharge

(m³/s) 24-Jul-61 744.7 20-Jul-95 2773.0 22-Jul-62 943.0 10-Jul-97 1009.6 17-Jul-65 809.9 16-Jul-98 759.5 31-Jul-66 1002.4 7-Mar-99 843.4 24-Jul-67 900.5 30-Jul-00 451.7 30-Jul-68 926.0 23-Jul-01 1438.9

10-Aug-69 985.4 14-Aug-02 809.4 6-Oct-70 673.9

31-Oct-73 781.5

Page 32: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

27

Table 1.13 Kalam: Series of Maximum Floods

Date Discharge

(m³/s) Date Discharge

(m³/s) 16-Jul-61 311.5 17-Jun-84 413.4 22-Jul-62 404.9 12-Jul-85 308.7 12-Jul-63 472.9 8-Jul-86 518.2

4-Jul-64 521.0 25-Jul-87 379.4 26-Jul-65 464.4 15-Jul-88 390.8

19-Jun-66 424.8 30-Jul-89 333.8 25-Jul-67 421.9 25-Jun-90 534.0

9-Jul-68 438.9 13-Jul-91 549.8 456.0 22-Jul-92 468.8

1-Jul-70 371.0 7-Jul-93 403.1 12-Jun-71 351.1 3-Jul-94 489.3 27-Jun-72 472.9 25-Jul-95 487.8

3-Jul-73 387.9 13-Jun-96 533.7 19-Jul-74 337.0 10-Jul-97 344.7

16-May-75 464.4 12-Jul-98 494.7 393.0 9-Jun-99 373.6

24-Jun-77 342.6 12-May-00 236.9 6-Jul-78 597.5 24-Jul-01 196.5

470.0 24-Jun-02 347.5 25-Jun-80 393.6 27-Jun-03 393.1 30-Jun-81 407.8 17-Jun-04 327.7 24-Jul-82 233.0 27-Jun-05 505.6 2-Jun-83 368.1 13-Jul-06 270.4

Table 1.14 Frequency Analysis of Floods

Maximum Floods (m3/s) Return Period

Chakdara (A = 5,776 km2)

Kalam (A = 2,012 km2)

2 806.7 394 5 940.1 472

10 1,028.4 524 20 1,113.1 589 50 1,222.7 638

100 1,304.9 686 1,000 1,576.4 844

10,000 1,847.4 1,002 Figure 1.19 shows the similar pattern of the flood frequency curves of Kalam and Chakdara. The figure shows that the two maximum recorded floods of the Chakdara series, follow a different pattern as compared to the general pattern defined by the rest of the floods and described by the frequency curve.

Page 33: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

28

The magnitude of the maximum floods of snowmelt origin at the sites of weir and power house was estimated by interpolating the area of the catchment in a curve connecting the specific discharges of both stations for each period of return. The specific discharges of the maximum floods are included in Table 1.15.

Table 1.15 Specific Discharges of Maximum Floods

Specific Discharge of Maximum Floods (Lts/(s-km2)

Return Period

Chakdara (A = 5,776 km2)

Kalam (A = 2,012 km2)

2 140 196 5 163 235

10 178 260 20 193 293 50 212 317

100 226 341 1,000 273 419

10,000 320 498

0.010.112510205091

10,0001,000100502010521.1

100

1000

10000

- 2.79 -0.79 1.21 3.21 5.21 7.21 9.21

Probability (%)

Max

imum

Flo

od (m

3 /s)

KalamChakdara

Return Period (years)

Figure 1.19 Flood Frequency Curves

Page 34: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

29

The distribution of floods along a catchment does not follow a simple catchment area relationship, due to the fact that smaller catchments tend to have higher specific discharges. It has been observed that a power equation better describes the distribution of flows in the same catchment or in catchments with similar pattern of floods. The power equation used to interpolate the values of the maximum floods at intake and power house is of the form:

q = C * A n Where: q = specific discharge (lts/(s-km2)) C = coefficient A = catchment area n = coefficient The values of the coefficients obtained from the specific discharges of the floods for the given return periods are included in Table 1.16.

Table 1.16 Coefficients

Coefficient Return Period N C

2 -0.32 2,242 5 -0.35 3,277

10 -0.36 4,047 20 -0.40 5,974 50 -0.38 5,849

100 -0.39 6,638 1,000 -0.41 9,316

10,000 -0.42 12,144 The interpolated values of the floods of snowmelt origin at weir and power house are shown in Table 1.17.

Table 1.17 Maximum Floods of Snowmelt Origin at

Weir and Power House Maximum Floods (m3/s)

Return Period

Weir Site (A = 2403 km2)

Power House (A = 2878 km2)

2 445 502 5 530 596

10 587 659 20 656 731 50 712 796

100 764 853 1,000 938 1,043

10,000 1,111 1,233

Page 35: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

30

1.4.3 Rainfall Generated Floods

To estimate the magnitude of the rainfall generated floods, a precipitation- run off model was applied. The computer program selected to simulate the floods in the Swat Catchment was HEC-HMS developed by the Hydrologic Engineering Centre of the US Corp of Engineers. The program utilizes four main components called model managers, the Basin Model Manager, the Meteorological Model Manager, the Control Specifications Manager and the Time-Series Data Manager. The basin model manager is intended to manage the models that describe the different conditions of the catchment. The model of the catchment includes catchment areas, river topology (catchments, channels and connections), definition of the methods to estimate water losses, transform rainfall excess into run-off and base flow, and the parameters to estimate excess, and transform the excess into a hydrograph. The meteorological model manager defines the rainfall gauges to be used to calculate the precipitation over the catchment. The control specifications manager defines the time limits of the simulation, i.e. the starting date and time, and the ending date and time of the simulation. In the time series data manager the data of the storm are given. The data of the storm include the amount of precipitation and time distribution of the rainfall, used to estimate the floods.

1.4.4 Model Development

The geomorphologic parameters of the Swat River catchment, required to simulate the catchment, were obtained from the 1:50,000 topographic sheets. The catchment of the Swat River was divided into 4 sub-catchments, as follows: Gabral River, Ushu River, Swat River to Weir and Swat River from Weir to Power House. The model of the catchment is presented on Figure 1.20. The method selected to estimate the water losses was the Curve Number classification developed by the US Soil Conservation Soils (SCS). To estimate the parameters required by the program especially the water losses, an approximation to the land use was obtained from the 1:50,000 maps of the catchment. The areas of the catchments classified by land use are included in Table 1.18. The soils were classified according to the following criteria: Forest Land: thin stand, poor cover, no mulch. Hydrologic soil group B, soils with low organic content and usually high in clay. SCS No 66.

Page 36: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

31

Table 1.18 Catchment Areas by Land Use

Areas by Land Use (km2)

No Reach ForestCulti- vated

Bare Land Glaciers

Total Without Glaciers Total

1 Gabral 388 21 575 194 984 11782 Ushu 313 13 304 141 629 7703 Swat-1 2 28 361 65 391 4564 Swat-2 56 25 372 21 453 474

Cultivated Land: without conservation treatment, Hydrologic soil group B, Shallow loess, sandy loam. SCS No 70. Bare Land: range land in poor condition. Hydrologic soil group C, soils that swell significantly when wet. SCS No 80. For catchments that consist of several soil types and land uses a composite CN is calculated as:

CN = Σ Ai CNi/ Σ Ai The Initial loss was calculated for each sub catchment according to the following formula:

Ia = 0.2 * S

S = (100/CN) - 10

Figure 1.20 Swat River Catchment Model

Page 37: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

32

The values obtained for the catchments of the Swat River are included in Table 1.19.

Table 1.19 Calculation of Water Losses

No Reach Weighted

CN S Ia=0.2S1 Gabral U/S Conf Ushu 74 88.0 17.62 Ushu U/S Conf Gabral 73 94.7 18.93 Swat U/S Weir 79 66.6 13.34 Swat Weir-PH 78 72.8 14.6

To transform the precipitation into run-off the SCS unit hydrograph was selected. The SCS unit hydrograph is a dimensionless single peaked UH. The SCS suggests that the UH lag time (tlag) of the hydrograph can be related to the time of concentration (tc) as:

tlag = 0.6 * tc The time of concentration can be estimated as:

tc = 3 * L 1.15/(154 * (hu – hd)0.38) L = Length of flow in meters hu = Elevation at the highest point in meters hd = Elevation at lowest point in meters The values of the times of concentration and lags for the catchments and channels are given in Table 1.20.

Table 1.20 Time of Concentration and Lags

Time of Concentration

(minutes) Lag

(minutes) Sub-catchment Catchment Channel Catchment ChannelGabral 1541 925 Ushu 846 507 Swat-1 553 452 332 271Swat-2 530 240 318 144

Simulation of September 1992 Flood The 1992 flood recorded at the hydrologic station Kalam was simulated using the parameters described above. The input data to simulate the flood, comprises the precipitation recorded on September 9th of 1992 at meteorological station Kalam. Other precipitation data of the storm is not available to improve the data basis of the storm.

Page 38: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

33

Precipitation over larger areas decrease as the areas of the storm increase, then recorded precipitation represents point values. The precipitation was calibrated to meet the flood values recorded at Kalam. The reduction coefficient is within the limits of the study on storms on the Swat catchment in reference 4. In this regard, it has to be pointed out that the Swat catchment is not at the centre of the storm analyzed in the study and is not expected to be at the centre of the storm when a major storm occurs. The values of the precipitation recorded the 09/09/1992 and the reduced values are presented in Table 1.21.

Table 1.21 Precipitation of 9/9/1992

Precipitation (mm) Time (Hours) Recorded Reduced

1:00 AM 2.5 1.4 2:00 AM 2.5 1.4 3:00 AM 2.5 1.4 4:00 AM 3.8 2.1 5:00 AM 1.3 0.7 6:00 AM 1.3 0.7 7:00 AM 0.0 0.0 8:00 AM 2.3 1.3 9:00 AM 1.3 0.7

10:00 AM 1.3 0.7 11:00 AM 2.5 1.4 12:00 PM 6.3 3.5

1:00 PM 5.1 2.8 2:00 PM 3.8 2.1 3:00 PM 7.6 4.2 4:00 PM 57.7 31.7

The results of the simulation of the September 1992 are shown in Figure 1.21. A summary of the observed and simulated peak values is included in Table 1.22.

Page 39: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

34

Table 1.22 Comparison of Observed and Simulated Flood

Flood Date Time

Peak Flood (m3/s)

Simulated 10-Sep-92 2:00 374.40 Observed 10-Sep-92 0:00 381.14

The time to peak of the simulated flood is two hours later than the observed flood and the volume of the simulated flow is slightly smaller that the volume of the observed flood. However, the results of the simulation are considered satisfactory. Consequently, it was concluded that the simulation of the September 1992 flood represents the conditions in the catchment during a major flood event, and the simulation of the 100, 1,000 and 10,000 flood was undertaken.

1.4.5 Simulation of Rainfall Generated Floods

To establish the precipitation model to be used for simulation of the maximum floods generated by rainfall, frequency analysis of the annual maximum hourly and daily precipitation recorded at Kalam was performed. The series of maximum hourly and daily precipitation recorded at the meteorological station Kalam is given in Table 1.23.

Figure 1.21 Simulation of September 92 Flood

Page 40: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

35

Table 1.23 Kalam: Maximum Precipitation

Maximum Precipitation

(mm)

Maximum Precipitation

(mm) Year Hourly Daily Year Hourly Daily 1963 14.0 47.2 1985 13.7 24.41964 10.9 65.5 1986 26.7 62.01965 15.2 43.4 1987 15.7 48.81966 7.6 40.9 1988 10.2 51.81967 36.1 51.6 1989 61.0 88.91968 12.2 66.8 1990 30.5 59.21969 14.2 45.0 1991 41.9 80.01970 15.5 41.9 1992 57.7 94.01971 10.7 39.6 1993 22.9 38.41972 10.7 26.7 1994 21.6 62.61973 9.9 43.4 1995 19.3 108.01974 18.5 34.3 1996 14.5 52.11975 19.3 68.6 1997 12.7 83.81976 15.2 55.9 1998 20.8 82.61977 20.1 62.2 1999 31.2 99.11978 30.7 51.8 2000 20.3 64.81979 8.6 63.2 2001 15.2 33.31980 12.7 39.6 2002 16.5 60.21981 12.2 116.3 2003 11.4 68.61982 17.3 37.8 2004 9.1 80.01983 35.6 40.6 2005 17.8 62.71984 13.2 49.0 2006 15.2 69.9

Various frequency distributions were applied to estimate the maximum precipitation for the large period of return. Various distribution give good results, but the 3-parameter log normal distribution adjusted by the method of maximum likelihood gives the best fit for both hourly and daily maximum precipitation (see Table 1.31a and 1.31b). The results of the frequency analysis of maximum hourly and daily precipitation are shown on Table 1.24 an in Figure.1.22.

Table 1.24

Kalam: Frequency Analysis of Maximum Precipitation Maximum

Precipitation (mm)

Return Period (Years) Hourly Daily

2 16.2 62.0 5 25.5 82.0

10 33.5 95.5 20 42.4 108.7 50 56.1 126.0

100 68.0 139.3 1000 118.7 185.5

10000 190.4 236.0

Page 41: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

36

For simulation of the maximum floods various distributions of precipitation were applied to the maximum precipitation. The model was the run with the catchment conditions of the September event. The distribution of the precipitation of the September 1992 event was found to be the most critical, producing the highest flood. Therefore, the distribution of the September 1992 was adopted for estimation of the maximum floods. The hyetographs of the other storms are given in Table 1.25.

10,000

0.010.11

1,000500200100502510521.1

251020501

10

100

1000

-1.40 0.60 2.60 4.60 6.60 8.60

Probability (%)

Max

imum

Pre

cipi

tatio

n (m

m)

HourlyDaily

Return Period (years)

Figure 1.22 Frequency Analysis of Maximum Precipitation

Page 42: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

37

Table 1.25 Hyetographs of Storms

Time Precip(mm) Time

Precip (mm) Time

Precip (mm)

In Date 8/9/92 In Date 1/5/89 In Date 24/5/95 2400 2.5 100 1.8 2400 5.1

100 2.5 200 4.6 100 4.3 200 2.5 300 1.8 200 4.6 300 2.5 400 0 300 3.8 400 3.8 500 0 400 3.8 500 1.3 600 0 500 5.1 600 1.3 700 0 600 5.1 700 0 800 61 700 6.4 800 2.3 900 1.3 800 0 900 1.3 1000 1.3 900 6.4

1000 1.3 1100 6.3 1000 6.4 1100 2.5 1200 3.8 1100 6.4 1200 6.3 1300 2.5 1200 6.4 1300 5.1 1400 2.5 1300 6.4 1400 3.8 1500 6.3 1400 7.6 1500 7.6 1600 2.5 1500 5.1 1600 57.7 1700 5.8 1600 5.1

1800 5.6 1700 3.8 1900 1.5 1800 3.8 2000 2.3 1900 12.7 2100 5.3 2000 6.4 2200 0 2100 0 2300 0 2200 6.4 2400 1 2300 3.8 100 2 2400 3.8 200 5.6 128.7 300 10.2 400 7.6 500 2 600 0.5 700 2.5 800 10.2 900 1.3 1000 1.3 1100 0 1200 0.5 1300 0.5

The time distribution of the September 1992 rainfall is given in Table 1.26 along with the values and the data of the adopted 100-year, 1,000-year and 10,000-year maximum precipitation.

Page 43: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

38

Table 1.26 Precipitation Data

September 1992 Storm (mm)

Maximum Reduced Storms (mm) Time

(Hours) Observed Reduced 100-y 1,000y 10,000-y 1 2.5 1.4 2.0 2.5 3.22 2.5 1.4 2.0 2.5 3.23 2.5 1.4 2.0 2.5 3.24 3.8 2.1 3.0 3.8 4.85 1.3 0.7 1.1 1.3 1.76 1.3 0.7 1.1 1.3 1.77 0 0.0 0.0 0.0 0.08 2.3 1.3 1.8 2.3 2.99 1.3 0.7 1.1 1.3 1.7

10 1.3 0.7 1.1 1.3 1.711 2.5 1.4 2.0 2.5 3.212 6.3 3.5 5.0 6.3 8.013 5.1 2.8 4.0 5.1 6.514 3.8 2.1 3.0 3.8 4.815 7.6 4.2 6.1 7.6 9.716 57.7 31.7 33.3 57.8 73.6

When the distribution of the September 92 was applied to the 100-year maximum precipitation, the maximum 1-hour precipitation was exceeded. The precipitation data of the 100-year flood was adjusted to prevent the 1-hour maximum to exceed the maximum 1-hour precipitation with a return period of 100-year. Similarly, the reduction coefficient of the same return period was slightly reduced to meet more frequent conditions. The data presented in Table 1.26 constitutes the input data to the flood model to estimate the design floods. In the simulation of the design floods the following conditions were taken into consideration: a) The western disturbances can produce heavy precipitation

during summer as well as in winter, and therefore they can produce maximum precipitation in June.

b) The base flow at the beginning of the flood is considered to be

high; the occurrence of a high flood resulting from snow melt is not considered to be a realistic at the same time as a flood from a rainfall scenario; rainfall is accompanied by a drop in the temperature and consequently, high snow melt floods cannot occur in the event of a rainfall generated flood; the base flow was estimated from the flow records of the gauging station at Kalam.

c) As a consequence of the above, the base flow of the

maximum floods is calculated for every sub-catchment from the specific discharge of the mean monthly flow at Kalam during June. The other conditions remain as in the simulation model of the 1992 flood.

Page 44: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

39

d) The frequency analysis of maximum precipitation obtained

applying the 3-parameter log normal distribution was adopted. The summary of the results of the simulation of the design floods is shown in Table 1.27, obtained from the simulation model. The hydrograph of the 10,000-year flood at the weir site, as shown by the HEC program, is depicted in Figure 1.23. The detailed hydrograph of the maximum rainfall generated floods are given in Annex 3.

Table 1.27

Estimated Maximum Rainfall Generated Floods Maximum Flood (m3/s)

Site 100-y 1,000-y 10,000-y Weir 860 1,450 2,002 Power House 1,095 1,785 2,450

1.4.6 Design Floods

From the results of the flood studies, it is concluded that the floods from snowmelt origin, estimated by frequency analysis are relevant for the short periods of return, while for the larger periods of return, the floods estimated with the precipitation run-off model are more critical. In the latter case, the design floods are composite of the large snowmelt and rainfall generated floods. The maximum values obtained from the flood analysis for the site of the weir and power house, are shown in Table 1.28. The values of the maximum floods are depicted in Figure 1.24.

Figure 1.23 10,000-year Flood at Weir

Page 45: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

40

Table 1.28

Design Floods Maximum Floods

(m3/s) Return Period Weir Site Power H

2 445 521 5 530 617

10 587 681 20 656 755 50 712 822

100 860 1,095 1,000 1,450 1,785

10,000 2,002 2,405

1.5 Sediment Transport

Substantial sediment transport takes place in Swat River in the high flow season only, i.e. from May to October. High river flows largely constitute of snow and glacier melt flow and the sediment yield from the catchment is rather low during the cold season when precipitation is largely snow fall. The riverbed is covered by cobbles and boulders of up to several meter in diameter and is thus largely prevented from contributing to substantial bed load transport. The flow conditions in Swat River are characterized by strong currents and high flow velocities (in excess of 6 to 8 m/s in the high flow season). Previous field studies (PALT, 2006) confirmed that bed load measurement with reasonable accuracy is practically not feasible in this type of mountain-rivers.

10,000

0.010.11

1,00050020010050251052

2102050100

1000

10000

-0.87 1.13 3.13 5.13 7.13 9.13

Probability (%)

Max

imum

Flo

od (m

3 /s)

Snowmelt Generated FloodsRainfall Generated Floods

Return Period (years)

Figure 1.24 Design Floods

Page 46: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

41

For estimation of suspended sediments, series of data on sediment concentrations are available from the sites at Kalam, Kedam and Ramet. The details of the sediment data are included in Annex 4. In accordance with common practice in Northern Pakistan the bed load transport is estimated as a percentage of the measured suspended sediment transport.

1.5.1 Suspended Sediment Transport

For estimation of suspended sediments, series of data on sediment concentrations are available from the sites at Kalam, Kedam and Ramet. The details of the sediment data are included in Annex 4. The sediment data in terms of sediment concentrations converted into sediment transport rates in Ton/day were compared to establish the coincidences or differences in sediment transport rates between the different sites. The sediment samples of Kedam and Kalam were found to have similar rates of transport. Sediment transport rates could be measured at Ramet gauging station at low and medium flows only. Therefore, the justification to use this data for extrapolation of sediment transport at higher discharges is limited. The relation between river flow and sediment transport for the gauging stations at Kalam and Kedam is shown in Figure 1.25. Figure 1.25 indicates that the relationship between river flow and suspended sediment transport remains nearly unchanged in the river reach between Kalam and Kedam gauging stations. Therefore, the rate of sediment transport at the weir site can be calculated reasonably applying the rating curves given in Figure 1.25. The Consultant proposes consideration of two rating curves. The solid curve in Figure 1.25 represents the mean rate of suspended sediment transport, while the dashed line represents a high estimate of the sediment transport which is considered relevant for the design of the desanding facilities.

Page 47: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

42

The suspended sediment transport at the weir site was calculated using both rating curves, and the monthly summary is shown in Table 1.29. The distribution of the suspended sediment transport is shown in Figure 1.26.

Table 1.29 Weir Site: Suspended Sediment Transport

Sediment Transport (Ton)

Period Mean High Jan 2,573 9,991 Feb 2,095 8,135 Mar 3,163 12,283 Apr 13,088 50,829 May 51,361 199,462 Jun 115,199 447,376 Jul 122,822 476,980 Aug 68,950 267,769 Sep 24,966 96,954 Oct 8,339 32,385 Nov 4,410 17,127 Dec 3,196 12,411 Total 420,162 1,631,703

Figure 1.25 Suspended Sediment Rating Curves

y = 1.0404Qw1.3826

R2 = 0.7321

1

10

100

1000

10000

100000

10 100 1000

Water Discharge (m3/s)

Sus

pend

ed S

edim

ent D

isch

arge

(Ton

/Day

)

Kedam Kalamy = 4.0 Qw1.3826

Page 48: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

43

1.5.2 Grain Size Characteristics

The grain size distribution of the samples demonstrates that the size distribution of the suspended sediment is in average made up of 53% Silt (0.0625 < D < 0.0055), 28% Sand (D > 0.0625) and 19% Clay (D < 0.0055). The size distribution does not show a pronounced tendency regarding the increment in concentration or water flow.

1.5.3 Estimation of Bed Load and Total Sediment Transport

The bed load transport at the weir site was estimated as a percentage of the measured and calculated suspended sediment transport. In accordance with common experience in Northern Pakistan and considering the particular conditions of the catchment of Swat River a factor of 10 % was applied to estimate bed load transport based on the calculated suspended sediment transport rates. It is assumed that bed load transport ceases entirely in the period from December to February. The corresponding monthly bed load transport is given in Table 1.30.

0

100

200

300

400

500

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Sus

pend

ed S

edim

ent D

isch

arge

(Ton

*103 )

MeanHigh

Figure 1.26 Suspended Sediment Transport

Page 49: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

44

CHAKDARA GAUGING STATION RESULTS OF FREQUENCE ANALYSIS OF MAXIMUM FLOW

Return Period 2 5 10 20 50 100 1000 10000Distribution T R Value +/- % Value +/- % Value +/- % Value +/- % Value +/- % Value +/- % Value +/- % Value +/- %

NORMAL 1 2 831.5 10. 958.5 10. 1024.9 10. 1079.7 11. 1141.5 12. 1182.6 13. 1297.9 15. 1392.8 16.LOG-NORMAL-2 1 5 818.1 9. 952.0 11. 1030.5 13. 1100.1 14. 1184.2 16. 1243.7 17. 1427.1 20. 1598.2 22.GUMBEL 1 7 806.7 9. 940.1 13. 1028.4 16. 1113.1 19. 1222.7 22. 1304.9 24. 1576.4 29. 1847.4 33. LOG-GUMBEL 1 12 788.6 10.* 949.4 17.* 1073.4 23.* 1207.7 29.* 1406.6 38.* 1576.9 >40 * 2300.3 >40 * 3353.3 >40 *GAMMA 1 4 822.4 10. 955.1 11. 1029.8 12. 1094.3 13. 1170.0 14. 1222.2 15. 1376.7 18. 1512.9 19. LOG-GAMMA 1 10 810.7 11.* 971.7 14.* 1072.6 16.* 1166.3 19.* 1284.3 22.* 1371.8 24.* 1658.5 31.* 1951.9 37.*LOG-WEIB-2 1 3 837.2 11.* 975.9 10.* 1045.1 10.* 1100.5 10.* 1160.9 11.* 1200.2 12.* 1306.4 13.* 1389.7 15.*EXPONENT-1 - 14 576.3 >40 1338.2 >40 1914.6 >40 2490.9 >40 3252.8 >40 3829.2 >40 5743.8 >40 7658.2 >40 GUMBEL MLH 1 11 815.8 13. 1011.6 16. 1141.3 18. 1265.7 20. 1426.7 22. 1547.3 24. 1945.9 27. 2343.8 29. LOG-GUMB MLH 1 13 802.0 16.* 1081.9 25.* 1319.2 33.* 1595.5 >40 * 2040.8 >40 * 2454.3 >40 * 4514.8 >40 * 8296.1 >40 *GAMMA MLH 1 6 821.4 10. 961.6 11. 1040.9 13. 1109.4 14. 1190.0 16. 1245.8 17. 1411.1 20. 1557.2 23. LOG-W-2 MLH 1 1 839.4 11.* 946.6 9.* 998.2 9.* 1038.8 9.* 1082.3 9.* 1110.2 10.* 1184.2 10.* 1240.9 11.*WEIB-3 MLH 1 8 816.5 10. 952.0 10. 1023.1 11. 1081.5 12. 1146.5 13. 1189.4 13. 1307.5 15. 1402.3 16. LOG-W-3 MLH 1 9 811.1 11.* 953.1 12.* 1032.5 13.* 1100.5 15.* 1179.3 17.* 1233.3 18.* 1390.2 22.* 1525.6 24.*GP-NORMAL - 15 838.3 9. 949.2 10. 1004.4 10. 1048.8 11. 1097.5 12. 1129.4 12. 1216.2 13. 1285.1 14.

Table 1.30: Total Sediment Transport at Weir Site

Sediment Transport(Ton)

Suspended Sediments Bed Load Total LoadMean High Mean High Mean High

Jan 2573 9991 0 0 2573 9991Feb 2095 8135 0 0 2095 8135Mar 3163 12283 316 1228 3479 13511Apr 13088 50829 1309 5083 14397 55912May 51361 199462 5136 19946 56497 219408Jun 115199 447376 11520 44738 126719 492114Jul 122822 476980 12282 47698 135104 524678Aug 68950 267769 6895 26777 75845 294546Sep 24966 96954 2497 9695 27463 106649Oct 8339 32385 834 3239 9173 35624Nov 4410 17127 441 1713 4851 18840Dec 3196 12411 0 0 3196 12411Total 420162 1631702 41230 160117 461392 1791819

Period

Table 1.31a: Results of Frequency Analysis of Chakdara Gauging Stations

Madian Hydropower Project

Page 50: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

45

KALAM GAUGING STATION RESULTS OF FREQUENCE ANALYSIS OF MAXIMUM FLOW

Return Period 2 5 10 20 50 100 1000 10000Distribution T R Value +/- % Value +/- % Value +/- % Value +/- % Value +/- % Value +/- % Value +/- % Value +/- %

NORMAL 1 1 408.9 6. 483.1 6. 521.9 7. 563.2 7. 590.0 8. 614.0 8. 681.4 9. 736.8 10.LOG-NORMAL-2 1 9 399.7 6. 478.2 7. 525.3 9. 580.5 10. 619.3 11. 656.4 11. 772.5 13. 883.3 14.GUMBEL 2 11 394.4 6. 472.3 8. 523.9 10. 589.1 12. 637.5 13. 685.5 15. 844.1 17. 1002.4 19.LOG-GUMBEL 3 14 383.5 6.* 472.2 11.* 541.9 14.* 644.9 19.* 733.7 23.* 834.1 27.* 1273.7 >40 * 1943.6 >40 *GAMMA 1 6 402.6 6. 480.6 7. 525.2 8. 575.5 9. 609.6 9. 641.4 10. 736.2 11. 820.4 12.LOG-GAMMA 2 13 393.4 7.* 483.6 9.* 542.9 11.* 617.8 13.* 674.0 14.* 730.4 16.* 925.7 21.* 1139.9 25.*WEIBULL-2 1 3 414.2 6. 484.9 6. 518.5 6. 552.0 6. 572.5 6. 590.3 7. 636.8 7. 672.0 8.LOG-WEIB-2 1 5 406.7 7.* 487.9 7.* 530.9 7.* 576.8 8.* 606.5 9.* 633.2 9.* 707.9 11.* 769.4 12.*EXPONENT-1 - 16 283.4 32. 658.0 31. 941.4 33. 1316.1 35. 1599.5 36. 1882.9 37. 2824.3 38. 3765.7 39.GUMBEL MLH 2 12 397.1 8. 498.4 9. 565.5 11. 650.2 12. 713.1 13. 775.5 13. 981.7 15. 1187.6 16.LOG-GUMB MLH 3 15 388.9 9.* 531.1 14.* 652.7 18.* 846.9 24.* 1027.5 28.* 1244.9 33.* 2346.7 >40.* 4418.5 >40 *GAMMA MLH 1 7 402.1 7. 483.3 7. 529.8 8. 582.5 9. 618.3 10. 651.7 11. 751.3 13. 840.2 14.WEIB-2 MLH 1 4 414.3 6. 484.6 5. 518.0 6. 551.3 6. 571.7 6. 589.3 7. 635.5 7. 670.4 8. LOG-W-2 MLH 1 2 407.6 7.* 481.7 6.* 520.3 7.* 561.1 8.* 587.2 8.* 610.5 9.* 675.1 10.* 727.5 10.*WEIB-3 MLH 1 8 402.8 6. 482.3 7. 524.5 7. 569.4 8. 598.2 8. 623.9 9. 695.2 9. 752.7 10.LOG-W-3 MLH 1 10 396.1 7.* 481.8 8.* 531.6 9.* 588.4 10.* 627.0 11.* 663.1 12.* 770.9 14.* 867.2 16.*GP-NORMAL - 17 411.1 6. 482.3 6. 518.6 7. 556.7 7. 581.0 7. 602.7 8. 662.4 9. 710.7 9.

Table 1.31b: Results of Frequency Analysis of Kalam Gauging Stations

1.6 References

1. WAPDA. Meteorological Data Bank. Snow and Ice

Hydrological Project. Lahore, July 2007. 2. WAPDA. Hydrological Data Bank. Surface Water Hydrology

Project. Lahore, January 2008. 3. Pakistan Meteorological Department. Report on Flood

Activities 1992. Flood Forecasting and Warning Centre. Lahore, February 1993.

4. Moazan Sufi, M. Probable Maximum Precipitation for

November-May Season over the Swat River Basin. Pakistan Meteorological Service. Lahore, Pakistan 1964.

5. Chow, V.T., Maidment, D.R., Ways, L.W. Applied Hydrology.

McGraw-Hill Book Company. New York 1988. 6. Pakistan-German Technical Cooperation. Report on

Hydrological Activities. HEPO-GTZ. Lahore 1999.

Page 51: Feasibility Study for the Madian Hydropower Projectgfg.com.pk/mhpl/Madian Feasibility Study_200902/VOLUME IV HYDRO... · Feasibility Study for the Madian Hydropower Project Weir Axis

Feasibility Study Madian Hydropower Project

7166 P02 Report on Hydrology

1