Environmental Statement Chapter 5 Project Description Application Reference: 6.5
DOGGER BANK CREYKE BECK
F-OFC-CH-005 Issue 4 2013 Forewind Chapter 5 Page ii
Document Title Dogger Bank Creyke Beck
Environmental Statement Chapter 5
Project Description
Forewind Document Reference F-OFC-CH-005 Issue 4
Date August 2013
Drafted by Forewind
Checked by Adrian Pattison
Date / initials check AP 05/08/2013
Approved by Mark Legerton
Date / initials approval ML 05/08/2013
Forewind Approval FAC
Date / Reference approval FAC 05/08/2013
DOGGER BANK CREYKE BECK
F-OFC-CH-005 Issue 4 2013 Forewind Chapter 5 Page iii
Title: Dogger Bank Creyke Beck Environmental Statement - Chapter 5 Project Description
Contract No. (if applicable) (Onshore / Offshore)
Document Number: F-OFC-CH-005
Issue No: 4
Issue Date: 05-Aug-13
Status: Issued for 1st. Technical Review Issued for 2nd. Technical Review
Issued for PEI3 Issued for Application Submission
Prepared by:
Forewind Engineering & Electrical Teams
Checked by:
Adrian Pattison / Sophie Barrell
Approved by: Mark Legerton
Signature / Approval (Forewind)
Mark Legerton
Approval Date: 05-Aug-13
Revision History
Date Issue No. Remarks / Reason for Issue Author Checked Approved
31/10/2012 1 Draft for first technical review Forewind ER AP
21/01/2013 2 Draft for second technical review Forewind ER ML
21/03/2013 3 Issued for PEI3 Forewind AP ML
05/08/2013 4 Issued for Application Submission Forewind AP ML
DOGGER BANK CREYKE BECK
F-OFC-CH-005 Issue 4 2013 Forewind Chapter 5 Page iv
Contents
1 Introduction ................................................................................................................... 1
1.1 Overview ............................................................................................................. 1
1.2 Project Development Envelope - Flexibility ......................................................... 1
1.3 Project Description - Summary ........................................................................... 2
1.4 Project Capacities & Overplanting ...................................................................... 8
1.5 Project Output & Electricity Generation ............................................................... 8
1.6 Links to the Development Consent Order ........................................................... 9
1.7 Relevant Guidance ........................................................................................... 11
1.8 Consultation ...................................................................................................... 14
2 Site Description ........................................................................................................... 21
2.1 Site Location ..................................................................................................... 21
2.2 Offshore Site Description .................................................................................. 36
2.3 Onshore Site Description .................................................................................. 37
3 Offshore Project Components ..................................................................................... 40
3.1 Wind Turbines ................................................................................................... 40
3.2 Offshore Structure Foundations ........................................................................ 50
3.3 Protection Against Foundation Scour & Subsea Damage ................................. 78
3.4 Grout ................................................................................................................. 82
3.5 Seabed Preparation, Drilling & Disposal of Spoil Arisings ................................ 83
3.6 Piling & Noise Modelling ................................................................................... 88
3.7 Offshore Platforms ............................................................................................ 97
3.8 Offshore Cables .............................................................................................. 104
3.9 Offshore Cable Installation and Removal ........................................................ 110
3.10 Remedial Cable Protection ............................................................................. 118
3.11 Offshore Cable & Pipeline Crossings .............................................................. 124
3.12 Offshore Electromagnetic Fields ..................................................................... 129
3.13 Meteorological Monitoring Stations ................................................................. 133
3.14 Vessel Moorings ............................................................................................. 136
4 Onshore Project Components ................................................................................... 139
4.1 Cable Landfall ................................................................................................. 139
DOGGER BANK CREYKE BECK
F-OFC-CH-005 Issue 4 2013 Forewind Chapter 5 Page v
4.2 Onshore Cables .............................................................................................. 142
4.3 Onshore Cable Routes ................................................................................... 145
4.4 Cable Installation ............................................................................................ 149
4.5 Onshore Construction ..................................................................................... 163
4.6 Onshore Converter Station ............................................................................. 174
4.7 Expected Construction Traffic ......................................................................... 178
5 Offshore Project Layouts ........................................................................................... 179
5.1 Wind Farm Layouts ......................................................................................... 179
5.2 Wind Turbine Array Layout Rules ................................................................... 180
5.3 Layout of Other Offshore Project Components ............................................... 187
5.4 Wind Turbine Spacing ..................................................................................... 187
5.5 Proximity to Existing Infrastructure .................................................................. 188
6 Project Life Cycle ...................................................................................................... 190
6.2 Pre-Construction Engineering Surveys ........................................................... 190
6.3 Construction .................................................................................................... 191
6.4 Commissioning ............................................................................................... 204
6.5 Operation & Maintenance ............................................................................... 205
6.6 Replanting/Life Extension ............................................................................... 214
6.7 Decommissioning ............................................................................................ 215
7 Health & Safety and Environmental Management .................................................... 220
7.1 Health and Safety ........................................................................................... 220
7.2 Waste Management ........................................................................................ 220
7.3 Hazardous Material ......................................................................................... 222
7.4 Safety Zones and Other Potential Navigation Safety Measures ..................... 224
7.5 Navigation and Aviation Safety Markings ........................................................ 225
DOGGER BANK CREYKE BECK
F-OFC-CH-005 Issue 4 2013 Forewind Chapter 5 Page vi
Table of Tables
Table 1.1: Summary of key project components ........................................................... 6
Table 1.2: Key project capacity figures (per individual project) ..................................... 8
Table 1.3: NPS requirements ...................................................................................... 11
Table 1.4: Summary of key consultation and issues raised by consultees.................. 15
Table 2.1: Key Zone characteristics ............................................................................ 21
Table 2.2: Dogger Bank Creyke Beck A key project characteristics............................ 23
Table 2.3: Dogger Bank Creyke Beck A boundary co-ordinates ................................. 24
Table 2.4: Dogger Bank Creyke Beck B key project characteristics............................ 24
Table 2.5: Dogger Bank Creyke Beck B boundary co-ordinates ................................. 25
Table 2.6: Export cable corridor key co-ordinates (major vertices) ............................. 28
Table 2.7: Temporary work area dimensions