Experiences from offshore wind installations in the North Sea Science Meets Industry April 2014 Maria Pedrosa - Head Aviation Services

Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

Experiences from offshore wind

installations in the North Sea

Science Meets Industry – April 2014

Maria Pedrosa - Head Aviation Services

Page 2: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

Silicon Valley

Anchorage

Houston

New York

Rio de Janeiro

Singapore

Tokyo

Seoul

Shanghai

Hong KongDubai

Baku

London

Aberdeen

Stavanger

Bergen

Oslo

Stockholm

Copenhagen

Hamburg

STORMGEO GROUP – where we are

COMPETENCE - INSPIRATION - INNOVATION

22 Offices g 7 Forecast Centres g 1 Vision

24/7 Operation Centres / Sales

Daytime Operational Support / Sales

R&D

Miami

Muscat

Page 3: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

3

Core competenceDecision Support for Weather

Sensitive Operations.

Core competence• Meteorology

• Oceanography

• Naval Architecture

• Statistics

• Business development

SolutionsTransforming know-how into

cutting edge products together

with our customers.

STORMGEO GROUP – what we do

Page 4: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

REFERENCES - North Sea/Irish Sea

Project Client

Thanet Vattenfall

London Array London Array Ltd.

Sheringham Shoal SCIRA

Gwynt y Môr RWE Innogy

Dogger Bank Fred.Olsen Windcarrier

and Forewind

Humber Gateway E.ON

Dudgeon SCIRA

Beatrice SSE/Repsol

Firth of Forth Seagreen, ESG

Hywind Scotland Statoil

Page 5: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

Project Client

BARD 1 BARD

Nordsee Ost RWE Innogy

alpha ventus EWE

Riffgat EWE

Meerwind WindMW

Amrumbank E.ON

DanTysk ABJV, Van Oord

Borkum I Technip

HelWin1 SeaRenergy

BorWin2 SeaRenergy

Baltic 1 EnBW

Baltic 2 EnBW

Butendiek WPD

REFERENCES - GERMANY

Page 6: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

FORECAST SITES

Page 7: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

WHAT IS A WEATHER FORECAST?

‘A prediction of the future state of the atmosphere

based on current atmospheric conditions’

Page 8: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

OBSERVATIONS

• Provide an accurate starting point to the forecast

• Allow real-time monitoring

• Provide a dataset for analyses, e.g.

- forecast verification

- hindcast reports

- future design criteria

Key to accurate forecasts

Page 9: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

Forecast Models simulate the physical processes of the

atmosphere to produce a numerical forecast

FORECASTING

Page 10: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

WRF 9 km WRF 3 km WRF 1 km

SAM

Global

Models25-100 km

Regional Models1-16 km

Local Fine Scale Models300m-4 km

3DVar/ENKF

SWAN 300m

Projects

External Data From Global to Local

FINE SCALE MODELLING

Page 11: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE NEARSHORE ENVIRONMENT

Challenges:

• Model Land/Sea mask

• Coastal Effects

• Tidal Effects

Successful Forecasts:

• Observations

• Forecaster Intervention

• May Require Fine-scale Models

Grid spacing 16km

Page 12: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE NEARSHORE ENVIRONMENT

Challenges:

• Model Land/Sea mask

• Coastal Effects

• Tidal Effects

Successful Forecasts:

• Observations

• Forecaster Intervention

• May Require Fine-scale Models

Grid spacing 16km

Page 13: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

WAVE MODELS AT 300M RESOLUTION

Hit 65%

ME -0.3

Hit 72%

ME -0.2

SWAN 300 m Broadhaven

ECMWFECMWF

Page 14: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

WAVE MODELS AT 300M RESOLUTION

Hit 65%

ME -0.3

Hit 72%

ME -0.2

SWAN 300 m Broadhaven

ECMWFECMWF

June 2013 Broadhaven Bay

Swan model identified an operational window for a Shell umbilical

laying job that saved 2-3 weeks of work

Page 15: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Observations

Numerical Modelling

Customer Forecast

Human Forecaster

Page 16: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecaster intervention is done on raw model output

Page 17: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecaster intervention is done on raw model output

Page 18: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecasts to Customer

Page 19: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecasts to Customer

Page 20: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecasts to Customer

Page 21: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecasts to Customer“Hi Bard1 – High risk of lightning between

1500 and 1800 today when front passes”

Page 22: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecasts to Customer“OK RWE NSO – High confidence of

weather window tomorrow. Hsig falling

below 2.1m between 0300 and 2200”

Page 23: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

THE FORECAST PROCESS

Forecasts to Customer

“Yes LAL – Winds above 22ms-1 for next 12 hours,

but decreasing below by 0600 tomorrow”

Page 24: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

SAFE AND EFFICIENT OPERATIONS

We manage numerous customer operational limits. It can be very complex!

One Customer typically has the following limits:

Crew boat transfer to turbines: Hsig = 1.0-1.3 m

Crew transfer to turbines by helicopter:

Wind 22 m/s. Vis. 5km. Cloud base 1500ft

Work on rotating parts in turbine: 15 m/s

All work on turbine: 25 m/s

Page 25: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

SAFE AND EFFICIENT OPERATIONS

We manage numerous customer operational limits. It can be very complex!

……and more:

Crane vessel ops:

Transfer: Hs 2m. Wave period 8s

Jack-up: Hs 0.5-0.75m - depending on

direction of vessel vs wave direction

Crane ops: 9m/s at 100m

Page 26: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

PositionStormGeo is the challenger in

this market, as well as offering

services to oil&gas operators

not having integrated solutions

today.

Products• Official aviation forecasts

• Operational decision

guidance

• Aviation training

• Aviation instrumentation

CertificationStormGeo is the only ICAO

certified private company in

Europe for producing aviation

forecasts.

CERTIFIED AVIATION FORECASTS

Page 27: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

DECISION SUPPORT SOLUTIONSIntegration of our capabilities and deliveries into our customers’ operative environment

Manage risk

Improve planning

Control cost

Reduce down-time

Protect revenue

We help our

customers to

Page 28: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

28

EXPANDING KNOWLEDGE

• Weather Appreciation Workshops

• Specialist Lunch and Learns

• Reciprocal Liaison Visits

Page 29: Experiences from offshore wind installations in the … 2014/SMI Stavanger...Experiences from offshore wind installations in the North Sea Science Meets Industry –April 2014 Maria

29

Thank You