15
Elementary Principal’s Report December 12, 2011

Elementary Principal’s Report

Embed Size (px)

DESCRIPTION

Elementary Principal’s Report. December 12, 2011. Book Fair. Open during the week of Parent-Teacher Conferences (October 24-27) Total Sales - $3,097.76 Scholastic Dollars - $1,828.72 - PowerPoint PPT Presentation

Citation preview

Page 1: Elementary Principal’s Report

Elementary Principal’s ReportDecember 12, 2011

Page 2: Elementary Principal’s Report

Book Fair

• Open during the week of Parent-Teacher Conferences (October 24-27)• Total Sales - $3,097.76• Scholastic Dollars - $1,828.72• Booster Club bought book from the book fair to get the total sales about

$3,000. By selling more than $3,000 worth of books, the schools get 50% in scholastic dollars instead of 40%.

Page 3: Elementary Principal’s Report

Elementary Events• The 5th grade students had visitors from Blue Ox on November 22nd,

and they visited Blue Ox on November 29th.• The Elementary Holiday Concert will be held on December 19th at

6:00 pm in the old gym.• The 5th and 6th grade band will perform holiday music for the

residents at Prairie Breeze on Tuesday, December 20th.• There will be a 1:00 pm dismissal on December 22nd.• There will be no school from December 23rd to January 2nd.• The second semester begins on January 3rd.• Nebraska Kids on the Block• Bullying presentation for grades K-3 and 4-6• February 8th

• Puppet Show• FREE to the school district!!

Page 4: Elementary Principal’s Report

Thurston County Spelling Bee• Scheduled for February 16 in Pender• Make up date February 24 in Pender• Multipurpose room• Grades 6-8• Top 3 from each grade at each school participate• The winner of the Thurston County Spelling Bee qualifies for

the State Spelling Bee held in Omaha.

Page 5: Elementary Principal’s Report

Early Childhood Education• Cancelled classes Thursday, December 8 and Friday,

December 9.• No heat• The broken part was supposed to be shipped Friday and here

Saturday or today, but it was not shipped until today.• Heater should be up and running by the end of the day

tomorrow.• Classes were held today but are cancelled again tomorrow.

Page 6: Elementary Principal’s Report

Teacher Evaluations• The first of two formal evaluations for all probationary

teachers have been completed.• 13 teacher evaluations need to be completed this year, and 7

are done as of today.• 11 people…13 evaluations• 2 teachers are required to be evaluation twice

• The other 6 will be completed after the winter break.• 2 of those 6 are the second of two formal evaluations for

probationary teachers.• Informal walk-through observations are conducted several

times per week.

Page 7: Elementary Principal’s Report

Superintendent’s ReportDecember 12, 2011

Page 8: Elementary Principal’s Report

Sign at the Football Field

•Should be installed on Wednesday•Love Signs planned to be here last Friday, but inclement weather delayed the installation of the sign•Should be fully functional by the end of the week

Page 9: Elementary Principal’s Report

Out of Office• Thursday, December 16th after noon.• All day Friday, December 17th.

Page 10: Elementary Principal’s Report

New Gym Floor• A new coat of finish will be added to the new gym floor.• Recommended after about 6 months.• This will cost $2,000.• Egan will start this process on December 22nd and will be

finished before the NSAA sports moratorium is over.• We may try to refinish the floor every year at this time instead

of during the summer.

Page 11: Elementary Principal’s Report

New Gym Bleachers• The south bleachers need some work.• Bleacher Solutions provided us with a quote. ($4,200)• Jack and weld top row.• Adjust motors for even running.• Loosen sway braces and adjust rolling frames then tighten.• Clean and grease all moving parts.

• Alternate proposal ($3,400)• Remove top row of bleachers to allow clearance to court.• Move all wall attachment brackets to next lower row and re-

attach.• Install seats back on bottom row.

• Since these projects are over $2,500, I plan to meet with the facilities/transportation committee and then get more than one quote if we decide to move forward.

Page 12: Elementary Principal’s Report

Qualified Capital Purpose Undertaking Fund• Project overview• All duct work will be above false ceiling except in cafeteria,

kitchen, and kitchen store room.• All exposed duct work would save an estimated $75,000 but

would create future house keeping issues. It would also not look as finished as hidden duct work.

• Air handlers will be installed in current boiler room.• Boilers will be installed in Mr. Olin’s current office. A new fire

rated wall will be constructed to meet codes.• Ductwork will run up the building on the outside just west of fire

escape or above current boiler room. There are options for the appearance of this duct work.

• The area we lovingly refer to as the “doghouse” will be eliminated during this project.

Page 13: Elementary Principal’s Report

Qualified Capital Purpose Undertaking Fund• Plan to put projects out for bid by the first part of January• At the January Board of Education meeting, the Board will

need to approve the final plans• Facilities/Transportation Committee meeting will be held

between now and the January meeting with KEI to discuss final plans

• I have a meeting scheduled with a potential owner’s representative tomorrow morning (see next slide)

• Bids will be due in February• Construction will begin in May

Page 14: Elementary Principal’s Report

Qualified Capital Purpose Undertaking Fund• Bid process will be made up of 4 components• Windows – Brian Foxworthy (incite Design Studio)• HVAC (Old Gym) – Ed Kucirek• Temperature Control

• Ed Kucirek• Combine new building and old building controls

• HVAC (High School)• Hire an Owner’s Representative• Owner’s Representative and Ed will coordinate to bid out the pieces

of the project• Mechanical• Electrical• Ceilings• Fire

Page 15: Elementary Principal’s Report

Community Wellness Center and Football/Track Complex• This project is picking up steam!• I visited the newly constructed wellness center in Oakland on

Friday…VERY impressive. A facility of that nature would be a tremendous asset to the community of Pender

• A big piece of this project is the football field/track complex.• Entire project is about $4 million.• The football field/track complex is about $1 to $1.5 million.• Donations will play a major role in the construction of these

facilities.• Donors may specifically state how they would like their donation

spent. In other words, someone may choose to donate to the football field/track complex only.

• This has major implications for the school.• Are we willing to support this project?