Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
kiloWatthour (kWh) Value of savings @ Rs. . / kWh666
Lighting666666 .1 1 1 1 1 1 1 1 1
Air-conditioner 1 1 1 1 1 1 .66666666
Canteen Heating 66666 .6666666
Winter Heating 666666 .6666666
Pumping 66666 .666666
Total 666666 .66666666
Summary of annual savings f
rom variousEEMs
uaranteed savings - 788143 kWh / year
7/29/2019 Energy efficiency in indian buildings
2/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
Lightin
. %6666Canteen heatin
. %666
Winter heatin
. %1 1 1 1
Pumpin
. %666
AC
. %1 1 1 1
Percentage contribution to savings byvarious EEMs
7/29/2019 Energy efficiency in indian buildings
3/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
EEM # 1 - Lighting
Estimated contribution to gross savings 38.26%
Proposed improvements are
Replace existing fluorescent tube lights withenergy efficient T-5 fluorescent tube lights andelectronic ballast
Replace GLS lamps with CFL / T-5 FTL withelectronic ballast
Replace sodium vapour / metal halide streetlights with T-5 FTL-based weatherproof streetlights
7/29/2019 Energy efficiency in indian buildings
4/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
EEM # 2 - Air-conditioning
Estimated contribution to gross savings 37.51%
Proposed improvements are
Install occupancy sensor above work-table, toensure that AC operates only when the space isoccupied.
Integrate a wireless thermostat in the samesensor which helps in controlling the workplacetemperature (instead of the regular ACthermostat which measures the return-air pathtemperature)
Have hand-held field programming devices for
7/29/2019 Energy efficiency in indian buildings
5/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
EEM # 3 - Canteen Heating
Estimated contribution to gross savings 4.21%
Proposed improvement is
Replace existing electrical storage geysers withenergy-efficient LPG-fired on-line water heaters
Cost of additional LPG expense to be borne by the
ESCO
7/29/2019 Energy efficiency in indian buildings
6/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
EEM # 4 - Winter Heating
Estimated contribution to gross savings 18.54%
Proposed improvements are
In air-conditioned space, use the occupancysensor and wireless thermostat to regulate theusage of the heaters within a set temperature
range and at the time of occupancy only In non-air-conditioned space, replace existing
electrical blowers with more efficient (hencelower capacity) blowers / quartz heaters withrotary operation to ensure proper heat circulation
7/29/2019 Energy efficiency in indian buildings
7/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
EEM # 5 - Water Pumping
Estimated contribution to gross savings 1.48%
Proposed improvement is
Replace one 10 HP water pump each in ShramShakti Bhavan and Transport Bhavan premises,with efficient submersible pumps
All other pumps have been installed after 2002,and hence, need not be replaced now.
7/29/2019 Energy efficiency in indian buildings
8/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
Project schedule at a glance
Ends
-Jul
66 -A
ug
6-Aug
66
-Aug
66
-Aug
11 -S
ep
6-Sep
66
-Sep
66
-Sep
11 -O
ct
6-Oct
6-Oct
11
-Oct
66
-Oct
11 -N
ov
6-Nov
66
-Nov
66
-Nov
66 -D
ec
6
Starts
-Jul
66
-
Aug
6 -Aug
6
-Aug
66
-Aug
66
-Aug
66
-
Sep
6
-Sep
66
-Sep
66
-Sep
66
-
Oct
6
-Oct
66
-Oct
66
-Oct
66
-Oct
66
-
Nov
6
-Nov
66
-Nov
66
-Nov
66
Week
6 6 6 6 6 6 6 6 6 66
66
66
66
66
66
66
66
66
66
ASASASASASASASASASAS
ASAS
Sl.No.
Activity
6 Receipt of approval from CPWD
6 Obtaining permissions
6 Submittals of plans & specifications
6 Equipment / material acquisition
6Mobilization
6 Final inspecition
6 Installation at site
6 Clean up
66Training
11 Notice of substantial completion
66Post-installation submittals
6 Start-up / testing
A - Actual
S - Scheduled
7/29/2019 Energy efficiency in indian buildings
9/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
Case Study: DISCOM model, AECo,Ahmedabad
Total installation base 70,000 Nos. T-5retrofit FTL (and stillgrowing)
Savings in VA 4.2 MVA
Participants Individual
consumers Current status Ongoing
7/29/2019 Energy efficiency in indian buildings
10/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
The DISCOM model - advantage utilities
Reduced peak demand load on account of energy
savings.
Improved power factor, enhanced systemcapacity and lower T&D losses - all at zeroinvestment.
60 kVA reduced load for every 1000 unitsinstalled.
Additional revenue by way of collection charges.
To pay money to AEL only if the money iscollected from consumer.
7/29/2019 Energy efficiency in indian buildings
11/11
Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project
The DISCOM model - advantage consumers
Reduced energy bill.
Monthly installments can be paid from savings.
Easy retrofit installation in existing fittings - nochange in wiring
Increased and better quality of light.
Model available to cater to new fittingrequirement