    Criterion for Selection ofEPC Partner

    Presented by - B N Bhardwaj

    May 16 , 2012

    Electrotherm Immodo Renewables Ltd.

    Global Solar EPC summit India

    2012

  • 7/28/2019 Epc Summit

    3/41

    Solar projects

    1. Licensee / PPA regime :-

    Projects allotted by NVVN

    Projects allotted by States

    2. Renewable Energy Certificate (REC) mechanism3. Renewable Purchase Obligations (RPO)

    4. Allocation of projects linked with setting up of solar

    manufacturing facilities

    5. Roof top projects arising out of policies by MNRE andvarious states

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    4/41

    What is there in Store National solar Mission ----- to achieve 20000 MW by

    2020

    Gujarat Planning to add 5000 MW of solar PV Plants

    Rajasthan Developing a global hub of solar power andhas a target of 10000-12000 MW in the long term

    Karnataka 80 MW

    Madhya Pradesh bidding process already over. States

    like Rajasthan, Maharashtra, Tamil Nadu and Andhra

    Pradesh are in various stages of bidding process.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    5/41

    Contd..

    World wide 2012 may see a capacity addition of 20-30GW around the world.

    Main capacity addition will be contributed by China and

    India, followed by the southeast Asia, Latin America,the Middle East and North Africa in the next five years.

    MNRE and many states are now in the process of

    forming Roof top policy.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    6/41

    NodalAgencies

    Developer

    Discoms

    State

    Govt.

    NVVN /

    MNRE

    Financial

    Institutions

    Local

    Admn

    Custom Excise

    Electrotherm Immodo Renewables Ltd.

    Stake Holders

  • 7/28/2019 Epc Summit

    7/41

    EPC for Solar PV - Definition

    Under an EPC contract, the EPC Provider willEngineer/Design the installation, Procure the necessary

    materials and Construct the PV Installation. The EPC

    Provider bears the projects risk not only in terms of

    timing but also in terms of budget

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    8/41

    EPC Roles

    Electrotherm Immodo Renewables Ltd.

    Investor

    EPCIntegrator

    DevelopingLegal &

    Financial

    advice

    Engineering Procurement ConstructionO & M

    Full

    Services

  • 7/28/2019 Epc Summit

    9/41

    EPC - Definition

    An Investor/Owner chooses an EPC Provider for severalcritical reasons, that is:

    EPC approach ensures quality and minimizes risks,

    EPC gives the Investorone point contact, facilitating

    its monitoring and coordination

    Owner is not affected by the market componentsfluctuations, since the Investment amount is known at

    the start of the project.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    10/41

    Reasons for EPC contract

    Reduced stress for owner

    Single point of contact for owner simplifies execution

    and communications.

    Ready availability of post-commissioning services

    Ensures quality construction and reduces practical issues

    faced in other ways

    Owner is protected against changing prices for materials,

    labor, etc.

    Cost is known at the start of the project

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    11/41

    Points to consider

    Scope and the specifications of the plant

    Quality

    Project duration

    Cost

    The cost (the price to be paid to the EPCC) is negotiated

    and finalized and paid in mutually agreed installments.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    12/41

    Why EPC is important

    The project installation in Solar PV Power project is a crucial

    step as it involves perfect planning, technical expertise and

    right execution strategy

    Selecting right EPC provider holds key to successful and

    sustainable business revenue for developer

    Project requires right PMC skills to keep watch on milestonesand EPC work quality during project installation.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    13/41

    Role of EPC in solar

    An EPC Contractor executes a Solar Power Plant projecton turnkey basis, which includes plant design &

    engineering, procurement and construction at site.

    The EPC Contractor is responsible for delivering thesolar plant within agreed cost, time and with desired

    quality

    The EPC Contractor guarantees plant performance, thusenabling the project developer to avail finance from their

    banking partners.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    14/41

    Criterion for EPC partner

    EPC company shall be backed up with:- Vast experience

    World wide presence

    Experience of working under different conditions

    Execution of project in given time frame . Revenue is

    directly linked to time taken by EPC contractor.

    In house manufacturing and technical capabilities

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    15/41

    Contd..

    In house ready availability of construction equipments

    like:-

    Diesel Generator,

    Porta cabins,

    Portable diesel lights,

    Hydra, crane, Fork lift etc.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    16/41

    Criterion for EPC Partner -

    Operation & Maintenance

    Should have experience of managing solar assets and

    assure performance globally.

    Provide additional value at market prices analyzingproduction daily with optimization software.

    Control system accessible to an investor/banker daily by

    cell phones or through password protected on-line accessfor each specific project for stakeholders to see

    operations in anywhere in the world .

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    17/41

    How EPC achieves its objective

    Realistic planning and scheduling

    Efficient and economic design of plant

    Source material & equipment globally from proven

    manufacturers

    Manage logistics of delivering material & equipment to

    site.

    Expediting delivery to ensure project is completed on

    schedule

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    18/41

    Cost optimization that includes using designs based on

    local standards, reducing manufacturing cost, forming

    strategic alliances, maximizing local content, and

    standardizing the power block design.

    Clear and clean installation of panel, inverter and cable

    is important task from O & M perspective once EPC

    completes his job.

    Electrotherm Immodo Renewables Ltd.

    Contd..

  • 7/28/2019 Epc Summit

    19/41

    Key Selection

    Modules

    Stability of module manufacturer

    Size

    Modules of only tier 1 manufacturers Best available efficiencies,

    Positive tolerances,

    Proven reliability and

    25 years performance warranty

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    20/41

    Key Selection

    Modules

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    21/41

    Contd..Inverters

    Only from internationally reputed manufactures

    Best efficiency,

    Thermal tolerance,

    Minimum auxiliary power consumption and Proven performance under Indian conditions.

    For large size projects larger capacity like 800 KW

    with IP65 (outdoor) installation.

    Inverters, transformers and AC side equipments shall

    be economically sized without sacrificing energy

    generation or plant / equipment long term reliability.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    22/41

    Contd..Inverters

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    23/41

    Contd..Transformers

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    24/41

    Contd..

    Module Mounting Structure Module mounting structures (MMS) are designed to

    meet site conditions

    Maximum wind velocity; Ease in prefabrication,

    Ease in Transportation & Installation (totally bolted

    construction)

    Hot dip galvanized carried out under strict qualitycontrol.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    25/41

    Contd..

    Module Mounting Structure

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    26/41

    Contd..Cabling

    Adequately sized DC & AC cables to ensureminimum losses, long term reliability

    Cables are to be buried at suitable depth underground

    with inspection chambers suitable at suitable

    distances.

    PE warning tapes are installed in entire cable trench

    to protect the cable.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    27/41

    Contd..Cabling

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    28/41

    Contd..Washing of modules

    A well designed piped (non corrosive PVC) wash watersystem:-

    Eliminates the dependence of local water tankers

    Dust raised by them while moving in the plant area.

    Ensures minimum water consumption

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    29/41

    Contd..Tilt

    Key factors affecting:- Land

    Budget

    Incremental cost

    Type :-

    Fixed Tilt

    Seasonal Tilt

    Single Axis tracking

    Double Axis tracking

    Seasonal Tilt is most preferred these days because of Incremental land required is very marginal

    Can be operated through semi skilled labor.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    30/41

    Overall Plant Design

    To make best and effective use of land available.

    Fully accessible in case of hazards,

    Security & O & M aspects

    Computes and predicts energy generation data usinglatest tools and solar.

    Meteo data bases like PVSyst 5.31,

    METEONORM 6.1 etc.

    Shadow analysis is conducted for the proposedconstruction.

    Very effective Lightning Arrestor (L A) for Solar Field.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    31/41

    Monitoring/optimization/control system integrated witha 1st class security system with on-site surveillance when

    alarms are tripped.

    24*7 manned control center which manages distributedskilled O&M workforce.

    Electrotherm Immodo Renewables Ltd.

    Contd..

  • 7/28/2019 Epc Summit

    32/41

    Overall Plant Design Finer Points Provision of Ring Main Units (RMU) for switching,

    transformer protection and redundancy

    Provision of UPS with sufficient back up supply toinverters ensuring quality of power as well as continuity.

    Data Monitoring System (DMS) is critical and shouldhave features like remote accessibility.

    Weather Monitoring Station (WMS) with data logger

    and parameters like temperature measurement ofambient and module frame, anemometer, rain gauge,relative humidity etc.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    33/41

    Overall Plant Design Finer Points

    Electrotherm Immodo Renewables Ltd.

    RMU

    DMS

    WMS-PYRANOMETER

  • 7/28/2019 Epc Summit

    34/41

    Electrotherm Immodo Renewables Ltd.

    Sr. No. PERFORMANCE RATIO (PR)

    1 PV Syst Estimation 74.4%

    2 EIRL Guarantee for FAT 73%

    3 Actual Average PR achieved during

    FAT

    76.66%

    4 Max. PR achieved during FAT 80.82%

    5 PR Result 5% gain overguaranteed PR value

    Note: FAT stands for Facility

    Acceptance Test. It was conducted

    for 30 days (720 hours continuously)

    15 MW Solar PV Plant, Solar

    Park, Charanka

  • 7/28/2019 Epc Summit

    35/41

    Electrotherm Immodo Renewables Ltd.

    Sr. No. ENERGY GENERATION

    1 PV Syst Estimation 24.1 million

    units/annum

    2 EIRL Guarantee for Generation in 1st Year 23.25 million

    units/annum3 Target Energy Generation Target for April

    2012 based on Ratio of Radiation for April

    and Total Annual Radiation

    2.30 million units

    4 Actual Energy Generation in April 2012 2.46 million units

    5 Energy Generation Result 5 % above

    guaranteed

    generation

    15 MW Solar PV Plant, Solar Park,

    Charanka

    P f C i S l PV

  • 7/28/2019 Epc Summit

    36/41

    Electrotherm Immodo Renewables Ltd.

    Performance Comparison at Solar PV

    Gujarat Solar Park, Charanka

    Source: SLDC, Gujarat

    STATION

    April 2012-

    Generation (Export-

    Thousand Units)

    (Reference:SLDC)

    Thousand Units/MWp

    in April 2012

    Performance

    (Rank)

    Palace (15 MWp) 2467 164.47 1

    Developer 2 (20 MWp) 3281 164.05 2

    Developer 3 (6 MWp) 966 161.00 3Developer 4 (10 MWp) 1577 157.70 4

    Developer 5 (25 MWp) 3899 155.96 5

    Developer 6 (25 MWp) 3863 154.52 6

    Developer 7 (25 MWp) 3848 153.92 7

    Developer 8 (5 MWp) 735 147.00 8

    Developer 9 (10 MWp) 1437 143.70 9Developer 10 (25 MWp) 3583 143.32 10

    Developer 11 (5 MWp) 694 138.80 11

    Developer 12 (5 MWp) 668 133.60 12

    Developer 13 (15 MWp) 1267 84.47 13

    Developer 14 (15 MWp) 856 57.07 14

  • 7/28/2019 Epc Summit

    37/41

    Electrotherm Immodo Renewables Ltd.

    Performance Comparison at Solar PV

    Gujarat Solar Park, Charanka

    Source: SLDC, Gujarat

    0.00

    20.00

    40.00

    60.00

    80.00

    100.00

    120.00

    140.00

    160.00

    180.00

    Gross Energy Export-April 2012(Thousand Units/MWp)

    Palace (15 MWp)

    Developer 2 (20 MWp)

    Developer 3 (6 MWp)

    Developer 4 (10 MWp)Developer 5 (25 MWp)

    Developer 6 (25 MWp)

    Developer 7 (25 MWp)

    Developer 8 (5 MWp)

    Developer 9 (10 MWp)

    Developer 10 (25 MWp)

    Developer 11 (5 MWp)Developer 12 (5 MWp)

    Developer 13 (15 MWp)

    Developer 14 (15 MWp)

  • 7/28/2019 Epc Summit

    38/41

    Guaranteed and Enhanced plant performance. ProvenGuarantee.

    One-point contact

    Upfront knowledge of project cost and payment terms

    Insulation from variation of prices

    Electrotherm Immodo Renewables Ltd.

    Fruits of Good EPC

  • 7/28/2019 Epc Summit

    39/41

    Insulation from variation of prices

    LD clauses - timely completion

    Effective O&M service as they are the ones whoconstructed the plant in the first place.

    Other Value added services.

    Electrotherm Immodo Renewables Ltd.

    Contd..

  • 7/28/2019 Epc Summit

    40/41

    So choose your EPC partner carefully

    COST SHOULD NOT BE ONLY

    FACTOR.

    Electrotherm Immodo Renewables Ltd.

  • 7/28/2019 Epc Summit

    41/41

    THANK YOU