Introduction

EOSS at A Glance

What We Do

Our Projects

Competitiveness Advantages

Personnel Breakdown

Quality & HSE

Our Tools and equipments

Our Certifications

Organization Chart

Summary of Accomplishments

Business Focus

Client base

11/2/2015 www.eossae.ae 2

Page 3: EOSS Presentation - DPF

Founded in 1989

100% Locally owned, Part Of Al Qubaisi Holdings

Wholly owned premises in Abu Dhabi & Dubai (incl. Warehouse (300 sq.m)

5 Sister Companies

Networking Professionals

ESAS

KOTE – Khalifa Obaid Trading Establishment

KOGM – Khalifa Obaid General Maintenance

GMCE – Grand Maintenance & Contracting Establishment

250 Permanent Staff

ISO 9001:2008 Certified since 2005

ISO 14001 Accreditation under process

11/2/2015 www.eossae.ae 3

Page 4: EOSS Presentation - DPF

EOSS is an I.T. & Telecom Infrastructure Service Provider company specializing indesigning, implementation and execution of:

11/2/2015 www.eossae.ae 4

Page 5: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 5

• Designing and implementation of complete SCS networks

• Capability to provide a total turnkey installation service to implement acomplete LAN/WAN environment

Structured Cabling

• Installatation, configuration and commissioning of Point to Point, Pointto MultiPoint Wireless solutions

• Microwave links - installation, configuration and line of sightWireless Networks

• PDH-SDH migration, commissioning, ATM/Frame Relay

• Installation and commissioning of GPON & IP TechnologyNetwork Operations

• Installation and commissioning of customer premises networkequipment and integration onto carrier’s network

• Project Management

Customer Premises Equipment Installations

• Outside Plant Cabling deployment

• Multipair Cabling Designs, Jointing, Termination and Testing

• Splicing and termination of Fiber Optic Cable

Outside Plant Cabling

Page 6: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 6

• Designing and provision of a complete solution for any nature ofprojects – small, medium and large.

• Experience with a vast number vendors and technologies

Closed Circuit Television Cameras

• Installation of Intrusion detection systems, Card Readers, RFID/NFCsolutions, Biometric Entry systems, Gate Barrier systems, etc.

• Highly skilled professionals to configure and commission the systems

Access Control Systems

• Installation, testing and commissioning of various PA/BGM systemsfrom several different vendors and technologies

Public Address Systems

• Installation, testing and commissioning of Fire Alarm systems

• Complete understanding of Heat detectors, smoke detectors, BreakGlass, etc.,

Fire Alarm Systems

• Time Display systems, Building Management System, Securitynetworks, Master clocks, Perimeters intrusion detection systems,RADAR, Terrestrial Trunk radio, Port operating systems etc.,

Special Projects

Page 7: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 7

We have been operating in the region for more than 2 decades – our experiencegives us an integral knowledge of the regional market and outstanding reach andexpertise to fully understand Project/Client requirements. We are perfectlypositioned to understand what resources are required to successfully execute andultimately deliver complex Projects.

• Access Requirement from Client

Stage 1

• Search Our own Database

• Search our resources to screen a suitable candidate

Stage 2 • Submit the resume to client for approval

Stage 3

•Once approved, Complete the outsourcing process

•Regular service enquiry is done to ensure the candidate stands upto expectation

Stage 4

Page 8: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 8

I.T & Telecom

•PMP Certified Engineers

•Cisco Skill Set CCNA, CCNP, CCIEprofessionals

•Microsoft Skill Set

•Oracle Professionals

•Onshore-Offshore DevelopmentProfessionals

•Electronic Engineers

•Telecommunication Engineers

•Cabling Staff

Engineering Services

• Project Managers

• Contract Engineers

• Mechanical Engineer

• Electrical Engineer

• Network Engineers

• HSE Engineers

• Procurement Engineers

• Engineering Support Services:

AutoCAD, HSE, Project Coordinator

• Admin Staff

Oil and Petroleum

• Petroleum Engineer

• Geotechnical Engineer

• Operation Engineer

• Maintenance Engineer

• Process Engineer

• Instrumentation Engineer

• Procurement and Contract Engineer

• Equipment Engineer

• Technicians

• Admin Staff

EOSS can help by providing resources – on our visa and payroll – to perform specificfunctions. This could be on temporary assignment or project oriented (time/material) forthe vacancies where clients don’t want to be burdened with the overheads of employingpeople on their payroll and visa.

Page 9: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 9

Page 10: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 10

Our solutions are consistent with the full spectrum of IT Infrastructure Library (ITIL)standards-based processes, such as :-

Incident and Problem Management

Change Management

Release Management

Service-level Management

Capacity and Availability Management

Continuity and Configuration Management

EOSS currently offers Managed I.T. Services in the following areas:

Datacenter Establishment IT Facilities Management Remote Management Managed Security System Integration Infrastructure Optimization

Page 11: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 11

EOSS believes in providing a very cost effective Maintenance solution to itscustomers.

We have the right service levels and will customize them for you to provide youwith time-sensitive response to critical business functions.

EOSS has the right support options to help you reduce your IT costs by providinga more responsive alternative to overpriced manufacturer maintenance.

Our project support team is dedicated to ensuring projects run smoothly and ontime.

Covering activities such as site surveys, site supervision, clerk-of-works activityand site audits, they provide an additional resource to the project managementteam.

Our Support team is 24x7 at work to cater to problems of any scale and nature.

Page 12: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 12

Our dedicated team of professionals have a complete understanding and experienceto analyse, install and commission:

Raised Flooring

Environmental Management System

Cooling Systems

Uninterruptible Power Supply

FM200 – Fire Fighting

Closed Circuit Television Systems

Access Control Systems

Fire Alarm System

Leak Detection System

Very Early Warning Aspirating Smoke Detection (VESDA)

Page 13: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 13

Page 14: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 14

Page 15: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 15

Page 16: EOSS Presentation - DPF

Installation and Commissioning of Structured Cabling Networkand 48V DC System:

Fiber Optic System: Fiber Optic Cable Installation of more than 760 Km’s(Including 96, 36,24,18,12,6 and 2 Cores FO Cable Fiber Optic cableTermination, testing and commissioning of more than 50,000 cores(largest Fiber to Desk Installation in the region to date)Equipment Installation: Installation of Control Room Equipment, FiberOutlets and FTTO SwitchesRack Installation: Installation and arrangement of 96 Cabinets rangingfrom 9RU to 42RU in sizeCopper Cabling: Copper Cable Installation of 58 Km’s (100 Pair, 50 Pair, 4Pair and Cat5e, Cat 6). Copper Cable termination and testing of morethan 5500 PairsPower Cabling: Power Cable Installation 420 Km’s. Power Cable Testing& Installation of 6942. Power Termination of 8000 FTTO SwitchesCabling: Various systems like SACS, CCTV, SCN, MATV, RADIO, WDN,IEVT, BHS, BMS, Interconnectivity etc.

11/2/2015 www.eossae.ae 16

Page 17: EOSS Presentation - DPF

Supply, Installation and commissioning of the following systems:-

Structured cabling system – With more than 3500 Points cable pulling,termination and testingWireless Access points – Cable pulling, installation, testing andcommissioning of more than 1000 Cisco wireless access equipment and therelated controllers.Access Control – Installation, testing and commissioning of S2 Based accesscontrol system controllers and Biometric Readers.CCTV Surveillance System – Cameras installation, configuration, softfocusing and commissioning of 50 Indoor camerasQueue Management system – Installation, testing and commissioning of acompletely customized system for DEWA authorities with LED UnitsPublic Address system – Installation of ceiling mount speakers and wallmount speakers in The Meeting room and mosque.

11/2/2015 www.eossae.ae 17

The office is the largest government building in the world to have secured Leadership in Energy and Environmental Design (LEED) platinum rating for green buildings

Page 18: EOSS Presentation - DPF

Fiber Optic cable termination and testing at below locations:

EMAL : Termination and testing of 2500 coresShweihat S2 :Termination and testing of 3000 coresShweihat S3 :Termination and testing of 4200 coresBorouge 3 :Termination and testing of 920 coresADCO Habshan 5 :Termination and testing of 200 coresGasco Ruwais :Migration of telecom Facilities

:Termination and testing of 2000 coresADNOC Distribution :Termination and testing of 700 coresMirfa Power Company :Termination and testing of 672 cores

11/2/2015 www.eossae.ae 18

Page 19: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 1911/2/2015 www.eossae.ae 19

Supply and Installation of Structured Cabling System in BorougeII expansion, Survey, Cable pulling, Labeling, Termination andTesting of the Outside Plant Cabling System, Installation of Lowvoltage system including the following systems :Our job consists of:PABX-Hot Line Facilities–Installation, testing and commissioningof 7000 meters of 20p telephone cable, installation of 15Analogue telephones, laying of 12,600 meters telephone cableand power cablePublic Address –Installation, testing and commissioning of 17central equipments, pulling of 8,080 meters cable forloudspeakers, laying of 40,671 meters of 2pair telephone cable,fixation of 488 loudspeakersCCTV – pulling of 10,800 meters of fiber optic cable and powercable, fixation, installation and testing of 100 CCTV camerasOPC – Installation, testing and commissioning of 43,868 metersof 24 core fiber optic cable with testing and pulling of 12,050meters of 12 core fiber optic cable and drum testing

Page 20: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 2011/2/2015 www.eossae.ae 20

Supply, Installation, testing and commissioning of thecomplete Structured Cabling system for Senior &Junior accommodations.

The systems installed were Data and Telephone as wellas Satellite Master Antenna Television system.

More than 2500 points of Data and TelephoneCategory 6 points installed points, along with theSMATV System outlets using RG6 and RJ11 Cables.

Total Fiber Optic cable pulled was beyond 11.5 km’s &more than 500 terminations.

Page 21: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 2111/2/2015 www.eossae.ae 21

Supply, Installation, testing and commissioning of thecomplete Structured Cabling system foraccommodations.

The systems installed were Data and Telephone as wellas Satellite Master Antenna Television system.

More than 1000 points of Data and TelephoneCategory 6 points installed points, along with theSMATV System outlets using RG6 and RJ11 Cables.

Total Fiber Optic cable pulled was beyond 11.5 km’s &more than 400 terminations.

Page 22: EOSS Presentation - DPF

Installation and Commissioning of Low Voltage Systemsincluding the following systems (CCTV system, IASsystem, TDS system, TN-ECB system PAS-PIS system) inDubai Metro Red line, Green Line and Car Parks.

CCTV – installation of 998 outdoor IP (Pelco) cameras, 15,000terminations of fiber at ODF, laying of 517,463 meters of fiber opticcable, SSTP Cat6 cable and power cable.IAS – installation of 250 Door control module, proximity card reader andlaying of 200,000 meters of power cable, SSTP Cat6 Ethernet cable andBelden cable.TDS – installation of 30 central master clock and digital clock, laying andtermination of 2000 meters GPS antenna cable, laying and terminationof 333 meters of power cable.TN-ECB – installation of 59 ECB, laying of 80,000 meters of twisted paircable, termination of 800 telephone cables at socket.PAS – installation of 3,086 loudspeakers, 87 ambient noise sensors,laying and termination of 137,284 meters of power cables.FON – laying of 24,000 meters of 24 core fiber optic cable, andterminations of 4500 fiber at ODF.

11/2/2015 www.eossae.ae 22

Page 23: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 23

Installation, termination, testing, labeling andcommissioning of 858 indoor/outdoor IPCamera System (DC system) (PELCO)

Supply and Installation of 79 IntermediateDistribution Frames, 2 Optical Distributionframe along with 1 Main Distribution Frame

Installation of 20 kilometers of fiber optic cableand 60 kilometers of UTP Cat 6 Cable

Page 24: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 24

Active Networks including installation andcommissioning of 4000 Switches and Routers ofCisco, Huawei, Ericsson, Zhone and others.

Outside Plant Cabling – Installation, testing andcommissioning along with 75,000 Splices

Electromechanical installation – 15,000 meter ofcable trays, 5000 electrical point, 500 AC and 500Environmental Monitoring Device

Installation of 100 GPON devices, 200 Kms ofCategory 3 Cable and 15,000 UTP Points

Civil Related Works – 30 Kms of trenches, 200 Polefoundations and other civil related works.

Wireless Networks – installation, testing,configuration and commissioning of PTP and PMPdevices for more than 300 sites.

Page 25: EOSS Presentation - DPF

Electrical and Instrumentation Hook up:-

• Cable Containment – More than 12 kms of electrical and instrumentation cableladders, laid over PARS and sleepers.

• Earthing- More than 150 earthing pits and earthing rods, which has been installed andterminated with the earthing Grid, using CAD welding and crimping terminals.

• Power Distribution ( HV, LV, Control, Space heater, UPS) – More than 360 Kms ofPower cables pulled over cable ladders and duct banks, including termination and finaltesting of all types of cables like Drum testing, HiPot testing, continuity and loopresistance testing.

• Instrumentation and Control - Pulling of 177 Kms of Control cables includingtermination and testing, between JBs and Field instruments from one side and LERSsand CCRs from the other side.

• Instrumentation Chemical injection and pneumatic tubing Installation of morethan 3000 meters of chemical injection tubing and 1000 meter of pneumatic tubing.

• CCTV Cameras and cabling – Installation of more than 40 outdoor CCTV cameras onpoles for Perimeter security.

• PAGA Speakers and cabling - Installation of more than 175 outdoor/indoorspeakers on poles and ceiling in two Loops A &B, including termination and systemtesting.

• ICSS Cabling – Pulling, termination, testing of More than 6 kms of 32,24 and 4 coreFiber Optic cable for ICSS networks and CCTV application.

• Field Instruments and JB Cabling- Installation of Field instruments including morethan 475 gauges, transmitters and manifolds, with the required supports, shades andlabels.

• Fire and Gas System Installation – Installation of more than 300 Fire and gasdetection equipment including call points, smoke detectors, IR detector, with therequired support and labels.

• Street and Field Lighting- Installation of more than 2100 lighting fixtures, includingfield lighting fixtures, poles and pipe racks fixtures and street flood lights (Single andDual fixtures, over 12 meters Poles Height

• Installation of ship loose items – For skids and substations

11/2/2015 www.eossae.ae 25

Page 26: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 26

• Installation of More than 12 kms of electrical and instrumentation cable ladders, laidover PARS and sleepers.

• Sizes:- 150mm, 300mm, 450mm, 600mm, 900mm including all the fittings (Tee,elbow, drop-off, reducers, risers, Crosses, etc.,) with covers, joints and earthinglugs.

Page 27: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 27

Page 28: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 28

HV, LV, Control, Space heater & UPS – More than 360 Km’s of Power cables pulled over cableladders and duct banks, including termination and final testing of all types of cables like Drumtesting, HiPot testing, continuity and loop resistance testing.

Page 29: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 29

More than 150 earthing pits and earthing rods, which has been installed and terminatedwith the earthing Grid, using CAD welding and crimping terminals.

Pulling of 177 Km’s of Control cables including termination and testing, between JBs andField instruments from one side and LERSs and CCRs from the other side.

Page 30: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 30

EOSS was able to successfully complete projects, due to the availability ofexperienced and skilled Engineers, Technicians and supervisors, who were able towork in critical and high level sensitive areas in terms of:-

Location Borouge 2, Ruwais Oil & Gas, Remote locations - Shah & Baraka in UAE and Hammar, Zubair & Rafidiyah in Basra, Iraq.

Complexity Gasco Telecom facilities Migration in Ruwais Dubai Airport Expansion Phase 2 Sharjah Airport runway Extension

Completion Time Officers Club Dubai Metro Zayed University

Page 31: EOSS Presentation - DPF

EOSS has the right expertise and know how, a large proven track record &competitiveness in delivering high quality Telecom Infrastructure Services :

11/2/2015 www.eossae.ae 31

StrengthsOur complete

Range of owned Tools &

Equipments

Quality of Work

Level & Breadth of Expertise

Best People and Process

Practices

Resource Skills & Certifications

Proven Track Record in executing

Major Projects

Page 32: EOSS Presentation - DPF

Project Management,

12

Engineering, 45

HSE, 4

Quality, 3

Technical On Site Staff, 166

Admin, 20

11/2/2015 www.eossae.ae 32

Page 33: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 33

EOSS complies with the HSE Plan & Procedures which are ruling the work on site,and commits with the Zero Accident Philosophy.

A Number Of Training sessions are Provided to the EOSS work Force such asDefensive Drive, Work at Height, Fall Protection Training, Safe erecting OfScaffolding Training, Crain lifting Operation Training, riggers & bank Man TrainingCoarse .

A weekly tool-box talk and continuous monitoring for Environmental savingbehaviors (Waste Management, housekeeping activities, etc).

Risk Assessments & Responses are maintained as per the Probability & Effectmatrix which would be generated after the site survey and the understanding ofthe WBS Activities.

Page 34: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 34

Eoss complies with the Quality Plan & Global and Local Standards which are rulingthe work on site, and commits with the Zero Defect Philosophy.

A daily, weekly, & monthly Reporting procedure takes a place to keep on theharmony and the control of the quality level of the work on site.

EOSS Believes that every body on site is Responsible, Accountable and liable ofmaintaining the upper level of quality.

Page 35: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 35

Page 36: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 36

Page 37: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 37

Page 38: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 38

Page 39: EOSS Presentation - DPF

General Manager

Operations Manager

Infrastructure Division - 190

Project Manager

Site Engineer

Supervisor

Senior Technician

Junior Technician

HSE Division -4

HSE Engineer

HSE Officers

Quality Division - 3

Quality Engineers

Quality Coordinators

Outsource Division

(13)

Senior Engineer

IT Engineer

Admin

Active Network Division

(16)

Engineer

Technician

General Services Division

(24)

Finance

Senior Finance Officer

Accountants

Human Resource

Senior HR Officer

Junior HR Officer

PRO

Logistics

Store Manager

Store Assistant

Drivers

11/2/2015 www.eossae.ae 39

Page 40: EOSS Presentation - DPF

Structured Cabling Network :More than 10 Million Data/Voice Points

Fiber Optic Cable :1,500,000 Meters

Fiber Optic Splicing :200,000 +

Active Networks :4000 + switches of Huawei, Cisco,

Ericsson & Zhone

GPON Devices :100 + Equipments

Wireless Equipment :300 + Sites

Outsourcing :2000+ People for more than 70 Projects

Low Voltage System Integration:75 + Projects

11/2/2015 www.eossae.ae 40

Page 41: EOSS Presentation - DPF

30%

30%

20%

10%

10%Oil & Gas

TelecommunicationOperators

Transportation

Government Entities

Commercial

11/2/2015 www.eossae.ae 41

Page 42: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 42

Page 43: EOSS Presentation - DPF

11/2/2015 www.eossae.ae 43

Page 44: EOSS Presentation - DPF

ESAS HVACComprehensive HVAC services

Page 45: EOSS Presentation - DPF

About Us

ESAS HVAC EST.

is an Engineering and Procurement Company

serving the Construction Industries in the U.A.E ,and GCC Countries since 2011.

Page 46: EOSS Presentation - DPF

Associate Factories

Page 47: EOSS Presentation - DPF

Product And Services

• General Ventilation

• Smoke Extraction

• Car Park Ventilation systems

• Kitchen Filtration Systems

• Electrostatic Precipitator

Page 48: EOSS Presentation - DPF

General Ventilation

WALL & GLASS MOUNTED

Wide range of different products for different

applications.

From 90 m3/h to 1.400 m3/h

Page 49: EOSS Presentation - DPF

General Ventilation

AXIAL FANS

Wall mounted, in-line duct mounted & box noise isolated

7 different types of impeller & material

From 200 mm to 1.600 mm

Page 50: EOSS Presentation - DPF

General Ventilation

ROOF FANS

Axial, centrifugal and fire rated

From 500 m3/h to 100.000 m3/h

Page 51: EOSS Presentation - DPF

General Ventilation

CENTRIFUGAL FANS

Forward curved wheel, Backward curved wheel &

Radial wheel

Standard & fire rated

From medium to high pressure

Page 52: EOSS Presentation - DPF

Smoke Extraction

• Stair Case Pressurization Fans

• Lift lobby Pressurization Fans

• Lobby Smoke Extract Fans

Page 53: EOSS Presentation - DPF

Car Park Ventilation

• Jet System

• Axial Fire Rated Fans up to 1600 MM Dim

• Co Sensors

• Fire Sensors

• UAE Civil defense approved

• CFD analysis

Page 54: EOSS Presentation - DPF

Car Park Ventilation

Control Parking System (CPS)

MCC PANEL

WARNING LIGHTS

Page 55: EOSS Presentation - DPF

Car Park Ventilation

AXIAL FANS – FIRE RATED

Wall mounted, in-line duct mounted, jet fan & box noise

isolated

Certification: 400ºC/2h 300ºC/2h and

200ºC 2h

From 315 mm to 1.600 mm

Page 56: EOSS Presentation - DPF

Kitchen Ventilation

• Ecology unit for kitchen hood Exhaust Treatment

• Fresh Air Units

• Auto Wash Systems

• Kitchen Extract Fans

• Media Filters

• Odor Treatment System

Page 57: EOSS Presentation - DPF

Kitchen Ventilation

OdorControlModule

OutletPlenumCollecti

onCells System

BlowerInletPlenum

MotorStarter

Impingement

BafflePrefilter

StructuralSteelSkid

PowerPacks

Page 58: EOSS Presentation - DPF

Electrostatic precipitator

• Electrostatic precipitator for kitchen and air handling units

Page 59: EOSS Presentation - DPF

Contact Us

• ESAS HVAC

• Abu Dhabi, 13th Street, Delma Street, Al QubaisiBuldg. M03

• P.O.Box 53644, Abu Dhabi, U.A.E.

• Tel: (+971) 02 4460591

• Fax: (+971) 02 4460594

• Dubai, Dubai Investment Park, CEO Buldg. Office 213

• Box 454307 Dubai, United Arab Emirates

• Tel: (+971) 04-8852322

• Fax: (+971) 04-8852433