Module 101JA LASER SCAN, QC LNG Module Yard, Thailand 13° 3'15.24"N | | | 100°54'53.78"E Establishing Practice Guidelines for Using Building Information Modeling (BIM) Information in Construction Joseph Betit, Bechtel Construction 2014 TRB / NIBS Workshop Event Number: GPW14-006 Presentation Number: P14-5383 CIVIL GOVERNMENT SERVICES MINING & METALS OIL, GAS & CHEMICALS POWER

Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

  • Upload
    lycong

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Module 101JA LASER SCAN, QC LNG Module Yard, Thailand

13° 3'15.24"N |||| 100°54'53.78"E

Establishing Practice

Guidelines for Using

Building Information

Modeling (BIM) Information

in Construction

Joseph Betit, Bechtel Construction

2014 TRB / NIBS Workshop Event Number: GPW14-006 Presentation Number: P14-5383

CIVIL

GOVERNMENT SERVICES

MINING & METALS

OIL, GAS & CHEMICALS

POWER

Page 2: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Construction Digital Project Delivery Vision

© Bechtel | 2

� Leverage Technology to Improve

– Project internal and cross-functional communication

– Safety and environmental processes

– Lean work processes

– Model driven scheduling

– Material logistics and quantities tracking and reporting

� Key Elements of Success for Deployment

– Communication

– Data Integrity

– Integration

– Scalable

Page 3: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

The Modes of Digital Project Delivery in Bechtel – a Global Company

� BIM

� Virtual Design Construction

� Virtual Work Front

� Virtual Project Delivery

© 2012 Bechtel | 3

Digital Project Delivery in Bechtel Must Be

Designed to Support Projects and Local Staff

on Every Continent

Page 4: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Construction Benefits of DeploymentAreas of Interest

� Model Requirements

� Visualization and Augmented Reality

� Construction Sequence (4D) and Work Packaging

� Construction Installation Planning

� As-built Information Integration with Model

� Data Access and Integrity

� Competency and Capability

© 2012 Bechtel | 4

Page 5: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Changing the Processes – Discussion and Communication Across Functional Groups is a Key Activity for Success

� Vision

� Value

� Roles and Responsibilities

� Software Programs

� Path Forward

– How do we get there?

– What are the first steps?

– How do we evaluate maturing vendor programs?

– What is the timeline and future near term milestones for BIM

implementation by construction?

© 2012 Bechtel | 5

Page 6: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

The BIM Information Model Handoff Chain and Improved Communication

© 2012 Bechtel | 6

PROCPROPOSAL ENGR CONSTCLIENT

START

UP O&M ASSET

BIM as vehicle for improved communication of Construction requirements

Page 7: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Relative Value of BIM to Participants

� IS BECHTEL RECEIVING APPROPRIATE COMPENSATION FOR BIM CREATION?

© Bechtel | 7

CONSTRUCTION

& TURNOVER

OPERATION &

MAINTENANCE

ENGR

CLIENT ASSET

LIFE CYCLE TO DEMOLITION

SCHEDULEON TIME DELIVERY TO

CLIENT OF AGREED

DELIVERABLE

REVENUE FLOWON TIME START

Page 8: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Productivity Baseline – Where Is It?

© 2012 Bechtel | 8

?

Page 9: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Global Staff Demographics

© 2012 Bechtel | 9

Our Project and Company Workforce Dilemma

Arc of Compensating Actions

Formalized:

• Procedures

• Processes

• Hierarchical Structures

TECHNOLOGY

Page 10: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Demographics of Global Construction Companies

With Staff on All Continents – Years With the

Company – Will BIM Help Bridge the Experience

Gap?

© 2012 Bechtel | 10

Page 11: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Construction BIM Goals – Merger of Design Models With Laser Scan and Laser Tracker Field Data

� Smart Plant Review (SPR)

� Tekla design detail models

merged

� Static laser scanner and laser

tracker point cloud field data

information

– LNG Modules

– LNG Tanks

– Turbine Deck Dimensional Control

© Bechtel | 11

� LNG Module Design Model Merged With Laser Scan

Point Cloud

� LNG Module static laser

scan � Turbine Deck

Page 12: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

This is What the Real Work Front Looks Like

© 2012 Bechtel | 12

Page 13: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Tools for Virtual Work Front Delivery at the Work Face – Move From Desk To Field

© 2012 Bechtel | 13

Page 14: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Tunnel Cut and Cover Laser Scan

© 2012 Bechtel | 14

Page 15: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Data Fusion – Laser Scan and Models3D Tunnel Model - Tunnel Invert Boxes - Support

Structures

© 2012 Bechtel | 15

Page 16: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

What Form Will the Virtual Work Front Tools Take That Will Aide The Constructors at the Work Face?

© 2012 Bechtel | 16

Page 17: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

How Will Technology Change Quality and Productivity? ROI?

© 2012 Bechtel | 17

Page 18: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Hand Held Portable Scanners for Field Engineer Materials Tracking and Quality Assurance – ZEB1

� Tekla model + hand held 3D

Laser Mapping ZEB1 laser

scanner

– Training of scanning process is quick

© Bechtel | 18

Page 19: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Low Cost Hand Held 3D Imaging Devices Will Drive Software Data Interoperability – Dotproduct image synthesis

© 2012 Bechtel | 19

Trimble

Page 20: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Bentley

© 2012 Bechtel | 20

Page 21: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Autodesk

© 2012 Bechtel | 21

Page 22: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

BIM Long Term Construction Focus Areas

� Evaluation areas:

– Via model point and click ability with direct access to information; vendor data,

fabrication documents, inspection and test data, etc.

– In the model identify Construction work sequences and work packages

(electronic Work Package development)

– Use model for temporary construction;

» Temporary utilities and facilities

» Test and Hazard boundaries

» Construction equipment including rigging activities

» Scaffold planning

– Construction completion status identified and tracked in the model

© 2012 Bechtel | 22

Page 23: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Path Forward - Partners

� BIM and CAD Software Partners

– Smart Plant 3D (Intergraph - Hexagon)

– MicroStation (Bentley)

– Revit, BIM 360, Glue (Autodesk)

– Tekla, Sketchup (Trimble)

– Synchro 4D

� Survey, Machine Control and Laser Scanning Partners

– Trimble (survey)

– Leica - Hexagon (survey and laser scanning)

– MDL (mobile laser scanning)

– 3D Laser Mapping (mobile laser scanning and ZEB 1 hand held scanner)

– DotProduct (hand held 3D Imaging)

© 2012 Bechtel | 23

Page 24: Establishing Practice Guidelines for Using BIM Information ... · BIM Long Term Construction Focus Areas Evaluation areas: – Via model point and click ability with direct access

Path Forward – COTS InteroperabilityDirect Hire and Project/Contract Mgmt

© 2012 Bechtel | 24

SUBCONTRACTORS

(populate BIM)

INFOWORKS

TEAMWORKS

BPS

PARTNERS

(Software Suites)

SUPPLIERS

(populate BIM)

iRING(ISO 15926)