17
FACTORY SEC NAA Band Date of Insp Ta CURITY INSPECTION RE AFCO Pharma Limited dia, Bhaluka, Mymensing pection: Thursday, June 4, 201 able of content 1 EPORT 15

Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

Embed Size (px)

Citation preview

Page 1: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

FACTORY SECURITY

NAAFCO PharmaBandia,

Date of Inspection:

Table of content

SECURITY INSPECTION REPORT

NAAFCO Pharma Limitedandia, Bhaluka, Mymensing

Date of Inspection: Thursday, June 4, 2015

Table of content

1

REPORT

, 2015

Page 2: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

2

Sl. No. Details Page No.1 Table of content 2

NAAFCO Pharma Limited2 General Information 3

3 Objective 3

4 Observation 3-4

5 Map 5

6 Evaluation 6

7 Pictures 7-9Shetu Pesticides Limited

8 General Information 11

9 Objective 11

10 Observation 11-12

11 Map 13

12 Evaluation 14

13 Pictures 15-17

1. General information

Page 3: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

3

1.1 Inspection organaization’s name: ISF Limited.Team leader: Md. Fahimul Goni Manager, Marketing ISF Ltd.Email: [email protected]: 01614730371, 01678733656Team member: Md. Taiyebur RahmanDate of inspection: Thursday, June 4, 2015

1.2 Client’s name: NAAFCO GROUPAddress: 12/A, Suvastu tower, 6/1, Panthapath, Dhaka.Post Code: 1212Tel: 02-) 8610819, 8610997Contact person’s name: Chowdhury S A Fuad DGM (Operation)Web: www.naafco.com

1.3 Factory’s registered name: NAAFCO Pharma LimitedFactory address: Bandia, Bhaluka, MymensingTel: 01713274255Contact person’s name: Abdul Mumin Khan Admin Officer, Factory

1.4 No. of security Personnel (Hired): 11(Including an In charge and two supervisor)

2. Objective

Finding out the current status and weakness of the factory security.

Suggestion for improvement.

3. Observation

Note: A “ ✔” will be used inside the box of “yes” and “no” to indicate the same. Where any clause is not applicable that is indicate “N/A” inside the box of “yes” and

“no”.

Security Measures Yes No Remarks3.1 Physical Security

Total no. of security personnel

N/AEleven (11). Seems fair enough considering guards position during duty hours in both shifts.

Total no. of security personnel, shift wise

N/A

In charge

Day Shift Night ShiftSupervisor Guard Supervisor Guard

Hired 1 1 2 1 7Total 1 3 8

Duty hour/shift N/ATwelve (12) hours. For sound and perfect dutyhours could decrease to maximum eight (8)

Page 4: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

4

hours for each guard, each shift.

Boundary Walls ✔

The entire boundary wall of west side is in a very weak position, wall went down deep.

Trees covering the view of the west side boundaries. Identified walls need to be

reconstructed and a watchtower is necessary.

Barbed Wire ✔There is no “Barbed wire” on the entire perimeter fencing walls. “Barbed wire” should add entirely.

Lights ✔

There are not enough lights on the perimeter fencing, especially on the west side. I suggest moving flood lights on the west and north side.

Watchtower ✔

There is no watchtower. Wide areas like this factory needs watch tower. I suggest 2 watchtowers, One is near the west gate behind the trees and another in the north-east corner with 360 degree moving flood light.

3.2 Physical Access Control

Identification ✔The main gate security asked for our identity. Didn’t ask what the purpose of visiting was and other details.

Reception ✔ The security requested us to take a sit.Entry register ✔ The security asked for signing the register.Body checking ✔ The main gate security didn’t check our body.

Intercom ✔The security didn’t called the factory manager using the intercom for permission.

Searching equipment ✔No searching equipment seen. (Metal detector or under vehicle searching mirror)

3.3 Information Technology Security

CC Camera ✔No CC Camera in the main gate, factory building or on the perimeter fencing. Camera is very helpful for monitoring.

3.4 Security Environment

Shed ✔

There is only one shed in the north-west corner behind the factory. A couple of plastic sheds near the other gates will be helpful, preventing from the heat and rain.

Weather N/AHarsh weather, very hot and there is only one fan in the main gate reception. Should add fans in sheds, too. It will help improve the performance.

Difficulties ✔Trees on the west side. There should be a watchtower behind the trees.

Page 5: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

5

4. Map of “NAAFCO Pharma Limited”

Page 6: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

6

5. Evaluation

Interviewing the Administrative officer, Mr. Abdul Mumin Khan, we found that the hired guards are

The management doesn’t have any objection about the security but as the company is going to step in to Human pharmacy products they need more trained and advanced service.

The factory needs lady guard/checker also, which we have, but the existing company don’t.

Identification should more strong and specific.

Overall, the commanding personnel, himself didn’t seem strong enough to command the others or even aware about his duties at all.

_____________________________________________________________________________________________

Note:

This report is prepared under the request of the relevant authority.

The undersigned person should be aware of the contents of this report.

Inspection team leader: Md. Fahimul Goni

____________ Signature

Date:

Factory’s representative:Md. Nazrul Islam

____________Signature

Date:

Page 7: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

7

No barbed wire on the entire perimeter fencing.

Need a watch tower on the north-east corner.

Page 8: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

8

Not enough lights on the back of the factory north and west side.

Page 9: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

9

Trees covering the view of the west side boundaries.

Boundaries are low in some places.

Page 10: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

FACTORY SECURITY INSPECTION REPORT

Shetu PesticJadurchar, Hemayetpur, Savar, Dhaka

Date of Inspection: Saturday, May 30, 2015

1. General information

1.1 Inspection organaization’s name:Team leader: Md. Fahimul Goni Manager, Marketing

FACTORY SECURITY INSPECTION REPORT

Shetu Pesticides LimitedJadurchar, Hemayetpur, Savar, Dhaka

Date of Inspection: Saturday, May 30, 2015

Inspection organaization’s name: ISF Limited.Md. Fahimul GoniManager, Marketing

10

FACTORY SECURITY INSPECTION REPORT

Date of Inspection: Saturday, May 30, 2015

Page 11: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

11

ISF Ltd.Email: [email protected]: 01614730371, 01678733656Team member: Md. Tawhidul AlamDate of inspection: Saturday, May 30, 2015

1.2 Client’s name: NAAFCO GROUPAddress: 12/A, Suvastu tower, 6/1, Panthapath, Dhaka.Post Code: 1212Tel: (02-) 8610819, 8610997Contact person’s name: Chowdhury S A Fuad DGM (Operation)Web: www.naafco.com

1.3 Factory’s registered name: Shetu Pesticides LimitedFactory address: Jadurchar, Hemayetpur, Savar, DhakaTel: 01717672748Contact person’s name: Md. Nazrul Islam Manager, Factory

1.4 No. of security Personnel (Private): 4 (Including a supervisor)No. of security Personnel (Hired): 7 (Including a supervisor)

2. Objective

Finding out the current status and weakness of the factory security.

Suggestion for improvement.

3. Observation

Note: A “ ✔” will be used inside the box of “yes” and “no” to indicate the same. Where any clause is not applicable that is indicate “N/A” inside the box of “yes” and

“no”.

Security Measures Yes No Remarks3.1 Physical Security

Total no. of security personnel

N/A

Eleven (11). Seems fair enough considering guards position during duty hours in both shifts. A couple of guards can be increased during the day shift.

Total no. of security personnel, shift wise(including private guards )

N/A

Day Shift Night ShiftSupervisor Guard Supervisor Guard

- - 1 3Hired 1 2 - 4Total 3 8

Duty hour/shift N/A Twelve (12) hours. For sound and perfect duty duty

Page 12: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

12

hours could decrease to maximum eight (8) hours for each guard, each shift.

Boundary Walls ✔

Boundary wall of north-east side found leaned backwards.

The height of the entire wall of east side is comparatively low than the other sides.

There is a shed covering the view of the top of the generator room in the west-north corner.

Identified walls need to be reconstructed.

Barbed Wire ✔There is no “Barbed wire” on the walls other than the “Belly keds factory” wall. “Barbed wire” should add entirely.

Lights ✔There are lights on the top of the wall on east side, but when it rains the lights may go dead. Precaution should take for rainy season.

3.2 Physical Access Control

Identification ✔The main gate security asked for our identity and details. Didn’t ask what the purpose of visiting was.

Reception ✔ The security requested us to take a sit.

Entry register ✔The security didn’t asked for signing the register. Register must sign for keeping the record.

Body checking ✔ The security didn’t check our body.

Intercom ✔The security called the factory manager using the intercom for permission.

Searching equipment ✔No searching equipment seen. (Metal detector or under vehicle searching mirror)

3.3 Information Technology Security

CC Camera ✔No CC Camera in the main gate, factory building or on the perimeter fencing. Camera is very helpful for monitoring.

3.4 Security Environment

Shed ✔

There is only one shed in the west end of the passage between fertilizer and genolar unit. A couple of plastic sheds will be helpful, preventing the heat and rain.

Weather N/AHarsh weather, very hot and there is only one fan in the main gate reception. Should add fans in sheds, too. It will help improve the performance.

Difficulties ✔Tiny insects biting every single uncovered parts of the body. An umbrella can prevent that.

Page 13: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

13

4. Map of “Shetu Pestisides Limited”

Page 14: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

14

5. Evaluation

Interviewing the Factory Manager, Mr. Nazrul Islam, we found that the hired guards are

Failing again and again following the instructions. Such as, entering the register. They are not trained properly. Such as, how and where to check a vehicle. During the inspection, guards who were engaged in patrolling seems tired and

weak. Identification should more strong and specific.

They failed to answer when we asked the location of their own office.

Overall, the commanding personnel, himself didn’t seem strong enough to command the others or even aware about his duties at all.

_____________________________________________________________________________________________

Note:

This report is prepared under the request of the relevant authority.

The undersigned person should be aware of the contents of this report.

Inspection team leader: Md. Fahimul Goni

____________ Signature

Date:

Factory’s representative:Md. Nazrul Islam

____________Signature

Date:

Page 15: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

15

Page 16: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

16

Page 17: Factory security inspection, NAAFCO Pharma Limited and Shetu Pesticide Limited

17