    Ing. Jaime Oscar Gonzalez 1

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    2/43

    Ing. Jaime Oscar Gonzalez 2

    En nuestro pas no existe la culturade implementar programas de

    seguridad, medio ambiente y saludocupacional y hasta la fecha soloalgunas empresas de manufactura,petroleras y multinacionales, tienenprogramas que protegen tanto a susempleados como a su propiedad.

    IMPORTANCIA DE UN PROGRAMA DE

    SEGURIDAD PARA CONTRATISTAS

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    3/43

    Ing. Jaime Oscar Gonzalez 3

    Cada empresa tiene sus propias

    caracteristicas. Existen reglas, politicas, procedimientos,

    instrucciones, misin, visin y toda unacultura, que la mayora de los empleados

    del contratista probablemente no conozcan,y ni decir de los sub-contratistas de estos. Esta modalidad de los contratistas, si no

    tiene el debido control puede salir muycostosa.

    IMPORTANCIA DE UN PROGRAMA DE

    SEGURIDAD PARA CONTRATISTAS

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    4/43

    Ing. Jaime Oscar Gonzalez 4

    Todos tenemos diferentes criterios y conceptos sobre laseguridad, sin embargo normalmentetodos consideramos

    que algo es seguro si creemos que los riesgos asociados sonaceptablesyestn previamente determinados.

    Uno de los mayores problemas est en que en cualquiersituacin cada individuo evala los riesgos de diferentemanera. La base que usa cada persona para medir laaceptabilidad del riesgo, y en consecuencia la seguridad o

    inseguridad de cada situacin a la que se enfrenta, puedeestar asentada en unos conocimientos tcnicos y cientficosen unos casos o en experiencias personales en otros.

    IMPORTANCIA DE UN

    PROGRAMA DE SEGURIDAD

    PARA CONTRATISTAS

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    5/43

    Ing. Jaime Oscar Gonzalez 5

    SISTEMA DE PERMISOS DE

    TRABAJO Las operaciones de alto riesgo deben ser

    controladas a travs de la aplicacin deesfuerzos especiales tales como permisos y

    procedimientos especiales.

    El Sistema de Permisos de Trabajo estdiseado para controlar los riesgos y peligros atravs del uso del sistema de permisos

    especializado de trabajo. Estos riesgos podranocurrir durante operaciones extremadamentepeligrosas, tales como: Trabajo en altura,espacios confinados y otros.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    6/43

    Ing. Jaime Oscar Gonzalez 6

    SISTEMA DE PERMISOS DE

    TRABAJOx Toda persona que est realizando un

    trabajo de alto riesgo en lasinstalaciones debe estar debidamente

    entrenado y conocer cuales son losriesgos de sus tareas para as tomarlas precauciones necesarias. Noobstante, para asegurar que losempleados y contratistas estnhaciendo los trabajos especiales en

    condiciones seguras, debe apareceruna lista de chequeo detrs de cadapermiso de trabajo que la personaautorizada deber verificar antes deaprobar la realizacin del trabajo.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    7/43

    Ing. Jaime Oscar Gonzalez 7

    PORQUE TENER REGLAS Y PERMISOS

    DE TRABAJO? Existe alguna actividadque sea completamentesegura?... Realmente NO,no creo exista NADA queofrezca completa seguridad.Actividades y situacionesque parecen muy segurasencierran ciertos riesgos

    que bajo circunstanciassimples como veremos acontinuacin, o bajocircunstancias extremas,como un terremoto o unincendio, pudierantransformarse en peligrosas.Por lo tanto, cualquier

    producto, actividad oprocedimiento, por muyseguro que parezca, puedefallar.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    8/43

    Ing. Jaime Oscar Gonzalez 8

    Diagrama % de Accidente Segn laRama de Actividad

    27.62

    0.1017.45

    8.24

    40.46

    6.13

    Manufacturera Agroindustria Construccion

    Comercio Transporte No Especifica

    Estadsticasdel Instituto Dominicano de Seguros Sociales (IDSS)

    PORQUE TENER REGLAS Y PERMISOS

    DE TRABAJO?

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    9/43

    Ing. Jaime Oscar Gonzalez 9

    PROCEDIMIENTOAUTOEVALUACION PARA ACTUAR

    CON SEGURIDADPara iniciar cualquier trabajo, tarea oactividad.EVALUE el Riesgo o peligro!

    ESTUDIE como reducir el riesgo o peligro!CONTROLE el riesgo o peligro!COMUNIQUE los requerimientos

    las personas deben saber de qu son

    responsables de hacerPROCEDA debidamente y asegure una

    actividad segura!

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    10/43

    Ing. Jaime Oscar Gonzalez 10

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    11/43

    Ing. Jaime Oscar Gonzalez 11

    Propsito del Permiso de

    TrabajoEl objetivo del sistema es

    asegurar:

    La identificacin de

    todos los riesgospotenciales y de alto

    riesgo antes de iniciar

    actividades no

    rutinarias,

    El establecimientooportuno de los

    controles apropiados, y

    El mantenimiento de los

    controles en la ejecucin

    del trabajo.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    12/43

    Ing. Jaime Oscar Gonzalez 12

    Propsito del Permiso deTrabajo

    Proteger a las personas Empleados Personal Contratistas

    vecinos Proteger instalaciones

    Asegurar la continuidad del negocio.

    Proteger el ambiente

    Requerimientos legales y de otras regulaciones Asegurar la autorizacin correcta de trabajo no

    rutinario Ayuda a identificar las precauciones

    necesarias.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    13/43

    Ing. Jaime Oscar Gonzalez 13

    Propsito del Permiso deTrabajo

    Indicar a los operarios en el trabajo acerca de: Riesgos asociados Precauciones requeridas

    Indicar a los operadores y empleados del sitio acercade: La no rutina y los posibles peligros asociados en el

    trabajo.

    Nombrar gente responsable para asegurar que: Los contratistas siguen las condiciones de

    seguridad establecidas Se cumplen las especificaciones de seguridad de

    la empresa y de las leyes locales.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    14/43

    Ing. Jaime Oscar Gonzalez 14

    Que son los Permisos deTrabajo?

    Los permisos de trabajo son documentos que definen el

    trabajo a ser realizado, los riesgos envueltos y las

    precauciones a ser tomadas. En estos permisos se estableceque los riesgos han sido tomados en consideracin y que se

    tomaron las precauciones apropiadas.

    El Permiso de Trabajo no hace que el trabajo

    sea seguro.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    15/43

    15

    TrabajoTrabajo en Alturaen Altura Trabajo con ElectricidadTrabajo con Electricidad Trabajo en fro yTrabajo en fro y

    calientecaliente

    EN TRABAJOS RIESGOSOS

    Donde se usa un Permiso

    de Trabajo?

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    16/43

    16

    ExcavacionesExcavaciones oo DemolicionesDemoliciones Control de TrficoControl de Trfico Espacios ConfinadosEspacios Confinados

    TRABAJOS RIESGOSOS

    Donde se usa un Permiso

    de Trabajo?

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    17/43

    Ing. Jaime Oscar Gonzalez 17

    Permiso de Trabajo -

    Documentos

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    18/43

    Ing. Jaime Oscar Gonzalez 18

    Procedimiento - Tres

    fases Preparacin del trabajo Definir el trabajo (detalles, ubicacin exacta,

    herramientas) Declaracin del Mtodo Definicin de medidas preventivas Definicin de procedimientos de recuperacin

    Ejecucin del trabajo Firma diaria de verificacin al inicio y final

    Asegurar que las medidas preventivas an seencuentran activas Hoja de continuacin

    Terminacin del trabajo Devolucin y aceptacin del trabajo dado por

    completado

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    19/43

    Ing. Jaime Oscar Gonzalez 19

    Permiso de Trabajo y Hojade Continuacin

    Shell Oil Products Latin America PERMIT TO WORK No. PTW ... .. .. .. .. .. .. .. .

    Retail

    Permit Applicant: Name: ......... Contractor Company: ......Funct ion: ..... .. ..... . .. . .. . Tools to be used: ......

    Job to be Done: ............ ........

    ..................... .........................

    Service Station: ................. Exact Location: .......................Date: ...... Estimated Duration: . hours .. days Number of people on the job: ......

    The "administrator of the site" has been informed of the scope of work to be carried out under this permit.

    Site administrator signature .....................................................................................................................................

    Certificates Required for this Permit Yes / No Safety Precautions to be Taken

    1. Clearance Certificate (see below) Personal: Yes / No Workplace: Yes / No

    2. Hot Work Certificate safety helmet temporary demarcation

    3 . Co nf in ed S pa ce Ce rt if ic at e s af et y s pe ct ac le s c on es

    4. Excavation Certificate safety goggles barricades

    5. Electrical Certificate full face visor warning signs

    6. Work at height Certificate dust mask road closure

    7. Traffic control Certificate light fume mask lighting

    Clearance Certificate b re at hin g a pp ar at us f ire ex ti ng ui sh er AB C t yp e

    Equipment is isolated: Yes / No Notes - self contained powder cannon

    by spades or blinds . - compressed air line tags and locks (elec.panels)

    by physical separation . - air line with blower by closed valves . hearing protection

    from motive power . leather gloves Possible Hazards:

    Equipment has been: Yes / No neoprene gloves .

    depressurized . safety shoes .

    drained . rubber boots .

    flushed with water . safety harness .

    blown with air/nitrogen . fluorescent vest .

    steamed . antistatic bracelet .

    All other required certificates have been issued Other Precautions:

    I have personally checked the equipment, and confirm ............

    th at it is is olat ed a s def ined abov e. . . .. ... ... ..

    Signed ASI Date ............

    ........ Use the back of the permit to add other necessary precautions

    I certify that I have fully considered the implications of the work in line

    with the responsibilities given overleaf and confirm that I am authorized to

    issue this Permit To Work and that the above precautions are adequate for

    the work to be carried out provided they are established and maintained.

    requirements and responsibilities. Signed ASI Date

    Signed Permit Applicant Date.......

    .... From

    Date Time Date Time Sign Date

    Permit Validity: The work may be undertaken between the

    times specified here, extensions beyond this time must

    be re-authorized.

    Daily sign on Daily sign off

    Date T ime Clearance to Start (Permit Appli cant) Cer ti fy (Permit Appli cant) T ime Site in safe condi tion (Permi t Appli cant)

    Hand back

    I certify that the work has been completed* and the site left in a safe condition. (*If not completed, describe reason)

    Signed Permit Applicant Date Accepted by ASI Date

    ........................... ...........................

    To

    I certify that I am aware of my responsibilities and have

    read, understood, and will establish and maintain the

    precautions detailed above. I shall ensure that all persons

    under my control are also aware of the safety

    Yes

    Shell Oil Products Latin America CONTINUATION SHEET

    Retail

    PTW number Continuation Sheet for daily sign on and sign off

    Daily sign on Daily sign off

    Date Time Clearance to Start (Permit Applicant/ASI) Certify (Permit Applicant) Time Site in safe condition (Permit Applicant)

    The shadow spaces are for the validation signature of the ASI

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    20/43

    Ing. Jaime Oscar Gonzalez 20

    Declaracin del Mtodo

    Tarea Ubicacin

    Herramientas /Equipo EPP Mtodo de trabajo

    y secuencia deactividades Peligros posibles

    Precauciones parareducir peligros

    Aislamientos Disposicin de

    excedentes omaterialescontaminados

    Autoridadesexternas

    Firmas

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    21/43

    Ing. Jaime Oscar Gonzalez 21

    Todos los permisos, certificados, letrerosy dems deben estar a la vista de todos.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    22/43

    Ing. Jaime Oscar Gonzalez 22

    Certificado de Electricidad

    Trabajoelctrico

    Aislamiento Mantenimiento

    no elctrico

    Prevencin dearranqueinadvertido

    Shell Oil Products Latin America ELECTRICAL CERTIFICATE

    Retail

    Certifies that equipment to be worked on has been isolated and that measures have been taken to

    prevent reconnection. For scope refer to the PtW Guideline.

    Valid only when attached to PTW number

    Equipment to be Worked on ...

    .....

    Exact Location

    Inadvertent Starting Prevention Electrical Isolation

    (non-electrical maintenance) (electrical work)

    I have personally checked that starting the electric I have checked that the primary side of the electric power

    driver is prevented by (in descending order of supply to the equipment has been isolated and checked

    preference) dead by (in descending order of preference)

    padlocking the starter / isolator switch in the OFF Position racking out the circuit breaker / contactor (withdrawal

    type) and padlocking the busbar shutter

    removing the fuse

    padlocking the circuit breaker / isolator switch in the OFF position

    switching OFF the (Miniature) Circuit Breaker(s)

    removing the fuse in the primary circuit

    switching OFF the socket point AND REMOVING THE PLUG

    switching OFF the (Miniature) Circuit Breaker(s)

    The warning sign The warning sign

    "CAUTION: WORK IN PROGRESS. DO NOT OPERATE!" "CAUTION: WORK IN PROGRESS. DO NOT OPERATE!"

    is also displayed at the above ticked location is also displayed at the above ticked location

    Signature:.. Signature:..

    Date:..... Date:.....

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    23/43

    Ing. Jaime Oscar Gonzalez 23

    Descalzo Dentro del agua Escalera metalica Sin guantes Mojado Posicion inadecuada Sin casco

    Descubre losriesgos y

    peligros

    C ifi d d b j

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    24/43

    Ing. Jaime Oscar Gonzalez 24

    Certificado de trabajo enaltura Shell Oil Products Latin America WORK AT HEIGHT CERTIFICATERetailCertifies that all activities at height (defined as above 1.50 m.) are carried out taking into considerations

    all precautions to avoid fallings

    Valid only when attached to PTW number

    All items to be checked All items to be checked

    Scaffolding Ladders

    Firm foundation Firm foundation

    Surface leveled Surface leveled

    Bracing and connections in good conditions Adequate inclination (65-75 degrees)

    Adequate platforms Properly fastened at the top.

    Handrail Side rails extend at least 0.90m above the upper

    Lifeline landing surface

    A person is 'Footing' the ladder to ensure it does not slip.

    Control and Handover process Adequate distance between steps (0.25-0.30m)

    Log book available at working area Adequate distance between bars (0.28m internal as min)

    Status tags available Bar and steps in good conditions

    Restricted accessOthers Keep areas clear around top and bottom

    Life jackets (if working above water) needs JHA

    Name of responsible supervisor: Company:....

    Exact location...................

    ........

    Other Precautions to be taken

    I have checked the working area and certify that the activities proposed under Permit to Work Number ..............

    dated can be carried out in a safely manner.

    Signature:..

    Situation Sketch / Indication of Hazards

    Notes

    Not for suspended scaffolding, for this type a JHA will be required

    Wood and aluminum scaffolds are forbidden. (fire vulnerability). Working at Zone 1 requires PTW

    If the total length of the climb on a fixed ladder equals or exceeds 7.30m, the ladder must be equipped with ladder safety devices

    or self retracting lifelines and rest platforms at intervals not to exceed 45.70m.

    Sobre 1.50 m. Todos los tems deben

    ser chequeados Andamios

    Construccin Proceso de entrega

    Escaleras Instalacin Condicin Acceso

    Cinturn de Seguridad

    Precauciones aconsiderar

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    25/43

    Ing. Jaime Oscar Gonzalez 25

    Andamios y Escaleras

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    26/43

    Ing. Jaime Oscar Gonzalez 26

    RIESGOS SIMILARES?

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    27/43

    Ing. Jaime Oscar Gonzalez 27

    SEGURIDAD!

    C tifi d d T b j F

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    28/43

    Ing. Jaime Oscar Gonzalez 28

    Certificado de Trabajo en Froy Caliene

    Gas tester Chequeo de

    seguridad Espacios confinados Extinguidores Peligros

    predominantes

    Shell Oil Products Latin America HOT WORK

    Retail CERTIFICATE

    To be used for work involving actual or potential sources of ignition, including welding, flame cutting,

    spark-producing tools, non-intrinsically safe tools.

    Valid only when attached to PTW number

    Name of Gas Tester:........ Company:.............

    Exact location of Test:................

    ......

    Date of Test: Time of Test:

    Safety Checklist Yes / No

    Workplace checked for absence of combustible material

    Sewers and drains near workplace are free of hydrocarbons

    Sewers and drains near workplace are covered against sparks

    Fire extinguishers placed for easy use

    Other checks for prevailing hazards .

    .

    Required gas test frequency: every .. hours* / once only*

    *delete as appropriate

    GAS TEST - Initial Result Yes / No Date Time

    Gas test taken and found satisfactory (not more than 1% LEL)

    Gas test meter used: Make: .

    Model: Signature:..

    Date last tested / calibrated: Gas Tester

    GAS TEST - Subsequent Checks

    Date

    Time

    Gas Meter Reading

    Checked by (initials)

    Date

    Time

    Gas Meter Reading

    Checked by (initials)

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    29/43

    Ing. Jaime Oscar Gonzalez 29

    Trabajo en fro y caliente

    Trabajo en froTrabajo en fro Uso de herramientas

    para construccin,

    desmantelamiento ylimpieza que noproducen chispa.

    Perforacin, golpear ycortar donde las

    herramientas y el trabajose mantienen debajo delos 100 gradoscentgrados.

    Trabajo enTrabajo encalientecaliente

    Soldadura, uso de llamao arco elctrico.

    Equipo que puedeproducir calor, llama ochispa

    Picar, perforar,remachar, chorro dearena, etc...

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    30/43

    Ing. Jaime Oscar Gonzalez 30

    Peligros de trabajo encaliente

    Luz brillante Calor (chispas, metal caliente, etc...)

    Humos txicos Peligros elctricos Cilindros de gas El soldador est limitado a saberlo que

    est sucediendo alrededor de l.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    31/43

    Ing. Jaime Oscar Gonzalez 31

    Y ENTONCES?ALGUIEN ME LO EXPLICA?

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    32/43

    Ing. Jaime Oscar Gonzalez 32

    Certificado para trabajo

    espacios confinados

    Regulaciones Aparato de respiracin Aptitud para el trabajo

    Gas test Txicidad Oxgeno Flamabilidad

    Lista de verificacin

    Shell Oil Products Latin America CONFINED SPACERetail CERTIFICATE

    Certifies that the atmosphere is safe for breathing and that breathing apparatus is not necessary. Ifapparatus is necessary, a specific JHA must be done and this one must be signed by a HSSE advisor whois certificated as ASI too.Emergency telephones numbers must be available at all times.Fill the checklist provided in the PtW System Guideline before commencing (part if this spreadsheet)

    Valid only when attached to PTW number

    All persons involved agree on the communication (inside with outside) that will be maintained through the work:

    ..................................................................................................................................................................

    ..................................................................................................................................................................

    Do the persons invo lved in the work have a medica l certi fica te . Yes No

    Does the certificate fulfill the local legal requirements. Yes No NA

    To be valid, the medical certificate can not be older than 12 months

    Name of Gas Tester: Company:....Exact location of Test:......................................................................

    Date of Test: Time of Test:

    INITIAL GAS TEST - Toxic Gases

    The space was personally tested by me for the gases below with the following results:Gas n ame Tes t metho d/ e qu ip me nt C on ce nt ra ti on fou nd * OEL .. . .. ..

    .. . .. ..

    .. . .. ..

    .. . .. ..

    *Concentration to be < 50% of OEL Signature:..Gas Tester

    INITIAL GAS TEST - Oxygen Concentration

    The space was personally tested by me and found to contain not less than 20% (volume) and not more than21% volume of oxygen.

    Gas test meter used: Make: .Model: Signature:..

    Date last tested / calibrated: Gas Tester

    INITIAL GAS TEST - Flammability Yes / No Date Time

    Gas test taken and found satisfactory

    (not more than 1% LEL)Gas test meter used: Make: .

    Model: Signature:..Date last tested / calibrated: Gas Tester

    GAS TESTS - Subsequent Checks Required gas test frequency: every .. hours* / once only**delete as appropriate

    Oxygen Flammabil ity

    20

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    33/43

    Ing. Jaime Oscar Gonzalez 33

    n ra a a espac osconfinadosQu es un espacio confinado?

    EjemplosEjemplos Tanques de producto Depsitos de agua

    Rejillas Drenajes Tanques de tren Camin tanque

    Fosas de lubricacin ysus drenajes Separadores de grasa

    CaractersticasCaractersticas Espacio parcial o

    totalmente cerrado.

    Sobre o bajo nivel detierra o cubierta Riesgo de deficiencia de

    oxgeno Riesgo de polvos o

    gases inflamables opeligrosos a la salud Ingreso total o parcial

    del cuerpo (ej. cabeza)

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    34/43

    Ing. Jaime Oscar Gonzalez 34

    Espacios confinados

    Peligros (requerimientospre-entrada) Permiso de Trabajo

    Aislamiento Remover fuentes de

    ignicin Cierre y etiquetado

    elctrico/ hidrulico Verificacin de

    atmsfera antes de entrar,

    regularmentedurante el trabajo ydespus de cada

    interrupcin

    Desgasificacin ylimpieza de tanques Peligros Deficiencia/enriquecimie

    nto de oxgeno Flamabilidad, fuego y

    explosin Peligros qumicos Peligros fsicos

    Otros peligros

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    35/43

    Ing. Jaime Oscar Gonzalez 35

    LA UNION HACE LAFUERZA?

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    36/43

    Ing. Jaime Oscar Gonzalez 36

    trfico

    Riesgo de altavelocidad ocirculacin de trfico

    vehicular Regulaciones Instrucciones Precauciones

    adicionales Exmenes Mdicos

    Shell Oil Products Latin America

    Retail

    Certifies that planned activities are managed in order to avoid accidents in any public roads, streets and

    similar areas where the risk of high speed traffi c exists or where the n umber of vehicles circulat ing is high

    Valid only when attached to PTW number

    Authorization from Department of Transportation is needed Yes No

    The support of Municipal or other local authorities to control traffic was required Yes No

    Instruction s to the Permit Applicant

    - If the activities include the use of cranes, a Job Hazard Analysis must be done

    - Warning signs and devices shall be in place and protectively functional prior to the comm encement of any of the permitted works within

    the limits of the highway right-of-way, and shall protect the public until all permit associated works are complete

    - For jacked installations across and beneath any freeway, no vehicle, equipment nor material shall be any nearer to any freeway travel lane

    than the jacking pits; and no jacking pit shall be any nearer to the outer edge of the nearest freeway lane than 9 meters

    - Warning signs are located as far as necessary to avoid vehicles obstruction

    - Signs are sufficient and in good conditions and are clearly visible or, must comply with the Traffic Control standards as per local regulation

    - "Flaggers" are using reflective vests and flags are in good condition

    - Avoid the entrance of any third party to the working area

    - No vehicle, equipment or material relating to the permitted work shall be parked or stored within the limits of the highway right of way

    except such as are actively engaged in the work operation.

    - Notify the neighborhood about the activities to be carried and the duration

    - Workplace must be in the same conditions before the activities were done. Do not let unfinished works

    Name of person in charge : Company:....

    Exact location..... ... .. .................

    I have checked the site and sur roundings and certify that the proposed activ ities under Permit to Work number ..

    dated can be carried out:

    a)* with the help of Municipal authorities to control tra ffic

    b)* By doing a a JHA to implement additional precautions. Details are explaine d in Method of statement

    * delete as ap propriate Signature: ..

    Situation S ketch / Indication of Hazards or Ensure sketch of site and situation i s attached

    TRAFFIC CONTROL CERTIFICATE

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    37/43

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    38/43

    Ing. Jaime Oscar Gonzalez 38

    Certificado para excavacin

    Certificado de readespejada

    Riesgo de dao ainfraestructura Instrucciones para

    la excavacin

    Precaucionesadicionales Esquema

    Shell Oil Products Latin America EXCAVATION CERTIFICATE

    Retail

    Certifies that planned excavation will not damage existing buried facilities such as pipelines, drains

    and electric cables.

    A Clearance Certificat e or equivalent is required for any excavation work. For any excavation work w here there is risk of

    damage to buried pipework, equipment, structur es foundations, electr ic cables or harm to personnel, the Clearance

    Certificate should be supported by an Excavation Certificate.

    Valid only when attached to PTW number

    Digging instructions to the Permit Applicant

    - piping and electrical / instrumentation cabling must be localized by hand digging (with spades)

    - identified cabling and piping must be marked with wooden pegs

    - piping and cabling may have moved from its original location, as indicated on as-built drawings, due to soil settlement

    - within 1 meter radius around piping and cabling, only hand digging with spades may be used

    - excavations deeper than 1.2 meters require slopes of 70 degrees (max) or side supporting structures to prevent collapse

    - use of digging machinery is allowed: yes / no (a Gas Test Certificate - Hot Work might be required)- exposed piping and cabling to be supported

    - the handling of contaminated soil requires the use of PPE as defined on the Permit To Work

    - debris to be at least .. meters from the edge of the excavation

    Name of Responsible Supervisor: Company:....

    Exact location............................

    I have checked the site / studied the layout drawings and certify that the excavation proposed under Permit toWork number .. dated can be carried out:

    a)* without risk of damage to any underground services

    b)* provided that the following additional precautions are taken to prevent damage to the equipment/services

    specified below:

    * delete as appropriate Signature:..

    Situation Sketch / Indication of Hazards

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    39/43

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    40/43

    Ing. Jaime Oscar Gonzalez 40

    Peligros en la excavacin

    Acumulacin de materiales peligrosos / Vapores

    Inundaciones

    Personas u objetos cayendo dentro de la

    excavacin (trfico cercano )

    Maquinaria para excavacin puede necesitar un

    Permiso para Trabajo en Caliente

    P t ? P t ?

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    41/43

    Ing. Jaime Oscar Gonzalez 41

    Patron? Patron?

    Tengo un pequeo

    problema

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    42/43

    Ing. Jaime Oscar Gonzalez 42

    Finalizacin del trabajoProceso de entrega

    El Supervisor o Encargado del Area debeinspeccionar el sitio

    El trabajo se ha completado? Area Libre de escombros y

    herramientas? Elctricamente reconectado? Tanques vacos (sin desperdicios)?

    Equipos fijados y aterrizados? Debe firmarse para aceptar que el

    equipo/rea es segura y lista para su usooperacional.

  • 8/14/2019 Empresas Contratistas Hacia Un Trabajo Seguro II

    43/43