EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

  • View
    228

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

1

Chapter 6

Page 2: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

2

Chapter 6

Page 3: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

3

Chapter 6 • Fig 6.2 shows where the SEMP fits into the

earliest program stages.

• Fig 6.5 has an example SEMP outline.

• Also see SEMP builder on the website.– Excel based and asks lots of good questions.

• My SEMP preference follows in the next several slides.

Page 4: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

4

Chapter 6 SEMP Outline

1. Scope

2. Program Management and Organization Overall organization Program management Subcontractor control Status reviews Contract Work Breakdown Structure (CWBS) Work authorization Schedule and resource (cost) management Risk management program

Page 5: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

5

Chapter 6

SEMP Outline3. System Engineering Product

System engineering approach Integrated process and product teams Interface to configuration management System engineering activities Technical Performance Measurement Interface to risk management Technical data interchange

Page 6: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

6

Chapter 6

SEMP Outline4. Integration of system engineering effort

Requirements traceability System engineering integration activities

5. Technical reviews, major milestones, decision points, and their accomplishment criteria

Program events Incremental review

Page 7: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

7

Chapter 6 SEMP Outline

6. Critical technologies and research breakthroughs Critical technology selection approach Research breakthroughs Critical technologies

7. System test IPT roles in system I & T System development integration and test flow System test documentation

Page 8: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

8

Chapter 6 SEMP Outline

• Special system test and verification considerations Subcontractor roles and responsibilities Risk mitigation through system testing

8. Additional system engineering activities Long lead time activities Human system interface Make/buy approach

• Design to cost/life cycle cost

Page 9: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

9

Chapter 6 Appendices

1. Reliability Program Plan Reliability program overview and tailoring Reliability reporting and organization Reliability schedule and milestones Program surveillance and control tasks Design and evaluation tasks Development and production testing

Page 10: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

10

Chapter 6 Appendices

2. Maintainability Program Plan Maintainability Program overview and tailoring Relationship to other plans Maintainability reporting and organization Maintainability schedule and milestones Program surveillance and control tasks Design and analysis tasks Evaluation and test

Page 11: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

11

Chapter 6 Appendices

3. Producibility engineering program plan Producibility engineering program management Producibility criteria Internal review process Producibility risk assessment Producibility tradeoffs for performance or

schedule

Page 12: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

12

Chapter 6 Appendices

4. Human engineering plan Legacy system human engineering User system interface standards Analysis and support to preliminary and detail design Prototyping Decision action diagram preparation Test and evaluation Human engineering milestones

Page 13: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

13

Chapter 6 Appendices

5. Testability program plan Organization and responsibilities Testability program schedules and milestones Testability design approach Testability analyses Testability design monitoring and control Testability verification

Page 14: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

14

Chapter 6 Appendices

6. Technical performance measurement implementation plan Technical performance measurement Technical performance measurement process Technical performance measurement parameter list Technical performance measurement parameter

dependency trees

Page 15: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

15

Chapter 6 Appendices

6. Technical performance measurement implementation plan (continued) Technical performance measurement parameter

profiles Tree parameter relationships Technical performance measurement interfaces

Page 16: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

16

Chapter 6 Appendices

7. Program plan Term definitions Program events definition System flow Major review content Program entry accomplishments and criteria Program exit accomplishments and criteria

8. Acronyms

Page 17: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

17

Chapter 6 • Figure 6.40 shows SEMP’s central role.

• Along with the SEMP comes the need for the work breakdown structure (WBS).– Breaks the work into manageable pieces.– Provides specific places to accumulate costs.

• FFP internal use.

• CPF customer and internal use.

Page 18: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

18

Chapter 6

Page 19: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

19

Chapter 6

Page 20: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

20

Chapter 6

Page 21: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

21

Chapter 6

Page 22: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

22

Chapter 6 • Statement of Work (SOW)

– Shorter is better– Make sure that the work you want to be chargeable

under the contract is included. Converse is true too!• If you are unsure and you trust your contractor then

perhaps some vagueness is prudent.

• Otherwise, frequent SOW changes, which are as ‘painful’ as contract changes, will be necessary.

Page 23: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

23

Chapter 6 • SOW (cont’d)

– CORs, DLA, and DCMA are responsible to make sure work performed is in scope.

• Fig 6.6 contains typical System Engineering tasks for a SOW.

Page 24: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

24

Chapter 6 • Program schedules, things to know.

– Based on experience and educated estimates.– When using PERT/CPM first build a network of

activities that shows the interrelated events through the life of the program

• Start at the end and work backwards.

– Next develop three estimates: the optimistic, pessimistic and the most likely times for each event.

Page 25: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

25

The WBS is the Foundation for Project SchedulingThe WBS is the Foundation for Project Scheduling

ProjectProject

Subsystem ASubsystem A

Subsystem BSubsystem B

Assembly A1Assembly A1

Assembly A2Assembly A2

CS Component B1CS Component B1

SubAssyA11

SubAssyA11

SubAssyA12

SubAssyA12

SubAssyA13

SubAssyA13

TestB1

TestB1

CodeB1

CodeB1

DesignB1

DesignB1

TestA2

TestA2

BuildA2

BuildA2

Design A2

Design A2

TestA12

TestA12

BuildA12

BuildA12

DesignA12

DesignA12

TestB1

TestB1

CodeB1

CodeB1

DesignB1

DesignB1

Design A2

Design A2

BuildA2

BuildA2

TestA2

TestA2

TestA1

TestA1

BuildA2

BuildA2

DesignA1

DesignA1

Chapter 6

Page 26: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

26

Chapter 6 • Program schedules—things to know (cont’d).

– What does the term “critical path” mean?• Longest or shortest path through the network?

• See Fig 6.19 on page 282.

– What does the term “slack” mean?– What does the term “crunch” mean?

Page 27: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

27

Chapter 6 • Cost estimates.

– Rough order of magnitude (ROM)• +/- 30% .

• Distressing when proposals are always more than ROM!

– Cost estimates are expected to be +/-5%.

• See Figure 6.27– Typically where is most the cost?

• See last paragraph page 305.

Page 28: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

28

Chapter 6

Risk

• Avoidance

• Control

• Acceptance

• TransferSee pages 138, 139 in SE Handbook.

Page 29: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

29

Technology Readiness Assessment• Why and How We Use Technology

Readiness Levels (TRL).– Technology Readiness Levels (TRL) 1-9 as

defined by NASA.– Goal is for all high-risk items to reach TRL 5/6

by PDR.– A project that reaches TRL 6 or higher by the

start of Phase C/D is likely to stay within 15% of the baseline cost estimate made at the start of Phase C/D. (NASA analysis)

Page 30: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

30

• PROJECT CYCLES• Pre-Phase A = Advanced studies = Preconceptual planning• Phase A = Concept exploration = Conceptual design =

Preliminary analysis• Phase B = Preliminary design = Product/Program

definition• Phase C = Detailed design• Phase D = Construction = Engineering and manufacturing

development• Phase E = Operations

Page 31: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

31

Page 32: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

32

• Note: The line between the “technology risk factor ” and the “design and engineering risk factor” is somewhat fuzzy since both involve development. The “technology risk factor” focuses on research and developing the application while the “design and engineering risk” focuses on the detailed implementation of the end-item.

Page 33: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

33

Page 34: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

34

Chapter 6 • BRASSBOARD - An experimental device (or group of devices) used to

determine feasibility and to develop technical and operational data. It normally is a model sufficiently hardened for use outside of laboratory environments to demonstrate the technical and operational principles of immediate interest. It may resemble the end item, but is not intended for use as the end item. It is normally built during Advanced Studies / Pre-Conceptual and Conceptual Design /Preliminary Analyses Phases and may be continued in the Preliminary Design Phase.

• BREADBOARD - An experimental device (or group of devices) used to determine feasibility and to develop technical data. It normally is configured only for laboratory use to demonstrate the technical principles of immediate interest. It may not resemble the end item and is not intended for use as the projected end item. It is normally built during Advanced Studies or Pre-Conceptual and Conceptual Design Phases.

Page 35: EMIS 7307 1 Chapter 6. EMIS 7307 2 Chapter 6 EMIS 7307 3 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an

EMIS 7307

35

Analysis--Risk Rating MatrixChapter 6