Engineering Services for Temporary Structures

Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Embed Size (px)

Citation preview

Page 1: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Engineering Services for Temporary Structures

Page 2: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

StructuralCivil

EnvironmentalGeotechnical Highways &

Transport

Page 3: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

3

Commercial

Residential

IndustrialHealthcare

Education

Hotels & Hospitality

Sports & Leisure

Arts & Events Defence

RetailRegeneration

Infrastructure

Page 4: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

1 // Introduction

Established in 1960, the practice works in a broad range of sectors: schools, hospitals, commercial buildings, hotels, sports and leisure centres, defence structures, large-scale regeneration projects, industrial and infrastructure, student accommodation and high-rise residential schemes.

Among CampbellReith’s recent and current major projects are the award-winning Radley College Clock Tower Court – an impressive development in this boarding school near Oxford; the Islamic Centre in Oxford – one of the city’s boldest developments; Woolston Riverside regeneration scheme in Southampton - a mixed industrial and residential development vital for the development of the area; Ghana Hospitals – six new district hospitals project, the winner of the Banker Magazine’s 2013 Infrastructure and Project Finance Award for Africa; Rushden Park and Lakes development – a large scale scheme of shops and leisure facilities in Northamptonshire.

CampbellReith was extensively involved in the 2012 London Olympics, supplying structural engineering services tothe organisers.

The Practice

CampbellReith is an independent multidisciplinary engineering practice, providing structural, civil, environmental, geotechnical, highways and transport services from five UK offices and overseas.

44

Imaginative, innovative and cost effective design solutions.

Centre for Engineering and Manfacturing Excellence, Dagenham

Page 5: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

2 // Services

Portman Road, Ipswich

Temporary Structures

CampbellReith is regularly involved with the development and design of temporary demountable structures for exhibitions and events and has an enviable track record in this field.

We have been responsible for several innovations in venue design for squash and these included the patented ‘Courtback’ retractable seating system used to convert a squash court into an auditorium for viewing a facing glass-backed championship court.

We were also at the forefront in the development of transparent walled squash courts, including the worlds first court to have four unobstructed transparent walls.

In recent years we have become increasingly involved in the design of complex structures at major events and shows, including the Motorshow, Southampton and London Boat Shows, Ideal Home Show, Smithfield Show and Harrogate Gift Fair. Framework arrangements for the provision of design services have been established with many leading BECA members, including Cherwell Display, Dalesgate and Stanco.

Blending imaginative, innovative thinkingwith practical construction knowledge.

Page 6: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

2 // Services

6

CampbellReith has been involved in a number of major event venues and theatres and in addition to the evaluation and appraisal/design of tiered structures/systems, has been responsible for the design of fly tower and stage structures.

We have also been involved in the development and design of portable audience safety barrier systems.

Our recent experiences in production and concert technology include design of support frameworks for computer controlled scenery, modular stage systems and robotics.

Since 2000, we have been involved in over 300 events at ExCel, including many seated events for up to 12,000 people including sporting events.

This includes the demountable TFS for the London Boat Show, which measures over 10,000 m2 and provided a temporary facility for windsurfing displays.

Watersports Arena @ London Boat Show

Temporary Structures

Page 7: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

7

Primary responsibility for the safety of persons attending an event and of the users of temporary structures lies with the client, ie the organiser.

2 // Services

Complex structures used at events:

• Multideck Stands

• Structures over 4m in height

• Platforms, Stages and Steps

• Tiered Seating

• Lighting Towers and Rigs

• Tents and Marquees

• Crowd Barriers

World Travel Market, Japan Stand

Venue owners and management also carry responsibilities to ensure the suitability of the venue for the proposed event and to satisfy themselves that the organiser has undertaken and implemented the necessary risk assessments.

Whilst the Local Licensing Authority may request details and calculations for such structures, most temporary structures are not subject to control under the Building Regulations and there is a growing trend for Local Authorities to no longer ’approve’ such details.

Responsibility for ensuring the structural safety and stability of their structures will rest with the organiser, who is unlikely to have the appropriate technical expertise to ensure that the necessary details and calculations have been prepared to acceptable standards or that the structure has been competently erected.

Organisers should therefore give careful consideration to the appointment of an independent competent person to advise them on structural issues, this would normally be a chartered structural engineer with appropriate skill and experience of temporary demountable structures.

Temporary Structures

Page 8: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

As part of our comprehensive range of services, CampbellReith have developed a structural auditing and certification service for temporary structures to meet venue and local authority requirements.

2 // Services

Structural Display of James Bond Premier, Royal Albert Hall, London

Planning Stage• General advice to exhibitors and organisers on

exhibition regulations and design parameters concerning stand layouts, loadings, etc

• Advice on content of stand submission information, including guidance on preparation of erection method statements, risk assessments, etc

Audit Stage• Initial review of design undertaken and organiser

notified of any outstanding information required• Detailed review and check of structural design

calculations, resolve queries directly with designers • Issue of certification to organiser to confirm adequacy

of designs and documentation and listing outstanding matters for site resolution

Construction Stage• Inspection of complex stands during construction to

ensure these are erected generally in accordance with submitted designs, details and method statements

• Issue of remedial works notices where required and monitoring of outstanding matters

• Visual inspection and sign-off of all non-complex space only stands

• Issue of certification to organiser confirming that stand has been constructed to a competent standard

CampbellReith have been engaged by many leading organisers to provide our auditing services at many major events since 1992. Regular clients include CMP, Reed Exhibitions, Montgomery, Turret RAI, DMG, Clarion Events and EMAP.

8

Temporary Structures

Page 9: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Case Study

CampbellReith was a supplier of structural engineering services (Olympic venues) to the London 2012 Games.

We had extensive involvement in the 2012 London Olympics and supplied assistance and support to various parties including LOCOG, ExCeL, Earls Court, Arena Seating and GL Events.

Support and site checks / signoffs were carried out on the following tem-porary tiered seating installations:

Equestrian Events, Greenwich Royal Park: 23,000 seats in 3 blocks, with extensive system modifications for circulation aisleways, ballasting calculations.

Canoe Slalom, Lee Valley Centre: 12,000 tiered seats in 5 blocks, including monitoring and assessment of screwpile foundations.

Hockey Arena, Olympic Park: 16,000 tiered seats in 4 linked blocks.

BMX, Olympic Park: 6,000 tiered seats in 2 blocks on screwpile founda-tions.

Rowing, Eton Dorney: 20,000 tiered seats in 4 blocks.

Hyde Park: 3,000 tiered seats, scaffold platforms and towers.

Volleyball, Earls Court: 15,000 tiered seats in 4 blocks.

Archery, Lords Cricket Ground: 6,500 tiered seats in 2 blocks.

Shooting, Royal Artillery Barracks: 7,500 tiered seats in 5 blocks.

Boxing/Weightlifting/Table Tennis, Excel: 25,000 tiered arena seats in 3 separate indoor arenas.

Beach Volleyball Arena, Horse Guards Parade / The Mall: 15,000 tiered arena seats in 4 blocks.

In addition site specific wind calculations / ballast assessments were undertaken for numerous marque installations at over 27 competition and training venues.

Checks also included lighting towers and gantry bridge structures.

London Olympics 2012

3 // Experience

Hockey, Olympic Park Beach Volleyball, Horse Guards Parade

Equestrian, Greenwich Royal Park BMX, Olympic Park

Canoe Slalom, Lee Valley Olympic Park

9

Page 10: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Case Study 3 // Experience

Old Trafford, Manchester• Client: Manchester United Football Club• Architect: Atherden Fuller Leng• 25,000 seat West Stand• 10,000 seat Stretford End• Carrington Training Ground• Plus variety of projects

Preston North End• Client: Preston North End Football Club• Architect: Atherden Fuller Leng• 9,000 seat North Stand• 8,000 seat Tom Finney Stand• National Football Museum which opened in 2000

Portman Road, Ipswich• Client: Ipswich Town FC• Architect: Atherden Fuller Leng• Design and monitoring for new grandstand

The Oval• Client: Surrey County Cricket Club• Architect: Darbourne & Partners• New Bedser Stand• Ken Barrington Centre

Dagenham and Redbridge West Stand• Client: Dagenham and Redbridge FC• Architect: Peter Fisk• 2000 seat West Stand• Completed Summer 2009

Grandstands

Old Trafford, Manchester

Preston North End The Oval

Dagenham and Redbridge

10

Page 11: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Case Study

The Curragh• Client: The Turf Club• Architect: EPR• Masterplan for the redevelopment• New grandstand• New hotel

Galway Racecourse• Client: Galway Racecourse• Architect: EPR• The new West Stand to replace the existing outdated stand • Design construction allows for racing to continue without interruption while the works were undertaken.

Chester Racecourse• Client: Chester Racecourse• Retained engineer for grandstand inspections• Safety checks of permanent structures

Aintree Racecourse• Client: Aintree Racecourse Ltd• Installation, advice and safety checks for various temporary structures• Annual safety check of permanent structures

Fontwell Park Racecouse• Client: Fontwell Park Racecourse• New Premier Grandstand to replace old 1920’s stand• Throughout the construction programme Fontwell’s fortnightly race

meetings continued unaffected by the works.

Racecourses

3 // Experience

The Curragh Galway Racecourse

Chester Racecourse Aintree Racecourse

Fontwell Park Fontwell Park

11

Page 12: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Case Study 3 // Experience

Madejski Stadium and Hotel• Client: Reading Football Club• New 25,000 seater stadium• New conference and leisure facilities including 200 bed hotel• Hotel extension• Plus various smaller projects

ExCel• Client: ADNEC • 500,000 ft2 of flexible sub-divideable event space for exhibitions,

conferences, events and concerts• Advice, design and installation of over 200 events since 1999

Earls Court and Olympia• Clients: Earls Court and Olympia• Structural engineers since 1992 on all major projects such as media

centre, restaurants, conference facilities and external structures including new lorry park and access structures.

• Advice, design and installation of over 700 events since 1992.

National Exhibition Centre, Birmingham• Clients: Various Major Event Organisors• Approved Certifier on NEC Register• Various events audited since 1998 including Spring Fair, IFSEC,

Interbuild, MPH etc.

Alexander Palace• Clients: Alexander Palace• Various events since 2003• Analysis of loading capacity of roof structures.

Multi-use Facilities

Madejski Stadium

Earls Court ExCel

12

Page 13: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Case Study

Royal Horticultural SocietyMajor shows audited at Chelsea, Hampton Court and Tatton Park.Client: RHS

London Fashion Week, National History Museum, LondonNumerous large marquee/pavilions checked for Spring/Autumn fashion shows since 1996.Client: Single Market Events Harrogate, YorkshireVarious major marquee and scaffold structures audited and inspected for annual Gift Fair.Client: Clarion Events

Southampton Boat ShowMajor international outdoor event, structures audited include footbridges, mar-quees, raised decks and pavilions.Client: National Boat Shows

Clapham Common Annual Weekender festival, includes stage, scaffold towers and tented structures.Client: Lock N Load Events

Johnnie Walker Championship, Gleneagles Major golf event, including tiered seating, pavilions and tower structure.Client: Gleneagles

Farnborough AirshowMajor International event, over 108,000 visitors includes marquees and viewing platformsClient: Farnborough International Airshows Ltd

Glasgow Exhibition CentreTechnical design audit, appraisal and site inspection of exhibition structures for Ideal Home Show ScotlandClient: DMG Angex

Venues and Events

3 // Experience

Farnborough International Airshow RHS Chelsea flower show

Southampton Boat Show Clapham Common

Gleneagles London Fahion Week

13

Page 14: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Case Study 3 // Experience

European Dealer Event, Palace Sant Jordi, BarcelonaDesign of 5,000m2 mezzanine deck within Olympic Sports Hall to provide dining area for 4,000 persons.Client: Caribina International GMex, ManchesterTechnical design audit and appraisal of exhibition structures for Papex.Client: Reed Exhibitions Wembley Exhibition Centre, LondonTechnical design audit, appraisal and site inspection of exhibition struc-tures.Client: Reed Exhibitions The Brighton CentreTechnical design audits, appraisal and site inspections of various exhibi-tion structures undertaken since 1996 for Telecommunications Managers Association annual exhibition.Client: TMA Brussels Exhibition Centre BrusselsTechnical design audit, appraisal and site inspection of exhibition struc-tures for Labelexpo Europe 1999.Client: Tarsus Exhibitions Ltd Disneyland Display Floats, ParisDesign of internal aluminium structures for 9 tonne mobile display floats featuring 15m high Futura coated carved polystyrene characters..Client: MICE

Aberdeen Exhibition CentreTechnical auditing of ‘Offshore Europe’.Client: Reed International

Wembley Exhibition Centre

Palace Sant Jordi Barcelona Disneyland Display Floats

Gmex

14

Page 15: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Case Study

CampbellReith was responsible for the design and checking of the tempo-rary demountable structures for World Travel Market (WTM) 2015 exhibi-tion, the leading global event for the travel industry.

A vibrant business-to-business event covering a variety of destinations and industry sectors, WTM attracts around 50,000 people every year. The 2015 event featured about 5000 exhibitors from over 186 countries.

WTM was launched at London’s Olympia in 1980 before moving to Earl’s Court in 1992 and then to ExCeL London in 2002. It is administered by Reed Exhibitions with whom CampbellReith has worked for 20 years now, providing structural engineering services for this prestigious event.

It took the contractor teams six days to build the 33 double decker stands, 73 complex stands and 310 space structures. The CampbellReith team reviewed the complex stand calculations prior to the show and issued cer-tificates to build. Then they worked on site for the duration of the build to ensure the structures are built as per the calculations/drawings.

World Travel Market

3 // Experience

World Travel Market, Japan Stand World Travel Market, Cyprus Stand

World Travel Market, Greece Stand World Travel Market, Indonesia Stand

Display for New Bond Film “Spectre” Royal Albert Hall, London

CampbellReith’s engineers designed the structures supporting the external displays outside the Albert Hall for the opening premiere of the new James Bond film Spectre, which took place in October 2015.

The main feature display is a 40 ft high skeleton – a reference to the film’s opening action sequence set at the Day of the Dead Carnival in Mexico City. One of Mexico’s cultural highlights, the Day of the Dead festival included a carnival parade of dancing skeletons.

The skeleton skull prop was formed by an outer shell of polystyrene, which was foam glued to an internal structure of scaffolding. This internal scaffold-ing was then tied back to the main stage, and then braced by a portion of scaffolding that stuck out the back of the skull which would be out of sight from the red carpet, and stabilises it from any wind loading.

Display for New Bond Film “Spectre”

15

Page 16: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Steve CalderSenior PartnerBSc MSc CEng MICE MIStructE FConsE

Projects worked on:

Steve has over 40 years structural engineering experience, and has been with CampbellReith since 1981. He has been responsible for a number of the practice’s most prestigious projects and has been a Partner at the Practice for 26 years, becoming a Senior Partner in 1999.

Steve has many years experience of delivering high quality structural engineering solutions for major complex engineering projects. Since 1991 Steve has been responsible for a number of the practice’s major arts and leisure projects.

These include the refurbishment of the Palace Theatre and Adelphi Theatres for the Really Useful Group, together with ongoing consultancy advice for Earls Court and Olympia Exhibition Centres where, in addition to design schemes, we have advised on all structural issues involved in hosting over fifty 18,000 seat concerts in the main auditoriums since 1993.

He also has ongoing commissions with some of the biggest exhibition venues in the UK including ExCel. For whom he has recently completed a complex commission evaluating building response and behaviour to blast over pressure from a variety of terrorist events. A similar commission on blast response was completed for DZ Bank for their headquarters building in the City of London.

Background

ExCel

Olympia

Earls Court

• ExCel• Olympia• Earls Court• Leicester Marriott• Heathrow Marriott• Heathrow Travel Lodge• Tower Bridge Road Capital Travel Inn• ExCel Managed Travel Inn• Southampton Travel Inn• County Hall Apartments• The Mander Centre• London Airport Mail Unit• Major West London Postal Sorting Office and

Governmental buildings• Adelphi Theatre• Birmingham International Hotel• Kings Walk Shopping Mall, Kensington• County Hall Apartments• Heath House• 83 - 103 Kings Road• Warrington Centre Park

Olympia

4 // CVs

16

Page 17: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Elizabeth BrownGeotechnical PartnerMSc BSc CGeol FGS

Since graduating with a Masters degree in Soil Mechanics in 1988, Liz has been providing geotechnical engineering services for a wide range of civil and structural engineering projects. She worked at senior level in two major site investigation companies before joining CampbellReith to provide geotechnical consultancy advice and services.

In 1999 Liz joined CampbellReith as a senior geotechnical engineer, becoming an associate in 2001, and partner in 2007. She now manages a team of engineering geologists and civil and structural engineers experienced in ground investigation, geotechnical design and numerical modelling.

Liz has designed and managed many varied geotechnical investigations for projects including regeneration schemes, residential developments, city centre developments and medical, leisure and educational facilities. She has provided advice and recommendations on earthworks, varied foundation solutions, basement and floor slab design, and slope stability and retaining wall design for new and refurbished structures and landscaping. The diverse range of projects covered by Liz includes the following:

Prediction of immediate and long term settlements beneath site in East London underlain by made ground and alluvium including substantial peat layers. Design of vibro stone columns to control settlements beneath the route of the proposed infrastructure which included new access and distribution roads and two large diameter sewers. The design of new retaining walls up to 4.50m height was also required to accommodate changing site levels.

Background

4 // CVs

Ground investigation in East London of a 9m high mound of foundry sand and domestic refuse overlying alluvium. The site is now the Centre of Excellence for Manufacturing and Engineering and required the design of reinforced slopes using site won fill, retaining walls, ground improvement including stone columns and surcharging, and varied foundation options. A new bus route and service roads and parking required the consideration of road pavement and drainage design and construction.

Investigation and analysis of effects of demolition and construction on Mail Rail tunnels and underground engineering depot at Mount Pleasant mail centre. Design of large diameter base grouted piles.

Detailed soil/structure interaction analysis in order to predict ground movements and changes in stress within the East London Line tunnel arising from a proposed development at the Royal London Hospital. The analysis, was undertaken to the satisfaction of LUL. It indicated no undue affect on the tunnel, which was subsequently confirmed by the successful completion of the proposed development.

Ground investigation and geotechnical design for commercial redevelopment on Tottenham Court Road in central London. Analysis of interaction between retained foundations and facade, and new piled foundations. Consideration of impact of demolition and construction on adjacent Northern line running tunnels and future Chelsea - Hackney rail route including preparation of reports to satisfy LUL, Crossrail and planning authority.

Design and interpretation of ground investigation for proposed self storage unit with double basement in Sheen, west London. Provision of advice and recommendations with respect to acceptable deflections around excavation and appropriate construction techniques for retaining walls to meet deflection and watertightness criteria. Analysis of heave pressures and hydrostatic forces to be resisted by piled foundations and basement slab.

Bracknell College

Canterbury College

Abingdon and Witney College

Chelmsford College

17

Page 18: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

18

Projects worked on:

Wembley NW01, Wembley

Sam is the senior engineer for a new build development of 7 residential apartment buildings surrounding a raised podium courtyard in North-West London. The structure is a reinforced concrete frame, predominantly supported on piled foundations. The project comprises of 475 residential units spread over 17 storeys with ground level commercial retail units.

Great Eastern Quays, East London

A new build development on an existing built up site in East London working with Maccreanor Lavington Architects. The project consists of 7 blocks with the main three being 8-9 storey residential buildings with ground level commercial units and car park. One of the blocks is to be constructed adjacent to an existing dock. Corsham Street, London, N1

Sam was involved in the design of a new 8 storey student residential accommodation building in North London. The structure was an RC Frame with a large transfer slab at 2nd floor to accommodate commercial

Sam has 7 years structural engineering experience on a wide range of projects in retail, residential, commercial and public sectors. Sam graduated from the University of Bath with a degree in Civil Engineering.

Sam joined CampbellReith as a Senior Structural Engineer in 2013, having previously worked on large residential projects in Kings Cross and Canning Town, London.

Background

18

Wembley NW01, Wembley

Corsham Street

Great Eastern Quays

Wembley NW01, WembleySam KnightAssociateCEng MIStructE

and leaning spaces at ground and 1st floors. The project included a one storey basement constructed with sheet piled walls.

Previous Project experience with Ramboll: Kings Cross R5, London

A development of three residential apartment buildings surrounding a central courtyard, ranging from 8 to 16 stories in the Kings Cross development. The floors were post-tensioned RC slabs to reduce floor depths and one of the buildings housed a two storey basement for car parking. Rathbone Market, Canning Town

Sam worked on the development of a residential building housing over 500 apartments in Canning Town. The main building was 8 stories with two towers either end, one being 22 storeys. The first floor acted as a transfer structure to accommodate the requirements of column positions in the ground floor commercial units. There was a one storey basement under the whole building footprint. BBC Broadcasting House, London

This large development in central London included the refurbishment of Broadcasting House along with new build structure behind extending down to a three storey basement with 13 storeys above. The basement included box-in-box construction to isolate the TV studios from the underground tube line that ran beneath.

4 // CVs

Page 19: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Sivam SomarsStructural AssociateBEng (Hons) MSc DIC CEng MIStructE

Sivam has been with CampbellReith since 1998. He has a strong structural engneering background and has particular experience in design detailing, structural assessment and site supervision for projects. He also has extensive experience working, on site, with temporary demountable structures.

Professional Experience Sivam graduated in 1993 and was employed as a Graduate Engineer with Gathard Brook & Partners.

He gained experience on a number of commercial developments including responsibility for the detailed design of a seven storey concrete framed office block in Central London, a police training centre in Hendon and an industrial unit at Tower Business Park.

During this period, he completed his academic studies at Imperial College and attained an MSc/ DIC in Concrete Structures.

He joined Pell Frischman in 1995 where he gained a wide range of experience in various projects including the construction of a new £12 million office development behind a retained facade at Caxtongate, Birmingham, as well as undertaking detailaed designs for the £200 million Oracle development in Reading.

Sivam joined in CampbellReith in April 1998 as a Project Engineer. He was initially involved in the design of Cleveland House, St James’s, a steel-

Background

4 // CVs

framed office development with composite floor construction founded on existing raft foundations.

He has recently completed the £9 million office development at South Street, Mayfair.

This building comprises the construction of five storey concrete frames, reinforced concrete flat slab and high strength concrete columns, upper steel frames forming mansard roof profiles as well as supporting intermediate composite floors.

As well as being responsible for the design detailing, structural assessment and site supervision for the project, Sivam also coordinated the project team to ensure the project’s running on a day to day basis.

He is currently completing a £4 million office refurbishment project in Marlow. This is being carried out under a construction management form of contract.

Cleveland House

South Street

NEC Birmingham

ExCel

19

Page 20: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Tony ThorpeAssociateIOSH tec sp MIIRSM

Tony Thorpe started in engineering in 1966 with a four year apprenticeship as a draughtsman with Fife Belcher and Grimsey.

He then gained experience with a number of consulting engineers including Ove Arup and Partners working on a number of major developments both in England and abroad.

During four years at Bernard Sonley and Sons Tony worked on several multi-storey concrete structures in the Middle East including the Dubai Trade Centre and Hotel, and the ADNOC building in Abu Dhabi.

These required reinforcement design to resist earthquake movement and specialist protection to the concrete in the ground due to high sulphate levels.

Tony is our in-house advisor and has gained membership of the Institute of Occupational Safety and Health as a Technical Safety Practitioner and Membership of the International Institute of Risk and Safety Management.

He is highly experienced in monitoring the safe erection of temporary Exhibition and concert structures with 17 years experience at major venues throughout the UK.

Background

4 // CVs

British Steel Stand

Car Stand

Osma Stand

Selected Shows and Venues

Earls Court: Royal Tournament Boat Show Paul McCartney U2 Oasis Coldplay MPH Live

Excel: Boat Show Motor Show

NEC: Motorshow MPH Live

Southampton: Boat Show

Gleneagles: Johnnie Walker Championship

London Olympic Test Events - Various Venues

20

Page 21: Engineering Services for Temporary Structures · temporary demountable structures. Temporary ... • Design construction allows for racing to continue ... advice and safety checks

Campbell Reith Hill LLP. Registered in England & Wales. Limited Liability Partnership No OC300082

A list of Members is available at our Registered Office at: Friars Bridge Court, 41-45 Blackfriars Road, London SE1 8NZ

VAT No 974 8892 43

T: +971 4 453 4735E: [email protected]

Office 705, Warsan BuildingHessa Street (East)PO Box 28064 Dubai, UAE

UAE

T: +44 (0)161 819 3060E: [email protected]

No. 1 Marsden StreetManchesterM2 1HW

Manchester

T: +44 (0)1675 467 484E: [email protected]

Chantry HouseHigh StreetColeshillBirmingham B46 3BP

Birmingham

T: +44 (0)117 916 1066E: [email protected]

Wessex HousePixash Lane KeynshamBristol BS31 1TP

Bristol

T: +44 (0)1737 784 500E: [email protected]