    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    kiloWatthour (kWh) Value of savings @ Rs. . / kWh666

    Lighting666666 .1 1 1 1 1 1 1 1 1

    Air-conditioner 1 1 1 1 1 1 .66666666

    Canteen Heating 66666 .6666666

    Winter Heating 666666 .6666666

    Pumping 66666 .666666

    Total 666666 .66666666

    Summary of annual savings f

    rom variousEEMs

    uaranteed savings - 788143 kWh / year

  • 7/29/2019 Energy efficiency in indian buildings

    2/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    Lightin

    . %6666Canteen heatin

    . %666

    Winter heatin

    . %1 1 1 1

    Pumpin

    . %666

    AC

    . %1 1 1 1

    Percentage contribution to savings byvarious EEMs

  • 7/29/2019 Energy efficiency in indian buildings

    3/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    EEM # 1 - Lighting

    Estimated contribution to gross savings 38.26%

    Proposed improvements are

    Replace existing fluorescent tube lights withenergy efficient T-5 fluorescent tube lights andelectronic ballast

    Replace GLS lamps with CFL / T-5 FTL withelectronic ballast

    Replace sodium vapour / metal halide streetlights with T-5 FTL-based weatherproof streetlights

  • 7/29/2019 Energy efficiency in indian buildings

    4/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    EEM # 2 - Air-conditioning

    Estimated contribution to gross savings 37.51%

    Proposed improvements are

    Install occupancy sensor above work-table, toensure that AC operates only when the space isoccupied.

    Integrate a wireless thermostat in the samesensor which helps in controlling the workplacetemperature (instead of the regular ACthermostat which measures the return-air pathtemperature)

    Have hand-held field programming devices for

  • 7/29/2019 Energy efficiency in indian buildings

    5/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    EEM # 3 - Canteen Heating

    Estimated contribution to gross savings 4.21%

    Proposed improvement is

    Replace existing electrical storage geysers withenergy-efficient LPG-fired on-line water heaters

    Cost of additional LPG expense to be borne by the

    ESCO

  • 7/29/2019 Energy efficiency in indian buildings

    6/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    EEM # 4 - Winter Heating

    Estimated contribution to gross savings 18.54%

    Proposed improvements are

    In air-conditioned space, use the occupancysensor and wireless thermostat to regulate theusage of the heaters within a set temperature

    range and at the time of occupancy only In non-air-conditioned space, replace existing

    electrical blowers with more efficient (hencelower capacity) blowers / quartz heaters withrotary operation to ensure proper heat circulation

  • 7/29/2019 Energy efficiency in indian buildings

    7/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    EEM # 5 - Water Pumping

    Estimated contribution to gross savings 1.48%

    Proposed improvement is

    Replace one 10 HP water pump each in ShramShakti Bhavan and Transport Bhavan premises,with efficient submersible pumps

    All other pumps have been installed after 2002,and hence, need not be replaced now.

  • 7/29/2019 Energy efficiency in indian buildings

    8/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    Project schedule at a glance

    Ends

    -Jul

    66 -A

    ug

    6-Aug

    66

    -Aug

    66

    -Aug

    11 -S

    ep

    6-Sep

    66

    -Sep

    66

    -Sep

    11 -O

    ct

    6-Oct

    6-Oct

    11

    -Oct

    66

    -Oct

    11 -N

    ov

    6-Nov

    66

    -Nov

    66

    -Nov

    66 -D

    ec

    6

    Starts

    -Jul

    66

    -

    Aug

    6 -Aug

    6

    -Aug

    66

    -Aug

    66

    -Aug

    66

    -

    Sep

    6

    -Sep

    66

    -Sep

    66

    -Sep

    66

    -

    Oct

    6

    -Oct

    66

    -Oct

    66

    -Oct

    66

    -Oct

    66

    -

    Nov

    6

    -Nov

    66

    -Nov

    66

    -Nov

    66

    Week

    6 6 6 6 6 6 6 6 6 66

    66

    66

    66

    66

    66

    66

    66

    66

    66

    ASASASASASASASASASAS

    ASAS

    Sl.No.

    Activity

    6 Receipt of approval from CPWD

    6 Obtaining permissions

    6 Submittals of plans & specifications

    6 Equipment / material acquisition

    6Mobilization

    6 Final inspecition

    6 Installation at site

    6 Clean up

    66Training

    11 Notice of substantial completion

    66Post-installation submittals

    6 Start-up / testing

    A - Actual

    S - Scheduled

  • 7/29/2019 Energy efficiency in indian buildings

    9/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    Case Study: DISCOM model, AECo,Ahmedabad

    Total installation base 70,000 Nos. T-5retrofit FTL (and stillgrowing)

    Savings in VA 4.2 MVA

    Participants Individual

    consumers Current status Ongoing

  • 7/29/2019 Energy efficiency in indian buildings

    10/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    The DISCOM model - advantage utilities

    Reduced peak demand load on account of energy

    savings.

    Improved power factor, enhanced systemcapacity and lower T&D losses - all at zeroinvestment.

    60 kVA reduced load for every 1000 unitsinstalled.

    Additional revenue by way of collection charges.

    To pay money to AEL only if the money iscollected from consumer.

  • 7/29/2019 Energy efficiency in indian buildings

    11/11

    Shram Shakti Bhavan / TransportBhavanEnergy Services Performance Contracting Project

    The DISCOM model - advantage consumers

    Reduced energy bill.

    Monthly installments can be paid from savings.

    Easy retrofit installation in existing fittings - nochange in wiring

    Increased and better quality of light.

    Model available to cater to new fittingrequirement