Upload
ramesh-kancherla
View
221
Download
3
Embed Size (px)
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 1/108
SAP ECC 6.03
August 2008
English
Materials Management
(104)
SAP AGDietmar-Hopp-Allee 1669190 Walldorf Germany
Building Block Configuration Guide
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 2/108
SAP Best Practices Materials Management (104): Configuration Guide
Copyright
© Copyright 2008 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without theexpress permission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary softwarecomponents of other software vendors.
Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390,OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli,and Informix are trademarks or registered trademarks of IBM Corporation in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarksor registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide WebConsortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technologyinvented and implemented by Netscape.
MaxDB is a trademark of MySQL AB, Sweden.
SAP, R/3, mySAP, mySAP.com, xApps, xApp, and other SAP products and services mentioned hereinas well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and inseveral other countries all over the world. All other product and service names mentioned are thetrademarks of their respective companies. Data contained in this document serves informationalpurposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and itsaffiliated companies ("SAP Group") for informational purposes only, without representation or warrantyof any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. Theonly warranties for SAP Group products and services are those that are set forth in the expresswarranty statements accompanying such products and services, if any. Nothing herein should beconstrued as constituting an additional warranty.
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 3/108
SAP Best Practices Materials Management (104): Configuration Guide
Icons
Icon Meaning
Caution
Example
Note
Recommendation
Syntax
Typographic Conventions
Type Style Description
Example text Words or characters that appear on the screen. These include fieldnames, screen titles, pushbuttons as well as menu names, paths andoptions.
Cross-references to other documentation.
Example text Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT Names of elements in the system. These include report names,program names, Transaction codes, table names, and individual keywords of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text Screen output. This includes file and directory names and their paths,messages, source code, names of variables and parameters as well asnames of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or theENTER key.
Example text Exact user entry. These are words or characters that you enter in thesystem exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace thesewords and characters with appropriate entries.
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 4/108
SAP Best Practices Materials Management (104): Configuration Guide
Contents
Materials Management............................................................................................................. 6
1 Purpose.................................................................................................................................. 6
2 Preparation............................................................................................................................ 62.1 Prerequisites .................................................................................................................. 6
3 Configuration of Logistics General.........................................................................................6
3.1 Logistics General: Material Master..................................................................................6
3.1.1 Setting up Posting Period for Company Code........................................................... 6
3.1.2 Defining Attributes for Material Types.......................................................................8
3.1.3 Defining Material Groups........................................................................................11
3.1.4 Defining Units of Measure Groups..........................................................................11
3.1.5 Defining Product Hierarchies .................................................................................12
3.2 Engineering Change Management................................................................................13
3.2.1 Setting Ctrl. Data - Engineering Change Manag. Ctrl. Data....................................13
3.3 Checking consistency....................................................................................................13
3.3.1 Checking consistency of unit of measurement tables.............................................13
4 Configuration of Materials Management..............................................................................14
4.1 Consumption-Based Planning.......................................................................................14
4.1.1 Overall Maint. of Plant Par. - General Settings.......................................................14
4.1.2 Overall Maint. of Plant Par. - MRP controllers.........................................................22
4.1.3 Overall Maint. of Plant Par. - Special procurement................................................234.1.4 Defining Storage Location MRP per Plant............................................................... 24
4.1.5 Defining Floats (Scheduling Margin Key)................................................................25
4.1.6 Activating Materials Requirements Planning...........................................................26
4.1.7 Defining Scope of Planning for Total Planning........................................................26
4.2 Purchasing....................................................................................................................27
4.2.1 Activating batch-specific Unit of Measures..............................................................27
4.2.2 Creating Release Procedure Characteristics..........................................................27
4.2.3 Creating Release Procedure Class.........................................................................31
4.2.4 Defining Release Procedure for Purchase Orders .................................................32
4.2.5 Defining Release Procedure for Purchase Orders - Set Criterias...........................33
4.2.6 Defining Calculation Schema..................................................................................34
4.2.7 Maintaining Rounding Profiles................................................................................37
4.2.8 Unit of Measure Rounding Rules............................................................................39
4.2.9 Maintaining Account Assignment Categories..........................................................39
4.2.10 Maintaining Account Assignment Categories - Translation ..................................57
4.2.11 Defining Scope of List...........................................................................................58
4.2.12 Defining Permissible Partner Roles per Account Group.......................................594.2.13 Defining Condition Types......................................................................................60
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 5/108
SAP Best Practices Materials Management (104): Configuration Guide
4.2.14 Taxes in Procurement...........................................................................................60
4.2.15 Checking Incoterms .............................................................................................63
4.2.16 Returns to Vendor ................................................................................................64
4.2.17 Vendor Evaluation.................................................................................................64
4.3 Inventory Management and Physical Inventory.............................................................71
4.3.1 Defining Screen Layout...........................................................................................71
4.3.2 Printer Determination by Plant/Storage Location....................................................73
4.3.3 Printer Determination by Plant/Stor.Loc./User Group.............................................74
4.3.4 Copy, Change Movement Types.............................................................................75
4.4 Valuation and Account Assignment...............................................................................78
4.4.1 Defining Valuation Classes.....................................................................................78
4.5 Logistics Invoice Verification.........................................................................................79
4.5.1 Setting Tolerance Limit...........................................................................................79
4.5.2 Editing PO Supplement Text in Invoice Verification................................................83
4.5.3 PO Supplement Text: Parameters, Invoice Verification..........................................83
4.5.4 Configuring Vendor-Specific Tolerances.................................................................84
4.5.5 Activating Direct Posting to G/L Accounts and Material Accounts..........................85
4.5.6 Setting check for duplicate invoices........................................................................85
4.5.7 Maintaining Number Assignments for Accounting Documents................................86
5 Configuration of Sales and Distribution................................................................................87
5.1 Basic Functions.............................................................................................................87
5.1.1 Setting Up Part. Determ. - Accnt. Groups - Function Ass.......................................87
6 Configuration of Logistics Execution....................................................................................88
6.1 Shipping........................................................................................................................ 88
6.1.1 Setting Up Partner Determination for Deliveries ....................................................88
7 Master Data......................................................................................................................... 88
7.1 Purchasing Output Conditions.......................................................................................88
7.1.1 Output Condition Records: Purchasing RFQ..........................................................88
7.1.2 Output Condition Records: Purchase Order............................................................89
7.1.3 Output Condition Records: Purchasing Outline Agreement....................................91
7.1.4 Output Condition Records: Schedule Agreement...................................................92
7.1.5 Output Condition Records: Service Entry Sheet.....................................................93
7.1.6 Output Condition Records: Inventory Management................................................94
7.1.7 Output Condition Record: Invoice Verification.......................................................103
8 Individual BC Sets/ Manual Steps......................................................................................107
8.1 Defining Parallel Processing in MRP...........................................................................107
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 6/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Materials Management
1 PurposeThis configuration guide provides the information you need to set up the configuration of thisbuilding block manually.
If you prefer an automated installation process using the SAP Best Practices Installation Assistantand other tools, refer to the SAP Best Practices Quick Guide.
2 Preparation
2.1 Prerequisites
Before you start installing this scenario, you must install prerequisite building blocks. For moreinformation, see the building block prerequisite matrix (Prerequisites_Matrix_[ xx ]_EN_JP.xls; theplaceholder [ xx ] depends on the SAP Best Practices version you use, for example BL refers tothe SAP Best Practices Baseline Package: Prerequisites_Matrix_BL_EN_JP.xls). This documentcan be found on the SAP Best Practices documentation DVD in the folder: ..\BBLibrary\General\.
3 Configuration of Logistics General
3.1 Logistics General: Material Master 3.1.1 Setting up Posting Period for Company Code
Use
The purpose of this activity is to set up the first posting period for materials management.
In Customizing, the period/year for which the last postings were performed is set and displayed.To be able to perform postings in the current period you have to close every single period up tothe current year and period.
This step is necessary to set up posting periods correctly. The last period of theprevious year has to be included.
Please note that the corresponding financial posting period should be open for postings as well.
To set up posting periods correctly proceed as described in the below procedures:
© SAP AG Page 6 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 7/108
SAP Best Practices 104 - Materials Management: Configuration Guide
3.1.1.1 Maintaining Company Codes for MaterialsManagement
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Logistics General → Material Master → Basic Settings→
Maintain Company Codes for Materials Management
Transaction code OMSY
2. On the Change View “Materials Management View on Company Codes”: Overview screen,make the following entries:
Field name User action and values Comment
Company Code 1000 Select line
Year <Previous Year> Previous year
Period 12 Last period of previous year
ABp - Allow Posting to Pre-vious Period (Backposting)
select
3. Choose Save.
3.1.1.2 Running ‘Close Period’
Procedure
1. Access the activity using one of the following navigation options:
SAP ECC menu Logistics→ Materials Management → Material Master → Other
→ Close Period
Transaction code MMPV
2. On the Close Period for Material Master Records screen, make the following entries:
Fromcompanycode
To companycode
Period Fiscal year Check andClose Period
1000 1000 <Last Period of previousyear>, e.g. 12
<PreviousYear>, e.g. 2007
Select
3. Choose Execute (F8).
4. Repeat steps two and three until you arrive at the current period
© SAP AG Page 7 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 8/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Example for August 2008:
Fromcompanycode
To companycode
Period Fiscal year Check andClose Period
1000 1000 12 2007 Select
1000 1000 01 2008 Select
1000 1000 02 2008 Select
1000 1000 03 2008 Select
1000 1000 04 2008 Select
1000 1000 05 2008 Select
Result
The current posting period for materials management is set and all recordable posting periods inthe materials master are set (last period of previous year, previous period current year, currentperiod).
3.1.2 Defining Attributes for Material Types
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Logistics General → Material Master → Basic Settings→
Material Types→ Define Attributes of Material Types
Transaction code SPRO
2. On the Change View “Material Types”: Overview screen, select material type ABF (see tablein step 4).
3. Double click Quantity/value updating in the Dialog Structure.
4. On the Change View “Quantity/Value Updating”: Overview screen, make the following entries:
Val. Area MaterialType
Quantityupdating
ValueUpdating
Pipelinemandatory
Pipelineallowed
Plant_1 (1000) ABF
Plant_2 (1100) ABF
5. Choose Back (F3).
6. Repeat steps 2. to 5. for the following material types:
Val. Area MaterialType
Quantityupdating
ValueUpdating
Pipelinemandatory
Pipelineallowed
Plant_1 (1000) ABF (done)
Plant_2 (1100) ABF (done)
© SAP AG Page 8 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 9/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Val. Area MaterialType
Quantityupdating
ValueUpdating
Pipelinemandatory
Pipelineallowed
Plant_1 (1000) CONT
Plant_2 (1100) CONT
Plant_1 (1000) COUPPlant_2 (1100) COUP
Plant_1 (1000) DIEN
Plant_2 (1100) DIEN
Plant_1 (1000) ERSA X X
Plant_2 (1100) ERSA X X
Plant_1 (1000) FERT X X
Plant_2 (1100) FERT X X
Plant_1 (1000) FGTR X X
Plant_2 (1100) FGTR X X
Plant_1 (1000) FHMI X X
Plant_2 (1100) FHMI X X
Plant_1 (1000) FOOD X X
Plant_2 (1100) FOOD X X
Plant_1 (1000) FRIP X X
Plant_2 (1100) FRIP X X
Plant_1 (1000) HALB X X
Plant_2 (1100) HALB X X
Plant_1 (1000) HAWA X X
Plant_2 (1100) HAWA X X
Plant_1 (1000) HERS X X
Plant_2 (1100) HERS X X
Plant_1 (1000) HIBE X X
Plant_2 (1100) HIBE X X
Plant_1 (1000) IBAU
Plant_2 (1100) IBAU
Plant_1 (1000) INTR X X
Plant_2 (1100) INTR X X
Plant_1 (1000) KMAT
Plant_2 (1100) KMAT
Plant_1 (1000) LEER X X
Plant_2 (1100) LEER X X
© SAP AG Page 9 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 10/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Val. Area MaterialType
Quantityupdating
ValueUpdating
Pipelinemandatory
Pipelineallowed
Plant_1 (1000) LEIH X
Plant_2 (1100) LEIH X
Plant_1 (1000) LGUT X XPlant_2 (1100) LGUT X X
Plant_1 (1000) MODE X X
Plant_2 (1100) MODE X X
Plant_1 (1000) NLAG
Plant_2 (1100) NLAG
Plant_1 (1000) NOF1 X X
Plant_2 (1100) NOF1 X X
Plant_1 (1000) PIPE X
Plant_2 (1100) PIPE X X
Plant_1 (1000) PLAN
Plant_2 (1100) PLAN
Plant_1 (1000) PROC
Plant_2 (1100) PROC
Plant_1 (1000) PROD
Plant_2 (1100) PROD
Plant_1 (1000) ROH X X
Plant_2 (1100) ROH X X
Plant_1 (1000) UNBW X
Plant_2 (1100) UNBW X
Plant_1 (1000) VERP X X
Plant_2 (1100) VERP X X
Plant_1 (1000) VKHM X X
Plant_2 (1100) VKHM X X
Plant_1 (1000) VOLL X X
Plant_2 (1100) VOLL X X
Plant_1 (1000) WERB X X
Plant_2 (1100) WERB X X
Plant_1 (1000) WERT X
Plant_2 (1100) WERT X
Plant_1 (1000) WETT
Plant_2 (1100) WETT
© SAP AG Page 10 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 11/108
SAP Best Practices 104 - Materials Management: Configuration Guide
7. Save your settings.
3.1.3 Defining Material Groups
Procedure1. Access the activity using one of the following navigation options:
IMG menu Logistics General → Material Master → Settings for Key Fields
→ Define Material Groups
Transaction code SPRO
2. On the Change View “Material Groups”: Overview screen, choose New Entries.
3. Make the following sets of entries:
Material Group Mat.grp.description Description 2
YBF01 Product Group F01 Product Group Discrete Man.
YBF02 Product Group F02 Product Group Process Man.
YBR01 Product Group R01 Product group Plastic
YBR02 Product Group R02 Product group Metal
YBR03 Product Group R03 Product Group Stationary
YBR04 Product Group R04 Product Group Spares
YBR05 Product Group R05 Product Group Misc
YBS01 Product Group S01 Product Group Subcon.
YBS02 Product Group S02 Product Group Phantom
YBSVM1 Spare parts Spare parts
YBSVS1 SP-Services Services
YBT01 Product Group T01 Product Group Trade
YBZ01 Product Group Z01 Product Group Consumables
YBZ02 Product Group Z02 Product Group Supplies
YBZ03 Product Group Z03 Product Group Computers
4. Save your settings.
3.1.4 Defining Units of Measure Groups
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Logistics General → Material Master → Settings for Key Fields
→ Define Units of Measure Groups
Transaction code SPRO
© SAP AG Page 11 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 12/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Change View “Define Units of Measure Groups”: Overview screen, choose New Entries.
3. Make the following sets of entries.
Fieldname
Unit Group AlternativeUnite
MeasurementUnit Text
Counter Denominator for conversion
Entry 1 10 DZ Dozen 12 1
Entry 2 10 GRO Gross 144 1
4. Save your settings.
3.1.5 Defining Product Hierarchies
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Logistics General → Material Master → Settings for Key Fields
→ Data Relevant to Sales and Distribution→ Define Product
Hierarchies
Transaction code SPRO
2. On the Customizing Product Hierarchy screen, select Maintain: Product hierarchy andchoose Choose (F2).
3. On the Change View “Materials: Product Hierarchies”: Overview screen, choose New Entries.
4. Make the following entries. Start with all Level-1 entries and save them, then continue with allLevel-2 entries, etc.:
Product Hierarchy Level No. Description
#00001 1 Best Practices Prod. Hier. Top Level
#00001P0001 2 Prod. Hier. Second Level - Products A
#00001P000100000001 3 Prod. Hier. Third Level - Product A.01
#00001P000100000002 3 Prod. Hier. Third Level - Product A.02
#00001P000100000003 3 Prod. Hier. Third Level - Parts A.03
#00001P0002 2 Prod. Hier. Second Level - Products B
#00001P000200000001 3 Prod. Hier. Third Level - Product B.01
#00001P000200000002 3 Prod. Hier. Third Level - Product B.02
5. Save your settings.
© SAP AG Page 12 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 13/108
SAP Best Practices 104 - Materials Management: Configuration Guide
3.2 Engineering Change Management
3.2.1 Setting Ctrl. Data - Engineering Change Manag. Ctrl.Data
Procedure1. Access the activity using one of the following navigation options:
IMG menu Logistics General → Engineering Change Management → Set
Control Data
Transaction code OS54
2. On the Change View "Engineering Change Management Control Data": Details screen, checkthe following entries:
Field name Description User action and values Comment
Parameter Effectivity
Rev.Level Act. X
3. Choose Save.
3.3 Checking consistency
3.3.1 Checking consistency of unit of measurement tables
After you have installed BB - Materials Management, check the Units of Measurement. We highlyrecommend that you run the report RBZMECHK to avoid any inconsistencies.
1. Access the activity using one of the following navigation options:
SAP Easy Access Tools→ ABAP Workbench→ Development → User Interface
→ ABAP Editor
Transaction code SE38
2. Enter the program RBZMECHK and choose Execute (F8).
This report establishes the consistency of the tables T006, T006A, T006B and T006C. Itensures, in particular, that each unit of measurement has an indicator in every language.However, since the report cannot know the correct translation of a unit of measurement, itonly numbers missing indicators. This procedure is therefore only recommended if you haveto restore the consistency of the database tables very quickly. Of course, the generated
numeric indicators can be adjusted subsequently with transaction CUNI.
© SAP AG Page 13 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 14/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4 Configuration of Materials Management
4.1 Consumption-Based Planning Access the Customizing activities as outlined in the BC Set output documentation below and
change the settings according to the respective table values listed.
4.1.1 Overall Maint. of Plant Par. - General Settings
4.1.1.1 Overall Maint. of Plant Par. - Number Ranges
Use
The purpose of this step is to maintain the number ranges per plant.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Create.
3. In the Create Plant Parameters dialog box make the following entries:
Create the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
4. Choose Create.
5. On the Maintain Plant Parameters screen choose number ranges.
6. On the Assign Number ranges screen choose the Planned Orders button, and make thefollowing entries:
Plant NRge pl. orders Simulative planned order
1000 01 01
1100 01 01
7. On the Assign Number ranges screen choose the Reservation/Dependent Requirements button, and make the following entries:
Plant NR: StkTrns Res.
1000 01
© SAP AG Page 14 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 15/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Plant NR: StkTrns Res.
1100 01
8. On the Assign Number ranges screen, choose the Purchase Requisition button, and makethe following entries:
Plant NR – Preq.
1000 01
1100 01
9. On the Assign Number ranges screen, choose the MRP Lists button, and make the followingentries:
Plant No. Range - MRP
1000 01
1100 0110. On the Assign Number ranges screen choose the Simulative Dep Req button, and make the
following entries:
Plant NR. SimDepRs
1000 01
1100 01
11. Choose Save.
12. Choose Back .
4.1.1.2 Overall Maint. of Plant Par. - Conversion PlannedOrder To PReq.
Use
The purpose of this step is to maintain the number of planned orders converted to purchaserequisitions per plant.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
© SAP AG Page 15 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 16/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for
additional plants.Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose Conversion PlOrd->Preq.
6. On the Change View “Number Of Planned Orders”: Overview screen make the followingentries:
Plnt Number of planned orders
1000 500
1100 500
7. Choose Save.
8. Choose Back .
4.1.1.3 Overall Maint. of Plant Par. - Dep.reqmt availability
Use
The purpose of this step is to define the availability check of dependent requirements.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant
Parameters
Transaction code O MI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
© SAP AG Page 16 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 17/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose Availability Dep. Req.
6. On the Change View “Availability Check”: Overview screen, make the following entries:
Plnt Avail. Check Rule
1000 PP1100 PP
7. Choose Save.
8. Choose Back .
4.1.1.4 Overall Maint. of Plant Par. - External Procurement
Use
The purpose of this step is to define external procurement.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose External Procurement
6. On the Change View “Default Values Purchasing/MRP”: Overview screen, make the followingentries:
Plnt Purchasingprocess.time
Sub.Purch.Group
Description Scheduling:Inforecord
/agreem.
Schedulelines
UnkownAcctAssignmentwm
1000 X U
1100 X U
7. Choose Save.
© SAP AG Page 17 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 18/108
SAP Best Practices 104 - Materials Management: Configuration Guide
8. Choose Back .
4.1.1.5 Overall Maint. of Plant Par. - Rescheduling
UseThe purpose of this step is to define a rescheduling check.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose External Procurement
6. On the Change View “Plant rescheduling”:Details screen, make the following entries:
Plnt 1000 1100
Rescheduling horizon 100 100
Firm planned orders X X
Production order X X
Firm.pur.requisition X X
Order itm/sched.line X X
QM inspection lot X X
Shipping notificat. X X
Tolerance value forward 02 02
Tolerance value for displacement 02 02
7. Choose Save.
8. Choose Back .
© SAP AG Page 18 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 19/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4.1.1.6 Overall Maint. of Plant Par. - Planning Horizon
Use
The purpose of this step is to define a planning horizon for plant.
Procedure
Use
The purpose of this step is to define a rescheduling check.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose Planning Horizon.
6. On the Change View “Planning Horizon for Plant”: Overview screen, choose New Entries.
Plnt PlanningHorizon
1000 100
1100 100
7. Choose Save.
8. Choose Back .
4.1.1.7 Overall Maint. of Plant Par. - Available Stocks
Use
The purpose of this step is to define availability of stock.
© SAP AG Page 19 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 20/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose Available Stocks.
6. On the Change View “Available Stocks”: Overview screen, make the following entries:
Plnt Stock in transfer Blocked stock Restricted-use stock
1000 X
1100 X
7. Choose Save.
8. Choose Back .
4.1.1.8 Overall Maint. of Plant Par. - Error Handling
Use
In this step, you determine how the system is to react if errors occur in the planning run.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
© SAP AG Page 20 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 21/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Error Handling.
6. On the Change View “Error Handling in the Planning Run”: Overview screen, make thefollowing entries:
Plnt Max.Proposals Subs.
1000 050 101
1100 050 111
7. Choose Save.
8. Choose Back.
4.1.1.9 Overall Maint. of Plant Par. - Line Item Numbers
Use
The purpose of this step is to define a line item number.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI82. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose Item Numbers.
6. On the Change View: “Item Numbers”: Overview screen, make the following entries:
Plnt Item Number:PurchaseRequisition
Item of stock transfer reserve.
1000 10 100
© SAP AG Page 21 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 22/108
SAP Best Practices 104 - Materials Management: Configuration Guide
1100 10 100
7. Choose Save.
8. Choose Back .
4.1.2 Overall Maint. of Plant Par. - MRP controllers
Use
The purpose of this step is to maintain the MRP controller per plant.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose MRP controllers.
6. On the Change View “MRP Controllers”: Overview screen make the following entries:
Plnt Name MRPCont.
MRP Controller Name
Telephone
1000 生生生生生生 1 100 生生生生 100 03-5325-0201
1000 生生生生生生 1 101 生生生生 101 03-5325-0202
1000 生生生生生生 1 102 生生生生 102 03-5325-0203
1000 生生生生生生 1 103 生生生生 103 03-5325-0204
1100 生生生生生生 2 110 生生生生 110 03-5325-0206
1100 生生生生生生 2 111 生生生生 111 03-5325-0207
1100 生生生生生生 2 112 生生生生 112 03-5325-0208
© SAP AG Page 22 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 23/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Plnt Name MRPCont.
MRP Controller Name
Telephone
1100 生生生生生生 2 113 生生生生 113 03-5325-0209
7. Choose Save.
8. Choose Back .
4.1.3 Overall Maint. of Plant Par. - Special procurement
Use
In this step, you define the special procurement keys which as well as the procurement typecontrol the procurement and storage of a material. The special procurement type always refers toa procurement type.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Plant Parameters→ Overall Maintenance of Plant Parameters
Transaction code OMI8
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.
3. In the Maintain Plant Parameters dialog box make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for
additional plants.Plant
1000
1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen choose Special Procurement.
6. Choose the New Entries.
7. Make the following entries:
Plnt S
PT
Long Text Procure-
ment type
Sp.
proc.
Plnt Phantom
item
Direct
pro-duction
Withdr.
altern.plant
Issuing
plant
1000 10 Consignment F 2
1000 20 External procurement F 0
1000 30 Subcontracting F 3
1000 40 Stock transfer F 7 1100
© SAP AG Page 23 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 24/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Plnt SPT
Long Text Procure-ment type
Sp.proc.
Plnt Phantomitem
Directpro-duction
Withdr.altern.plant
Issuingplant
(proc.from alter.plant)
1000 45 Stock transfer fromplant to MRP area
F 7 1100
1000 50 Phantom assembly E E X
1000 52 Direct production /collective order
E E X
1000 60 Phantom in planning E E
1000 70 Withdrawal fromalternative plant
E R X 1100
1000 80 Production inalternative plant
E P 1100
1100 10 Consignment F 2
1100 20 External procurement F 0
1100 30 Subcontracting F 3
1100 40 Stock transfer (proc.from alter.plant)
F 7 1000
1100 45 Stock transfer fromplant to MRP area
F 7 1000
1100 50 Phantom assembly E E
1100 52 Direct production /collective order E E X
1100 60 Phantom in planning E E
1100 70 Withdrawal fromalternative plant
E E X 1000
1100 80 Production inalternative plant
E P 1000
8. Choose Save.
9. Choose Back .
4.1.4 Defining Storage Location MRP per Plant
Procedure
1. Access the activity using on of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Planning → Define Storage Location MRP per Plant
© SAP AG Page 24 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 25/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Transaction code SPRO
2. In the Determine Work Area: Entry dialog box make the following entries:
Create the plant parameters for plant 1000 first, then create the parameters for
additional plants.
Plant
1000
1100
3. Choose Enter .
On the Change View “Storage Location MRP": Overview , make the following entries:
Plnt SLoc MRP Ind.
1000 1010
1000 1020
1100 1030
1000 1040
1000 1050
1000 1060 1
1100 1110
1100 1120
1100 1130
1100 1140
1100 1150
1100 1160 1
4. Choose Save.
4.1.5 Defining Floats (Scheduling Margin Key)
Use
The purpose of this step is to define scheduling margin key.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Materials Management → Consumption-Based Planning →
Planning → Define Floats (Scheduling Margin Key)
2. On the Change View “Margins for scheduling”: Overview screen, choose New Entries.
© SAP AG Page 25 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 26/108
SAP Best Practices 104 - Materials Management: Configuration Guide
3. Make the following entries:
Plant Key Name 1 OpeningPeriod
Float After Production
Float BeforeProduction
ReleasePeriod
1000 000 000 000 000 000
1000 001 010 001 002 005
1100 000 000 000 000 000
1100 001 010 001 002 005
4. Choose Save.
4.1.6 Activating Materials Requirements Planning
Use
The purpose of this activity is to activate MRP.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
Planning → Activate Materials Requirements Planning
Transaction code SPRO
2. Choose button Material Requirements Planning .
3. Make the following entries:
Plant Activate requirements planning Comment
0001 This plant is never included!1000 X
1100 X
4. Choose Save.
5. Choose Back .
4.1.7 Defining Scope of Planning for Total Planning
Use
The purpose of this activity is to define the scope of planning for Total Planning . This means thatthe planning includes the selected plants and tells the system in which order the plants have to beplanned, e.g. distribution center before production plant.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Consumption-Based Planning →
© SAP AG Page 26 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 27/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Planning → Define Scope of Planning for Total Planning
Transaction code OM0E
2. Choose New entries.
3. Make the following entries:
Planning Scope Activate requirements planning
YB01 All Plants
4. Mark the created entry and double-click in the left menu Sequence of plants/MRP areas.
5. Choose button New Entries.
6. Make the following entries:
Cntr. Plant Comment
200 1100 Distribution center first
210 1000 Production plant second
7. Choose Save.
8. Choose Back .
4.2 Purchasing
Access the Customizing activities as outlined in the BC Set output documentation below, andmake the settings according to the respective table values listed.
4.2.1 Activating batch-specific Unit of Measures
Use
The purpose of this activity is to activate the batch-specific unit of measures.
Procedure
1. Access the activity using one of the following navigation options:
IMG Menu Logistics - General Batch Management Batch-Specific
Material Unit of Measure Activate Batch-Specific Material Unit of Measure
Transaction Code OMWS
2. On the Activate Batch-Specific Material Unit of Measure screen select Batch-specific units of
measure active and save your entry.
Result
The batch-specific unit of measure was activated.
4.2.2 Creating Release Procedure Characteristics
Procedure
© SAP AG Page 27 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 28/108
SAP Best Practices 104 - Materials Management: Configuration Guide
1. Access the activity using on of the following navigation options:
SAP SAP ECC menu Cross Application Components→ Classification System→
Master Data→ Characteristics
Transaction code CT04
2. On the Characteristics screen, make the following entries:
Field name User action and values
Characteristic R2R_PURCH_GRP
3. Choose Create.
4. On the Create Characteristics screen, make the following entries:
5. Choose the Basic tab:
Field name User action and values
Description Purchasing Group
Status 1
Data Type CHAR
Number of Characters 3
Multiple Values select
6. Choose the Description tab:
Field name User action and values
Language JA
Description生生生生生生
Language EN
Description Purchasing Group
7. Choose the Values tab:
Field name User action and values
Char. Value 100
Description Xxx
Char. Value 101
Description Xxxx
Char. Value 102
Description Xxxxxx
Char. Value 103
© SAP AG Page 28 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 29/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Description Xxxxxxx
Char. Value 200
Description Xxxxx
Char. Value 201
Description Xxx
Char. Value 202
Description Xxx
Char. Value 203
Description xxxxx
8. Choose the Addnl data tab:
Field name User action and values
Table Name CEKKO
Field Name EKGRP
Not Ready for Input select
9. Choose Save and go back to the Characteristics screen.
10. On the Characteristics screen, make the following entries:
Field name User action and values
Characteristic R2R_PURCH_ORD_TYPE
11. Choose Create.
12. On the Create Characteristics screen, make the following entries:
13. Choose the Basic tab:
Field name User action and values
Description Order Type (Purchasing)
Status 1
Data Type CHAR
Number of Characters 4
Multiple Values select
14. Choose the Description tab:
© SAP AG Page 29 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 30/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Language JA
Description 生生生生生生生
Language EN
Description Order Type (Purchasing)
15. Choose the Values tab:
Field name User action and values
Char. Value FO
Description 生生生生生生生生生
Char. Value NB
Description 生生生生生生
Char. Value UB
Description 生生生生生生生生
16. Choose the Addnl data tab:
Field name User action and values
Table Name CEKKO
Field Name BSART
Not Ready for Input select
17. Choose Save and go back to the Characteristics screen.
18. On the Characteristics screen, make the following entries:
Field name User action and values
Characteristic R2R_PURCH_ORD_VALUE
19. Choose Create.
20. On the Create Characteristics screen, make the following entries:
21. Choose the Basic tab:
Field name User action and values
Description Total net order value
Status 1
Data Type CURR
Number of Characters 15
© SAP AG Page 30 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 31/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Decimal Places 2
Currency JPY
Template _______________
Multiple Values select
22. Choose the Description tab:
Field name User action and values
Language JA
Description 生生生生生生生
Language EN
Description Total net order value
23. Choose the Values tab
Field name User action and values
Char. Value > 50,000 JPY
24. Choose the Addnl data tab:
Field name User action and values
Table Name CEKKO
Field Name GNETW
Not Ready for Input select
25. Choose Save.
4.2.3 Creating Release Procedure Class
Procedure
1. Access the activity using on of the following navigation options:
SAP SAP ECC menu Materials Management → Consumption Based Planning →
Planning →
Define Storage Location MRP per Plant Transaction code CL02
2. On the Class screen, make the following entries:
Field name User action and values
Class R2R_CL_REL_CEKKO
Class type 032
© SAP AG Page 31 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 32/108
SAP Best Practices 104 - Materials Management: Configuration Guide
3. Choose Create.
4. On the Create Class screen, make the following entries:
5. Choose the Basic data tab:
Field name User action and values
Description PO Release at Header Level
Status Released
6. Choose the Char. tab:
Field name User action and values
Char. R2R_PURCH_ORD_TYPE
Char. R2R_PURCH_GRP
Char. R2R_PURCH_ORD_VALUE
7. Choose Save.
4.2.4 Defining Release Procedure for Purchase Orders
Use
The purpose of this step is to define the release procedure for purchase orders containing stepsRelease Groups, Release Codes, Release Indicator, Release Strategies.
Procedure
1. Access the activity using on of the following navigation options:
SAP SAP ECC menu Materials Management → Purchasing → Purchase Order →
Release Procedure for Purchase Orders→ Define Release
Procedure for Purchase Orders
Transaction code SPRO
2. Double-click Release Groups.
3. Choose New Entries.
4. Make the following entries:
Grp Obj Class Description
PH 2 R2R_CL_REL_CEKKO PO Release (Overall)
5. Choose Save.
6. Choose Back .
7. Double-click Release Codes.
8. Choose New Entries.
9. Make the following entries:
Grp Code Description
© SAP AG Page 32 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 33/108
SAP Best Practices 104 - Materials Management: Configuration Guide
PH 01 Purchasing Manager
10. Choose Save.
11. Choose Back .
12. Double-click Release Indicator .
13. Choose New Entries.
14. Make the following entries:
Rel R Chg VChTo Description
1 X 6 0.0 Changeable, but new release
15. Choose Save.
16. Choose Back .
17. Double-click Release Strategies.
18. Choose New Entries.
19. Make the following entries:
Grp Strat Code Description
PH 10 01 Overall Release
20. Choose Save.
21. Choose Back .
4.2.5 Defining Release Procedure for Purchase Orders - SetCriterias
Use
In this activity you will define a release procedure for purchase orders.
Procedure
1. Access the activity using on of the following navigation options:
SAP SAP ECC menu Materials Management → Purchasing → Purchase Order →
Release Procedure for Purchase Orders→ Define Release
Procedure for Purchase Orders
Transaction code SPRO
2. Double-click Release Strategies.
3. Choose Release Prerequisites and choose Continue.
4. Choose Release Statuses and choose Continue.
5. Choose Classification.
© SAP AG Page 33 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 34/108
SAP Best Practices 104 - Materials Management: Configuration Guide
6. On the Change View “Release Strategies”: Classification screen, make the following entries:
Field name User action and values
Order type (Purchasing) Framework order
Standard PO
Total net order value > 50,000 JPYPurchasing Group 生生生生 100
生生生生 101
生生生生 102
生生生生 103
7. Choose Back .
8. Choose Release Simulation.
9. Choose Simulate Release.
10. Choose Back .
11. Choose Save, and then Exit .
Result
The release procedure for purchase orders is defined.
4.2.6 Defining Calculation Schema
Procedure
1. Access the activity using on of the following navigation options:
IMG menu Materials Management → Purchasing → Conditions→ Define
Price Determination Process→ Define Calculation Schema
Transaction code SPRO
2. On the Change View “Schemas”: Overview screen, select Procedure RM0000 (Purchasing Document (Big)).
3. In the Dialog Structure, double-click Control data.
4. Enter the values shown below.
Step
Counter
Cond.
Type
From
To
Cond.Det.manu
ally
Stat
ID
Cond.
subtotal
Req
Cal.Ty
pe
BaseTy
pe
AccntKey
Accruals
1 1 PB00
9
1 2 PBXX
9 5
2 0 VA00
© SAP AG Page 34 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 35/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Step
Counter
Cond.
Type
From
To
Cond.Det.manually
Stat
ID
Cond.
subtotal
Req
Cal.Type
BaseType
AccntKey
Accruals
3 0 VA0
1
4 0 GAU1
X 31
5 0 GAU2
31 32 32
10 1 RB00
X X
10 2 RC00
X X
10 3 RA00
X X
10 4 RA01
1 X
10 5 HB00
X X
10 6 ZB00 X X
10 7 ZC00
X X
10 8 ZA00 X X
10 9 ZA01 1 X X
10 10 HB01
X X
10 11 RL01 1 X
10 15 MM00
X X
10 16 MM01
1 X X
10 17 REST
X
17 0 EDI1 X 53
19 0 EDI2 53 40
20 0 S 7
21 1 NAVS
X 60
21 2 NAVM
X 29
22 0 20 2
© SAP AG Page 35 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 36/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Step
Counter
Cond.
Type
From
To
Cond.Det.manually
Stat
ID
Cond.
subtotal
Req
Cal.Type
BaseType
AccntKey
Accruals
1
24 0 21 21
S
25 0 22 23
31 1 FRA1
20 X X FRE FR1
31 2 FRB1
20 X X FRE FR1
31 3 FRC1
20 X X FRE FR1
31 4 RUE1
20 X X FRE RUE
31 5 RUB1
20 X X FRE RUE
31 6 RUC1
20 X X FRE RUE
31 7 ZOA1
20 X X FRE FR3
31 8 ZOB1
20 X X FRE FR3
31 9 ZOC1 20 X X FRE FR3
31 10 FRA2
20 X X FRE FR2
31 11 FRB2
20 X X FRE FR2
31 12 FRC2
20 X X FRE FR2
32 1 MAR1
20 X 12 FRE RUE
35 1 SKT
O
20 X 17
37 0 A001 20 X 26 EIN BO1
38 0 A002 20 X 26 EIN BO1
39 0 30 32
S
40 0 25 38
S
© SAP AG Page 36 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 37/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Step
Counter
Cond.
Type
From
To
Cond.Det.manually
Stat
ID
Cond.
subtotal
Req
Cal.Type
BaseType
AccntKey
Accruals
41 0 25 3
2
S
60 0 WOTB
X 3
70 0 GRWR
20 X 8
75 0 GWLB
X 54 60
79 0 70 78
X C 8
5. Save your settings.6. Choose Back (F3) two times.
4.2.7 Maintaining Rounding Profiles
Procedure
1. Access the activity using on of the following navigation options:
IMG menu Materials Management → Purchasing → Order Optimizing →
Quantity Optimizing and Allowed Logistics Units of Measure→
Maintain Rounding Profile
Transaction code SPRO
2. On the Create Quantity Addition/Subtraction screen, enter rounding profile YG00 in theRounding profile field of the dialog box Maintain Rounding Profile: Initial Screen.
3. Enter the plant Plant_1 (1000) in the field Plant of the dialog box Maintain Rounding Profile:Initial Screen.
4. Choose Create Dynamic ( F5).
5. On the Create Dynamic Rounding Profile screen, enter the values shown below.
Field name User action and values
Rounding Profile YG00
Description Rounding to cartons, layers and pallets
Plant Plant_1 (1000)
Rounding off method 3
Rounding rule Y1
6. Save your settings.
7. Choose Back (F3).
© SAP AG Page 37 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 38/108
SAP Best Practices 104 - Materials Management: Configuration Guide
8. Repeat steps 2. - 6. for the same rounding profile and for the plant Plant_2 (1100) as shownbelow:
Field name User action and values
Rounding Profile YG00
Description Rounding to cartons, layers and palletsPlant Plant_2 (1100)
Rounding off method 3
Rounding rule Y1
9. To maintain the description of the rounding profile YG00 in Japanese, logon in language JA.
10. To access the customizing transaction, use IMG Path:
生生/購買管理
購買管理
発注の最適化
生生生生生生生生生生生生生生生生生生生生生生生
生生生生生生生生
11. Enter the rounding profile YG00 in the Rundungsprofil field of the dialog box Rundungsprofil pflegen: Einstieg .
12. Enter the plant Plant_1 (1000) in the field Werk.
13. Choose Change (F7).
14. On the 生生生生生生生生生生生生生 screen, make the following entries.
Field name User action and values
Rounding Profile YG00
Description 生生生生/生/生生生生生生生
Plant Plant_1 (1000)
Rounding off method 3
Rounding rule Y1
15. Save your settings.
16. Repeat steps 10. - 14. for the same rounding profile YG00 and for the plant Plant_2 (1100) asshown below:
Field name User action and values
Rounding Profile YG00
Description 生生生生/生/生生生生生生生
Plant Plant_2 (1100)
Rounding off method 3
Rounding rule Y1
© SAP AG Page 38 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 39/108
SAP Best Practices 104 - Materials Management: Configuration Guide
17. Save your settings.
18. Choose Back (F3).
4.2.8 Unit of Measure Rounding Rules
Procedure
1. Access the activity using on of the following navigation options:
IMG menu Materials Management → Purchasing → Order Optimizing →
Quantity Optimizing and Allowed Logistics Units of Measure
→ Unit of Measure Rounding Rules
Transaction code SPRO
2. On the Change View “Unit of Measure Rounding Rule”: Overview screen, choose New Entries.
3. On the New Entries: Overview of Added Entries screen, make the following entries:
Rounding Rule Alternative Unit of measure % rounding up % rounding down
Y1 CAR 80.0 0.1
Y1 PAL 80.0 0.1
4. Save your settings.
5. Choose Back (F3).
4.2.9 Maintaining Account Assignment Categories
Procedure
1. Access the activity using on of the following navigation options:
IMG menu Materials Management → Purchasing → Account Assignment
→ Maintain Account Assignment Categories
Transaction code SPRO
2. On the Change View “Account Assignment Categories”: Overview screen, choose Acctassignment cat. A (Asset).
3. Choose Details (Ctrl+Shift+F2).
4. On the Change View “Account Assignment Categories”: Details screen, make the followingentries:
Field name User action and values
Consumption posting A
Description Asset
Distribution 1
AA Changeable at IR X
Partial Invoice 2
© SAP AG Page 39 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 40/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
ID.Account Assignment Screen 2
Goods receipt X
GR non-valuated X
Invoice receipt X
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
© SAP AG Page 40 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 41/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Sales document schedule X
Service/activity type X
Unloading point X
5. Save your settings.
6. Repeat steps 1. to 5. for the account assignment categories B, …, X using the values shownbelow.
Acct. assignmt. cat. B
Field name User action and values
Consumption posting E
Description MTS prod./sales ord.
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen
Goods receipt
GR non-valuated
Invoice receipt X
Acct. assignmt. cat. C
Field name User action and values
Consumption posting V
Description Sales order
Distribution 1
AA Changeable at IR X
Account modification
Partial Invoice 2
ID.Account Assignment Screen 1
Goods receipt X
GR non-valuated
Invoice receipt X
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
© SAP AG Page 41 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 42/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area XFunds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. D
Field name User action and values
Consumption posting P
Description Indiv.cust./project
© SAP AG Page 42 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 43/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen 1
Special Stock E
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. binding X
Field name Mandatory
Entry
Optional
Entry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object XCost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
© SAP AG Page 43 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 44/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. E
Field name User action and values
Consumption posting E
Description Ind. cust. w. KD-CO
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen 1
Special Stock E
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Binding X
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area XBusiness process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
© SAP AG Page 44 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 45/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. F
Field name User action and values
Consumption posting V
Description Order
Distribution 1
AA Changeable at IR X
Account modification VBR
Partial Invoice 2
ID.Account Assignment Screen 1
Special Stock
Goods receipt X
© SAP AG Page 45 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 46/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
© SAP AG Page 46 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 47/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Service/activity type X
Unloading point X
Acct. assignmt. cat. G
Field name User action and values
Consumption posting P
Description MTS prod./project
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen
Special Stock
Goods receipt
GR non-valuated
Invoice receipt X
GR Ind. Firm
Acct. assignmt. cat. K
Field name User action and values
Consumption posting V
Description Cost center
Distribution 1
AA Changeable at IR X
Account modification VBR
Partial Invoice 2
ID.Account Assignment Screen 1
Special Stock
Goods receipt X
GR non-valuated Invoice receipt X
GR Ind. Firm
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
© SAP AG Page 47 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 48/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area XFunds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. M
Field name User action and values
Consumption posting
Description Ind. cust. w/o KD-CO
© SAP AG Page 48 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 49/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen 1
Special Stock E
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. binding X
Field name Mandatory
Entry
Optional
Entry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object XCost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
© SAP AG Page 49 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 50/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. N
Field name User action and values
Consumption posting V
Description Network
Distribution 1
AA Changeable at IR X
Account modification VBR
Partial Invoice 2
ID.Account Assignment Screen 1
Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area XBusiness process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
© SAP AG Page 50 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 51/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. P
Field name User action and values
Consumption posting V
Description Project
Distribution 1
AA Changeable at IR X
Account modification VBR
Partial Invoice 2
ID.Account Assignment Screen 1
Special Stock
Goods receipt X
© SAP AG Page 51 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 52/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
© SAP AG Page 52 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 53/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Service/activity type X
Unloading point X
Acct. assignmt. cat. Q
Field name User action and values
Consumption posting P
Description Proj. make-to-order
Distribution
AA Changeable at IR
Account modification VBR
Partial Invoice
ID.Account Assignment Screen 1
Special Stock Q
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. binding X
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
© SAP AG Page 53 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 54/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. T
Field name User action and values
Acct.assignment changeable X
Consumption posting V
Description All new aux.acc.ass.
Distribution 1
AA Changeable at IR X
Account modification VBR
Partial Invoice 2
ID.Account Assignment Screen 1
Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm
© SAP AG Page 54 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 55/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.
block
X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. U
Field name User action and values
Acct.assignment changeable
© SAP AG Page 55 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 56/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Consumption posting U
Description Unknown
Distribution
AA Changeable at IR
Account modification
Partial Invoice
ID.Account Assignment Screen 1
Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. FirmAcct. assignmt. cat. X
Field name User action and values
Acct.assignment changeable X
Consumption posting V
Description All aux.acct.assgts.
Distribution 1
AA Changeable at IR X
Account modification VAX
Partial Invoice 2
ID.Account Assignment Screen 1
Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
Asset X
Asset Subnumber X
Business Area X
Business process X
© SAP AG Page 56 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 57/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name MandatoryEntry
OptionalEntry
Dislay Hidden
CO/PP Order X
Commitment Item X
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt.block
X
Functional Area X
Funds X
Funds Center X
Funds reservation XGeneral Ledger Account X
Goods recipient/ship-to party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
4.2.10 Maintaining Account Assignment Categories -Translation
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Account Assignment
→ Maintain Account Assignment Categories
Transaction code SPRO
© SAP AG Page 57 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 58/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Change View “Account Assignment Categories”: Overview screen, choose accountassignment category A.
3. Choose Goto→ Translation.
4. On the Choose languages dialog box, choose Language JA Japanese.
5. Choose Copy (Enter).
6. In the Maintain Texts in Other Languages dialog box, check that the Japanese descriptionexists. If not, enter Anlage.
7. If you entered a translation, choose Continue (Enter).
8. Choose Back (F3).
9. Repeat steps 1. to 7. for all the account assignment categories B, …, Z using the Japanesedescription shown in the table below.
Acctassignment cat
AcctAssgtCatDesc.Language EN
AcctAssgtCatDesc.Language JA
B MTS prod./sales ord. MTS 生生/生生
C Sales order 生生
D Indiv.cust./project 生生生生生/Project
E Ind. cust. w. KD-CO KD-CO 生生生生生生
F Order 生生
G MTS prod./project MTS 生生/PROJECT
K Cost center 生生生生生
M Ind. cust. w/o KD-CO 生生生生生 w/o KD-CO
N Network 生生生生生生
P Project プロジェクト
Q Proj. make-to-order 生生生生生生生生生生
T All new aux.acc.ass. 生生生生生生生生生
U Unknown 勘定未設定
X All aux.acct.assgts. 生生生生生生生
10. Save your settings.
11. Choose Back (F3).
4.2.11 Defining Scope of List
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Vendor Evaluation
→ Define Scope of List
Transaction code SPRO
© SAP AG Page 58 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 59/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Change View “Scope of List for Vendor Evaluation”: Overview screen, choose New Entries.
3. On the New Entries: Overview of Added Entries screen, enter the values as shown below.
Field name User action and values
List scope Y_CONSPR01
Description Ranking list consumer products
4. Save your settings.
5. Choose Back (F3).
6. On the Change View “Scope of List for Vendor Evaluation”: Overview screen, double click thenew entry Y_CONSPR01.
7. Enter the values shown below.
Main Criterion Sequence
01 1
02 2
03 3
8. Save your settings.
9. Choose Back (F3).
4.2.12 Defining Permissible Partner Roles per Account Group
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Partner
Determination→ Partner Roles→ Define Permissible
Partner Roles per Account Group
Transaction code SPRO
2. On the Change View “Permissible Partner Roles per Account Group”: Overview , choose New Entries.
3. On the New Entries: Overview of Added Entries screen, enter the values shown below.
Function Group
DP YBAC
VN YBAC
4. Save your settings.
5. Choose Back (F3) twice.
© SAP AG Page 59 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 60/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4.2.13 Defining Condition Types
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Logistic General → Agency Business→ Basic Settings→
Define Price Determination Process → Define Condition
Types
Transaction code SPRO
2. In the Choose Activity dialog box, choose Define Condition Type.
3. On the Change View “Conditions: Condition Types”: Overview screen, choose New Entries and make the following entries:
Field name User action and values
Condition Type NAVS
Description Non-Deductable Tax
Access Sequence 0003
Condition Class D
Calculat.type B
Cond.category D
Item Condition Select
Delete Select
Delete fr.DB Do not delete (set the deletion flag only)
Exclusion X - Gross Price
4.2.14 Taxes in Procurement
4.2.14.1 Setting Tax Indicator for Material
Use
In this step, you maintain the tax indicators that you wish to assign to materials. You do this for
each country of destination.
Procedure
1. Access the activity using one of the following navigation options:
SAP IMG menu Materials Management → Purchasing → Taxes→ Set Tax
Indicator for Material
Transaction code SPRO
© SAP AG Page 60 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 61/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Change View “Determination of Tax Code: Maintain Material Indicator: Overview” screen, choose New entries.
3. On the “New Entries: Overview of Added Entries” screen, make the following entries.
Dst. Country Material Description
JP 0 Material 0%
JP 1 Material 100%
4. Save your settings.
5. Choose Back (F3).
Result
The tax indicators are created.
4.2.14.2 Setting Tax Indicator for Plant
Use
In this step, you maintain the tax indicators that you wish to assign to materials. You do this for each country of destination.
Procedure
1. Access the activity using one of the following navigation options:
SAP IMG menu Materials Management → Purchasing → Taxes→ Set Tax
Indicator for Plant
Transaction code SPRO
2. On the Change View “Determination of Tax Indicator: Maintain Plant Indicator: Overview” screen, choose New entries.
3. On the New Entries: Overview of Added Entries screen, make the following entries.
Dst. Country Plant Tax ID Description
JP 0 Exempt
JP 1 Taxable
4. Save your settings.
5. Choose Back (F3).
Result
The tax indicators are created.
4.2.14.3 Setting Tax Indicator for Account Assignment
Use
© SAP AG Page 61 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 62/108
SAP Best Practices 104 - Materials Management: Configuration Guide
In this step, you maintain the tax indicators that you wish to assign to materials. You do this for each country of destination.
Procedure
1. Access the activity using one of the following navigation options:
SAP IMG menu Materials Management → Purchasing → Taxes→ Set Tax Indicator for Account Assignment
Transaction code SPRO
2. On the Change View “Determine Tax Code: Maintain Account Assignment Indicator:Overview” screen, choose New entries.
3. On the “New Entries: Overview of Added Entries” screen, make the following entries:
Dst. Country Plant Tax ID Description
JP 0 Exempt
JP 1 Taxable
4. Save your settings.5. Choose Back (F3).
Result
The tax indicators are created.
4.2.14.4 Assigning Tax Indicators for Plant
Use
In this step, you maintain the tax indicators that you wish to assign to materials. You do this for each country of destination.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Taxes→ Assign Tax
Indicators for Plants
Transaction code SPRO
2. On the Change View “Assignment of Tax Indicator to Plant”: Overview” screen, make thefollowing entries:
Plant Plant Tax ID DescriptionPlant_1 (1000) 1 taxable
Plant_2 (1100) 1 taxable
3. Save your settings.
4. Choose Back (F3)
Result
© SAP AG Page 62 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 63/108
SAP Best Practices 104 - Materials Management: Configuration Guide
The tax indicators are created.
4.2.14.5 Assigning Tax Indicators for Account Assignments
Procedure1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Taxes→ Assign
Tax Indicators for Account Assignments
Transaction code SPRO
2. On the Change View “Assignment of Tax Indicator to Account Assignment Category”:Overview” screen, choose New Entries.
3. Make the following entries:
A DstC AcAsg
JP 0
M JP 0
4. Save your settings.
5. Choose Back (F3).
4.2.15 Checking Incoterms
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Vendor Master → Check Incoterms
Transaction code SPRO
2. Choose New Entries.
3. Make the following entries:
IncoT Description Cty
AIR Airborne Express X
DHL DHL Worldwide Express X
EMY Emery Worldwide X
FED Federal Express X
UPS United Parcel Service X
USP United States Postal Service X
© SAP AG Page 63 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 64/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4. Choose Save.
5. Choose Back .
4.2.16 Returns to Vendor
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Purchase Order
→ Returns Order → Returns to Vendor
Transaction code SPRO
2. Choose New Entries.
3. Make the following entries:
Cat Type SPlt Del. Type Returns
F NB Plant_1 (1000) RL
F NB Plant_2 (1100) RL
F UB Plant_1 (1000)
F UB Plant_2 (1100)
4. Choose Save.
5. Choose Back .
4.2.17 Vendor Evaluation
4.2.17.1 Defining Criteria
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Vendor Evaluation→
Define Criteria
Transaction code SPRO
2. Choose New Entries.
3. Make the following entries:
CR Criterion Short Text f. M.Crit
01 Price PRICE
02 Quality QUALIT
03 Delivery DELIV
4. Choose Save.
5. Choose Back .
© SAP AG Page 64 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 65/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4.2.17.2 Defining Subcriteria
Procedure
1. Access the activity using one of the following navigation options:IMG menu Materials Management → Purchasing → Vendor
Evaluation→ Define Criteria
Transaction code SPRO
2. On the Change View “Main Criteria”: Overview screen, select the according previouslycreated criteria “Price” and double-click the subcriteria folder.
3. Choose New Entries.
4. Make the following entries:
CR Criterion Scoring Method
01 Price Level 4
02 Price Behavior 5
5. Choose Save.
6. On the Change View “Main Criteria”: Overview” screen, select the next criteria “Quality” anddouble-click the subcriteria folder.
7. Choose New Entries.
8. Make the following entries:
CR Criterion Scoring Method
01 GR Inspection 7
02 Rejection/Complaint 803 Audit 9
9. Choose Save.
10. On the Change View “Main Criteria”: Overview” screen, select the Delivery criteria anddouble-click the subcriteria folder.
11. Choose New Entries.
12. Make the following entries:
CR Criterion Scoring Method
01 On-Time Delivery 3
02 Quantity Reliability 203 Shipping Instr. 6
04 Adher. to Conf. Date B
13. Choose Back
14. Choose Back .
© SAP AG Page 65 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 66/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4.2.17.3 Defining Scope of List
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Purchasing → Vendor
Evaluation→ Define Scope of List
Transaction code SPRO
2. On the Change View “Scope of List for Vendor Evaluation: Overview” choose New Entries.
3. Make the following entries:
List Scope Description
Y_CONSPR01 Ranking list consumer products
4. Choose Save.
5. Choose Back .
4.2.17.4 Maint. Purch. Org. Data - Purch. Organization
Procedure
1. Access the activity using one of the following navigation options:
IMG menu IMG→ Material Management → Purchasing → Vendor
Evaluation → Maintain Purchasing Organization Data
Transaction code SPRO
2. On the Change View "Purchasing organization”: Overview screen, choose Copy As… (F6) to
copy the data record 0001 to 1000 Purchasing Org. 1000, and confirm the message bychoosing Copy All.
3. Save your entries and go back to the IMG menu.
4.2.17.5 Maint. Purch. Org. Data - Main Criteria
Procedure
1. Access the activity using one of the following navigation options:
IMG menu IMG→ Material Management → Purchasing → Vendor
Evaluation → Maintain Purchasing Organization Data
Transaction code SPRO
2. On the Change View "Purchasing organization”: Overview screen, choose Purchasing Org.1000, and double-click the Main Criteria folder.
3. On the Change View “Main Criteria: Overview” screen, choose New Entries.
4. Make the following entries:
CR Manual maint. Description
© SAP AG Page 66 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 67/108
SAP Best Practices 104 - Materials Management: Configuration Guide
01 Do not select Price
02 Do not select Quality
03 Do not select Delivery
05 Do not select Service
5. Choose Return and the criteria description will be posted from the system.
6. Choose Save.
7. Choose Back .
4.2.17.6 Maint. Purch. Org. Data – Subcriteria
Procedure
1. Access the activity using one of the following navigation options:
IMG menu IMG→ Material Management → Purchasing → Vendor
Evaluation → Maintain Purchasing Organization Data
Transaction code SPRO
2. On the Change View "Purchasing organization”: Overview screen, choose Purchasing Org.1000, and double-click Main Criteria folder.
3. The “Change View: Main criteria: Overview ” screen appears. Choose the previously definedmain criteria 01 Price and double-click the Subcriteria folder . Choose New Entries and makethe following entries:
Subcrit. Weighting Manual maint. Description
01 1 Do not select Price Level
02 1 Do not select Price Behavior
4. Choose Save.
5. On the “Change View: Main criteria: Overview ” screen choose the previously defined maincriteria 02 Quality and double-click the Subcriteria folder . Choose New Entries and make thefollowing entries:
Subcrit. Weighting Manual maint. Description
01 1 Do not select GR Inspection
02 1 Do not select Rejection/Complaint
03 1 Do not select Audit
6. Choose Save.
7. On the “Change View: Main criteria: Overview ” screen, choose the previously defined maincriteria 03 Delivery and double-click the Subcriteria folder . Choose New Entries and make thefollowing entries:
Subcrit. Weighting Manual maint. Description
01 1 Do not select On-Time Delivery
02 1 Do not select Quantity Reliability
© SAP AG Page 67 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 68/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Subcrit. Weighting Manual maint. Description
03 1 Do not select Shipping Instr.
04 1 Do not select Adher. to Conf. Date
8. On the “Change View: Main criteria: Overview ” screen, choose the previously defined maincriteria 04 Service and double-click the Subcriteria folder . Choose New Entries and make thefollowing entries:
Subcrit. Weighting Manual maint. Description
01 1 Do not select Quality of Service
02 1 Do not select Service Timeliness
9. Choose Save.
10. Choose Back .
4.2.17.7 Maint. Purch. Org. Data – Weighting
Procedure
1. Access the activity using one of the following navigation options:
IMG menu IMG→ Material Management → Purchasing → Vendor
Evaluation → Maintain Purchasing Organization Data
Transaction code SPRO
2. On the Change View "Purchasing organization”: Overview screen, choose the Purchasing Org. 1000, and double-click the Weighting folder.
3. On the Change View "Weighting”: Overview screen, select New Entries and make thefollowing entries:
Wgt. Key Cr Weighting Criterion Description
01 01 1 Price
01 02 1 Quality
01 03 1 Delivery
01 05 1 Service
02 01 2 Price
02 02 1 Quality
02 03 2 Delivery
02 04 102 05 1 Service
4. Choose Save.
5. Choose Back .
© SAP AG Page 68 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 69/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4.2.17.8 Maint. Purch. Org. Data - Points Scores f. the Auto.Criteria
Procedure
1. Access the activity using one of the following navigation options:
IMG menu IMG→ Material Management → Purchasing → Vendor
Evaluation → Maintain Purchasing Organization Data
Transaction code SPRO
2. On the Change View "Purchasing organization”: Overview screen, choose Purchasing Org.1000, and doubleclick “Points Scores for the Automatic Criteria” folder.
3. On the Change View "Points Scores for the Automatic Criteria: Overview “screen, chooseNew Entries and make the following entries:
Scoring Method Percentage Sco. Description / Text
2 100 Qty. reliability
2 2.0 95 Qty. reliability
2 10.0 80 Qty. Reliability
2 15.0 60 Qty. Reliability
2 20.0 40 Qty. Reliability
2 30.0 10 Qty. Reliability
2 99.9 1 Qty. Reliability
2 -1.0 95 Qty. Reliability
2 -2.0 90 Qty. Reliability
2 -5.0 80 Qty. Reliability
2 -10.0 65 Qty. Reliability
2 -15.0 40 Qty. Reliability
2 -20.0 10 Qty. Reliability
2 -99.9 1 Qty. Reliability
3 100 On-time del.
3 1.0 90 On-time del.
3 2.0 95 On-time del.
3 10.0 80 On-time del.
3 20.0 60 On-time del.
3 30.0 40 On-time del.
3 40.0 20 On-time del.
3 50.0 5 On-time del.
3 99.9 1 On-time del.
3 -5.0 95 On-time del.
© SAP AG Page 69 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 70/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Scoring Method Percentage Sco. Description / Text
3 -10.0 65 On-time del.
3 -20.0 75 On-time del.
3 -30.0 60 On-time del.
3 -40.0 40 On-time del.
3 -50.0 20 On-time del.
3 -60.0 5 On-time del.
3 -99.9 1 On-time del.
4 40 Price level
4 5.0 20 Price level
4 15.0 10 Price level
4 99.9 1 Price level
4 -5.0 50 Price level
4 -10.0 90 Price level
4 -20.0 95 Price level
4 -99,9 100 Price level
5 40 Price behavior
5 5.0 20 Price behavior
5 10.0 1 Price behavior
5 -5.0 50 Price behavior
5 -10.0 100 Price behavior
B 2.0 90 Adherence to confirmation date
B 5.0 75 Adherence to confirmation date
B 10.0 40 Adherence to confirmation date
B 30.0 25 Adherence to confirmation date
B 40.0 10 Adherence to confirmation date
B 50.0 1 Adherence to confirmation date
B -2.0 90 Adherence to confirmation date
B -5.0 70 Adherence to confirmation date
B -10.0 40 Adherence to confirmation date
B -20.0 10 Adherence to confirmation date
B -50.0 1 Adherence to confirmation date
4. Choose Save.
5. Choose Back .
© SAP AG Page 70 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 71/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4.3 Inventory Management and Physical Inventory Access the customizing activities as outlined in the BC Set output documentation below andchange the settings according to the respective table values listed.
4.3.1 Defining Screen Layout
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Inventory Management and
Physical Inventory → Automatic Movements→ Define Screen
Layout
Transaction code SPRO
2. On the Change View “Field Selection”: Overview screen, choose Position.
3. On the Another Entry dialog box, enter 643 in the Movement Type input field.
4. Choose Continue (Enter).5. Mark the selected line of movement type 643 in the Change View “Field Selection”: Overview
screen as shown below.
6. Choose Details (Ctrl+Shift+F2).
7. On the Maintain Field Status Group: Overview screen, double-click General data in theSelect Group box.
8. On the Maintain Field Status Group: General data screen, make the following entries:
Field name Supress RequiredEntry
Optional Entry
Assignment number (FI only) X
Line item text X
Invoice reference (FI only) X
Exchange hedging (FI only) X
Collective invoice (FI only) X
Final issue indicator X
Goods recipient X
9. Choose Back (F3).
10. On the Maintain Field Status Group: Overview screen, double click Additional account assignments in the Select Group box.
11. On the Maintain Field Status Group: Additional account assignments screen, make thefollowing entries:
Field name Supress RequiredEntry
Optional Entry
Calculation period (FI only) X
Material number (FI only) X
Cost center X
© SAP AG Page 71 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 72/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name Supress RequiredEntry
Optional Entry
CO/PP order X
Project X
Sales order X
Personnel number (FI only) X
Network X
Commitment item X
Plant (FI only) X
Business area X
Trad.partn.bus.area (FI only) X
Quantity (FI only) X
Profit Center X
Profitability segment X
Cost object X
Joint venture acct assgnmt(FI) X
Joint venture partner X
Joint venture recovery indctr X
Fund X
Funds center X
Partner company code X
Trad.part.prof.center(FI only) XJoint venture calculation type X
Funds reservation (FI) X
Funds reservation item (FI) X
Functional Area X
Activity type X
Business process X
Grant X
12. Choose Back (F3).
13. On the Maintain Field Status Group: Overview screen, double click Materials Management inthe Select Group box.
14. On the Maintain Field Status Group: Materials management screen, make the followingentries:
Field name Supress RequiredEntry
Optional Entry
Vendor X
© SAP AG Page 72 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 73/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name Supress RequiredEntry
Optional Entry
Customer X
Purchase order X
Reservation number (FI only) X
Phys.inventory fields(FI only) X
Ext. GA amount in LC X
Transport request (FI only) X
Sales value in local currency X
Accounting indicator X
Tax code X
Alternate base amount X
15. Choose Back (F3).
16. On the Maintain Field Status Group: Overview screen, double-click Transfer Postings in theSelect Group box.
17. On the Maintain Field Status Group: Transfer postings screen, make the following entries:
Field name Supress RequiredEntry
Optional Entry
Receiving material X
Receiving plant X
Receiving storage location X
Sales order X
Project X
Receiving batch X
18. Save your settings.
19. Choose Back (F3) twice.
4.3.2 Printer Determination by Plant/Storage Location
Use
The purpose of this activity is to assign printers to storage locations. The result will be that goods
movement slip will be automatically printed at the printers of the corresponding storage location.
© SAP AG Page 73 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 74/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Inventory Management and Physical
Inventory → Output Determination→ Printer Determination→
Printer Determination by Plant/Storage Location
Transaction code OMJ3
2. On the Change View “Print Parameters”: Overview screen, choose New Entries.
3. On the New Entries: Details of Added Entries screen, enter:
Condition Type Plant Stor. Location Output Device
LP01
4. Save your settings.
5. Repeat steps 2-4 with the following entries:
Condition Type Plant Stor. Location Output Device
Plant_1 (1000) Shop floor (1020) LP01
Plant_1 (1000) Shipping - (Lean WM) (1030) LP01
Plant_1 (1000) Stores - (Lean WM) (1050) LP01
Plant_1 (1000) Returns (1060) LP01
Plant_2 (1100) Stores - (Lean WM) (1150) LP01
Plant_2 (1100) Returns (1160) LP01
6. Save your settings.
7. Choose Back (F3).
4.3.3 Printer Determination by Plant/Stor.Loc./User Group
Use
The purpose of this activity is to assign printers to storage locations and user groups. The resultwill be that a goods movement slip will be printed automatically at the printers of thecorresponding storage location and user group.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Inventory Management and Physical
Inventory → Output Determination→ Printer Determination→
Printer Determination by Plant/Stor.Loc./User group
Transaction code OMJ4
2. On the Change View “Printer Determination per Plant/SLOc/User Group”: Overview screen,choose New Entries.
3. On the New Entries: Details of Added Entries screen, make the following entries:
© SAP AG Page 74 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 75/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Condition Type Plant Stor. Location User Group Output Device
GROUP1 LP01
4. Save your settings.
4.3.4 Copy, Change Movement Types
4.3.4.1 Copy, Change Mov. Types - Movement Type
Use
The purpose of this activity is to copy standard movement types to customer specific movementtypes 9xx and adjust these 9xx movement types.
Procedure
1. Access the activity using one of the following navigation options:
IMG menu IMG→ Materials Management → Inventory Management and Physical Inventory → Movement Types→ Copy, Change
Movement Types
Transaction code OMJJ
2. In the Field Selection dialog box select Movement Type and choose Enter .
3. On the Determine Work Area: Entry screen, enter:
Movement Type From Movement Type To
551 999
4. On the Change View "Movement Type": Overview , select movement type 551 and chooseCopy As... (F6).
5. Choose Enter.
6. On the Change View "Movement Type": Details of Selected Set screen, make the followingentries for the current used movement type:
Account Control Account Control Control Reason
951 - +
952 - +
961 -
901 -
902 -
7. Choose Enter .
8. In the Specify object to be copied dialog box, choose Copy all .
9. Confirm the Information dialog box.
10. Choose Save.
11. Repeat step 1. - 11. with the following movement types:
Movement Type From Movement Type To
© SAP AG Page 75 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 76/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Movement Type From Movement Type To
552 952
561 961
562 962
601 901
602 902
4.3.4.2 Copy, Change Mov. Types - Short Texts
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.3 Copy, Change Mov. Types - Allowed Transactions
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.4 Copy, Change Mov. Types - Help Texts
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.5 Copy, Change Mov. Types - Field selection (from201)/Batch
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.6 Copy, Change Mov. Types - Field selection (Enjoy)
Use
The purpose of this activity is to maintain field selection for movement type 951 and 952.
Procedure
1. Access the activity using one of the following navigation options:IMG menu IMG→ Materials Management → Inventory Management and
Physical Inventory → Movement Types→ Copy, Change
Movement Types
Transaction code OMJJ
© SAP AG Page 76 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 77/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. In the Field Selection dialog box, choose Movement Type and choose Enter .
3. On the Determine Work Area: Entry screen, make the following entries:
Movement Type From Movement Type To
951 952
4. On the Change View "Movement Type": Overview screen, select movement types 951 and952 and choose Field Selection (Enjoy).
5. On the Change View "Field Selection (Enjoy)": Overview screen, choose optional entry for allentries:
Movement Type Field Name Required Entry Optional Entry
951 All entries deselect select
952 All entries deselect select
6. On the Change View "Field Selection (Enjoy)": Overview screen, choose New Entries.
7. On the New Entries: Overview of Added Entries screen make the following entries:
Movement Type Field Name Required Entry Optional Entry
951 PAOBJNR Select Deselect
952 PAOBJNR Select Deselect
961 AUFNR Select Deselect
961 SGTXT Deselect Select
961 WEMPF Deselect Select
962 AUFNR Select Deselect
962 SGTXT Deselect Select
962 WEMPF Deselect Select
8. Choose Save.
4.3.4.7 Copy, Change Mov. Types - Update control / WMmovement types
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.8 Copy, Change Mov. Types - Account Grouping
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.9 Copy, Change Mov. Types - Reason for Movement
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
© SAP AG Page 77 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 78/108
SAP Best Practices 104 - Materials Management: Configuration Guide
4.3.4.10 Copy, Change Mov. Types - Reversal/follow-onmovement types
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.11 Copy, Change Mov. Types - Deactivate QM inspection / deliver
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.3.4.12 Copy, Change Mov. Types - LIS Statistics Group
This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.
4.4 Valuation and Account Assignment
4.4.1 Defining Valuation Classes
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Valuation and Account Assignment
-→ Account Determination -→ Account Determination Without
Wizard -→
Define Valuation ClassesTransaction code OMSK
2. On the Account Category Reference/Valuation Classes screen, choose Valuation Class.
3. On the Change View: "Valuation Classes": Overview , choose New Entries and make thefollowing entries:
ValCl ARef Description
0710 0001 Equipment 1
0720 0001 Equipment 2
1210 0002 Spec.complex fixed assets
3000 0001 Raw materials 1
3001 0001 Raw materials 2
3002 0001 Raw materials 3
3003 0001 Raw materials 4
© SAP AG Page 78 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 79/108
SAP Best Practices 104 - Materials Management: Configuration Guide
ValCl ARef Description
3030 0002 Operating supplies
3031 0002 Operating supplies 2
3040 0003 Spare parts
3050 0004 Packaging and empties
3100 0005 Trading goods
3105 0005 Third Party Drop Ship
3110 0005 Trading goods Project
3200 0006 Services
3300 0007 Nonvaluated material
7900 0008 Semifinished products
7920 0009 Finished products
4. Choose Save.
4.5 Logistics Invoice Verification Access the customizing activities as outlined in the BC Set output documentation below andadjust the settings according to the respective table values listed.
4.5.1 Setting Tolerance Limit
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Logistics Invoice Verification→
Invoice Block → Set Tolerance Limits
Transaction code SPRO
2. On the Change View “Tolerance Limits”: Overview screen, choose New Entries.
3. On the New Entries: Details of Added Entries screen, enter the following values for companycodes 1000 and 1100.
Field name User action and values
Tolerance key AN
Company Code 1000
Do not check X
4. Save your settings.
© SAP AG Page 79 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 80/108
SAP Best Practices 104 - Materials Management: Configuration Guide
5. Repeat steps 2. to 3. for all combinations of company codes and tolerance keys displayed bythe following shortcuts:
Company Code 1000
Field name User action and values
Tolerance key AP
Comapany Code 1000
Absolute value: Do not check X
Field name User action and values
Tolerance key BD
Comapany Code 1000
Absolute value: Do not check
Absolute value: Check limit X
Value 500
Field name User action and values
Tolerance key BR
Company Code 1000
Lower Limit Percentage Check Limit X
Tolerance Limit % 20
Upper Limit Percentage Check Limit X
Value 10
Field name User action and values
Tolerance key BW
Company Code 1000
Percentage: Do not check (Lower limit) X
Percentage: Check limit (Lower limit)
Tolerance limit % (Lower limit) 5.00
Percentage: Do not check (Upper limit) X
Percentage: Check limit (Upper limit)
Tolerance limit % (Upper limit) 5.00
© SAP AG Page 80 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 81/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Tolerance key DQ
Company Code 1000
Lower Limit: Absolute- do not check X
Value 26,600
Lower limit : Percentage- Do not Check X
Tolerance limit % 5.00
Upper Limit: Absolute- check limit X
Value
Upper Limit : Percentage- Do not Check
X
Tolerance limit % 5.00
Field name User action and values
Tolerance key DW
Company Code 1000
Upper limit: Absolute Do not check
Check limit X
Value 500,000
Field name User action and values
Tolerance key KW
Comapany Code 1000
Lower limit: Check limit X
Value 102,300
Lower limit : Percentage- Do not Check X
Tolerance limit % 5.00
Upper Limit: Absolute-Check Limit X
Value 102,300
Upper Limit: Percentage-Do not Check Limit
X
Tolerance Limit % 5.00
© SAP AG Page 81 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 82/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Tolerance key PP
Company Code 1000
Lower limit: Absolute Do not check X
Value 26,600
Lower limit : Percentage- Check X
Tolerance limit % 10.00
Upper Limit: Absolute-Do not Check Limit
X
Value 26,600
Upper Limit: Percentage-Check Limit X
Tolerance Limit % 10.00
Field name User action and values
Tolerance key PS
Company Code 1000
Lower limit : Absolute Do not check X
Value
Lower limit : Percentage- Do not check X
Tolerance limit %
Upper Limit: Absolute- Do not check Limit
X
Value
Upper Limit: Percentage-Check Limit X
Tolerance Limit % 10.00
Field name User action and values
Tolerance key ST
Company Code 1000
Upper Limit: Absolute- check limit X
Value 5,000,000
Field name User action and values
Tolerance key VP
© SAP AG Page 82 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 83/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Company Code 1000
Lower limit : Percentage- Do not Check X
Tolerance limit %
Upper Limit: Percentage-Do not Check X
Tolerance Limit %
6. Choose Back (F3).
4.5.2 Editing PO Supplement Text in Invoice Verification
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Logistics Invoice Verification→
Incoming Invoice→ Edit PO Supplement Text in Invoice
Verification
Transaction code SPRO
2. On the PO Text Types screen, choose Order text general .
3. On the Change View “PO Supplement”: Overview screen, choose New Entries.
4. On the New Entries: Overview of Added Entries screen, make the following entries:
Company Code PO Text 1000 X
5. Save your settings.
4.5.3 PO Supplement Text: Parameters, Invoice Verification
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Logistics Invoice Verification→
Incoming Invoice→ Edit PO Supplement Text in Invoice
VerificationTransaction code SPRO
2. On the PO Text Types screen, choose Order text general .
3. On the Change View “PO Supplement”: Overview screen, choose New Entries.
4. On the PO Text Types screen, choose Notifiable order text types.
5. Choose New Entries and make the following entries:
© SAP AG Page 83 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 84/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Company Code ID 1000 F03
1000 F05
1000 F06
1000 F07
1000 F11
6. Save your entries.
4.5.4 Configuring Vendor-Specific Tolerances
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Logistics Invoice Verification→
Incoming Invoice→ Configure Vendor specific Tolerances
Transaction code SPRO
2. On the Change View “Vendor Specific Tolerances”: Overview screen, choose New Entries.
3. On the New Entries: Details of Added Entries screen, make the following entries for companycode 1000:
Field name User action and values
Company Code 1000
Tolerance Group 0001
Absolute lower limit: Check limit X
Negative Lower limit Acceptance 2,000,000-
Percentage lower limit:
Check limit
X
Percentage Lower Acceptance limit 4.00 %
Negative small difference: Check limit X
Small difference 100,000-
Positive small difference: Check limit X
Small difference 50,000
Absolute upper limit: Check limit X
Positive Acceptance Upper limit 500,000
© SAP AG Page 84 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 85/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Field name User action and values
Percentage upper limit: check limit X
Percentage upper acceptance limit 2.00 %
Automatic invoice reduction. Absolute Upper limit: Check limit
X
Invoice reduction tolerance amount 400,000
Percentage upper limit: Check limit X
Percentage Invoice reduction Tolerance 5.00 %
4. Save your settings.
4.5.5 Activating Direct Posting to G/L Accounts and Material
Accounts
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Logistics Invoice Verification→
Incoming Invoice→ Activate Direct Posting to G/L Accounts
and Material Accounts
Transaction code SPRO
2. On the Change View “Customizing: Direct Posting in Log. Invoice Verification” screen, makethe following entries:
Field name User action and values
Direct Posting to GL accounts is active X
Direct Posting to material account is active X
3. Save your settings.
4. Choose Back (F3).
4.5.6 Setting check for duplicate invoices
Procedure1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Logistics Invoice Verification→
Incoming Invoice→ Set Check for Duplicate Invoices
Transaction code SPRO
2. On the Change View “Duplicate Invoice Check”: Overview screen, choose New entries andmaintain the following values:
© SAP AG Page 85 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 86/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Company Code Check Co. Code Check reference Check Inv. Date
1000 X X X
3. Choose Save.
4.5.7 Maintaining Number Assignments for AccountingDocuments
Procedure
1. Access the activity using one of the following navigation options:
IMG menu Materials Management → Logistic Invoice Verification→
Incoming Invoice→ Number Assignment → Maintain Number
Assignment for Accounting Documents
Transaction code OMR4
2. On the Doc.Types/Number Range: Invoice receipt screen choose Document Types in InvoiceVerification.
3. On the Change view “Document Types Invoice Verification/Valuation”: Overview screen, choose the line with the Transaction code shown below and choose Details.
Transaction
MIRO
4. On the Change View “Document Types Invoice Verification/Valuation”: Details screen, enter the following data:
Transaction DocumentType
Doc. typereval.
Doc. type add.doc.
DocType invoicereduction
MIRO RE RK
5. Go Back .
6. On the Change view “Document Types Invoice Verification/Valuation”: Overview screen, choose the line with the Transaction code shown below and choose Details.
Transaction
MRKO
7. On the Change View “Document Types Invoice Verification/Valuation”: Details screen, enter the following data:
Transaction DocumentType Doc. typereval. Doc. type add.doc. DocType invoicereduction
MRKO Y1
8. Go Back .
9. On the Change view “Document Types Invoice Verification/Valuation”: Overview screen, choose the line with the Transaction code shown below and choose Details.
© SAP AG Page 86 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 87/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Transaction
MR8M
10. On the Change View “Document Types Invoice Verification/Valuation”: Details screen, enter the following data:
Transaction DocumentType
Doc. typereval.
Doc. type add.doc.
DocType invoicereduction
MR8M RE RK
11. Go Back .
12. Choose Save.
5 Configuration of Sales and Distribution
5.1 Basic Functions
5.1.1 Setting Up Part. Determ. - Accnt. Groups - Function Ass.
Procedure
1. Access the activity using one of the following navigation options:
SAP SAP ECC menu Sales and Distribution→ Basic Functions→ Partner
Determination→ Set Up Partner Determination
Transaction code SPRO
2. In the Choose Activity dialog box, double-click Set Up Partner Determination for Customer Master.
3. On the Change View “Partner Determinations Procedure": Overview screen, double-click Account Groups - Function Assignment .
4. On the Change View “Account Groups - Function Assignment”: Overview screen, chooseNew Entries.
5. On the New Entries: Overview of Added Entries screen, make the following entries:
Field name User action and values
Partner Function SH
Account Group YBVC
6. Choose Save.
© SAP AG Page 87 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 88/108
SAP Best Practices 104 - Materials Management: Configuration Guide
6 Configuration of Logistics Execution
6.1 Shipping
6.1.1 Setting Up Partner Determination for Deliveries
Use
In this activity, you set up partner determination for deliveries.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Logistics Execution→ Shipping → Basic Shipping Functions→
Partners→ Set Up Partner Determination for Deliveries
2. Double-click Partner Determination Procedure Assignment .
3. Choose New Entries.
4. Make the following entries:
DlvTy Description ParPr
RL Returns (Pur.Ord.) LF
5. Choose Save.
7 Master Data7.1 Purchasing Output Conditions
7.1.1 Output Condition Records: Purchasing RFQ
The purpose of this activity is to create an output condition record for a purchasing RFQ.
Procedure
1. Access the activity using one of the following navigation options:
SAP SAP ECC menu LogisticsMaterials Management Purchasing Master DataMessages Request for Quotation Create
Transaction code MN01
© SAP AG Page 88 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 89/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Create Output-Condition records: Purchasing RFQ screen, enter output type NEU and
choose Enter .
3. In the Key Kombination dialog box, select Purchasing Output determination: Document Typeand choose Enter.
4. On the Create Condition records (RFQ): Fast Entry screen, enter the following values and
choose Enter:Doc. Type Function Partner Medium Date/Time
AN VN 1 4
AB VN 1 4
5. Mark all l ines.
6. Choose Communication.
7. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field Description Values Comment
Output Device LP01 Insert your own printer
Number of messages
1
Printimmediately
Select flag if theprintout should beprinted immediatelyand not put into spoolonly
8. Goto next entry with button Next Output (shift F7). Enter entries from step before.
9. Save your entries.
10. Repeat steps 2-9 with output types ABSA and MAHN .
Result
The condition records are created. For output type NEU the system automatically generates anoutput message.
7.1.2 Output Condition Records: Purchase Order
The purpose of this activity is to create an output condition record for a purchase order.
Procedure
1. Access the activity using one of the following navigation options:
SAP SAP ECC menu LogisticsMaterials Management Purchasing Master DataMessages Purchase Order Create
Transaction code MN04
© SAP AG Page 89 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 90/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Create Output-Condition records: Purchase Order screen, enter output type NEU and
choose Enter .
3. In the Key Kombination dialog box, select Purchasing Output Determination: Document Typeand choose Enter.
4. On the Create Condition records (Purchase Order): Fast Entry screen, enter the following
values and choose Enter:Field name Description Values Comment
Doc. Type NB
Funct Partner function
VN
Medium Messagetransmissionmedium
1
Date/Time Dispatchtime
4
Next Item LineDoc. Type FO
Funct Partner function
VN
Medium Messagetransmissionmedium
1
Date/Time Dispatchtime
4
Next Item Line
Doc. Type DB
Funct Partner function
VN
Medium Messagetransmissionmedium
1
Date/Time Dispatchtime
4
5. Choose Communication.
6. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device
Number of messages
1
7. Save your entries.
Result
© SAP AG Page 90 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 91/108
SAP Best Practices 104 - Materials Management: Configuration Guide
The condition records are created. For output type NEU the system automatically generates anoutput message.
7.1.3 Output Condition Records: Purchasing Outline
AgreementThe purpose of this activity is to create an output condition record for an outline agreement.
Procedure
1. Access the activity using one of the following navigation options:
SAP SAP ECC menu LogisticsMaterials Management Purchasing Master DataMessages Outline Agreement Create
Transaction code MN07
2. On the Create Output-Condition records: Purch.Outline Agr. screen, enter output type NEU
and choose Enter .
3. In the Key Kombination dialog box, select Purchasing Output determination: Document Typeand choose Enter.
4. On the Create Condition records (Outline agreement): Fast Entry screen, enter the followingvalues and choose Enter:
Doc. Type Function Partner Medium Date/Time
MK VN 1 4
WK VN 1 4
LP VN 1 4
LPA VN 1 4
LU VN 1 45. Choose Communication.
6. On the Create Condition records (RFQ): Communication screen, for each document typemake the following entries:
Field name Description Values Comment
Output Device LP01 Insert your own printer
Number of messages
1
Printimmediately
Select flag if theprintout should be
printed immediatelyand not put into spoolonly
7. Save your entries.
Result
The condition records are created. For output type NEU the system automatically generates anoutput message.
© SAP AG Page 91 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 92/108
SAP Best Practices 104 - Materials Management: Configuration Guide
7.1.4 Output Condition Records: Schedule Agreement
The purpose of this activity is to create an output condition record for a schedule agreement.
Procedure1. Access the activity using one of the following navigation options:
SAP SAP ECC menu LogisticsMaterials Management Purchasing Master DataMessages Scheduling Agreement Delivery Schedule Create
Transaction code MN10
2. On the Create Output-Condition records: Purch.SchAgrRelease. screen, enter output typeLPET and choose Enter .
3. In the Key Kombination dialog box, select Purchasing Output determination: Document Type and choose Enter.
4. On the Create Condition records (…): Fast Entry screen, enter the following values andchoose Enter :
Doc. Type Function Partner Medium Date/Time
LP VN 1 4
LPA VN 1 4
LU VN 1 4
5. Choose all lines.
6. Choose Communication.
7. On the Create Condition records (…): Communication screen, make the following entries for each output:
Field Description Values Comment
Output Device LP01 Insert your own printer
Number of messages
1
Printimmediately
Select flag if theprintout should beprinted immediatelyand not put into spoolonly
8. Go to the next entry with button Next Output (shift F7). Enter entries from step before.
9. Save your entries.
10. Repeat steps 1-9 with the following entries:
Message Type
LPH2
LPJ2
LPMA
© SAP AG Page 92 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 93/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Result
The condition records are created. For output type LPET, LPH2, LPJ2, LPMA, the systemautomatically generates an output message.
7.1.5 Output Condition Records: Service Entry SheetThe purpose of this activity is to create an output condition record for a service entry sheet.
Procedure
1. Access the activity using one of the following navigation options:
SAP SAP ECC menu LogisticsMaterials Management Service Entry Sheet Environment Messages Create
Transaction code MN13
2. On the Create Output-Condition records: Purch.Outline Agr. screen, enter output type NEU and choose Enter .
3. In the Key Kombination dialog box, select Purchasing Output determination: Document Type and choose Enter.
4. On the Create Condition records (Entry of Srvc Prfrmd): Fast Entry screen, enter the followingvalues and choose Enter :
Doc. Type Function Partner Medium Date/Time
NB VN 1 4
FO VN 1 4
5. Mark all l ines.
6. Choose Communication.
7. On the Create Condition records (Entry of Srvc Prfrmd): Communication screen, make thefollowing entries:
Field name Description Values Comment
Output Device LP01 Insert your own printer
Number of messages
1
Printimmediately
Select flag if theprintout should beprinted immediatelyand not put into spoolonly
8. Go to the next entry with button Next Output (shift F7). Enter entries from step before.
9. Save your entries.
Result
The condition records are created. For output type NEU the system automatically generates anoutput message.
© SAP AG Page 93 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 94/108
SAP Best Practices 104 - Materials Management: Configuration Guide
7.1.6 Output Condition Records: Inventory Management
The purpose of this activity is to create an output condition record for Inventory Management.
Procedure
1. Access the activity using the following navigation option:
IMG menu Materials Management Inventory Management and Physical Inventory Output DeterminationMaintain Conditions
Transaction code MN21
2. On the Create Output-Condition records: Inventory Managemen. screen, enter output type WA01 and choose Enter .
3. On the Create Condition records (GI Note Vers.1): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WA
Print Version 1
Print Item 1 Printing of documentitem
Medium Messagetransmissionmedium
1
Date/Time Dispatchtime
4
Next Item Line
Doc. Type WAPrint Version 1
Print Item 6 Printing of documentitem
Medium Messagetransmissionmedium
1
Date/Time Dispatchtime
4
Next Item Line
Doc. Type WEPrint Version 1
Print Item 1 Printing of documentitem
Medium Messagetransmissionmedium
1
© SAP AG Page 94 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 95/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Date/Time Dispatchtime
4
4. Choose Communication.
5. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
6. Save your entries.
7. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype
WA02and choose Enter .
8. On the Create Condition records (GI Note Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WA
Print Version 2
Print Item Printing of document item
1
Medium Message
transmissionmedium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WA
Print Version 2
Print Item Printing of document item
6
Medium Messagetransmission
medium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WE
Print Version 2
Print Item Printing of document item
6
© SAP AG Page 95 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 96/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
9. Choose Communication.
10. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
11. Save your entries.12. Go back to the Create Output-Condition records: Inventory Management screen, enter output
type WA03 and choose Enter .
13. On the Create Condition records (GI Note Vers.3): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WA
Print Version 3
Print Item Printing of
document item
1
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WA
Print Version 3
Print Item Printing of document item
6
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WE
Print Version 3
© SAP AG Page 96 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 97/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Print Item Printing of document item
6
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
14. Choose Communication.
15. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output X select
16. Save your entries.
17. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WE01 and choose Enter .
18. On the Create Condition records (GR Note Vers.1): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WE
Print Version 1Print Item Printing of
document item1
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WE
Print Version 1
Print Item Printing of document item
2
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
19. Choose Communication.
© SAP AG Page 97 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 98/108
SAP Best Practices 104 - Materials Management: Configuration Guide
20. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
21. Save your entries.
22. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WE02 and choose Enter .
23. On the Create Condition records (GR Note Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WE
Print Version 2
Print Item Printing of document item
1
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WE
Print Version 2
Print Item Printing of document item
2
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
24. Choose Communication.
25. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
© SAP AG Page 98 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 99/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Release after output
X select
26. Save your entries.
27. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WE03 and choose Enter .
28. On the Create Condition records (GR Note Vers.3): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WE
Print Version 3
Print Item Printing of document item
1
Medium Messagetransmission
medium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WE
Print Version 3
Print Item Printing of document item
2
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
29. Choose Communication.
30. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
31. Save your entries.
© SAP AG Page 99 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 100/108
SAP Best Practices 104 - Materials Management: Configuration Guide
32. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WF01 and choose Enter .
33. On the Create Condition records (GR Prod. Ord. Vers.1): Fast Entry screen, enter thefollowing values and choose Enter:
Field name Description Values Comment
Trans./EventType
WF
Print Version 1
Print Item Printing of document item
1
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WF
Print Version 1
Print Item Printing of document item
2
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
34. Choose Communication.
35. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
36. Save your entries.
37. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WF02 and choose Enter .
38. On the Create Condition records (GR Prod. Ord. Vers.2): Fast Entry screen, enter thefollowing values and choose Enter:
Field name Description Values Comment
Trans./EventType
WF
© SAP AG Page 100 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 101/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Print Version 2
Print Item Printing of document item
1
Medium Messagetransmission
medium
1
Date/Time Dispatch time 4
Next Item Line
Doc. Type WF
Print Version 2
Print Item Printing of document item
2
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
39. Choose Communication.
40. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
41. Save your entries.
42. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WLB1 and choose Enter .
43. On the Create Condition records (GI Note RP. Vers.1): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WA
Print Version 1
Print Item Printing of documentitem
3
D/C indic Debit/Credit Indicator H
Medium Messagetransmissionmedium
1
© SAP AG Page 101 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 102/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Date/Time Dispatch time 4
44. Choose Communication.
45. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
46. Save your entries.
47. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WLB2 and choose Enter .
48. On the Create Condition records (GI Note RP. Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WA
Print Version 2
Print Item Printing of documentitem
3
D/C indic Debit/Credit Indicator H
Medium Message
transmissionmedium
1
Date/Time Dispatch time 4
49. Choose Communication.
50. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
51. Save your entries.
© SAP AG Page 102 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 103/108
SAP Best Practices 104 - Materials Management: Configuration Guide
52. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WLB3 and choose Enter .
53. On the Create Condition records (GI Note RP. Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description Values Comment
Trans./EventType
WA
Print Version 3
Print Item Printing of documentitem
3
D/C indic Debit/Credit Indicator H
Medium Messagetransmissionmedium
1
Date/Time Dispatch time 4
54. Choose Communication.
55. On the Create Condition records (RFQ): Communication screen, make the following entries:
Field name Description Values Comment
Output Device LP01
Number of messages
1
Printimmediately
X select
Release after output
X select
56. Save your entries.
Result
The condition records are created. For the following output types, the output messages aregenerated automatically: WA01, WA02, WA03, WE01, WE02, WE03, WF01, WF02, WLB1,WLB2, WLB3.
7.1.7 Output Condition Record: Invoice Verification
The purpose of this activity is to create an output condition record for invoice verification.
Procedure
1. Access the activity using the following navigation option:
SAP SAP ECC menuInvoice
MR00 → Environment → Messages→Condition
Records→Create
Transaction code MRM1
© SAP AG Page 103 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 104/108
SAP Best Practices 104 - Materials Management: Configuration Guide
2. On the Create Output-Condition records: Invoice Verification screen, enter output type EINK
and choose Enter .
3. Choose Key combination and select CoCode, Blocking Reason: Price in the Key Kombination dialog box. Choose Enter.
4. On the Create Condition records (Mail to Purchasing): Fast Entry screen, enter the following
values and choose Enter:Field name Description User Action/ Values Comment
Company Code 1000
BlockR Pr. Blockingreason:price
select
Funct Partner function
ME
Medium Messagetransmissionmedium
7
Date/time Dispatchtime
4
Language JA
5. Save your entries.
6. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype MLPP.
7. Choose Key combination and select CoCde, Choose Enter.
8. On the Create Condition records (Mail Price Deviation): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description User Action/ Values CommentCompany Code 1000
Funct Partner function
ME
Medium Messagetransmissionmedium
7
Date/time Dispatchtime
4
Language JA
9. Save your entries.
10. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype REKL.
11. Choose Key combination and select CoCde, Choose Enter.
12. On the Create Condition records (Complaint): Fast Entry screen, enter the following valuesand choose Enter:
Field name Description User Action/ Values Comment
© SAP AG Page 104 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 105/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Company Code 1000
Funct Partner function
PI
Medium Messagetransmission
medium
1
Date/time Dispatchtime
3
Language JA
13. Choose Communication.
14. On the Create Condition records (Complaint): Communication screen, make the followingentries:
Field name Description Values Comment
Output Device LP01
15. Save your entries.16. Go back to the Create Output-Condition records: Invoice Verification screen, enter output
type KONS.
17. Choose Key combination and select CoCde, Choose Enter.
18. On the Create Condition records (Consignment): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description User Action/ Values Comment
Company Code 1000
Funct Partner function
VN
Medium Messagetransmissionmedium
1
Date/time Dispatchtime
4
Language JA
19. Choose Communication.
20. On the Create Condition records (Consignment): Communication screen, make the followingentries:
Field name Description Values Comment
Output Device LP01
21. Save your entries.
© SAP AG Page 105 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 106/108
SAP Best Practices 104 - Materials Management: Configuration Guide
22. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype RAP.
23. Choose Key combination and select CoCde, Choose Enter.
24. On the Create Condition records (New Value Method): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description User Action/ Values Comment
Company Code 1000
Funct Partner function
VN
Medium Messagetransmissionmedium
1
Date/time Dispatchtime
4
Language JA
25. Choose Communication.
26. On the Create Condition records (New Value Method): Communication screen, make thefollowing entries:
Field name Description Values Comment
Output Device LP01
27. Save your entries.
28. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype RAP6.
29. Choose Key combination and select CoCde, Choose Enter.
30. On the Create Condition records (New Value Method): Fast Entry screen, enter the followingvalues and choose Enter:
Field name Description User Action/ Values Comment
Company Code 1000
Funct Partner function
VN
Medium Messagetransmissionmedium
1
Date/time Dispatchtime
4
Language JA
31. Choose Communication.
32. On the Create Condition records (New Valuation EDI): Communication screen, make thefollowing entries:
Field name Description Values Comment
Output Device LP01
© SAP AG Page 106 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 107/108
SAP Best Practices 104 - Materials Management: Configuration Guide
33. Save your entries.
34. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype ERS.
35. Choose Key combination and select CoCde, Choose Enter.
36. On the Create Condition records (ERS Procedure): Fast Entry screen, enter the following
values and choose Enter:
Field name Description User Action/ Values Comment
Company Code 1000
Funct Partner function
VN
Medium Messagetransmissionmedium
1
Date/time Dispatchtime
4
Language JA
37. Choose Communication.
38. On the Create Condition records (ERS Procedure): Communication screen, make thefollowing entries:
Field name Description Values Comment
Output Device LOCLU
Printimmediately
select
39. Save your entries.
Result
The condition records are created. For the following output types, the output messages aregenerated automatically: EINK, MLPP, REKL, KONS, RAP, RAP6, ERS.
8 Individual BC Sets/ Manual Steps
8.1 Defining Parallel Processing in MRP
UseThe purpose of this activity is to define parallel process in MRP.
Procedure
1. Access the activity using one of the following navigation options:
© SAP AG Page 107 of 108
7/28/2019 Engineering Change Management.doc
http://slidepdf.com/reader/full/engineering-change-managementdoc 108/108
SAP Best Practices 104 - Materials Management: Configuration Guide
Transaction code SPRO
IMG menu Materials Management → Consumption-Based Planning →
Define Parallel Processing in MRP
2. On the Change View ”Destinations for Parallel Processing“: Overview screen, choose New Entries.
3. On the screen New entries: Overview of Added Entries, make the following entries:
Field name Value
Destinat. for parallel processing for example, <PWDF0505_SD7_22>
No. of sessions 1
The value of Destinat. for parallel process must include a different value in a differentserver, if this value is determined by other Customizing steps. In this project, choosePWDF0505_SD7_22. You can use the input help to select the corresponding value.
4. Choose Save.
5. Choose Back . Result
You have made the required settings for parallel processing for MRP.