SAP ECC 6.03

 August 2008

English

Materials Management

(104)

SAP AGDietmar-Hopp-Allee 1669190 Walldorf Germany

Building Block Configuration Guide

Page 2: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 2/108

SAP Best Practices Materials Management (104): Configuration Guide

Copyright

© Copyright 2008 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without theexpress permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary softwarecomponents of other software vendors.

Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390,OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli,and Informix are trademarks or registered trademarks of IBM Corporation in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarksor registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide WebConsortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technologyinvented and implemented by Netscape.

MaxDB is a trademark of MySQL AB, Sweden.

SAP, R/3, mySAP, mySAP.com, xApps, xApp, and other SAP products and services mentioned hereinas well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and inseveral other countries all over the world. All other product and service names mentioned are thetrademarks of their respective companies. Data contained in this document serves informationalpurposes only. National product specifications may vary.

These materials are subject to change without notice. These materials are provided by SAP AG and itsaffiliated companies ("SAP Group") for informational purposes only, without representation or warrantyof any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. Theonly warranties for SAP Group products and services are those that are set forth in the expresswarranty statements accompanying such products and services, if any. Nothing herein should beconstrued as constituting an additional warranty.

Page 3: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 3/108

SAP Best Practices Materials Management (104): Configuration Guide

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

Typographic Conventions

Type Style Description

Example text  Words or characters that appear on the screen. These include fieldnames, screen titles, pushbuttons as well as menu names, paths andoptions.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names,program names, Transaction codes, table names, and individual keywords of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths,messages, source code, names of variables and parameters as well asnames of installation, upgrade and database tools.

EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or theENTER key.

Example text Exact user entry. These are words or characters that you enter in thesystem exactly as they appear in the documentation.

 <Example text>  Variable user entry. Pointed brackets indicate that you replace thesewords and characters with appropriate entries.

Page 4: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 4/108

SAP Best Practices Materials Management (104): Configuration Guide

Contents

Materials Management............................................................................................................. 6

1 Purpose.................................................................................................................................. 6

2 Preparation............................................................................................................................ 62.1 Prerequisites .................................................................................................................. 6

3 Configuration of Logistics General.........................................................................................6

3.1 Logistics General: Material Master..................................................................................6

3.1.1 Setting up Posting Period for Company Code........................................................... 6

3.1.2 Defining Attributes for Material Types.......................................................................8

3.1.3 Defining Material Groups........................................................................................11

3.1.4 Defining Units of Measure Groups..........................................................................11

3.1.5 Defining Product Hierarchies .................................................................................12

3.2 Engineering Change Management................................................................................13

3.2.1 Setting Ctrl. Data - Engineering Change Manag. Ctrl. Data....................................13

3.3 Checking consistency....................................................................................................13

3.3.1 Checking consistency of unit of measurement tables.............................................13

4 Configuration of Materials Management..............................................................................14

4.1 Consumption-Based Planning.......................................................................................14

4.1.1 Overall Maint. of Plant Par. - General Settings.......................................................14

4.1.2 Overall Maint. of Plant Par. - MRP controllers.........................................................22

4.1.3 Overall Maint. of Plant Par. - Special procurement................................................234.1.4 Defining Storage Location MRP per Plant............................................................... 24

4.1.5 Defining Floats (Scheduling Margin Key)................................................................25

4.1.6 Activating Materials Requirements Planning...........................................................26

4.1.7 Defining Scope of Planning for Total Planning........................................................26

4.2 Purchasing....................................................................................................................27

4.2.1 Activating batch-specific Unit of Measures..............................................................27

4.2.2 Creating Release Procedure Characteristics..........................................................27

4.2.3 Creating Release Procedure Class.........................................................................31

4.2.4 Defining Release Procedure for Purchase Orders .................................................32

4.2.5 Defining Release Procedure for Purchase Orders - Set Criterias...........................33

4.2.6 Defining Calculation Schema..................................................................................34

4.2.7 Maintaining Rounding Profiles................................................................................37

4.2.8 Unit of Measure Rounding Rules............................................................................39

4.2.9 Maintaining Account Assignment Categories..........................................................39

4.2.10 Maintaining Account Assignment Categories - Translation ..................................57

4.2.11 Defining Scope of List...........................................................................................58

4.2.12 Defining Permissible Partner Roles per Account Group.......................................594.2.13 Defining Condition Types......................................................................................60

Page 5: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 5/108

SAP Best Practices Materials Management (104): Configuration Guide

4.2.14 Taxes in Procurement...........................................................................................60

4.2.15 Checking Incoterms .............................................................................................63

4.2.16 Returns to Vendor ................................................................................................64

4.2.17 Vendor Evaluation.................................................................................................64

4.3 Inventory Management and Physical Inventory.............................................................71

4.3.1 Defining Screen Layout...........................................................................................71

4.3.2 Printer Determination by Plant/Storage Location....................................................73

4.3.3 Printer Determination by Plant/Stor.Loc./User Group.............................................74

4.3.4 Copy, Change Movement Types.............................................................................75

4.4 Valuation and Account Assignment...............................................................................78

4.4.1 Defining Valuation Classes.....................................................................................78

4.5 Logistics Invoice Verification.........................................................................................79

4.5.1 Setting Tolerance Limit...........................................................................................79

4.5.2 Editing PO Supplement Text in Invoice Verification................................................83

4.5.3 PO Supplement Text: Parameters, Invoice Verification..........................................83

4.5.4 Configuring Vendor-Specific Tolerances.................................................................84

4.5.5 Activating Direct Posting to G/L Accounts and Material Accounts..........................85

4.5.6 Setting check for duplicate invoices........................................................................85

4.5.7 Maintaining Number Assignments for Accounting Documents................................86

5 Configuration of Sales and Distribution................................................................................87

5.1 Basic Functions.............................................................................................................87

5.1.1 Setting Up Part. Determ. - Accnt. Groups - Function Ass.......................................87

6 Configuration of Logistics Execution....................................................................................88

6.1 Shipping........................................................................................................................ 88

6.1.1 Setting Up Partner Determination for Deliveries ....................................................88

7 Master Data......................................................................................................................... 88

7.1 Purchasing Output Conditions.......................................................................................88

7.1.1 Output Condition Records: Purchasing RFQ..........................................................88

7.1.2 Output Condition Records: Purchase Order............................................................89

7.1.3 Output Condition Records: Purchasing Outline Agreement....................................91

7.1.4 Output Condition Records: Schedule Agreement...................................................92

7.1.5 Output Condition Records: Service Entry Sheet.....................................................93

7.1.6 Output Condition Records: Inventory Management................................................94

7.1.7 Output Condition Record: Invoice Verification.......................................................103

8 Individual BC Sets/ Manual Steps......................................................................................107

8.1 Defining Parallel Processing in MRP...........................................................................107

Page 6: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 6/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Materials Management

1 PurposeThis configuration guide provides the information you need to set up the configuration of thisbuilding block manually.

If you prefer an automated installation process using the SAP Best Practices Installation Assistantand other tools, refer to the SAP Best Practices Quick Guide.

2 Preparation

2.1 Prerequisites

Before you start installing this scenario, you must install prerequisite building blocks. For moreinformation, see the building block prerequisite matrix (Prerequisites_Matrix_[ xx ]_EN_JP.xls; theplaceholder [ xx ] depends on the SAP Best Practices version you use, for example BL refers tothe SAP Best Practices Baseline Package: Prerequisites_Matrix_BL_EN_JP.xls). This documentcan be found on the SAP Best Practices documentation DVD in the folder: ..\BBLibrary\General\.

3 Configuration of Logistics General

3.1 Logistics General: Material Master 3.1.1 Setting up Posting Period for Company Code

Use

The purpose of this activity is to set up the first posting period for materials management.

In Customizing, the period/year for which the last postings were performed is set and displayed.To be able to perform postings in the current period you have to close every single period up tothe current year and period.

This step is necessary to set up posting periods correctly. The last period of theprevious year has to be included.

Please note that the corresponding financial posting period should be open for postings as well.

To set up posting periods correctly proceed as described in the below procedures:

© SAP AG Page 6 of 108

Page 7: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 7/108

SAP Best Practices 104 - Materials Management: Configuration Guide

3.1.1.1 Maintaining Company Codes for MaterialsManagement

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Logistics General → Material Master → Basic Settings→ 

Maintain Company Codes for Materials Management 

Transaction code OMSY

2. On the Change View “Materials Management View on Company Codes”: Overview screen,make the following entries:

Field name User action and values Comment

Company Code 1000 Select line

Year  <Previous Year> Previous year  

Period  12 Last period of previous year  

 ABp - Allow Posting to Pre-vious Period (Backposting)

select

3. Choose Save.

3.1.1.2 Running ‘Close Period’

Procedure

1. Access the activity using one of the following navigation options:

SAP ECC menu Logistics→ Materials Management → Material Master → Other 

→ Close Period 

Transaction code MMPV

2. On the Close Period for Material Master Records screen, make the following entries:

Fromcompanycode

To companycode

Period Fiscal year Check andClose Period

1000 1000 <Last Period of previousyear>, e.g. 12

<PreviousYear>, e.g. 2007

Select

3. Choose Execute (F8).

4. Repeat steps two and three until you arrive at the current period

© SAP AG Page 7 of 108

Page 8: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 8/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Example for August 2008:

Fromcompanycode

To companycode

Period Fiscal year Check andClose Period

1000 1000 12 2007 Select

1000 1000 01 2008 Select

1000 1000 02 2008 Select

1000 1000 03 2008 Select

1000 1000 04 2008 Select

1000 1000 05 2008 Select

Result

The current posting period for materials management is set and all recordable posting periods inthe materials master are set (last period of previous year, previous period current year, currentperiod).

3.1.2 Defining Attributes for Material Types

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Logistics General → Material Master → Basic Settings→ 

Material Types→ Define Attributes of Material Types

Transaction code SPRO

2. On the Change View “Material Types”: Overview screen, select material type ABF (see tablein step 4).

3. Double click Quantity/value updating in the Dialog Structure.

4. On the Change View “Quantity/Value Updating”: Overview screen, make the following entries:

Val. Area MaterialType

Quantityupdating

ValueUpdating

Pipelinemandatory

Pipelineallowed

Plant_1 (1000) ABF

Plant_2 (1100) ABF

5. Choose Back (F3).

6. Repeat steps 2. to 5. for the following material types:

Val. Area MaterialType

Quantityupdating

ValueUpdating

Pipelinemandatory

Pipelineallowed

Plant_1 (1000) ABF (done)

Plant_2 (1100) ABF (done)

© SAP AG Page 8 of 108

Page 9: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 9/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Val. Area MaterialType

Quantityupdating

ValueUpdating

Pipelinemandatory

Pipelineallowed

Plant_1 (1000) CONT

Plant_2 (1100) CONT

Plant_1 (1000) COUPPlant_2 (1100) COUP

Plant_1 (1000) DIEN

Plant_2 (1100) DIEN

Plant_1 (1000) ERSA X X

Plant_2 (1100) ERSA X X

Plant_1 (1000) FERT X X

Plant_2 (1100) FERT X X

Plant_1 (1000) FGTR X X

Plant_2 (1100) FGTR X X

Plant_1 (1000) FHMI X X

Plant_2 (1100) FHMI X X

Plant_1 (1000) FOOD X X

Plant_2 (1100) FOOD X X

Plant_1 (1000) FRIP X X

Plant_2 (1100) FRIP X X

Plant_1 (1000) HALB X X

Plant_2 (1100) HALB X X

Plant_1 (1000) HAWA X X

Plant_2 (1100) HAWA X X

Plant_1 (1000) HERS X X

Plant_2 (1100) HERS X X

Plant_1 (1000) HIBE X X

Plant_2 (1100) HIBE X X

Plant_1 (1000) IBAU

Plant_2 (1100) IBAU

Plant_1 (1000) INTR X X

Plant_2 (1100) INTR X X

Plant_1 (1000) KMAT

Plant_2 (1100) KMAT

Plant_1 (1000) LEER X X

Plant_2 (1100) LEER X X

© SAP AG Page 9 of 108

Page 10: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 10/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Val. Area MaterialType

Quantityupdating

ValueUpdating

Pipelinemandatory

Pipelineallowed

Plant_1 (1000) LEIH X

Plant_2 (1100) LEIH X

Plant_1 (1000) LGUT X XPlant_2 (1100) LGUT X X

Plant_1 (1000) MODE X X

Plant_2 (1100) MODE X X

Plant_1 (1000) NLAG

Plant_2 (1100) NLAG

Plant_1 (1000) NOF1 X X

Plant_2 (1100) NOF1 X X

Plant_1 (1000) PIPE X

Plant_2 (1100) PIPE X X

Plant_1 (1000) PLAN

Plant_2 (1100) PLAN

Plant_1 (1000) PROC

Plant_2 (1100) PROC

Plant_1 (1000) PROD

Plant_2 (1100) PROD

Plant_1 (1000) ROH X X

Plant_2 (1100) ROH X X

Plant_1 (1000) UNBW X

Plant_2 (1100) UNBW X

Plant_1 (1000) VERP X X

Plant_2 (1100) VERP X X

Plant_1 (1000) VKHM X X

Plant_2 (1100) VKHM X X

Plant_1 (1000) VOLL X X

Plant_2 (1100) VOLL X X

Plant_1 (1000) WERB X X

Plant_2 (1100) WERB X X

Plant_1 (1000) WERT X

Plant_2 (1100) WERT X

Plant_1 (1000) WETT

Plant_2 (1100) WETT

© SAP AG Page 10 of 108

Page 11: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 11/108

SAP Best Practices 104 - Materials Management: Configuration Guide

7. Save your settings.

3.1.3 Defining Material Groups

Procedure1. Access the activity using one of the following navigation options:

IMG menu Logistics General → Material Master → Settings for Key Fields

→ Define Material Groups

Transaction code SPRO

2. On the Change View “Material Groups”: Overview screen, choose New Entries.

3. Make the following sets of entries:

Material Group Mat.grp.description Description 2

YBF01 Product Group F01 Product Group Discrete Man.

YBF02 Product Group F02 Product Group Process Man.

YBR01 Product Group R01 Product group Plastic

YBR02 Product Group R02 Product group Metal

YBR03 Product Group R03 Product Group Stationary

YBR04 Product Group R04 Product Group Spares

YBR05 Product Group R05 Product Group Misc

YBS01 Product Group S01 Product Group Subcon.

YBS02 Product Group S02 Product Group Phantom

YBSVM1 Spare parts Spare parts

YBSVS1 SP-Services Services

YBT01 Product Group T01 Product Group Trade

YBZ01 Product Group Z01 Product Group Consumables

YBZ02 Product Group Z02 Product Group Supplies

YBZ03 Product Group Z03 Product Group Computers

4. Save your settings.

3.1.4 Defining Units of Measure Groups

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Logistics General → Material Master → Settings for Key Fields

→ Define Units of Measure Groups

Transaction code SPRO

© SAP AG Page 11 of 108

Page 12: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 12/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Change View “Define Units of Measure Groups”: Overview screen, choose New Entries.

3. Make the following sets of entries.

Fieldname

Unit Group AlternativeUnite

MeasurementUnit Text

Counter Denominator  for conversion

Entry 1 10 DZ Dozen 12 1

Entry 2  10 GRO Gross 144 1

4. Save your settings.

3.1.5 Defining Product Hierarchies

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Logistics General → Material Master → Settings for Key Fields

→ Data Relevant to Sales and Distribution→ Define Product 

Hierarchies

Transaction code SPRO

2. On the Customizing Product Hierarchy screen, select Maintain: Product hierarchy andchoose Choose (F2).

3. On the Change View “Materials: Product Hierarchies”: Overview screen, choose New Entries.

4. Make the following entries. Start with all Level-1 entries and save them, then continue with allLevel-2 entries, etc.:

Product Hierarchy Level No. Description

#00001 1 Best Practices Prod. Hier. Top Level

#00001P0001 2 Prod. Hier. Second Level - Products A

#00001P000100000001 3 Prod. Hier. Third Level - Product A.01

#00001P000100000002 3 Prod. Hier. Third Level - Product A.02

#00001P000100000003 3 Prod. Hier. Third Level - Parts A.03

#00001P0002 2 Prod. Hier. Second Level - Products B

#00001P000200000001 3 Prod. Hier. Third Level - Product B.01

#00001P000200000002 3 Prod. Hier. Third Level - Product B.02

5. Save your settings.

© SAP AG Page 12 of 108

Page 13: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 13/108

SAP Best Practices 104 - Materials Management: Configuration Guide

3.2 Engineering Change Management

3.2.1 Setting Ctrl. Data - Engineering Change Manag. Ctrl.Data

Procedure1. Access the activity using one of the following navigation options:

IMG menu Logistics General → Engineering Change Management → Set 

Control Data

Transaction code OS54

2. On the Change View "Engineering Change Management Control Data": Details screen, checkthe following entries:

Field name Description User action and values Comment

Parameter Effectivity 

Rev.Level Act. X

3. Choose Save.

3.3 Checking consistency

3.3.1 Checking consistency of unit of measurement tables

 After you have installed BB - Materials Management, check the Units of Measurement. We highlyrecommend that you run the report RBZMECHK to avoid any inconsistencies.

1. Access the activity using one of the following navigation options:

SAP Easy Access Tools→ ABAP Workbench→ Development → User Interface

→ ABAP Editor 

Transaction code SE38

2. Enter the program RBZMECHK and choose Execute (F8).

This report establishes the consistency of the tables T006, T006A, T006B and T006C. Itensures, in particular, that each unit of measurement has an indicator in every language.However, since the report cannot know the correct translation of a unit of measurement, itonly numbers missing indicators. This procedure is therefore only recommended if you haveto restore the consistency of the database tables very quickly. Of course, the generated

numeric indicators can be adjusted subsequently with transaction CUNI.

© SAP AG Page 13 of 108

Page 14: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 14/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4 Configuration of Materials Management

4.1 Consumption-Based Planning Access the Customizing activities as outlined in the BC Set output documentation below and

change the settings according to the respective table values listed.

4.1.1 Overall Maint. of Plant Par. - General Settings

4.1.1.1 Overall Maint. of Plant Par. - Number Ranges

Use

The purpose of this step is to maintain the number ranges per plant.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Create.

3. In the Create Plant Parameters dialog box make the following entries:

 

Create the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

4. Choose Create.

5. On the Maintain Plant Parameters screen choose number ranges.

6. On the Assign Number ranges screen choose the Planned Orders button, and make thefollowing entries:

Plant NRge pl. orders Simulative planned order 

1000 01 01

1100 01 01

7. On the Assign Number ranges screen choose the Reservation/Dependent Requirements button, and make the following entries:

Plant NR: StkTrns Res.

1000 01

© SAP AG Page 14 of 108

Page 15: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 15/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Plant NR: StkTrns Res.

1100 01

8. On the Assign Number ranges screen, choose the Purchase Requisition button, and makethe following entries:

Plant NR – Preq.

1000 01

1100 01

9. On the Assign Number ranges screen, choose the MRP Lists button, and make the followingentries:

Plant No. Range - MRP

1000 01

1100 0110. On the Assign Number ranges screen choose the Simulative Dep Req button, and make the

following entries:

Plant NR. SimDepRs

1000 01

1100 01

11. Choose Save.

12. Choose Back .

4.1.1.2 Overall Maint. of Plant Par. - Conversion PlannedOrder To PReq.

Use

The purpose of this step is to maintain the number of planned orders converted to purchaserequisitions per plant.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

© SAP AG Page 15 of 108

Page 16: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 16/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for 

additional plants.Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose Conversion PlOrd->Preq.

6. On the Change View “Number Of Planned Orders”: Overview screen make the followingentries:

Plnt Number of  planned orders

1000 500

1100 500

7. Choose Save.

8. Choose Back .

4.1.1.3 Overall Maint. of Plant Par. - Dep.reqmt availability

Use

The purpose of this step is to define the availability check of dependent requirements.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant 

Parameters

Transaction code O MI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

© SAP AG Page 16 of 108

Page 17: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 17/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose Availability Dep. Req.

6. On the Change View “Availability Check”: Overview screen, make the following entries:

Plnt Avail. Check Rule

1000 PP1100 PP

7. Choose Save.

8. Choose Back .

4.1.1.4 Overall Maint. of Plant Par. - External Procurement

Use

The purpose of this step is to define external procurement.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose External Procurement 

6. On the Change View “Default Values Purchasing/MRP”: Overview screen, make the followingentries:

Plnt Purchasingprocess.time

Sub.Purch.Group

Description Scheduling:Inforecord

 /agreem.

Schedulelines

UnkownAcctAssignmentwm

1000 X U

1100 X U

7. Choose Save.

© SAP AG Page 17 of 108

Page 18: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 18/108

SAP Best Practices 104 - Materials Management: Configuration Guide

8. Choose Back .

4.1.1.5 Overall Maint. of Plant Par. - Rescheduling

UseThe purpose of this step is to define a rescheduling check.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose External Procurement 

6. On the Change View “Plant rescheduling”:Details screen, make the following entries:

Plnt 1000 1100

Rescheduling horizon 100 100

Firm planned orders X X

Production order  X X

Firm.pur.requisition X X

Order itm/sched.line X X

QM inspection lot X X

Shipping notificat. X X

Tolerance value forward 02 02

Tolerance value for displacement 02 02

7. Choose Save.

8. Choose Back .

© SAP AG Page 18 of 108

Page 19: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 19/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4.1.1.6 Overall Maint. of Plant Par. - Planning Horizon

Use

The purpose of this step is to define a planning horizon for plant.

Procedure

Use

The purpose of this step is to define a rescheduling check.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose Planning Horizon.

6. On the Change View “Planning Horizon for Plant”: Overview screen, choose New Entries.

Plnt PlanningHorizon

1000 100

1100 100

7. Choose Save.

8. Choose Back .

4.1.1.7 Overall Maint. of Plant Par. - Available Stocks

Use

The purpose of this step is to define availability of stock.

© SAP AG Page 19 of 108

Page 20: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 20/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose Available Stocks.

6. On the Change View “Available Stocks”: Overview screen, make the following entries:

Plnt Stock in transfer Blocked stock Restricted-use stock

1000 X

1100 X

7. Choose Save.

8. Choose Back .

4.1.1.8 Overall Maint. of Plant Par. - Error Handling

Use

In this step, you determine how the system is to react if errors occur in the planning run.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

© SAP AG Page 20 of 108

Page 21: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 21/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen, choose Error Handling.

6. On the Change View “Error Handling in the Planning Run”: Overview screen, make thefollowing entries:

Plnt Max.Proposals Subs.

1000 050 101

1100 050 111

7. Choose Save.

8. Choose Back.

4.1.1.9 Overall Maint. of Plant Par. - Line Item Numbers

Use

The purpose of this step is to define a line item number.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI82. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box, make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose Item Numbers.

6. On the Change View: “Item Numbers”: Overview screen, make the following entries:

Plnt Item Number:PurchaseRequisition

Item of stock transfer reserve.

1000 10 100

© SAP AG Page 21 of 108

Page 22: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 22/108

SAP Best Practices 104 - Materials Management: Configuration Guide

1100 10 100

7. Choose Save.

8. Choose Back .

4.1.2 Overall Maint. of Plant Par. - MRP controllers

Use

The purpose of this step is to maintain the MRP controller per plant.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.

Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose MRP controllers.

6. On the Change View “MRP Controllers”: Overview screen make the following entries:

Plnt Name MRPCont.

MRP Controller Name

Telephone

1000  生生生生生生 1 100  生生生生 100 03-5325-0201

1000  生生生生生生 1 101  生生生生 101 03-5325-0202

1000  生生生生生生 1 102  生生生生 102 03-5325-0203

1000  生生生生生生 1 103  生生生生 103 03-5325-0204

1100  生生生生生生 2 110  生生生生 110 03-5325-0206

1100  生生生生生生 2 111  生生生生 111 03-5325-0207

1100  生生生生生生 2 112  生生生生 112 03-5325-0208

© SAP AG Page 22 of 108

Page 23: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 23/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Plnt Name MRPCont.

MRP Controller Name

Telephone

1100  生生生生生生 2 113  生生生生 113 03-5325-0209

7. Choose Save.

8. Choose Back .

4.1.3 Overall Maint. of Plant Par. - Special procurement

Use

In this step, you define the special procurement keys which as well as the procurement typecontrol the procurement and storage of a material. The special procurement type always refers toa procurement type.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Plant Parameters→ Overall Maintenance of Plant Parameters

Transaction code OMI8

2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain.

3. In the Maintain Plant Parameters dialog box make the following entries:

 

Maintain the plant parameters for plant 1000 first, then create the parameters for 

additional plants.Plant

1000

1100

4. Choose Maintain.

5. On the Maintain Plant Parameters screen choose Special Procurement.

6. Choose the New Entries.

7. Make the following entries:

Plnt S

PT

Long Text Procure-

ment type

Sp.

proc.

Plnt Phantom

item

Direct

pro-duction

Withdr.

altern.plant

Issuing

plant

1000 10 Consignment F 2

1000 20 External procurement F 0

1000 30 Subcontracting F 3

1000 40 Stock transfer F 7 1100

© SAP AG Page 23 of 108

Page 24: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 24/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Plnt SPT

Long Text Procure-ment type

Sp.proc.

Plnt Phantomitem

Directpro-duction

Withdr.altern.plant

Issuingplant

(proc.from alter.plant)

1000 45 Stock transfer fromplant to MRP area

F 7 1100

1000 50 Phantom assembly E E X

1000 52 Direct production /collective order 

E E X

1000 60 Phantom in planning E E

1000 70 Withdrawal fromalternative plant

E R X 1100

1000 80 Production inalternative plant

E P 1100

1100 10 Consignment F 2

1100 20 External procurement F 0

1100 30 Subcontracting F 3

1100 40 Stock transfer (proc.from alter.plant)

F 7 1000

1100 45 Stock transfer fromplant to MRP area

F 7 1000

1100 50 Phantom assembly E E

1100 52 Direct production /collective order  E E X

1100 60 Phantom in planning E E

1100 70 Withdrawal fromalternative plant

E E X 1000

1100 80 Production inalternative plant

E P 1000

8. Choose Save.

9. Choose Back .

4.1.4 Defining Storage Location MRP per Plant

Procedure

1. Access the activity using on of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Planning → Define Storage Location MRP per Plant 

© SAP AG Page 24 of 108

Page 25: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 25/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Transaction code SPRO

2. In the Determine Work Area: Entry dialog box make the following entries:

 

Create the plant parameters for plant 1000 first, then create the parameters for 

additional plants.

Plant

1000

1100

3. Choose Enter .

On the Change View “Storage Location MRP": Overview , make the following entries:

Plnt SLoc MRP Ind.

1000 1010

1000 1020

1100 1030

1000 1040

1000 1050

1000 1060 1

1100 1110

1100 1120

1100 1130

1100 1140

1100 1150

1100 1160 1

4. Choose Save.

4.1.5 Defining Floats (Scheduling Margin Key)

Use

The purpose of this step is to define scheduling margin key.

Procedure

1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Materials Management → Consumption-Based Planning → 

Planning → Define Floats (Scheduling Margin Key)

2. On the Change View “Margins for scheduling”: Overview screen, choose New Entries.

© SAP AG Page 25 of 108

Page 26: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 26/108

SAP Best Practices 104 - Materials Management: Configuration Guide

3. Make the following entries:

Plant Key Name 1 OpeningPeriod

Float After Production

Float BeforeProduction

ReleasePeriod

1000 000 000 000 000 000

1000 001 010 001 002 005

1100 000 000 000 000 000

1100 001 010 001 002 005

4. Choose Save.

4.1.6 Activating Materials Requirements Planning

Use

The purpose of this activity is to activate MRP.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

Planning → Activate Materials Requirements Planning 

Transaction code SPRO

2. Choose button Material Requirements Planning .

3. Make the following entries:

Plant Activate requirements planning Comment

0001 This plant is never included!1000 X

1100 X

4. Choose Save.

5. Choose Back .

4.1.7 Defining Scope of Planning for Total Planning

Use

The purpose of this activity is to define the scope of planning for Total Planning . This means thatthe planning includes the selected plants and tells the system in which order the plants have to beplanned, e.g. distribution center before production plant.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Consumption-Based Planning → 

© SAP AG Page 26 of 108

Page 27: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 27/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Planning → Define Scope of Planning for Total Planning 

Transaction code OM0E

2. Choose New entries.

3. Make the following entries:

Planning Scope Activate requirements planning

YB01 All Plants

4. Mark the created entry and double-click in the left menu Sequence of plants/MRP areas.

5. Choose button New Entries.

6. Make the following entries:

Cntr. Plant Comment

200 1100 Distribution center first

210 1000 Production plant second

7. Choose Save.

8. Choose Back .

4.2 Purchasing

 Access the Customizing activities as outlined in the BC Set output documentation below, andmake the settings according to the respective table values listed.

4.2.1 Activating batch-specific Unit of Measures

Use

The purpose of this activity is to activate the batch-specific unit of measures.

Procedure

1. Access the activity using one of the following navigation options:

IMG Menu Logistics - General  Batch Management  Batch-Specific 

Material Unit of Measure Activate Batch-Specific Material Unit of Measure

Transaction Code OMWS

2. On the Activate Batch-Specific Material Unit of Measure screen select Batch-specific units of 

measure active and save your entry.

Result

The batch-specific unit of measure was activated.

4.2.2 Creating Release Procedure Characteristics

Procedure

© SAP AG Page 27 of 108

Page 28: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 28/108

SAP Best Practices 104 - Materials Management: Configuration Guide

1. Access the activity using on of the following navigation options:

SAP SAP ECC menu Cross Application Components→ Classification System→ 

Master Data→ Characteristics

Transaction code CT04

2. On the Characteristics screen, make the following entries:

Field name User action and values

Characteristic  R2R_PURCH_GRP

3. Choose Create.

4. On the Create Characteristics screen, make the following entries:

5. Choose the Basic tab:

Field name User action and values

Description Purchasing Group

Status 1

Data Type CHAR

Number of Characters 3

Multiple Values select

6. Choose the Description tab:

Field name User action and values

Language JA

Description生生生生生生

Language EN

Description Purchasing Group

7. Choose the Values tab:

Field name User action and values

Char. Value 100

Description Xxx

Char. Value 101

Description Xxxx

Char. Value 102

Description Xxxxxx

Char. Value 103

© SAP AG Page 28 of 108

Page 29: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 29/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Description Xxxxxxx

Char. Value 200

Description Xxxxx

Char. Value 201

Description Xxx

Char. Value 202

Description Xxx

Char. Value 203

Description xxxxx

8. Choose the Addnl data tab:

Field name User action and values

Table Name CEKKO

Field Name EKGRP

Not Ready for Input  select

9. Choose Save and go back to the Characteristics screen.

10. On the Characteristics screen, make the following entries:

Field name User action and values

Characteristic  R2R_PURCH_ORD_TYPE

11. Choose Create.

12. On the Create Characteristics screen, make the following entries:

13. Choose the Basic tab:

Field name User action and values

Description Order Type (Purchasing)

Status 1

Data Type CHAR

Number of Characters 4

Multiple Values select

14. Choose the Description tab:

© SAP AG Page 29 of 108

Page 30: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 30/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Language JA

Description 生生生生生生生

Language EN

Description Order Type (Purchasing)

15. Choose the Values tab:

Field name User action and values

Char. Value FO

Description 生生生生生生生生生

Char. Value NB

Description 生生生生生生

Char. Value UB

Description 生生生生生生生生

16. Choose the Addnl data tab:

Field name User action and values

Table Name CEKKO

Field Name BSART

Not Ready for Input  select

17. Choose Save and go back to the Characteristics screen.

18. On the Characteristics screen, make the following entries:

Field name User action and values

Characteristic  R2R_PURCH_ORD_VALUE

19. Choose Create.

20. On the Create Characteristics screen, make the following entries:

21. Choose the Basic tab:

Field name User action and values

Description Total net order value

Status 1

Data Type CURR

Number of Characters 15

© SAP AG Page 30 of 108

Page 31: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 31/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Decimal Places 2

Currency  JPY

Template  _______________ 

Multiple Values select

22. Choose the Description tab:

Field name User action and values

Language JA

Description 生生生生生生生

Language EN

Description Total net order value

23. Choose the Values tab

Field name User action and values

Char. Value > 50,000 JPY

24. Choose the Addnl data tab:

Field name User action and values

Table Name CEKKO

Field Name GNETW

Not Ready for Input  select

25. Choose Save.

4.2.3 Creating Release Procedure Class

Procedure

1. Access the activity using on of the following navigation options:

SAP SAP ECC menu Materials Management → Consumption Based Planning → 

Planning →

Define Storage Location MRP per Plant Transaction code CL02

2. On the Class screen, make the following entries:

Field name User action and values

Class R2R_CL_REL_CEKKO

Class type 032

© SAP AG Page 31 of 108

Page 32: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 32/108

SAP Best Practices 104 - Materials Management: Configuration Guide

3. Choose Create.

4. On the Create Class screen, make the following entries:

5. Choose the Basic data tab:

Field name User action and values

Description PO Release at Header Level

Status Released

6. Choose the Char. tab:

Field name User action and values

Char. R2R_PURCH_ORD_TYPE

Char. R2R_PURCH_GRP

Char. R2R_PURCH_ORD_VALUE

7. Choose Save.

4.2.4 Defining Release Procedure for Purchase Orders

Use

The purpose of this step is to define the release procedure for purchase orders containing stepsRelease Groups, Release Codes, Release Indicator, Release Strategies.

Procedure

1. Access the activity using on of the following navigation options:

SAP SAP ECC menu Materials Management → Purchasing → Purchase Order → 

Release Procedure for Purchase Orders→ Define Release

Procedure for Purchase Orders

Transaction code SPRO

2. Double-click Release Groups.

3. Choose New Entries.

4. Make the following entries:

Grp Obj Class Description

PH 2 R2R_CL_REL_CEKKO PO Release (Overall)

5. Choose Save.

6. Choose Back .

7. Double-click Release Codes.

8. Choose New Entries.

9. Make the following entries:

Grp Code Description

© SAP AG Page 32 of 108

Page 33: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 33/108

SAP Best Practices 104 - Materials Management: Configuration Guide

PH 01 Purchasing Manager  

10. Choose Save.

11. Choose Back .

12. Double-click Release Indicator .

13. Choose New Entries.

14. Make the following entries:

Rel R Chg VChTo Description

1 X 6 0.0 Changeable, but new release

15. Choose Save.

16. Choose Back .

17. Double-click Release Strategies.

18. Choose New Entries.

19. Make the following entries:

Grp Strat Code Description

PH 10 01 Overall Release

20. Choose Save.

21. Choose Back .

4.2.5 Defining Release Procedure for Purchase Orders - SetCriterias

Use

In this activity you will define a release procedure for purchase orders.

Procedure

1. Access the activity using on of the following navigation options:

SAP SAP ECC menu Materials Management → Purchasing → Purchase Order → 

Release Procedure for Purchase Orders→ Define Release

Procedure for Purchase Orders

Transaction code SPRO

2. Double-click Release Strategies.

3. Choose Release Prerequisites and choose Continue.

4. Choose Release Statuses and choose Continue.

5. Choose Classification.

© SAP AG Page 33 of 108

Page 34: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 34/108

SAP Best Practices 104 - Materials Management: Configuration Guide

6. On the Change View “Release Strategies”: Classification screen, make the following entries:

Field name User action and values

Order type (Purchasing) Framework order 

Standard PO

Total net order value > 50,000 JPYPurchasing Group  生生生生 100

 生生生生 101

 生生生生 102

 生生生生 103

7. Choose Back .

8. Choose Release Simulation.

9. Choose Simulate Release.

10. Choose Back .

11. Choose Save, and then Exit .

Result

The release procedure for purchase orders is defined.

4.2.6 Defining Calculation Schema

Procedure

1. Access the activity using on of the following navigation options:

IMG menu Materials Management → Purchasing → Conditions→ Define

Price Determination Process→ Define Calculation Schema

Transaction code SPRO

2. On the Change View “Schemas”: Overview screen, select Procedure RM0000 (Purchasing Document (Big)).

3. In the Dialog Structure, double-click Control data.

4. Enter the values shown below.

Step

Counter 

Cond.

Type

From

To

Cond.Det.manu

ally

Stat

Print

ID

Cond.

subtotal

Req

Cal.Ty

pe

BaseTy

pe

AccntKey

Accruals

1 1 PB00

9

1 2 PBXX

9 5

2 0 VA00

© SAP AG Page 34 of 108

Page 35: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 35/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Step

Counter 

Cond.

Type

From

To

Cond.Det.manually

Stat

Print

ID

Cond.

subtotal

Req

Cal.Type

BaseType

AccntKey

Accruals

3 0 VA0

1

4 0 GAU1

X 31

5 0 GAU2

31 32 32

10 1 RB00

X X

10 2 RC00

X X

10 3 RA00

X X

10 4 RA01

1 X

10 5 HB00

X X

10 6 ZB00 X X

10 7 ZC00

X X

10 8 ZA00 X X

10 9 ZA01 1 X X

10 10 HB01

X X

10 11 RL01 1 X

10 15 MM00

X X

10 16 MM01

1 X X

10 17 REST

X

17 0 EDI1 X 53

19 0 EDI2 53 40

20 0 S 7

21 1 NAVS

X 60

21 2 NAVM

X 29

22 0 20 2

© SAP AG Page 35 of 108

Page 36: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 36/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Step

Counter 

Cond.

Type

From

To

Cond.Det.manually

Stat

Print

ID

Cond.

subtotal

Req

Cal.Type

BaseType

AccntKey

Accruals

1

24 0 21 21

S

25 0 22 23

31 1 FRA1

20 X X FRE FR1

31 2 FRB1

20 X X FRE FR1

31 3 FRC1

20 X X FRE FR1

31 4 RUE1

20 X X FRE RUE

31 5 RUB1

20 X X FRE RUE

31 6 RUC1

20 X X FRE RUE

31 7 ZOA1

20 X X FRE FR3

31 8 ZOB1

20 X X FRE FR3

31 9 ZOC1 20 X X FRE FR3

31 10 FRA2

20 X X FRE FR2

31 11 FRB2

20 X X FRE FR2

31 12 FRC2

20 X X FRE FR2

32 1 MAR1

20 X 12 FRE RUE

35 1 SKT

O

20 X 17

37 0 A001 20 X 26 EIN BO1

38 0 A002 20 X 26 EIN BO1

39 0 30 32

S

40 0 25 38

S

© SAP AG Page 36 of 108

Page 37: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 37/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Step

Counter 

Cond.

Type

From

To

Cond.Det.manually

Stat

Print

ID

Cond.

subtotal

Req

Cal.Type

BaseType

AccntKey

Accruals

41 0 25 3

2

S

60 0 WOTB

X 3

70 0 GRWR

20 X 8

75 0 GWLB

X 54 60

79 0 70 78

X C 8

5. Save your settings.6. Choose Back (F3) two times.

4.2.7 Maintaining Rounding Profiles

Procedure

1. Access the activity using on of the following navigation options:

IMG menu Materials Management → Purchasing → Order Optimizing → 

Quantity Optimizing and Allowed Logistics Units of Measure→ 

Maintain Rounding Profile

Transaction code SPRO

2. On the Create Quantity Addition/Subtraction screen, enter rounding profile YG00 in theRounding profile field of the dialog box Maintain Rounding Profile: Initial Screen.

3. Enter the plant Plant_1 (1000) in the field Plant of the dialog box Maintain Rounding Profile:Initial Screen.

4. Choose Create Dynamic ( F5).

5. On the Create Dynamic Rounding Profile screen, enter the values shown below.

Field name User action and values

Rounding Profile YG00

Description Rounding to cartons, layers and pallets

Plant  Plant_1 (1000)

Rounding off method  3

Rounding rule Y1

6. Save your settings.

7. Choose Back (F3).

© SAP AG Page 37 of 108

Page 38: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 38/108

SAP Best Practices 104 - Materials Management: Configuration Guide

8. Repeat steps 2. - 6. for the same rounding profile and for the plant Plant_2 (1100) as shownbelow:

Field name User action and values

Rounding Profile YG00

Description Rounding to cartons, layers and palletsPlant  Plant_2 (1100)

Rounding off method  3

Rounding rule Y1

9. To maintain the description of the rounding profile YG00 in Japanese, logon in language JA.

10. To access the customizing transaction, use IMG Path:

生生/購買管理

購買管理

発注の最適化

生生生生生生生生生生生生生生生生生生生生生生生

生生生生生生生生

11. Enter the rounding profile YG00 in the Rundungsprofil field of the dialog box Rundungsprofil  pflegen: Einstieg .

12. Enter the plant Plant_1 (1000) in the field Werk.

13. Choose Change (F7).

14. On the 生生生生生生生生生生生生生  screen, make the following entries.

Field name User action and values

Rounding Profile  YG00

Description 生生生生/生/生生生生生生生

Plant  Plant_1 (1000)

Rounding off method  3

Rounding rule Y1

15. Save your settings.

16. Repeat steps 10. - 14. for the same rounding profile YG00 and for the plant Plant_2 (1100) asshown below:

Field name User action and values

Rounding Profile YG00

Description 生生生生/生/生生生生生生生

Plant  Plant_2 (1100)

Rounding off method  3

Rounding rule Y1

© SAP AG Page 38 of 108

Page 39: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 39/108

SAP Best Practices 104 - Materials Management: Configuration Guide

17. Save your settings.

18. Choose Back (F3).

4.2.8 Unit of Measure Rounding Rules

Procedure

1. Access the activity using on of the following navigation options:

IMG menu Materials Management → Purchasing → Order Optimizing → 

Quantity Optimizing and Allowed Logistics Units of Measure

→ Unit of Measure Rounding Rules

Transaction code SPRO

2. On the Change View “Unit of Measure Rounding Rule”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries:

Rounding Rule Alternative Unit of measure % rounding up % rounding down

Y1 CAR 80.0 0.1

Y1 PAL 80.0 0.1

4. Save your settings.

5. Choose Back (F3).

4.2.9 Maintaining Account Assignment Categories

Procedure

1. Access the activity using on of the following navigation options:

IMG menu Materials Management → Purchasing → Account Assignment 

→ Maintain Account Assignment Categories

Transaction code SPRO

2. On the Change View “Account Assignment Categories”: Overview screen, choose Acctassignment cat. A (Asset).

3. Choose Details (Ctrl+Shift+F2).

4. On the Change View “Account Assignment Categories”: Details screen, make the followingentries:

Field name User action and values

Consumption posting   A

Description  Asset

Distribution 1

 AA Changeable at IR  X

Partial Invoice 2

© SAP AG Page 39 of 108

Page 40: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 40/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

ID.Account Assignment Screen 2

Goods receipt  X

GR non-valuated  X

Invoice receipt  X

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

© SAP AG Page 40 of 108

Page 41: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 41/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Sales document schedule X

Service/activity type X

Unloading point  X

5. Save your settings.

6. Repeat steps 1. to 5. for the account assignment categories B, …, X using the values shownbelow.

Acct. assignmt. cat. B

Field name User action and values

Consumption posting  E

Description MTS prod./sales ord.

Distribution

 AA Changeable at IR 

 Account modification VKA

Partial Invoice

ID.Account Assignment Screen

Goods receipt 

GR non-valuated 

Invoice receipt  X

Acct. assignmt. cat. C

Field name User action and values

Consumption posting  V

Description Sales order 

Distribution 1

 AA Changeable at IR  X

 Account modification

Partial Invoice 2

ID.Account Assignment Screen 1

Goods receipt  X

GR non-valuated 

Invoice receipt  X

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

© SAP AG Page 41 of 108

Page 42: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 42/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area XFunds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. D

Field name User action and values

Consumption posting  P

Description Indiv.cust./project

© SAP AG Page 42 of 108

Page 43: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 43/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Distribution

 AA Changeable at IR 

 Account modification VKA

Partial Invoice

ID.Account Assignment Screen 1

Special Stock  E

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. binding  X

Field name Mandatory

Entry

Optional

Entry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  XCost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

© SAP AG Page 43 of 108

Page 44: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 44/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. E

Field name User action and values

Consumption posting  E

Description Ind. cust. w. KD-CO

Distribution

 AA Changeable at IR 

 Account modification VKA

Partial Invoice

ID.Account Assignment Screen 1

Special Stock  E

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. Binding  X

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area XBusiness process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

© SAP AG Page 44 of 108

Page 45: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 45/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. F

Field name User action and values

Consumption posting  V

Description Order 

Distribution 1

 AA Changeable at IR  X

 Account modification VBR

Partial Invoice 2

ID.Account Assignment Screen 1

Special Stock 

Goods receipt  X

© SAP AG Page 45 of 108

Page 46: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 46/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

GR non-valuated 

Invoice receipt  X

GR Ind. Firm

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

© SAP AG Page 46 of 108

Page 47: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 47/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Service/activity type X

Unloading point  X

Acct. assignmt. cat. G

Field name User action and values

Consumption posting  P

Description MTS prod./project

Distribution

 AA Changeable at IR 

 Account modification VKA

Partial Invoice

ID.Account Assignment Screen

Special Stock 

Goods receipt 

GR non-valuated 

Invoice receipt  X

GR Ind. Firm

Acct. assignmt. cat. K

Field name User action and values

Consumption posting  V

Description Cost center 

Distribution 1

 AA Changeable at IR  X

 Account modification VBR

Partial Invoice 2

ID.Account Assignment Screen 1

Special Stock 

Goods receipt  X

GR non-valuated Invoice receipt  X

GR Ind. Firm

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

© SAP AG Page 47 of 108

Page 48: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 48/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area XFunds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. M

Field name User action and values

Consumption posting 

Description Ind. cust. w/o KD-CO

© SAP AG Page 48 of 108

Page 49: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 49/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Distribution

 AA Changeable at IR 

 Account modification VKA

Partial Invoice

ID.Account Assignment Screen 1

Special Stock  E

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. binding  X

Field name Mandatory

Entry

Optional

Entry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  XCost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

© SAP AG Page 49 of 108

Page 50: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 50/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. N

Field name User action and values

Consumption posting  V

Description Network

Distribution 1

 AA Changeable at IR  X

 Account modification VBR

Partial Invoice 2

ID.Account Assignment Screen 1

Special Stock 

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. Firm

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area XBusiness process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

© SAP AG Page 50 of 108

Page 51: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 51/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. P

Field name User action and values

Consumption posting  V

Description Project

Distribution 1

 AA Changeable at IR  X

 Account modification VBR

Partial Invoice 2

ID.Account Assignment Screen 1

Special Stock 

Goods receipt  X

© SAP AG Page 51 of 108

Page 52: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 52/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

GR non-valuated 

Invoice receipt  X

GR Ind. Firm

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

© SAP AG Page 52 of 108

Page 53: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 53/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Service/activity type X

Unloading point  X

Acct. assignmt. cat. Q

Field name User action and values

Consumption posting  P

Description Proj. make-to-order 

Distribution

 AA Changeable at IR 

 Account modification VBR

Partial Invoice

ID.Account Assignment Screen 1

Special Stock  Q

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. binding  X

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

© SAP AG Page 53 of 108

Page 54: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 54/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. T

Field name User action and values

 Acct.assignment changeable X

Consumption posting  V

Description  All new aux.acc.ass.

Distribution 1

 AA Changeable at IR  X

 Account modification VBR

Partial Invoice 2

ID.Account Assignment Screen 1

Special Stock 

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. Firm

© SAP AG Page 54 of 108

Page 55: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 55/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.

block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation X

General Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

Acct. assignmt. cat. U

Field name User action and values

 Acct.assignment changeable

© SAP AG Page 55 of 108

Page 56: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 56/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Consumption posting  U

Description Unknown

Distribution

 AA Changeable at IR 

 Account modification

Partial Invoice

ID.Account Assignment Screen 1

Special Stock 

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. FirmAcct. assignmt. cat. X

Field name User action and values

 Acct.assignment changeable X

Consumption posting  V

Description  All aux.acct.assgts.

Distribution 1

 AA Changeable at IR  X

 Account modification VAX

Partial Invoice 2

ID.Account Assignment Screen 1

Special Stock 

Goods receipt  X

GR non-valuated 

Invoice receipt  X

GR Ind. Firm

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

 Asset  X

 Asset Subnumber  X

Business Area X

Business process X

© SAP AG Page 56 of 108

Page 57: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 57/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name MandatoryEntry

OptionalEntry

Dislay Hidden

CO/PP Order  X

Commitment Item X

Cost Center  X

Cost Object  X

Cost Type X

Deletion indicator  X

Details account assgt.block 

X

Functional Area X

Funds X

Funds Center  X

Funds reservation XGeneral Ledger Account  X

Goods recipient/ship-to party 

X

Grant  X

Joint Venture Partner  X

Network  X

Profit Center  X

Profitability Segment  X

Project  X

Qty./percent. mat. acct.assgt 

X

Real Estate Management  X

Sales Order  X

Sales document schedule X

Service/activity type X

Unloading point  X

4.2.10 Maintaining Account Assignment Categories -Translation

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Account Assignment 

→ Maintain Account Assignment Categories

Transaction code SPRO

© SAP AG Page 57 of 108

Page 58: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 58/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Change View “Account Assignment Categories”: Overview screen, choose accountassignment category A.

3. Choose Goto→ Translation.

4. On the Choose languages dialog box, choose Language JA Japanese.

5. Choose Copy (Enter).

6. In the Maintain Texts in Other Languages dialog box, check that the Japanese descriptionexists. If not, enter  Anlage.

7. If you entered a translation, choose Continue (Enter).

8. Choose Back (F3).

9. Repeat steps 1. to 7. for all the account assignment categories B, …, Z using the Japanesedescription shown in the table below.

Acctassignment cat

AcctAssgtCatDesc.Language EN

AcctAssgtCatDesc.Language JA

B MTS prod./sales ord. MTS 生生/生生

C Sales order  生生

D Indiv.cust./project 生生生生生/Project

E Ind. cust. w. KD-CO KD-CO 生生生生生生

F Order   生生

G MTS prod./project MTS 生生/PROJECT

K Cost center   生生生生生

M Ind. cust. w/o KD-CO 生生生生生 w/o KD-CO

N Network 生生生生生生

P Project  プロジェクト

Q Proj. make-to-order    生生生生生生生生生生

T All new aux.acc.ass.  生生生生生生生生生

U Unknown  勘定未設定

X All aux.acct.assgts. 生生生生生生生

10. Save your settings.

11. Choose Back (F3).

4.2.11 Defining Scope of List

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Vendor Evaluation

→ Define Scope of List 

Transaction code SPRO

© SAP AG Page 58 of 108

Page 59: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 59/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Change View “Scope of List for Vendor Evaluation”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, enter the values as shown below.

Field name User action and values

List scope Y_CONSPR01

Description Ranking list consumer products

4. Save your settings.

5. Choose Back (F3).

6. On the Change View “Scope of List for Vendor Evaluation”: Overview screen, double click thenew entry Y_CONSPR01.

7. Enter the values shown below.

Main Criterion Sequence

01 1

02 2

03 3

8. Save your settings.

9. Choose Back (F3).

4.2.12 Defining Permissible Partner Roles per Account Group

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Partner 

Determination→ Partner Roles→ Define Permissible

Partner Roles per Account Group

Transaction code SPRO

2. On the Change View “Permissible Partner Roles per Account Group”: Overview , choose New Entries.

3. On the New Entries: Overview of Added Entries screen, enter the values shown below.

Function Group

DP YBAC

VN YBAC

4. Save your settings.

5. Choose Back (F3) twice.

© SAP AG Page 59 of 108

Page 60: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 60/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4.2.13 Defining Condition Types

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Logistic General → Agency Business→ Basic Settings→ 

Define Price Determination Process → Define Condition

Types

Transaction code SPRO

2. In the Choose Activity dialog box, choose Define Condition Type.

3. On the Change View “Conditions: Condition Types”: Overview screen, choose New Entries and make the following entries:

Field name User action and values

Condition Type NAVS

Description Non-Deductable Tax

 Access Sequence 0003

Condition Class D

Calculat.type B

Cond.category  D

Item Condition Select

Delete Select

Delete fr.DB Do not delete (set the deletion flag only)

Exclusion X - Gross Price

4.2.14 Taxes in Procurement

4.2.14.1 Setting Tax Indicator for Material

Use

In this step, you maintain the tax indicators that you wish to assign to materials. You do this for 

each country of destination.

Procedure

1. Access the activity using one of the following navigation options:

SAP IMG menu Materials Management → Purchasing → Taxes→ Set Tax 

Indicator for Material 

Transaction code SPRO

© SAP AG Page 60 of 108

Page 61: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 61/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Change View “Determination of Tax Code: Maintain Material Indicator: Overview”  screen, choose New entries.

3. On the “New Entries: Overview of Added Entries” screen, make the following entries.

Dst. Country Material Description

JP 0 Material 0%

JP 1 Material 100%

4. Save your settings.

5. Choose Back (F3).

Result

The tax indicators are created.

4.2.14.2 Setting Tax Indicator for Plant

Use

In this step, you maintain the tax indicators that you wish to assign to materials. You do this for each country of destination.

Procedure

1. Access the activity using one of the following navigation options:

SAP IMG menu Materials Management → Purchasing → Taxes→ Set Tax 

Indicator for Plant 

Transaction code SPRO

2. On the Change View “Determination of Tax Indicator: Maintain Plant Indicator: Overview”  screen, choose New entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries.

Dst. Country Plant Tax ID Description

JP 0 Exempt

JP 1 Taxable

4. Save your settings.

5. Choose Back (F3).

Result

The tax indicators are created.

4.2.14.3 Setting Tax Indicator for Account Assignment

Use

© SAP AG Page 61 of 108

Page 62: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 62/108

SAP Best Practices 104 - Materials Management: Configuration Guide

In this step, you maintain the tax indicators that you wish to assign to materials. You do this for each country of destination.

Procedure

1. Access the activity using one of the following navigation options:

SAP IMG menu Materials Management → Purchasing → Taxes→ Set Tax Indicator for Account Assignment 

Transaction code SPRO

2. On the Change View “Determine Tax Code: Maintain Account Assignment Indicator:Overview” screen, choose New entries.

3. On the “New Entries: Overview of Added Entries” screen, make the following entries:

Dst. Country Plant Tax ID Description

JP 0 Exempt

JP 1 Taxable

4. Save your settings.5. Choose Back (F3).

Result

The tax indicators are created.

4.2.14.4 Assigning Tax Indicators for Plant

Use

In this step, you maintain the tax indicators that you wish to assign to materials. You do this for each country of destination.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Taxes→ Assign Tax 

Indicators for Plants

Transaction code SPRO

2. On the Change View “Assignment of Tax Indicator to Plant”: Overview” screen, make thefollowing entries:

Plant Plant Tax ID DescriptionPlant_1 (1000) 1 taxable

Plant_2 (1100) 1 taxable

3. Save your settings.

4. Choose Back (F3)

Result

© SAP AG Page 62 of 108

Page 63: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 63/108

SAP Best Practices 104 - Materials Management: Configuration Guide

The tax indicators are created.

4.2.14.5 Assigning Tax Indicators for Account Assignments

Procedure1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Taxes→ Assign

Tax Indicators for Account Assignments

Transaction code SPRO

2. On the Change View “Assignment of Tax Indicator to Account Assignment Category”:Overview” screen, choose New Entries.

3. Make the following entries:

A DstC AcAsg

JP 0

M JP 0

4. Save your settings.

5. Choose Back (F3).

4.2.15 Checking Incoterms

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Vendor Master → Check Incoterms

Transaction code SPRO

2. Choose New Entries.

3. Make the following entries:

IncoT Description Cty

 AIR Airborne Express X

DHL DHL Worldwide Express X

EMY Emery Worldwide X

FED Federal Express X

UPS United Parcel Service X

USP United States Postal Service X

© SAP AG Page 63 of 108

Page 64: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 64/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4. Choose Save.

5. Choose Back .

4.2.16 Returns to Vendor 

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Purchase Order 

→ Returns Order → Returns to Vendor 

Transaction code SPRO

2. Choose New Entries.

3. Make the following entries:

Cat Type SPlt Del. Type Returns

F NB Plant_1 (1000) RL

F NB Plant_2 (1100) RL

F UB Plant_1 (1000)

F UB Plant_2 (1100)

4. Choose Save.

5. Choose Back .

4.2.17 Vendor Evaluation

4.2.17.1 Defining Criteria

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Vendor Evaluation→ 

Define Criteria

Transaction code SPRO

2. Choose New Entries.

3. Make the following entries:

CR Criterion Short Text f. M.Crit

01 Price PRICE

02 Quality QUALIT

03 Delivery DELIV

4. Choose Save.

5. Choose Back .

© SAP AG Page 64 of 108

Page 65: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 65/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4.2.17.2 Defining Subcriteria

Procedure

1. Access the activity using one of the following navigation options:IMG menu Materials Management → Purchasing → Vendor 

Evaluation→ Define Criteria

Transaction code SPRO

2. On the Change View “Main Criteria”: Overview screen, select the according previouslycreated criteria “Price” and double-click the subcriteria folder.

3. Choose New Entries.

4. Make the following entries:

CR Criterion Scoring Method

01 Price Level 4

02 Price Behavior 5

5. Choose Save.

6. On the Change View “Main Criteria”: Overview” screen, select the next criteria “Quality” anddouble-click the subcriteria folder.

7. Choose New Entries.

8. Make the following entries:

CR Criterion Scoring Method

01 GR Inspection 7

02 Rejection/Complaint 803 Audit 9

9. Choose Save.

10. On the Change View “Main Criteria”: Overview” screen, select the Delivery criteria anddouble-click the subcriteria folder.

11. Choose New Entries.

12. Make the following entries:

CR Criterion Scoring Method

01 On-Time Delivery 3

02 Quantity Reliability 203 Shipping Instr. 6

04 Adher. to Conf. Date B

13. Choose Back

14. Choose Back .

© SAP AG Page 65 of 108

Page 66: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 66/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4.2.17.3 Defining Scope of List

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Purchasing → Vendor 

Evaluation→ Define Scope of List 

Transaction code SPRO

2. On the Change View “Scope of List for Vendor Evaluation: Overview” choose New Entries.

3. Make the following entries:

List Scope Description

Y_CONSPR01 Ranking list consumer products

4. Choose Save.

5. Choose Back .

4.2.17.4 Maint. Purch. Org. Data - Purch. Organization

Procedure

1. Access the activity using one of the following navigation options:

IMG menu IMG→ Material Management → Purchasing → Vendor 

Evaluation → Maintain Purchasing Organization Data

Transaction code SPRO

2. On the Change View "Purchasing organization”: Overview screen, choose Copy As… (F6) to

copy the data record 0001 to 1000 Purchasing Org. 1000, and confirm the message bychoosing Copy All.

3. Save your entries and go back to the IMG menu.

4.2.17.5 Maint. Purch. Org. Data - Main Criteria

Procedure

1. Access the activity using one of the following navigation options:

IMG menu IMG→ Material Management → Purchasing → Vendor 

Evaluation → Maintain Purchasing Organization Data

Transaction code SPRO

2. On the Change View "Purchasing organization”: Overview screen, choose Purchasing Org.1000, and double-click the Main Criteria folder.

3. On the Change View “Main Criteria: Overview” screen, choose New Entries.

4. Make the following entries:

CR Manual maint. Description

© SAP AG Page 66 of 108

Page 67: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 67/108

SAP Best Practices 104 - Materials Management: Configuration Guide

01 Do not select Price

02 Do not select Quality

03 Do not select Delivery

05 Do not select Service

5. Choose Return and the criteria description will be posted from the system.

6. Choose Save.

7. Choose Back .

4.2.17.6 Maint. Purch. Org. Data – Subcriteria

Procedure

1. Access the activity using one of the following navigation options:

IMG menu IMG→ Material Management → Purchasing → Vendor 

Evaluation → Maintain Purchasing Organization Data

Transaction code SPRO

2. On the Change View "Purchasing organization”: Overview screen, choose Purchasing Org.1000, and double-click Main Criteria folder.

3. The “Change View: Main criteria: Overview ” screen appears. Choose the previously definedmain criteria 01 Price and double-click the Subcriteria folder . Choose New Entries and makethe following entries:

Subcrit. Weighting Manual maint. Description

01 1 Do not select Price Level

02 1 Do not select Price Behavior  

4. Choose Save.

5. On the “Change View: Main criteria: Overview ” screen choose the previously defined maincriteria 02 Quality and double-click the Subcriteria folder . Choose New Entries and make thefollowing entries:

Subcrit. Weighting Manual maint. Description

01 1 Do not select GR Inspection

02 1 Do not select Rejection/Complaint

03 1 Do not select Audit

6. Choose Save.

7. On the “Change View: Main criteria: Overview ” screen, choose the previously defined maincriteria 03 Delivery and double-click the Subcriteria folder . Choose New Entries and make thefollowing entries:

Subcrit. Weighting Manual maint. Description

01 1 Do not select On-Time Delivery

02 1 Do not select Quantity Reliability

© SAP AG Page 67 of 108

Page 68: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 68/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Subcrit. Weighting Manual maint. Description

03 1 Do not select Shipping Instr.

04 1 Do not select Adher. to Conf. Date

8. On the “Change View: Main criteria: Overview ” screen, choose the previously defined maincriteria 04 Service and double-click the Subcriteria folder . Choose New Entries and make thefollowing entries:

Subcrit. Weighting Manual maint. Description

01 1 Do not select Quality of Service

02 1 Do not select Service Timeliness

9. Choose Save.

10. Choose Back .

4.2.17.7 Maint. Purch. Org. Data – Weighting

Procedure

1. Access the activity using one of the following navigation options:

IMG menu IMG→ Material Management → Purchasing → Vendor 

Evaluation → Maintain Purchasing Organization Data

Transaction code SPRO

2. On the Change View "Purchasing organization”: Overview screen, choose the Purchasing Org. 1000, and double-click the Weighting folder.

3. On the Change View "Weighting”: Overview screen, select New Entries and make thefollowing entries:

Wgt. Key Cr Weighting Criterion Description

01 01 1 Price

01 02 1 Quality

01 03 1 Delivery

01 05 1 Service

02 01 2 Price

02 02 1 Quality

02 03 2 Delivery

02 04 102 05 1 Service

4. Choose Save.

5. Choose Back .

© SAP AG Page 68 of 108

Page 69: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 69/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4.2.17.8 Maint. Purch. Org. Data - Points Scores f. the Auto.Criteria

Procedure

1. Access the activity using one of the following navigation options:

IMG menu IMG→ Material Management → Purchasing → Vendor 

Evaluation → Maintain Purchasing Organization Data

Transaction code SPRO

2. On the Change View "Purchasing organization”: Overview screen, choose Purchasing Org.1000, and doubleclick “Points Scores for the Automatic Criteria” folder.

3. On the Change View "Points Scores for the Automatic Criteria: Overview “screen, chooseNew Entries and make the following entries:

Scoring Method Percentage Sco. Description / Text

2 100 Qty. reliability

2 2.0 95 Qty. reliability

2 10.0 80 Qty. Reliability

2 15.0 60 Qty. Reliability

2 20.0 40 Qty. Reliability

2 30.0 10 Qty. Reliability

2 99.9 1 Qty. Reliability

2 -1.0 95 Qty. Reliability

2 -2.0 90 Qty. Reliability

2 -5.0 80 Qty. Reliability

2 -10.0 65 Qty. Reliability

2 -15.0 40 Qty. Reliability

2 -20.0 10 Qty. Reliability

2 -99.9 1 Qty. Reliability

3 100 On-time del.

3 1.0 90 On-time del.

3 2.0 95 On-time del.

3 10.0 80 On-time del.

3 20.0 60 On-time del.

3 30.0 40 On-time del.

3 40.0 20 On-time del.

3 50.0 5 On-time del.

3 99.9 1 On-time del.

3 -5.0 95 On-time del.

© SAP AG Page 69 of 108

Page 70: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 70/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Scoring Method Percentage Sco. Description / Text

3 -10.0 65 On-time del.

3 -20.0 75 On-time del.

3 -30.0 60 On-time del.

3 -40.0 40 On-time del.

3 -50.0 20 On-time del.

3 -60.0 5 On-time del.

3 -99.9 1 On-time del.

4 40 Price level

4 5.0 20 Price level

4 15.0 10 Price level

4 99.9 1 Price level

4 -5.0 50 Price level

4 -10.0 90 Price level

4 -20.0 95 Price level

4 -99,9 100 Price level

5 40 Price behavior  

5 5.0 20 Price behavior  

5 10.0 1 Price behavior  

5 -5.0 50 Price behavior  

5 -10.0 100 Price behavior  

B 2.0 90 Adherence to confirmation date

B 5.0 75 Adherence to confirmation date

B 10.0 40 Adherence to confirmation date

B 30.0 25 Adherence to confirmation date

B 40.0 10 Adherence to confirmation date

B 50.0 1 Adherence to confirmation date

B -2.0 90 Adherence to confirmation date

B -5.0 70 Adherence to confirmation date

B -10.0 40 Adherence to confirmation date

B -20.0 10 Adherence to confirmation date

B -50.0 1 Adherence to confirmation date

4. Choose Save.

5. Choose Back .

© SAP AG Page 70 of 108

Page 71: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 71/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4.3 Inventory Management and Physical Inventory Access the customizing activities as outlined in the BC Set output documentation below andchange the settings according to the respective table values listed.

4.3.1 Defining Screen Layout

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Inventory Management and 

Physical Inventory → Automatic Movements→ Define Screen

Layout 

Transaction code SPRO

2. On the Change View “Field Selection”: Overview screen, choose Position.

3. On the Another Entry dialog box, enter 643 in the Movement Type input field.

4. Choose Continue (Enter).5. Mark the selected line of movement type 643 in the Change View “Field Selection”: Overview 

screen as shown below.

6. Choose Details (Ctrl+Shift+F2).

7. On the Maintain Field Status Group: Overview screen, double-click General data in theSelect Group box.

8. On the Maintain Field Status Group: General data screen, make the following entries:

Field name Supress RequiredEntry

Optional Entry

 Assignment number (FI only) X

Line item text  X

Invoice reference (FI only) X

Exchange hedging (FI only) X

Collective invoice (FI only) X

Final issue indicator  X

Goods recipient  X

9. Choose Back (F3).

10. On the Maintain Field Status Group: Overview screen, double click Additional account assignments in the Select Group box.

11. On the Maintain Field Status Group: Additional account assignments screen, make thefollowing entries:

Field name Supress RequiredEntry

Optional Entry

Calculation period (FI only) X

Material number (FI only) X

Cost center  X

© SAP AG Page 71 of 108

Page 72: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 72/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name Supress RequiredEntry

Optional Entry

CO/PP order  X

Project  X

Sales order  X

Personnel number (FI only) X

Network  X

Commitment item X

Plant (FI only) X

Business area X

Trad.partn.bus.area (FI only) X

Quantity (FI only) X

Profit Center  X

Profitability segment  X

Cost object  X

Joint venture acct assgnmt(FI) X

Joint venture partner  X

Joint venture recovery indctr  X

Fund  X

Funds center  X

Partner company code X

Trad.part.prof.center(FI only) XJoint venture calculation type X

Funds reservation (FI) X

Funds reservation item (FI) X

Functional Area X

 Activity type X

Business process X

Grant  X

12. Choose Back (F3).

13. On the Maintain Field Status Group: Overview screen, double click Materials Management inthe Select Group box.

14. On the Maintain Field Status Group: Materials management screen, make the followingentries:

Field name Supress RequiredEntry

Optional Entry

Vendor  X

© SAP AG Page 72 of 108

Page 73: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 73/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name Supress RequiredEntry

Optional Entry

Customer  X

Purchase order  X

Reservation number (FI only) X

Phys.inventory fields(FI only) X

Ext. GA amount in LC  X

Transport request (FI only) X

Sales value in local currency  X

 Accounting indicator  X

Tax code X

 Alternate base amount  X

15. Choose Back (F3).

16. On the Maintain Field Status Group: Overview screen, double-click Transfer Postings in theSelect Group box.

17. On the Maintain Field Status Group: Transfer postings screen, make the following entries:

Field name Supress RequiredEntry

Optional Entry

Receiving material  X

Receiving plant  X

Receiving storage location X

Sales order  X

Project  X

Receiving batch X

18. Save your settings.

19. Choose Back (F3) twice.

4.3.2 Printer Determination by Plant/Storage Location

Use

The purpose of this activity is to assign printers to storage locations. The result will be that goods

movement slip will be automatically printed at the printers of the corresponding storage location.

© SAP AG Page 73 of 108

Page 74: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 74/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Inventory Management and Physical 

Inventory → Output Determination→ Printer Determination→ 

Printer Determination by Plant/Storage Location

Transaction code OMJ3

2. On the Change View “Print Parameters”: Overview screen, choose New Entries.

3. On the New Entries: Details of Added Entries screen, enter:

Condition Type Plant Stor. Location Output Device

LP01

4. Save your settings.

5. Repeat steps 2-4 with the following entries:

Condition Type Plant Stor. Location Output Device

Plant_1 (1000) Shop floor (1020) LP01

Plant_1 (1000) Shipping - (Lean WM) (1030) LP01

Plant_1 (1000) Stores - (Lean WM) (1050) LP01

Plant_1 (1000) Returns (1060) LP01

Plant_2 (1100) Stores - (Lean WM) (1150) LP01

Plant_2 (1100) Returns (1160) LP01

6. Save your settings.

7. Choose Back (F3).

4.3.3 Printer Determination by Plant/Stor.Loc./User Group

Use

The purpose of this activity is to assign printers to storage locations and user groups. The resultwill be that a goods movement slip will be printed automatically at the printers of thecorresponding storage location and user group.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Inventory Management and Physical 

Inventory → Output Determination→ Printer Determination→ 

Printer Determination by Plant/Stor.Loc./User group

Transaction code OMJ4

2. On the Change View “Printer Determination per Plant/SLOc/User Group”: Overview screen,choose New Entries.

3. On the New Entries: Details of Added Entries screen, make the following entries:

© SAP AG Page 74 of 108

Page 75: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 75/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Condition Type Plant Stor. Location User Group Output Device

GROUP1 LP01

4. Save your settings.

4.3.4 Copy, Change Movement Types

4.3.4.1 Copy, Change Mov. Types - Movement Type

Use

The purpose of this activity is to copy standard movement types to customer specific movementtypes 9xx and adjust these 9xx movement types.

Procedure

1. Access the activity using one of the following navigation options:

IMG menu IMG→ Materials Management → Inventory Management and Physical Inventory → Movement Types→ Copy, Change

Movement Types

Transaction code OMJJ

2. In the Field Selection dialog box select Movement Type and choose Enter .

3. On the Determine Work Area: Entry screen, enter:

Movement Type From Movement Type To

551 999

4. On the Change View "Movement Type": Overview , select movement type 551 and chooseCopy As... (F6).

5. Choose Enter.

6. On the Change View "Movement Type": Details of Selected Set screen, make the followingentries for the current used movement type:

Account Control Account Control Control Reason

951 - +

952 - +

961 -

901 -

902 -

7. Choose Enter .

8. In the Specify object to be copied dialog box, choose Copy all .

9. Confirm the Information dialog box.

10. Choose Save.

11. Repeat step 1. - 11. with the following movement types:

Movement Type From Movement Type To

© SAP AG Page 75 of 108

Page 76: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 76/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Movement Type From Movement Type To

552 952

561 961

562 962

601 901

602 902

4.3.4.2 Copy, Change Mov. Types - Short Texts

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.3 Copy, Change Mov. Types - Allowed Transactions

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.4 Copy, Change Mov. Types - Help Texts

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.5 Copy, Change Mov. Types - Field selection (from201)/Batch

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.6 Copy, Change Mov. Types - Field selection (Enjoy)

Use

The purpose of this activity is to maintain field selection for movement type 951 and 952.

Procedure

1. Access the activity using one of the following navigation options:IMG menu IMG→ Materials Management → Inventory Management and 

Physical Inventory → Movement Types→ Copy, Change

Movement Types

Transaction code OMJJ

© SAP AG Page 76 of 108

Page 77: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 77/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. In the Field Selection dialog box, choose Movement Type and choose Enter .

3. On the Determine Work Area: Entry screen, make the following entries:

Movement Type From Movement Type To

951 952

4. On the Change View "Movement Type": Overview screen, select movement types 951 and952 and choose Field Selection (Enjoy).

5. On the Change View "Field Selection (Enjoy)": Overview screen, choose optional entry for allentries:

Movement Type Field Name Required Entry Optional Entry

951  All entries deselect select

952  All entries deselect select

6. On the Change View "Field Selection (Enjoy)": Overview screen, choose New Entries.

7. On the New Entries: Overview of Added Entries screen make the following entries:

Movement Type Field Name Required Entry Optional Entry

951 PAOBJNR  Select Deselect

952 PAOBJNR  Select Deselect

961  AUFNR  Select Deselect

961 SGTXT  Deselect Select

961 WEMPF  Deselect Select

962  AUFNR  Select Deselect

962 SGTXT  Deselect Select

962 WEMPF  Deselect Select

8. Choose Save.

4.3.4.7 Copy, Change Mov. Types - Update control / WMmovement types

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.8 Copy, Change Mov. Types - Account Grouping

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.9 Copy, Change Mov. Types - Reason for Movement

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

© SAP AG Page 77 of 108

Page 78: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 78/108

SAP Best Practices 104 - Materials Management: Configuration Guide

4.3.4.10 Copy, Change Mov. Types - Reversal/follow-onmovement types

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.11 Copy, Change Mov. Types - Deactivate QM inspection / deliver 

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.3.4.12 Copy, Change Mov. Types - LIS Statistics Group

This step has been performed by copying the movement type in the first step. There is no needfor more adjustments at this point.

4.4 Valuation and Account Assignment

4.4.1 Defining Valuation Classes

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Valuation and Account Assignment 

-→ Account Determination -→ Account Determination Without 

Wizard -→

Define Valuation ClassesTransaction code OMSK

2. On the Account Category Reference/Valuation Classes screen, choose Valuation Class.

3. On the Change View: "Valuation Classes": Overview , choose New Entries and make thefollowing entries:

ValCl ARef Description

0710 0001 Equipment 1

0720 0001 Equipment 2

1210 0002 Spec.complex fixed assets

3000 0001 Raw materials 1

3001 0001 Raw materials 2

3002 0001 Raw materials 3

3003 0001 Raw materials 4

© SAP AG Page 78 of 108

Page 79: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 79/108

SAP Best Practices 104 - Materials Management: Configuration Guide

ValCl ARef Description

3030 0002 Operating supplies

3031 0002 Operating supplies 2

3040 0003 Spare parts

3050 0004 Packaging and empties

3100 0005 Trading goods

3105 0005 Third Party Drop Ship

3110 0005 Trading goods Project

3200 0006 Services

3300 0007 Nonvaluated material

7900 0008 Semifinished products

7920 0009 Finished products

4. Choose Save.

4.5 Logistics Invoice Verification Access the customizing activities as outlined in the BC Set output documentation below andadjust the settings according to the respective table values listed.

4.5.1 Setting Tolerance Limit

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Logistics Invoice Verification→ 

Invoice Block → Set Tolerance Limits

Transaction code SPRO

2. On the Change View “Tolerance Limits”: Overview screen, choose New Entries.

3. On the New Entries: Details of Added Entries screen, enter the following values for companycodes 1000 and 1100.

Field name User action and values

Tolerance key   AN

Company Code 1000

Do not check  X

4. Save your settings.

© SAP AG Page 79 of 108

Page 80: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 80/108

SAP Best Practices 104 - Materials Management: Configuration Guide

5. Repeat steps 2. to 3. for all combinations of company codes and tolerance keys displayed bythe following shortcuts:

Company Code 1000

Field name User action and values

Tolerance key   AP

Comapany Code 1000

 Absolute value: Do not check  X

Field name User action and values

Tolerance key  BD

Comapany Code 1000

 Absolute value: Do not check 

 Absolute value: Check limit  X

Value 500

Field name User action and values

Tolerance key  BR

Company Code 1000

Lower Limit Percentage Check Limit  X

Tolerance Limit % 20

Upper Limit Percentage Check Limit  X

Value 10

Field name User action and values

Tolerance key  BW

Company Code 1000

Percentage: Do not check (Lower limit) X

Percentage: Check limit (Lower limit)

Tolerance limit % (Lower limit) 5.00

Percentage: Do not check (Upper limit) X

Percentage: Check limit (Upper limit)

Tolerance limit % (Upper limit) 5.00

© SAP AG Page 80 of 108

Page 81: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 81/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Tolerance key  DQ

Company Code 1000

Lower Limit: Absolute- do not check  X

Value 26,600

Lower limit : Percentage- Do not Check  X

Tolerance limit % 5.00

Upper Limit: Absolute- check limit  X

Value

Upper Limit : Percentage- Do not Check 

X

Tolerance limit % 5.00

Field name User action and values

Tolerance key  DW

Company Code 1000

Upper limit: Absolute Do not check 

Check limit  X

Value 500,000

Field name User action and values

Tolerance key  KW

Comapany Code 1000

Lower limit: Check limit  X

Value 102,300

Lower limit : Percentage- Do not Check  X

Tolerance limit % 5.00

Upper Limit: Absolute-Check Limit  X

Value 102,300

Upper Limit: Percentage-Do not Check Limit 

X

Tolerance Limit % 5.00

© SAP AG Page 81 of 108

Page 82: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 82/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Tolerance key  PP

Company Code 1000

Lower limit: Absolute Do not check  X

Value 26,600

Lower limit : Percentage- Check  X

Tolerance limit % 10.00

Upper Limit: Absolute-Do not Check Limit 

X

Value 26,600

Upper Limit: Percentage-Check Limit  X

Tolerance Limit % 10.00

Field name User action and values

Tolerance key  PS

Company Code 1000

Lower limit : Absolute Do not check  X

Value

Lower limit : Percentage- Do not check  X

Tolerance limit %

Upper Limit: Absolute- Do not check Limit 

X

Value

Upper Limit: Percentage-Check Limit  X

Tolerance Limit % 10.00

Field name User action and values

Tolerance key  ST

Company Code 1000

Upper Limit: Absolute- check limit  X

Value 5,000,000

Field name User action and values

Tolerance key  VP

© SAP AG Page 82 of 108

Page 83: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 83/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Company Code 1000

Lower limit : Percentage- Do not Check  X

Tolerance limit %

Upper Limit: Percentage-Do not Check  X

Tolerance Limit %

6. Choose Back (F3).

4.5.2 Editing PO Supplement Text in Invoice Verification

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Logistics Invoice Verification→ 

Incoming Invoice→ Edit PO Supplement Text in Invoice

Verification

Transaction code SPRO

2. On the PO Text Types screen, choose Order text general .

3. On the Change View “PO Supplement”: Overview screen, choose New Entries.

4. On the New Entries: Overview of Added Entries screen, make the following entries:

Company Code PO Text 1000 X

5. Save your settings.

4.5.3 PO Supplement Text: Parameters, Invoice Verification

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Logistics Invoice Verification→ 

Incoming Invoice→ Edit PO Supplement Text in Invoice

VerificationTransaction code SPRO

2. On the PO Text Types screen, choose Order text general .

3. On the Change View “PO Supplement”: Overview screen, choose New Entries.

4. On the PO Text Types screen, choose Notifiable order text types.

5. Choose New Entries and make the following entries:

© SAP AG Page 83 of 108

Page 84: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 84/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Company Code ID 1000 F03

1000 F05

1000 F06

1000 F07

1000 F11

6. Save your entries.

4.5.4 Configuring Vendor-Specific Tolerances

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Logistics Invoice Verification→ 

Incoming Invoice→ Configure Vendor specific Tolerances

Transaction code SPRO

2. On the Change View “Vendor Specific Tolerances”: Overview screen, choose New Entries.

3. On the New Entries: Details of Added Entries screen, make the following entries for companycode 1000:

Field name User action and values

Company Code 1000

Tolerance Group 0001

 Absolute lower limit: Check limit  X

Negative Lower limit Acceptance 2,000,000-

Percentage lower limit:

Check limit 

X

Percentage Lower Acceptance limit  4.00 %

Negative small difference: Check limit  X

Small difference 100,000-

Positive small difference: Check limit  X

Small difference 50,000

 Absolute upper limit: Check limit  X

Positive Acceptance Upper limit  500,000

© SAP AG Page 84 of 108

Page 85: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 85/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Field name User action and values

Percentage upper limit: check limit  X

Percentage upper acceptance limit  2.00 %

 Automatic invoice reduction. Absolute Upper limit: Check limit 

X

Invoice reduction tolerance amount  400,000

Percentage upper limit: Check limit  X

Percentage Invoice reduction Tolerance 5.00 %

4. Save your settings.

4.5.5 Activating Direct Posting to G/L Accounts and Material

Accounts

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Logistics Invoice Verification→ 

Incoming Invoice→ Activate Direct Posting to G/L Accounts

and Material Accounts

Transaction code SPRO

2. On the Change View “Customizing: Direct Posting in Log. Invoice Verification” screen, makethe following entries:

Field name User action and values

Direct Posting to GL accounts is active X

Direct Posting to material account is active X

3. Save your settings.

4. Choose Back (F3).

4.5.6 Setting check for duplicate invoices

Procedure1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Logistics Invoice Verification→ 

Incoming Invoice→ Set Check for Duplicate Invoices

Transaction code SPRO

2. On the Change View “Duplicate Invoice Check”: Overview screen, choose New entries andmaintain the following values:

© SAP AG Page 85 of 108

Page 86: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 86/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Company Code Check Co. Code Check reference Check Inv. Date

1000 X X X

3. Choose Save.

4.5.7 Maintaining Number Assignments for AccountingDocuments

Procedure

1. Access the activity using one of the following navigation options:

IMG menu Materials Management → Logistic Invoice Verification→ 

Incoming Invoice→ Number Assignment → Maintain Number 

 Assignment for Accounting Documents

Transaction code OMR4

2. On the Doc.Types/Number Range: Invoice receipt screen choose Document Types in InvoiceVerification.

3. On the Change view “Document Types Invoice Verification/Valuation”: Overview screen, choose the line with the Transaction code shown below and choose Details.

Transaction

MIRO

4. On the Change View “Document Types Invoice Verification/Valuation”: Details screen, enter the following data:

Transaction DocumentType

Doc. typereval.

Doc. type add.doc.

DocType invoicereduction

MIRO RE RK

5. Go Back .

6. On the Change view “Document Types Invoice Verification/Valuation”: Overview screen, choose the line with the Transaction code shown below and choose Details.

Transaction

MRKO

7. On the Change View “Document Types Invoice Verification/Valuation”: Details screen, enter the following data:

Transaction DocumentType Doc. typereval. Doc. type add.doc. DocType invoicereduction

MRKO Y1

8. Go Back .

9. On the Change view “Document Types Invoice Verification/Valuation”: Overview screen, choose the line with the Transaction code shown below and choose Details.

© SAP AG Page 86 of 108

Page 87: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 87/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Transaction

MR8M

10. On the Change View “Document Types Invoice Verification/Valuation”: Details screen, enter the following data:

Transaction DocumentType

Doc. typereval.

Doc. type add.doc.

DocType invoicereduction

MR8M RE RK

11. Go Back .

12. Choose Save.

5 Configuration of Sales and Distribution

5.1 Basic Functions

5.1.1 Setting Up Part. Determ. - Accnt. Groups - Function Ass.

Procedure

1. Access the activity using one of the following navigation options:

SAP SAP ECC menu Sales and Distribution→ Basic Functions→ Partner 

Determination→ Set Up Partner Determination

Transaction code SPRO

2. In the Choose Activity dialog box, double-click Set Up Partner Determination for Customer Master.

3. On the Change View “Partner Determinations Procedure": Overview screen, double-click Account Groups - Function Assignment .

4. On the Change View “Account Groups - Function Assignment”: Overview screen, chooseNew Entries.

5. On the New Entries: Overview of Added Entries screen, make the following entries:

Field name User action and values

Partner Function SH

 Account Group YBVC

6. Choose Save.

© SAP AG Page 87 of 108

Page 88: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 88/108

SAP Best Practices 104 - Materials Management: Configuration Guide

6 Configuration of Logistics Execution

6.1 Shipping

6.1.1 Setting Up Partner Determination for Deliveries

Use

In this activity, you set up partner determination for deliveries.

Procedure

1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Logistics Execution→ Shipping → Basic Shipping Functions→ 

Partners→ Set Up Partner Determination for Deliveries

2. Double-click Partner Determination Procedure Assignment .

3. Choose New Entries.

4. Make the following entries:

DlvTy Description ParPr  

RL Returns (Pur.Ord.) LF

5. Choose Save.

7 Master Data7.1 Purchasing Output Conditions

7.1.1 Output Condition Records: Purchasing RFQ

The purpose of this activity is to create an output condition record for a purchasing RFQ.

Procedure

1. Access the activity using one of the following navigation options:

SAP SAP ECC menu LogisticsMaterials Management  Purchasing Master DataMessages Request for Quotation Create

Transaction code MN01

© SAP AG Page 88 of 108

Page 89: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 89/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Create Output-Condition records: Purchasing RFQ screen, enter output type NEU and

choose Enter .

3. In the Key Kombination dialog box, select Purchasing Output determination: Document Typeand choose Enter.

4. On the Create Condition records (RFQ): Fast Entry screen, enter the following values and

choose Enter:Doc. Type Function Partner Medium Date/Time

 AN VN 1 4

 AB VN 1 4

5. Mark all l ines.

6. Choose Communication.

7. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field Description Values Comment

Output Device LP01 Insert your own printer  

Number of messages

1

Printimmediately

Select flag if theprintout should beprinted immediatelyand not put into spoolonly

8. Goto next entry with button Next Output (shift F7). Enter entries from step before.

9. Save your entries.

10. Repeat steps 2-9 with output types ABSA and MAHN .

Result

The condition records are created. For output type NEU the system automatically generates anoutput message.

7.1.2 Output Condition Records: Purchase Order 

The purpose of this activity is to create an output condition record for a purchase order.

Procedure

1. Access the activity using one of the following navigation options:

SAP SAP ECC menu LogisticsMaterials Management  Purchasing Master DataMessages Purchase Order  Create

Transaction code MN04

© SAP AG Page 89 of 108

Page 90: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 90/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Create Output-Condition records: Purchase Order screen, enter output type NEU and

choose Enter .

3. In the Key Kombination dialog box, select Purchasing Output Determination: Document Typeand choose Enter.

4. On the Create Condition records (Purchase Order): Fast Entry screen, enter the following

values and choose Enter:Field name Description Values Comment

Doc. Type NB

Funct Partner  function

VN

Medium Messagetransmissionmedium

1

Date/Time Dispatchtime

4

Next Item LineDoc. Type FO

Funct Partner  function

VN

Medium Messagetransmissionmedium

1

Date/Time Dispatchtime

4

Next Item Line

Doc. Type DB

Funct Partner  function

VN

Medium Messagetransmissionmedium

1

Date/Time Dispatchtime

4

5. Choose Communication.

6. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device

Number of messages

1

7. Save your entries.

Result

© SAP AG Page 90 of 108

Page 91: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 91/108

SAP Best Practices 104 - Materials Management: Configuration Guide

The condition records are created. For output type NEU the system automatically generates anoutput message.

7.1.3 Output Condition Records: Purchasing Outline

AgreementThe purpose of this activity is to create an output condition record for an outline agreement.

Procedure

1. Access the activity using one of the following navigation options:

SAP SAP ECC menu LogisticsMaterials Management  Purchasing Master DataMessages Outline Agreement  Create

Transaction code MN07

2. On the Create Output-Condition records: Purch.Outline Agr. screen, enter output type NEU 

and choose Enter .

3. In the Key Kombination dialog box, select Purchasing Output determination: Document Typeand choose Enter.

4. On the Create Condition records (Outline agreement): Fast Entry screen, enter the followingvalues and choose Enter:

Doc. Type Function Partner Medium Date/Time

MK VN 1 4

WK VN 1 4

LP VN 1 4

LPA VN 1 4

LU VN 1 45. Choose Communication.

6. On the Create Condition records (RFQ): Communication screen, for each document typemake the following entries:

Field name Description Values Comment

Output Device LP01 Insert your own printer  

Number of messages

1

Printimmediately

Select flag if theprintout should be

printed immediatelyand not put into spoolonly

7. Save your entries.

Result

The condition records are created. For output type NEU the system automatically generates anoutput message.

© SAP AG Page 91 of 108

Page 92: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 92/108

SAP Best Practices 104 - Materials Management: Configuration Guide

7.1.4 Output Condition Records: Schedule Agreement

The purpose of this activity is to create an output condition record for a schedule agreement.

Procedure1. Access the activity using one of the following navigation options:

SAP SAP ECC menu LogisticsMaterials Management  Purchasing Master DataMessages Scheduling Agreement Delivery Schedule Create

Transaction code MN10

2. On the Create Output-Condition records: Purch.SchAgrRelease. screen, enter output typeLPET and choose Enter .

3. In the Key Kombination dialog box, select Purchasing Output determination: Document Type and choose Enter.

4. On the Create Condition records (…): Fast Entry screen, enter the following values andchoose Enter :

Doc. Type Function Partner Medium Date/Time

LP VN 1 4

LPA VN 1 4

LU VN 1 4

5. Choose all lines.

6. Choose Communication.

7. On the Create Condition records (…): Communication screen, make the following entries for each output:

Field Description Values Comment

Output Device LP01 Insert your own printer  

Number of messages

1

Printimmediately

Select flag if theprintout should beprinted immediatelyand not put into spoolonly

8. Go to the next entry with button Next Output (shift F7). Enter entries from step before.

9. Save your entries.

10. Repeat steps 1-9 with the following entries:

Message Type

LPH2

LPJ2

LPMA

© SAP AG Page 92 of 108

Page 93: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 93/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Result

The condition records are created. For output type LPET, LPH2, LPJ2, LPMA, the systemautomatically generates an output message.

7.1.5 Output Condition Records: Service Entry SheetThe purpose of this activity is to create an output condition record for a service entry sheet.

Procedure

1. Access the activity using one of the following navigation options:

SAP SAP ECC menu LogisticsMaterials Management  Service Entry Sheet  Environment  Messages Create

Transaction code MN13

2. On the Create Output-Condition records: Purch.Outline Agr. screen, enter output type NEU and choose Enter .

3. In the Key Kombination dialog box, select Purchasing Output determination: Document Type and choose Enter.

4. On the Create Condition records (Entry of Srvc Prfrmd): Fast Entry screen, enter the followingvalues and choose Enter :

Doc. Type Function Partner Medium Date/Time

NB VN 1 4

FO VN 1 4

5. Mark all l ines.

6. Choose Communication.

7. On the Create Condition records (Entry of Srvc Prfrmd): Communication screen, make thefollowing entries:

Field name Description Values Comment

Output Device LP01 Insert your own printer  

Number of messages

1

Printimmediately

Select flag if theprintout should beprinted immediatelyand not put into spoolonly

8. Go to the next entry with button Next Output (shift F7). Enter entries from step before.

9. Save your entries.

Result

The condition records are created. For output type NEU the system automatically generates anoutput message.

© SAP AG Page 93 of 108

Page 94: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 94/108

SAP Best Practices 104 - Materials Management: Configuration Guide

7.1.6 Output Condition Records: Inventory Management

The purpose of this activity is to create an output condition record for Inventory Management.

Procedure

1. Access the activity using the following navigation option:

IMG menu Materials Management  Inventory Management and Physical Inventory  Output DeterminationMaintain Conditions

Transaction code MN21

2. On the Create Output-Condition records: Inventory Managemen. screen, enter output type WA01 and choose Enter .

3. On the Create Condition records (GI Note Vers.1): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WA

Print Version 1

Print Item 1 Printing of documentitem

Medium Messagetransmissionmedium

1

Date/Time Dispatchtime

4

Next Item Line

Doc. Type WAPrint Version 1

Print Item 6 Printing of documentitem

Medium Messagetransmissionmedium

1

Date/Time Dispatchtime

4

Next Item Line

Doc. Type WEPrint Version 1

Print Item 1 Printing of documentitem

Medium Messagetransmissionmedium

1

© SAP AG Page 94 of 108

Page 95: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 95/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Date/Time Dispatchtime

4

4. Choose Communication.

5. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

6. Save your entries.

7. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype

 WA02and choose Enter .

8. On the Create Condition records (GI Note Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WA

Print Version 2

Print Item Printing of  document item

1

Medium Message

transmissionmedium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WA

Print Version 2

Print Item Printing of  document item

6

Medium Messagetransmission

medium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WE

Print Version 2

Print Item Printing of  document item

6

© SAP AG Page 95 of 108

Page 96: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 96/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

9. Choose Communication.

10. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

11. Save your entries.12. Go back to the Create Output-Condition records: Inventory Management screen, enter output

type WA03 and choose Enter .

13. On the Create Condition records (GI Note Vers.3): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WA

Print Version 3

Print Item Printing of  

document item

1

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WA

Print Version 3

Print Item Printing of  document item

6

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WE

Print Version 3

© SAP AG Page 96 of 108

Page 97: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 97/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Print Item Printing of  document item

6

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

14. Choose Communication.

15. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output X select

16. Save your entries.

17. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WE01 and choose Enter .

18. On the Create Condition records (GR Note Vers.1): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WE

Print Version 1Print Item Printing of  

document item1

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WE

Print Version 1

Print Item Printing of  document item

2

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

19. Choose Communication.

© SAP AG Page 97 of 108

Page 98: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 98/108

SAP Best Practices 104 - Materials Management: Configuration Guide

20. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

21. Save your entries.

22. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WE02 and choose Enter .

23. On the Create Condition records (GR Note Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WE

Print Version 2

Print Item Printing of  document item

1

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WE

Print Version 2

Print Item Printing of  document item

2

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

24. Choose Communication.

25. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

© SAP AG Page 98 of 108

Page 99: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 99/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Release after output

X select

26. Save your entries.

27. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WE03 and choose Enter .

28. On the Create Condition records (GR Note Vers.3): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WE

Print Version 3

Print Item Printing of  document item

1

Medium Messagetransmission

medium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WE

Print Version 3

Print Item Printing of  document item

2

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

29. Choose Communication.

30. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

31. Save your entries.

© SAP AG Page 99 of 108

Page 100: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 100/108

SAP Best Practices 104 - Materials Management: Configuration Guide

32. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WF01 and choose Enter .

33. On the Create Condition records (GR Prod. Ord. Vers.1): Fast Entry screen, enter thefollowing values and choose Enter:

Field name Description Values Comment

Trans./EventType

WF

Print Version 1

Print Item Printing of  document item

1

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WF

Print Version 1

Print Item Printing of  document item

2

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

34. Choose Communication.

35. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

36. Save your entries.

37. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WF02 and choose Enter .

38. On the Create Condition records (GR Prod. Ord. Vers.2): Fast Entry screen, enter thefollowing values and choose Enter:

Field name Description Values Comment

Trans./EventType

WF

© SAP AG Page 100 of 108

Page 101: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 101/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Print Version 2

Print Item Printing of  document item

1

Medium Messagetransmission

medium

1

Date/Time Dispatch time 4

Next Item Line

Doc. Type WF

Print Version 2

Print Item Printing of  document item

2

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

39. Choose Communication.

40. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

41. Save your entries.

42. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WLB1 and choose Enter .

43. On the Create Condition records (GI Note RP. Vers.1): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WA

Print Version 1

Print Item Printing of documentitem

3

D/C indic Debit/Credit Indicator H

Medium Messagetransmissionmedium

1

© SAP AG Page 101 of 108

Page 102: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 102/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Date/Time Dispatch time 4

44. Choose Communication.

45. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

46. Save your entries.

47. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WLB2 and choose Enter .

48. On the Create Condition records (GI Note RP. Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WA

Print Version 2

Print Item Printing of documentitem

3

D/C indic Debit/Credit Indicator H

Medium Message

transmissionmedium

1

Date/Time Dispatch time 4

49. Choose Communication.

50. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

51. Save your entries.

© SAP AG Page 102 of 108

Page 103: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 103/108

SAP Best Practices 104 - Materials Management: Configuration Guide

52. Go back to the Create Output-Condition records: Inventory Management screen, enter outputtype WLB3 and choose Enter .

53. On the Create Condition records (GI Note RP. Vers.2): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description Values Comment

Trans./EventType

WA

Print Version 3

Print Item Printing of documentitem

3

D/C indic Debit/Credit Indicator H

Medium Messagetransmissionmedium

1

Date/Time Dispatch time 4

54. Choose Communication.

55. On the Create Condition records (RFQ): Communication screen, make the following entries:

Field name Description Values Comment

Output Device LP01

Number of messages

1

Printimmediately

X select

Release after output

X select

56. Save your entries.

Result

The condition records are created. For the following output types, the output messages aregenerated automatically: WA01, WA02, WA03, WE01, WE02, WE03, WF01, WF02, WLB1,WLB2, WLB3.

7.1.7 Output Condition Record: Invoice Verification

The purpose of this activity is to create an output condition record for invoice verification.

Procedure

1. Access the activity using the following navigation option:

SAP SAP ECC menuInvoice

MR00 → Environment → Messages→Condition

Records→Create

Transaction code MRM1

© SAP AG Page 103 of 108

Page 104: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 104/108

SAP Best Practices 104 - Materials Management: Configuration Guide

2. On the Create Output-Condition records: Invoice Verification screen, enter output type EINK  

and choose Enter .

3. Choose Key combination and select CoCode, Blocking Reason: Price in the Key Kombination dialog box. Choose Enter.

4. On the Create Condition records (Mail to Purchasing): Fast Entry screen, enter the following

values and choose Enter:Field name Description User Action/ Values Comment

Company Code 1000

BlockR Pr. Blockingreason:price

select

Funct Partner  function

ME

Medium Messagetransmissionmedium

7

Date/time Dispatchtime

4

Language JA

5. Save your entries.

6. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype MLPP.

7. Choose Key combination and select CoCde, Choose Enter.

8. On the Create Condition records (Mail Price Deviation): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description User Action/ Values CommentCompany Code 1000

Funct Partner  function

ME

Medium Messagetransmissionmedium

7

Date/time Dispatchtime

4

Language JA

9. Save your entries.

10. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype REKL.

11. Choose Key combination and select CoCde, Choose Enter.

12. On the Create Condition records (Complaint): Fast Entry screen, enter the following valuesand choose Enter:

Field name Description User Action/ Values Comment

© SAP AG Page 104 of 108

Page 105: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 105/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Company Code 1000

Funct Partner  function

PI

Medium Messagetransmission

medium

1

Date/time Dispatchtime

3

Language JA

13. Choose Communication.

14. On the Create Condition records (Complaint): Communication screen, make the followingentries:

Field name Description Values Comment

Output Device LP01

15. Save your entries.16. Go back to the Create Output-Condition records: Invoice Verification screen, enter output

type KONS.

17. Choose Key combination and select CoCde, Choose Enter.

18. On the Create Condition records (Consignment): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description User Action/ Values Comment

Company Code 1000

Funct Partner  function

VN

Medium Messagetransmissionmedium

1

Date/time Dispatchtime

4

Language JA

19. Choose Communication.

20. On the Create Condition records (Consignment): Communication screen, make the followingentries:

Field name Description Values Comment

Output Device LP01

21. Save your entries.

© SAP AG Page 105 of 108

Page 106: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 106/108

SAP Best Practices 104 - Materials Management: Configuration Guide

22. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype RAP.

23. Choose Key combination and select CoCde, Choose Enter.

24. On the Create Condition records (New Value Method): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description User Action/ Values Comment

Company Code 1000

Funct Partner  function

VN

Medium Messagetransmissionmedium

1

Date/time Dispatchtime

4

Language JA

25. Choose Communication.

26. On the Create Condition records (New Value Method): Communication screen, make thefollowing entries:

Field name Description Values Comment

Output Device LP01

27. Save your entries.

28. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype RAP6.

29. Choose Key combination and select CoCde, Choose Enter.

30. On the Create Condition records (New Value Method): Fast Entry screen, enter the followingvalues and choose Enter:

Field name Description User Action/ Values Comment

Company Code 1000

Funct Partner  function

VN

Medium Messagetransmissionmedium

1

Date/time Dispatchtime

4

Language JA

31. Choose Communication.

32. On the Create Condition records (New Valuation EDI): Communication screen, make thefollowing entries:

Field name Description Values Comment

Output Device LP01

© SAP AG Page 106 of 108

Page 107: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 107/108

SAP Best Practices 104 - Materials Management: Configuration Guide

33. Save your entries.

34. Go back to the Create Output-Condition records: Invoice Verification screen, enter outputtype ERS.

35. Choose Key combination and select CoCde, Choose Enter.

36. On the Create Condition records (ERS Procedure): Fast Entry screen, enter the following

values and choose Enter:

Field name Description User Action/ Values Comment

Company Code 1000

Funct Partner  function

VN

Medium Messagetransmissionmedium

1

Date/time Dispatchtime

4

Language JA

37. Choose Communication.

38. On the Create Condition records (ERS Procedure): Communication screen, make thefollowing entries:

Field name Description Values Comment

Output Device LOCLU

Printimmediately

select

39. Save your entries.

Result

The condition records are created. For the following output types, the output messages aregenerated automatically: EINK, MLPP, REKL, KONS, RAP, RAP6, ERS.

8 Individual BC Sets/ Manual Steps

8.1 Defining Parallel Processing in MRP

UseThe purpose of this activity is to define parallel process in MRP.

Procedure

1. Access the activity using one of the following navigation options:

© SAP AG Page 107 of 108

Page 108: Engineering Change Management.doc

7/28/2019 Engineering Change Management.doc

http://slidepdf.com/reader/full/engineering-change-managementdoc 108/108

SAP Best Practices 104 - Materials Management: Configuration Guide

Transaction code SPRO

IMG menu Materials Management → Consumption-Based Planning → 

Define Parallel Processing in MRP 

2. On the Change View ”Destinations for Parallel Processing“: Overview screen, choose New Entries.

3. On the screen New entries: Overview of Added Entries, make the following entries:

Field name Value

Destinat. for parallel processing for example, <PWDF0505_SD7_22> 

No. of sessions 1

The value of Destinat. for parallel process must include a different value in a differentserver, if this value is determined by other Customizing steps. In this project, choosePWDF0505_SD7_22. You can use the input help to select the corresponding value.

4. Choose Save.

5. Choose Back . Result

You have made the required settings for parallel processing for MRP.