Welcome to El Gallo Complex Mine Tour 1

El Gallo Analysts Tour Presentation

Embed Size (px)

Citation preview

Page 1: El Gallo Analysts Tour Presentation

Welcome to El Gallo Complex Mine Tour 1

Page 2: El Gallo Analysts Tour Presentation

Ian Ball – Senior Vice President Introduction

2

Page 3: El Gallo Analysts Tour Presentation

Taking a Phased Approach Original Plan

El Gallo + Magistral + Palmarito

Production 2014 3

Page 4: El Gallo Analysts Tour Presentation

Taking a Phased Approach A Better Way Forward

Magistral Phase 1

Production 2014 Production 2012

El Gallo + Palmarito Phase 2

4

Page 5: El Gallo Analysts Tour Presentation

Key Benefits •  Cash flow now

•  Build operational team

•  Test costs assumptions (labour, mining, etc.)

•  Prove success through phased approach

5

Page 6: El Gallo Analysts Tour Presentation

Magistral Mine 2007 6

Page 7: El Gallo Analysts Tour Presentation

Background •  Operated 2002-2005

•  Produced 70,000 oz Gold

•  Placed on care maintenance

•  Operating permit remained in place

7

Page 8: El Gallo Analysts Tour Presentation

Background •  2007: McEwen Mining acquired project

•  2009: El Gallo Phase 2 discovered

•  2012: Rebuilt Phase 1

•  2012: Positive Phase 2 feasibility study

8

Page 9: El Gallo Analysts Tour Presentation

Past Operational Issues 1.  Poor recoveries: crush size / soluble copper

2.  Long leach times

3.  Low mining rates

4.  Minimal working capital

Could we fix it? YES! 9

Page 10: El Gallo Analysts Tour Presentation

What Did We Do? 1.  Installed 3 stage crusher: 3/8 inch

2.  Cold strip for soluble copper

3.  Contract mining

4.  Strong balance sheet

10

Page 11: El Gallo Analysts Tour Presentation

How Did We Do? Great!

Budget: $15 Million

Final cost: $13.5 Million

Completion date: Q3, 2012

Under Budget, On Schedule 11

Page 12: El Gallo Analysts Tour Presentation

El Gallo Phase 1, 2013 12

Page 13: El Gallo Analysts Tour Presentation

El Gallo I EPCM Contractor Overview

Sonoran Resources 13

Page 14: El Gallo Analysts Tour Presentation

Cerro Prieto Project Sonora Mexico • EPCM – Gold Silver Mine • Oversaw permitting • Negotiations for surface and water rights

Santa Elena Mine Sonora Mexico • Procurement and Construction Management • Constructed and commissioned mine

Oatman Mine Arizona U.S.A. • Dewatering underground • Upgrades to electrical • Recommissioning ventilation

Golden Summit Alaska U.S.A. • Fabricated gravity circuit • Installed crushing circuit

Mesquite Mine California U.S.A. • Construction of ADR Plant • Recommissioned refinery • Development of truck shop • Electrical upgrades

La Bolsa Project Sonora Mexico • Prefeasibility Study • Scoping Study

Sonoran Resources Previous Projects

14

Page 15: El Gallo Analysts Tour Presentation

Initial Assessment - September 2011 15

Page 16: El Gallo Analysts Tour Presentation

1.  Process Plant

2.  Crushers

3.  Heap Leach Expansion

4.  Process Pond Upgrade

Key Areas of Rebuild

16

Page 17: El Gallo Analysts Tour Presentation

Process Plant

Before After

17

Page 18: El Gallo Analysts Tour Presentation

Assay Laboratory

Before After

18

Page 19: El Gallo Analysts Tour Presentation

Refinery

Before After

19

Page 20: El Gallo Analysts Tour Presentation

Vault

Before After

20

Page 21: El Gallo Analysts Tour Presentation

Generators

Before After

21

Page 22: El Gallo Analysts Tour Presentation

Installed Cold Strip & Acid Wash Circuit 22

Page 23: El Gallo Analysts Tour Presentation

Crushers

2 Stage Before 3 Stage After

23

Page 24: El Gallo Analysts Tour Presentation

Heap Leach Pad

Before After

24

Page 25: El Gallo Analysts Tour Presentation

Increased Capacity and Gold Recovery 25

Page 26: El Gallo Analysts Tour Presentation

Process Ponds 26

Page 27: El Gallo Analysts Tour Presentation

Increased Capacity and Reliability 27

Page 28: El Gallo Analysts Tour Presentation

Gold Pour 28

Page 29: El Gallo Analysts Tour Presentation

29

El Gallo 1

A Team That Builds Success!

Page 30: El Gallo Analysts Tour Presentation

John Read – Senior Geologist Exploration

30

Page 31: El Gallo Analysts Tour Presentation

M&I  Resource  345,000  oz  Au  

0 500

Meters N

M&I  Resource  113,350  oz  Au  

M&I  Resource  46,600  oz  Au  

Samaniego  Pit  

Lupita  Pit  

Sagrado  Corazon  Pit  

San  Rafael  Pit  

Phase I Resources

31

Page 32: El Gallo Analysts Tour Presentation

Lupita Deposit + Pit Design

0 200

Meters N

32

Page 33: El Gallo Analysts Tour Presentation

NW   SE  

46.1m  @  2.1  g/t  Au  Incl.  5m  @  9.9  g/t  

12.8m  @  3.0  g/t  Au  Incl.  1.1m  @  23.3  g/t  

Lupita Deposit

SECTION LUP-74 44.4m  @  1.1  g/t  Au  Incl.  2.5m  @  9.5  g/t  

0 100

Meters

33

Page 34: El Gallo Analysts Tour Presentation

65.2m  @  0.5  g/t  Au  

NW   SE  

41.2m  @  1.3  g/t  Au  Incl.  1.7m  @  13.4  g/t  

11m  @  0.96  g/t  Au  

Lupita Deposit

SECTION LUP-58

0 100

Meters 34

Page 35: El Gallo Analysts Tour Presentation

Guamuchil  

Pacific Ocean

El  Gallo  Complex  

0 100

Km N

Sonora

Sinaloa

Chihuahua

Durango

Zacatecas

Nayarit

Jalisco

Baja California

McEwen  ExploraGon  Project  

McEwen  ExploraGon  Project  

35

Page 36: El Gallo Analysts Tour Presentation

N

Mines in Western Mexico

36

Page 37: El Gallo Analysts Tour Presentation

37

El Gallo Complex Production Areas + New Potential

Page 38: El Gallo Analysts Tour Presentation

Mina  Grande  

Haciendita  

   

0 500

Meters N

38

Page 39: El Gallo Analysts Tour Presentation

Blast  Hole  Rig   Diamond  Drill  Rig  39

Page 40: El Gallo Analysts Tour Presentation

40

Page 41: El Gallo Analysts Tour Presentation

SW   NE  

17.8m  @  1.78  g/t  Au  

16.4m  @  2.07  g/t  Au  

23.8m  @  1.3  g/t  Au  

5.4m  @  1.49  g/t  Au  

Haciendita Exploration Project SECTION HC-10

0 100

Meters

41

Page 42: El Gallo Analysts Tour Presentation

Mina  Grande  

Haciendita  

   

0 500

Meters N 42

Page 43: El Gallo Analysts Tour Presentation

43

Page 44: El Gallo Analysts Tour Presentation

SW   NE  4.65m  @  12.35  g/t  Au  Incl.    1m  @  44.1  g/t  

12.5m  @  6.43  g/t  Au  Incl.  1.2m  @  49  g/t   5.1m  @  5.72  g/t  Au  

Incl.  1.3m  @  18.6  g/t  

Mina Grande Exploration Project SECTION MG-13

0 100

Meters 44

Page 45: El Gallo Analysts Tour Presentation

Patricia Angulo – Human Resources Community Relations

45

Page 46: El Gallo Analysts Tour Presentation

Mining brings prosperity to communities where economic activities are limited.

46

Page 47: El Gallo Analysts Tour Presentation

Compañía Minera Pangea in Region since 1995

McEwen Mining Acquired Project 2007

47

Page 48: El Gallo Analysts Tour Presentation

Three main municipalities surround the mine: Mocorito, Salvador Alvarado and Sinaloa.

48

Page 49: El Gallo Analysts Tour Presentation

49

El Tule de Arriba El Tule

Los Medina

Cerro Agudo

Los Becos

El Mezquite San Miguel

Las Milpas de los Gonzalez

Villages Around the Mine

Projects Villages

Page 50: El Gallo Analysts Tour Presentation

Mission To develop profitable mineral

deposits and enhance the community where we work.

50

Page 51: El Gallo Analysts Tour Presentation

Since 2007

McEwen Mining Contributed

US $3,000,000

51

Page 52: El Gallo Analysts Tour Presentation

McEwen Mining helps sponsor traditional holidays such as: Child´s Day, Mother's Day, Teacher’s day, and Christmas.

52

Page 53: El Gallo Analysts Tour Presentation

Providing Water for the Local Community

53

Page 54: El Gallo Analysts Tour Presentation

In 2010 US$20,000 donated to 24 schools Consisting : Air Conditioners Water Coolers Construction Material Fans Education Material Sports Equipment

54

Page 55: El Gallo Analysts Tour Presentation

School Supplies

Children’s Day

Christmas

Educational Material

Schools Donation Program

55

Page 56: El Gallo Analysts Tour Presentation

DESPUES   56

Making Schools Better

Before After

Page 57: El Gallo Analysts Tour Presentation

El Gallo Multipurpose Court

In 2011 a multipurpose court was built for the El Gallo community.

57

Page 58: El Gallo Analysts Tour Presentation

ANTES  

El Valle Road Paving (2 km) Investment US$650,000

2012

58

Page 59: El Gallo Analysts Tour Presentation

El Valle Paving Road Inauguration April 2012

59

Page 60: El Gallo Analysts Tour Presentation

El Magistral, Mocorito, Sinaloa In 2012, 4 houses built to relocate residents

60

Page 61: El Gallo Analysts Tour Presentation

61

Page 62: El Gallo Analysts Tour Presentation

Bill Faust – COO / Fernando Aguilar – Operations Manager El Gallo Phase 2

62

Page 63: El Gallo Analysts Tour Presentation

El Gallo Complex

63

Page 64: El Gallo Analysts Tour Presentation

El Gallo Phase 2 •  Conventional Open Pit, Mill, Agitated Leach

•  Est. Capex $180 Million

•  Est. production 5 Million silver oz / year

•  Est. cash cost $10 / oz

•  Mine life est. 6.5 years 64

Page 65: El Gallo Analysts Tour Presentation

Looking North Towards Process Plant 65

Page 66: El Gallo Analysts Tour Presentation

Looking South Towards Open Pit 66

Page 67: El Gallo Analysts Tour Presentation

El Gallo Open Pit Design

Leach Ore

Waste Dump

Stockpile

Open Pit

67

Page 68: El Gallo Analysts Tour Presentation

68 View of Historic Palmarito Pit 68

Page 69: El Gallo Analysts Tour Presentation

Palmarito Open Pit Design

Waste Dump

Open Pit

N

69

Page 70: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Reserve

70

Classification Tonnes (000’)

Silver (g/t)

Gold (g/t)

Silver (000’oz)

Gold (oz)

Proven Mineral Reserve 11,185 101.0 0.125 36,336 44,816 Probable Mineral Reserve 534 107.2 0.075 1,840 1,286 Proven and Probable Reserve 11,719 101.3 0.123 38,176 46,102

Page 71: El Gallo Analysts Tour Presentation

El Gallo - Construction

•  Pits mined using contractor

•  Permitting underway submittal Q1 2013

•  EPCM Contractor – M3 Engineering

•  Construction start expected Q3 2013

71

Page 72: El Gallo Analysts Tour Presentation

Process Flowsheet

72

BALL MILL

CYCLONE CLUSTERS

3-STAGE CRUSHING

LEACH TANKS

MERRILL CROWE

CCD CIRCUIT

REFINERY DRY STACK

TAILINGS

STOCKPILE

DORE

Page 73: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Site Layout

Mill Tailings Storage

Open Pit

Surface Rights

73

N

Page 74: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Process Plant Layout

Substation

CCD Tanks

Surface Rights Boundary

Crushers Ball Mill

Leach Tanks

Water Storage

Merrill Crowe

N

74

Page 75: El Gallo Analysts Tour Presentation

Planned Site for Process Plant 75

Page 76: El Gallo Analysts Tour Presentation

Dry Stacked Tailings 76

Page 77: El Gallo Analysts Tour Presentation

Future Substation Site – Project Power 77

Page 78: El Gallo Analysts Tour Presentation

Ian Ball – Senior Vice President El Gallo Phase 2 Economics

78

Page 79: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Initial Capital - $180 M

79

Process US Dollars (x000) Site Prep. Crushing Ore Storage Mill Leaching Merrill-Crowe Refinery Tailings Water Power Reagents Tanks Buildings Freight

$3,867 $15,686

$3,435 $12,836 $28,552

$9,688 $4,168

$20,195 $4,765 $8,382 $3,570 $2,632 $8,590

Subtotal $126,365 Indirect Costs Mobilization EPCM Commissioning / Spares Owner’s Cost Contingency (14.4%)

$1,856

$19,903 $2,345 $8,766

$18,813 Subtotal $51,683 Total $178,048

Page 80: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Operating Costs Production Cost $10 / oz Silver

80

Cost Per Ore Tonne

Processed Mining Processing Refining Royalty G&A Gold By-Product Credit ($1,415 per ounce)

$7.40 $21.37

$1.43 $1.01 $2.16

($4.63) Total Operating Costs $28.74

Page 81: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Mine Plan Avg 5.2 Million oz Silver / yr

81

Year

Silver Production

(000’)

Silver Grade (gpt)

Gold Production

(oz)

Gold Grade (gpt)

Strip Ratio

(Waste:Ore)

Ore Tonnes (000’)

1 2 3 4 5 6 7

6,113 5,540 5,562 4,241 4,632 4,749 1,182

135.1 113.4 113.6 86.0 94.4 95.5 47.8

4,030 11,754 6,189 5,271 4,949 4,152 1,964

0.095 0.248 0.123 0.106 0.099 0.088 0.078

1.99 2.65 2.89 3.22 2.53 1.84 2.22

1,669 1,825 1,825 1,825 1,825 1,825 925

Total 32,019 101.3 38,309 0.123 2.61 11,719

Page 82: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Metallurgical Testing

82

Area Silver Recovery (%)

Gold Recovery (%)

Silver and Gold Recovery

84.3

83.2

Cyanide (kg/tonnes)

1.52

Lime (kg/tonne) 6.77

Page 83: El Gallo Analysts Tour Presentation

El Gallo Phase 2 Financial Returns

83

After Income Tax Base Case ($25 Silver / $1,415 Gold)

Spot Case ($32 Silver / $1,700 Gold)

IRR NPV 0% NPV 5% NPV 10% Annual Cash Flow Payback (yrs)

26% $184 $118 $73 $56 2.6

44% $354 $248 $174 $82 1.8

*Dollar figures in millions

Page 84: El Gallo Analysts Tour Presentation

Simon Quick – VP Projects Permitting, Water Rights and Supply

84

Page 85: El Gallo Analysts Tour Presentation

Experienced Team

•  MS Chemical Engineering •  Permitted: Alamo Dorado,

La Bolsa Mine •  Good relationship with

SERMANAT

•  Ph.D. in hydrology •  Current projects:

Torex, Timmins Gold, Goldcorp.

•  Specializes in Water Rights Registration

Permit Specialist: Patricia Aguayo

Water Rights + Supply: Dr. Miguel Rangal

85

Page 86: El Gallo Analysts Tour Presentation

Sinaloa Permitting Favourable Marlin Gold permit submitted: (May 1st, 2012)

•  Located in Sinaloa

• Granted 140 days

•  Positive sign…!

El Gallo Complex

86

Page 87: El Gallo Analysts Tour Presentation

3 Required Permits: (MIA) Manifestacion de Impacto Ambiental

•  EIS equivalent USA (ETJ) Estudio Justificativo Para Cambio Uso Suelo

•  Change of Land Use

(ER) Analisis de Riesgo •  Risk Analysis

87

Page 88: El Gallo Analysts Tour Presentation

Q1  2013   Q2  2013   Q3  2013   Q4  2013  

MIA

ETJ

ER

Permitting Schedule

Permit Submission Expected Approval

(60 – 120 Days)

(60 – 120 Days)

(60 – 120 Days)

88

Page 89: El Gallo Analysts Tour Presentation

Regulators Like Safe & Simple

Dry Tailings Eliminates dam failure

Reduces environmental impact Lowers reclamation costs

89

Page 90: El Gallo Analysts Tour Presentation

Well 1 2.2 l/s

Well 5 6.3 l/s

Well 3 3.3 l/s

Well 4 40.4 l/s

  Water rights secured: 1 Million M3 / Year x 2   Water requirements satisfied: 17 l/s

- Production well - Litre per second l/s   90

Page 91: El Gallo Analysts Tour Presentation

Filter Press – Dry Stack Tailings 91