19
1 © Copyright 2011 EMC Corporation. All rights reserved. EMC Propel SAP on Vblock May 2011 Tony Pagliarulo, Vice President, Service Delivery EMC Corporation

EMC Propel SAP on Vblock · 2010 2011 2012 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 2013 Gate 2b Gate 3b Gate 6 Gate 4 Gate 2a Gate 3a Gate 5 Design Build Test ... •Mock Conversions

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

1© Copyright 2011 EMC Corporation. All rights reserved.

EMC Propel

SAP on Vblock

May 2011

Tony Pagliarulo, Vice President, Service Delivery

EMC Corporation

2© Copyright 2011 EMC Corporation. All rights reserved.

EMC IT at a Glance

User Profiles 48,000 “internal” users

IT Environment400,000+ customers and partners

5 data centers, 7 PB storage

Business Applications 400+ applications and tools

Virtualization ≈6,000 OS images (worldwide)

75% of all servers virtualized

Global Support 80+ countries and 20 languages

3© Copyright 2011 EMC Corporation. All rights reserved.

The New IT Landscape

Existing Apps New Cloud Apps SaaS Apps

Existing Datacenters Public Cloud Services

Private

Cloud

4© Copyright 2011 EMC Corporation. All rights reserved.

The New IT Landscape

Existing Apps New Cloud Apps SaaS Apps

Existing Datacenters Public Cloud Services

Private

Cloud

How do you weave all this together into a cohesive, secure,Cloud infrastructure?

5© Copyright 2011 EMC Corporation. All rights reserved.

EMC IT‟s Journey to the Cloud

% V

irtu

aliz

ed

86%

100%

75%

40%

30%

15%

2004-08 2009-10 2011+

Run IT as a

business

Mission-critical

applications

Development, test, and

IT-owned applications

WE ARE HERE

IT ProductionLower Cost

Business ProductionImprove Quality of Service

IT-as-a-ServiceImprove Agility

6© Copyright 2011 EMC Corporation. All rights reserved.

PROPEL Program Design Principles

• Design Approach

– Design for the future state of the business

– Minimize customizations and stay on vendor upgrade path

• Program Approach

– Move rapidly to migrate growing system risk

– Use phased approach to realize value

• People

– Drive cultural change and transformation

– Develop new skills and competencies for the team

7© Copyright 2011 EMC Corporation. All rights reserved.

Program Roadmap

Analyze

2010 2011 2012

Q2 Q3 Q4 Q1Q2 Q3 Q4 Q1Q2 Q3 Q4 Q1

2013

Gate 2b

Gate 3b

Gate 6

Gate 4

Gate 2a

Gate 3a

Gate 5

Design

Build

Test

Deploy

Phase/Gate: Plan/Analyze

Gate 2a

Design

Gate 2b

Build

Gate 3a – 3b

Test

Gate 4

Deploy

Gate 5 &6

Duration: 5 Months 8 Months 9 Months 9 Months 5 Months

Months: May „10 – Sept „10 Oct „10 – May „11 Feb „11- Oct „11 Aug „11– April „12 May „12 – Sept „12

(July 2012 Go Live)

Key Deliverables: • High Level Process

Designs

• Requirements

• RICEFW Inventory

• Instance Strategy

• Business Process Designs

• Configuration Rationales

• Functional Design

• Tech Arch Designs

• High Level Business Change

Impact

• High Level Training Strategy

• Initial Environment Build-outs

• Technical Design

• Source Code

• Training Materials

• Test Plan

• Mock Conversions

• Common Test Data

• String Test

• Integration Test

• User Verification Test

• Performance Test

• Deployment Plan

• Training Delivery

• Production Conversions

• Business Acceptance

8© Copyright 2011 EMC Corporation. All rights reserved.

Confirmed in

scope

Potential Agile /

Future Release

Incremental capability in

scope for foundation

SAP Module Landscape

ERP Central Component (ECC)– Core of 11.0.3 replacement

Credit

Management

Organization

Mgmt.

Nota Fiscal

Commissionaire

Localization

Financial Accounting

New GL AP

Asset

Account.

Bank

Account.

Logistics

General Transport. Warehouse

Financial Control

Overhead

Costs

Profit

Analysis

Product

Costing Production

Planning (PP)

General

eKanban

Planning

Sales and

Distribution

Supply Chain Mgmt (SCM)

Advanced Planning & Optimizer (APO)

Demand Planning

Global Available to

Promise

Supply Network

Planning

Supplier Network

Collaboration

BW

BWA

BO

Data Warehouse

Product

Hub

MDM Hub

Available to

Promise

High TechSupplier Relationship Mgmt (SRM)

MDM Catalogs Self-Service

Procurement

Product Lifecycle Mgmt (PLM)

Integrated Prod

Development

Product

Compliance

Materials

Management

Environment

al Health &

Safety

(EH&S)Product

Safety

SPRC

Quality

Management

Self Service

Registration

Sourcing

(RFx/Auction)

Project Systems

Cash Management &

Liquidity Planning

Note: This is not the full SAP landscape

Business

Planning

Bus. Planning & Consolidations (BPC)

Consolidation

Vertex or

Sabrix

3rd Party App.

Financial Supply Chain Mgmt (FSCM)

AR

9© Copyright 2011 EMC Corporation. All rights reserved.

Iomega

RSA

BRS

Re-architect the Business Processes to Enable the Future Business Model

Primary scope Other processes impacted

by ERP (TBD)

Out of scopeFuture

release (TBD)

Manage customer relationships

Track and manage product pipeline

Support install baseProvide professional

servicesManage contracts

General Accounting & Consolidation

Taxes & Treasury

Fixed Assets

Corp. FP&A

Functional Finance & Mgmt Reporting

Customer master

Item master

Other master

Business Intelligenceand Reporting

Forecast salesGenerate quote and configure products

Provide environment support services

Product &

Process Design

Plan

Ship

and

Deliver

Supply

Chain

Make to

order

Collect

payment

Order

confirmation

Revenue

& Cost

Posting

Post-order

IntegrationInvoice

Plan/install products and solutions

Design & develop

hardware

Design & develop software

SourcingOrder

Management

Contract

Management

Payment &

SettlementMaster Data Reporting

Engineering

Sales and Marketing

Release product

Manage hardwar

e changes

Release product & revisions

Manage electronic licenses

Other Businesses

Product Delivery

Order to Cash

Procure to Pay

Manageleases

Manage commissions

Record to Report

Information Mgmt

Global Services

10© Copyright 2011 EMC Corporation. All rights reserved.

VBlock for Mission Critical Applications

App

App

App

App

App

App

App

App

App

App

App

App

App

App

App

App

App

App

ArchitectureTechnology Highlights

App

App

App

App

App

MS

App

App

App

App

App

Oracle

Oracle ESX Cluster

SQL Server ESX Cluster

SAP App Tier ESX Cluster

3 Separate ESX Clusters• Best Practice

• License Restrictions

SAP App Tier Cluster

• VMware HA

• Load Balanced

SQL Server Cluster

• VMware HA

Oracle Cluster

• VMware HA

• Clusterware HA

ERPIntegration

11© Copyright 2011 EMC Corporation. All rights reserved.

Scope of Propel Integration Architecture

Private

Cloud

Enterprise

Integration

B2B

12© Copyright 2011 EMC Corporation. All rights reserved.

SpringSource Technology

• Enterprise software framework

• Web, Integration, Batch, Web Services

• Higher productivity framework for web applications

• Lightweight application server

• Enterprise monitoringReduce operational costs

Improve agility of IT

delivery

Drive workforce

productivity

• Team productivity ecosystem

• Scale projects through software, not people

• Make best practices a first and easy practice

Architect for the future• Enterprise Elastic Data Grid

• Enterprise Cloud Messaging

Implement EMC

“IT Proven” solutions

13© Copyright 2011 EMC Corporation. All rights reserved.

Current Integration Challenges

• Complexity

• Developer productivity at operations team expense

• Scalability and performance

• Application lifecycle management is too coupled to the

platform

• Too many platforms

• Middleware too specialized

• Little to no reuse across platforms

• Project cost

• Difficult to pool resources due to “stove-piped” skills

• Federated management and monitoring

• Scalability

Management / Security

Development

Operations

14© Copyright 2011 EMC Corporation. All rights reserved.

CIC – Integration Bus Example

Distribute

2

Distribute 1

Distribute

3

Process

Legacy 3

Integration Middleware

SAP

Legacy 1

Legacy 2CollectInvoice

15© Copyright 2011 EMC Corporation. All rights reserved.

Q&A

16© Copyright 2011 EMC Corporation. All rights reserved.

THANK YOU

17© Copyright 2011 EMC Corporation. All rights reserved.

Vblock – Environment

VMAX Configuration

• 4 Engines

• 3 Bays

• 96 FC drives with 4 hot spares

• 64 SATA drives with 4 hot spares

• No EFD drives (future)

• Microcode 5874

• 32 total FA‟s (16 dual port adapters)

• 213 empty drive slots for expansion

• RDF enabled

UCS Configuration

• 5108 Blade Chassis*

• 2104 Fabric Extender*

• B230-M1 Blade

• B440-M1 Blade

• 6140 Fabric Interface*

18© Copyright 2011 EMC Corporation. All rights reserved.

Technology Stack• EMC

• Recoverpoint

• Networker

• Avamar

• Data Domain

• VM backups ?

• Virtualization (VMware)

• vSphere 4.1 (5.0?)

• ESXi PXE boot (stateless, separate vNIC)

• vCenter

• vMotion

• Storage vmotion

• Site Recovery Manager (SRM)

• Dynamic Resource Scheduling (DRS)

• Distributed Virtual Switch (dvSwitch)

• Virtual Desktop Infrastructure (VDI)

• VM “gold” templates

• Vsphere management: accounts, authorization

• Clone policy

• Host profiles

Vmware vSphere

Application

Services

Vmotion

Storage vMotion

HA

Fault Tollerance

Data Recovery

Availability

vShield Zones

VMSafe

Security

DRS

Hot Add

Scalability

Application

Services

ESX and ESXi

DRS and DPM

Memory

Overcommit

vCompute

VMFS

Thin

Provisioning

vStorage

Distribution

Switch

Network I/O

Control

vNetwork