    Outline

    History & Current State of Affairs

    The Future for Zambia Railways Limited (ZR) 2013-2017 & Beyond

    Rehabilitation & Reconstruction of Existing Network Process

    Network Development Programme of the future

    Zambian Designed Motive Power & Rolling Stock

    Business Model For Sustainable Profitability & Growth

    Partnerships

    Floatation of Minority Stake to finance modernisation of the network

    Conclusions

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    3/52

    HISTORYZambia Railways Limited operated and still operates a

    network of 1062 km of 1067mm gauge, single track of which

    848km is the mainline and 214 km is on branch lines or spurs

    In 2001, two years before the concession ZRL moved 1.98

    million tonnes of traffic. Today that is 667,000 tonnes

    ZRL had and has a total of 37 locomotives (12 GT ,17 U20C

    and 8 U15C) and has a total of 2201 wagons of various types.

    ZRL own passenger coaches have become dilapidated and out

    of service during the concession. Therefore using 28passenger coaches belonging to Railway Systems of Zambia

    (RSZ).

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    4/52

    Track ConditionMainline Track

    The mainline extends from Victoria Falls Bridge in the South to Nkana

    Kitwe

    The weight of rails on the mainline is

    91lb per yard (606km)

    90lb per yard (101km)80lb per yard (141km), these need replacing with 91lb/yard

    530 km of the mainline is on concrete sleepers & 318 km on wooden

    sleepers

    The depth of ballast on mainline varies between 50mm and 160mm

    instead of the required depth of 250mm to 300mm.

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    5/52

    Track Condition

    Wooden sleepers in EXTREME poor condition

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    6/52

    Track Condition

    Missing rail fastenings on consecutive sleepers on the mainlinenear Kabwe and Monze railway stations, making the railway line

    unsafe.

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    7/52

    Track Condition

    The railway line is overgrown with weeds in manysections, thus even maintenance of the line difficult

    to carry out.

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    8/52

    Track Condition

    If repairs were made, the plan was to interlace 1concrete sleeper in 4 wooden sleepers and claim tohave upgraded the railway line

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    9/52

    Track ConditionMainline Track

    The mainline extends from Victoria Falls Bridge in the South to Nkana

    Kitwe

    The weight of rails on the mainline is

    91lb per yard (606km)

    90lb per yard (101km)80lb per yard (141km), these need replacing with 91lb/yard

    530 km of the mainline is on concrete sleepers & 318 km on wooden

    sleepers

    The depth of ballast on mainline varies between 50mm and 160mm

    instead of the required depth of 250mm to 300mm.

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    10/52

    Track Condition

    S/N Section Length Type of Rail Type of Sleeper

    i KitweChingola 67.95 80lb Steel

    ii NdolaSakania 27.36 80lb Steel

    iii ChambeshiMufulira 34.09 60lb Steel

    iv Luano Chililabombwe 30.93 80lb Wooden / Steel

    v ChomaMasuku 65.40 80lb Steel

    Total 214.00 - -

    Branch Lines

    The following are the branch lines on Zambia Railways Limited:-

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    11/52

    Track Condition

    S/N Section Length Type of Rail Type of Sleeper

    i KitweChingola 67.95 80lb Steel

    ii NdolaSakania 27.36 80lb Steel

    iii ChambeshiMufulira 34.09 60lb Steel

    iv Luano Chililabombwe 30.93 80lb Wooden / Steel

    v ChomaMasuku 65.40 80lb Steel

    Total 214.00 - -

    Branch Lines

    The following are the branch lines on Zambia Railways Limited:-

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    12/52

    Track Network Design &

    Construction

    Crossrail

    Linkages

    Linear Rail

    Curvilinear

    rail

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    13/52

    Track Network Design &

    Construction

    Full Period of Vibration

    Equations of Motion

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    14/52

    Station Condition More than 90% of stations along the main line and branch lines

    are dilapidated beyond repair due to lack of maintenance.

    Kitwe Total demolition

    Ndola Major repairs (Cheaper new build)

    Kapiri-Mposhi Total Demolition

    Kabwe Major repairs (Cheaper new build) Lusaka Substantial repairs

    Kafue Total demolition

    Mazabuka Total repairs

    Choma - Major repairs (Cheaper new build) Livingstone Substantial repairs

    All intermediate stations need total rehabilitation

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    15/52

    Station Condition More than 90% of stations along the main line and branch lines

    are dilapidated beyond repair due to lack of maintenance.

    Kitwe Total demolition

    Ndola Major repairs (Cheaper new build)

    Kapiri-Mposhi Total Demolition

    Kabwe Major repairs (Cheaper new build) Lusaka Substantial repairs

    Kafue Total demolition

    Mazabuka Total repairs

    Choma - Major repairs (Cheaper new build) Livingstone Substantial repairs

    All intermediate stations need total rehabilitation

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    16/52

    Track & Station Condition

    NEXT STEPS Track Rehabilitation is needed in many parts of the existing lines

    New Second Track construction from Chingola to Livingstone is

    therefore needed to make the rail come to 21st Century standards

    New Stations are needed for human occupation

    To achieve these goals

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    17/52

    Track & Station Condition

    NEXT STEPS Track Rehabilitation is needed in many parts of the existing lines

    New Second Track construction from Chingola to Livingstone is

    therefore needed to make the rail come to 21st Century standards

    New Stations are needed for human occupation

    To achieve this goal a new business model has been agreed withthe management team.

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    18/52

    The Vision

    To have an effective and efficient railwaysnetwork that is extremely profitable as a core

    business and that is the envy of the world,

    strategically connecting Zambia, its natural

    border countries and overseas.

    h k N k

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    19/52

    The Future Track Network

    Figure 1: The future Zambia Railways Network

    (This network is indicative of partial selected routes and not exhaustive as further lines can be added or removed)

    PHASE 1

    PHASE 2

    Livingstone Mulobezi lines Livingstone Chingola Lines Inter-mines & Ndola Sakania then Kolwezi (Congo) TAZARA connect to Chipata-Mchinji & to Mpulungu Chipata-Mchinji line (to Malawi/Mozambique)

    Lusaka Mongu Chingola Mwinilunga (On the way to Angola)Mpika Mansa Kaputa Mpulungu/Mbala ChoziMulobezi-Shangombo (On the way to Bostwana)Kafue to Harare (On the way to Zimbabwe)

    Total/Partial

    reconstruction

    of the existing

    lines &

    extension

    1

    -TAZARA & CHIPATA-MCHINJI

    LINES TO CONNECT

    -MULOBEZI-SHANGOMBO TO

    BOTSWANA

    3

    2

    4

    5

    2

    1

    3

    4

    5

    6

    7

    8

    9

    10

    PHASE 3

    9

    Further railway tracks to

    service our mining & Agro Co.

    industries plus passenger

    transport

    -LUSAKA-MONGU

    -CHINGOLA-MWINILUNGA

    -KAFUE-HARARE

    -MPIKA-MANSA-KAPUTA-MPULUNGU/MBALA-CHOZI

    6

    7

    8

    108

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    20/52

    The New ZR Business Model

    BUSINESS OUTLINE CHARACTERISTICS

    It is proposed herein that the business meets the expectations of the

    Zambian people. Among these outcomes are:

    To reconstruct the entire business to be profitable, self sustaining and

    become a major contributor to the exchequer accounts;

    To become a major employer that creates apprenticeship jobs of around

    10,000 during the reconstruction phases, and which reduce during full

    operation period to 3000 5000 pensionable jobs. In addition, there will bearound 3,000 4,000 jobs to be created in the supply chain as ZR intends

    to source 75% - 80% of parts, components and services from businesses in

    Zambia. ZR vision on employment is to maximise human capacity for

    maximum productivity that will make it a flag ship of the Nation;

    To build a solid partnership with satellite businesses that will enhance

    further ZR core business and profit margins.

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    21/52

    ZAMBIA RAILWAYS

    CORE BUSINESS

    INTER-MINE

    DIVISION

    PASSENGER

    DIVISIONFREIGHT

    DIVISION

    ENGINEERING

    DESIGN

    DIVISION

    INFRASTRUCTURE

    COMMERCIAL

    DIVISION

    The New ZR Business Model

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    22/52

    BRANDING

    BRANDING

    Creating;

    Identity, focus, values, pride.

    Denoting;

    Political, societal and commercial change.

    Presenting;

    A reality for the future a vibrant and

    successful Zambian Railway

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    23/52

    Rail Freight Creating the brand; customer

    focused divisions within he main brand,

    Mining, Inter Mine, International, Coal, Gold etc.

    BRANDING

    BRANDING

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    24/52

    Freight Cost Centre

    Current - Traditional business of a railway company that needs

    modernisation through intelligent marketing and management

    Traditional cargo such as copper ore and its products; coal; lime;

    maize; sugar; etc

    The future for ZR is to look for new cargo from none traditional

    routes: uranium ore; manganese ore; nickel; gold; rare metals; agro

    products; etc

    TARGET: To move from meagre tonnage to 1.5 million tonnes and

    beyond

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    25/52

    Passenger Cost Centre

    Traditional business of a railway company that needs

    modernisation through intelligent marketing and management

    Traditional passenger business that has deteriorated in quality of

    service

    The future for ZR is to look for new and modern coaches that

    attract the business community, offer comfort and reliability for

    repeat business

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    26/52

    Inter-Mine Cost Centre

    Traditional business for Zambia Railways that generated a lot of

    revenue prior to the concession. During the concession, this

    business was killed completely

    Rehabilitation and modernisation needed in many places to

    enable bring back the business from the roads to ZR

    Customers have invited us to offer them services

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    27/52

    Inter-Mine Cost CentreMr Amol Mehra

    Head Marketing/Logistics & ConcentrateProcurement

    Konkola Copper Mines plc

    Chingola, Zambia

    Phone: +260212350009

    Mobile: +260978778422

    E-mail: [email protected]

    OFFER: Up to 3 million tonnes per year in

    delivering: Ore, Anodes, Concentrates, Lime

    and other products for production.

    mailto:[email protected]:[email protected]
  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    28/52

    Engineering Design Cost Centre This is a new cost centre developed to capitalise on the skills in

    Kabwe The aim is to create the biggest engineering and design

    technology centre that develops products from first principles:

    - Wagons

    - Coaches

    - Locomotives

    - spares and components for use in the assemblies

    Design utility machines and vehicles

    Carry out research in the Think Tank

    The future for Zambia Railways Limited (ZR)

    I f t t C i l

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    29/52

    This is new cost centre that involves track and stations plus all the

    fixed assets

    The vision- To construct a second line track along the existing one

    To make all the dilapidated stations good and vibrant places by

    building Malls, Pubs, Restaurants & Cafs, shops; etc..

    To electrify the mainline in Phase I construction

    Use of $120 million. Not enough so proposal to float 48% to

    private institutions as advised by the Attorney General

    Infrastructure Commercial

    Cost Centre

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    30/52

    The Project

    INFRASTRUCTURE:

    RAILWAY NETWORK

    ENGINEERING DESIGN:

    PASSENGER COACHESWAGONS

    LOCOMOTIVES

    COMMERCIAL:

    STATIONS

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    31/52

    Project Workpackages

    INFRASTRUCTURE COMMERCIAL THINK TANK

    ENGINEERING

    Existing Line

    Rehabilitation

    Station Research &

    Development

    Second line

    construction

    Mall Engineering Design

    Bridge & Culvert

    construction

    Bar, Pub,

    Restaurant, shop

    Manufacture of

    Railway Vehicles

    Tunnel & Flyover

    Construction

    Hotel Manufacture of

    Auxiliary Equipment

    Electrification Business Offices Training

    THINK TANK OF TOTAL BUSINESS DELIVERY & MANAGEMENT

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    32/52

    Contribution Package

    INFRASTRUCTURE

    EXISTING LINE

    REHABILITATION

    RAIL

    BALLAST

    SLIPPERS

    FIXTURES

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    33/52

    Contribution Package

    INFRASTRUCTURE

    EXISTING LINE

    REHABILITATION

    RAIL

    BALLAST

    SLIPPERS

    FIXTURES

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    34/52

    Contribution Package

    INFRASTRUCTURE

    SECOND LINE

    CONSTRUCTION

    MODULAR DESIGN CONSTRUCTION

    MODULE 1: VICTORIA FALLS MAYOBA (105 KM)

    MODULE 2: MAYOBA CHOMA (112 KM)

    MODULE 3: CHOMA MONZE (101 KM)MODULE 4: MONZE NALUAMA (101 KM)

    MODULE 5: NALUAMA CHISAMBA (109 KM)

    MODULE 6: CHISAMBA LUANSHIMBA (103 KM)

    MODULE 7: LUANSHIMBA KAFULAFUTA (104 KM)

    MODULE 8: KAFULAFUTA MABOTE (94 KM)

    MODULE 9: MABOTE CHINGOLA (92 KM)

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    35/52

    Contribution Package

    INFRASTRUCTURE RAIL TRACKMODULAR DESIGN CONSTRUCTION

    50KG (91LB) RBS RAIL = 916,00 TONS

    BALLAST = 916,000 M

    CONCRETE SLEEPERS = 1,282,400

    5 MM THICH HDPE RAIL PAD =2,564,800

    E1820 TYPE PANDROL CLIP/BOLTS =

    5,129,600

    INSULATOR (BLUE/BLAC LINER) =

    5,129,600

    BAR FISHPLATE (PAIR) = 150,164

    FISHBOLT & WASHER = 600,656

    MODULE 1: VICTORIA FALLS MAYOBA (105 KM)

    MODULE 2: MAYOBA CHOMA (112 KM)

    MODULE 3: CHOMA MONZE (101 KM)

    MODULE 4: MONZE NALUAMA (101 KM)

    MODULE 5: NALUAMA CHISAMBA (109 KM)

    MODULE 6: CHISAMBA LUANSHIMBA (103 KM)

    MODULE 7: LUANSHIMBA KAFULAFUTA (104 KM)MODULE 8: KAFULAFUTA MABOTE (94 KM)

    MODULE 9: MABOTE CHINGOLA (92 KM)

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    36/52

    Contribution Package

    INFRASTRUCTURE - BRIDGESMODULAR DESIGN CONSTRUCTION

    RIVER BRIDGES = 22

    ROAD OVER BRIDGES = 3

    ROAD UNDER BRIDGES = 5

    FOOT BRIDGES = 5

    CULVERTS = 868

    MODULE 1: VICTORIA FALLS MAYOBA (105 KM)

    MODULE 2: MAYOBA CHOMA (112 KM)

    MODULE 3: CHOMA MONZE (101 KM)

    MODULE 4: MONZE NALUAMA (101 KM)

    MODULE 5: NALUAMA CHISAMBA (109 KM)

    MODULE 6: CHISAMBA LUANSHIMBA (103 KM)

    MODULE 7: LUANSHIMBA KAFULAFUTA (104 KM)MODULE 8: KAFULAFUTA MABOTE (94 KM)

    MODULE 9: MABOTE CHINGOLA (92 KM)

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    37/52

    Contribution Package

    INFRASTRUCTURE - ELECTRIFICATIONMODULAR DESIGN CONSTRUCTION

    14 SUB-STATIONS

    367,000 POLES

    921 KM CATENARY SYSTEM

    921 KM DISTRIBUTION

    FACILITY

    921 X 2 FANCING ALONG LINE

    MODULE 1: VICTORIA FALLS MAYOBA (105 KM)

    MODULE 2: MAYOBA CHOMA (112 KM)

    MODULE 3: CHOMA MONZE (101 KM)

    MODULE 4: MONZE NALUAMA (101 KM)

    MODULE 5: NALUAMA CHISAMBA (109 KM)

    MODULE 6: CHISAMBA LUANSHIMBA (103 KM)

    MODULE 7: LUANSHIMBA KAFULAFUTA (104 KM)MODULE 8: KAFULAFUTA MABOTE (94 KM)

    MODULE 9: MABOTE CHINGOLA (92 KM)

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    38/52

    Contribution Package

    FIXED ASSETS - STATIONSMODULAR DESIGN CONSTRUCTION

    REHABILITATION OF ALL SMALL

    STATIONS BY BUILDING

    PLATFORMS AND WAITING

    ROOMS > 150

    REBUILDING OF KITWE, NDOLA,

    KAPIRI, KABWE, KAFUE,

    MAZABUKA, CHOMA,

    LIVINGSTONE

    TOTAL SINKING OF LUSAKA FOR

    LAND DEVELOPMENT

    MODULE 1: VICTORIA FALLS MAYOBA (105 KM)

    MODULE 2: MAYOBA CHOMA (112 KM)

    MODULE 3: CHOMA MONZE (101 KM)MODULE 4: MONZE NALUAMA (101 KM)

    MODULE 5: NALUAMA CHISAMBA (109 KM)

    MODULE 6: CHISAMBA LUANSHIMBA (103 KM)

    MODULE 7: LUANSHIMBA KAFULAFUTA (104 KM)

    MODULE 8: KAFULAFUTA MABOTE (94 KM)

    MODULE 9: MABOTE CHINGOLA (92 KM)

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    39/52

    Contribution PackageFIXED ASSETS - STATION MODERNISATION

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    40/52

    Contribution PackageFIXED ASSETS - STATION MODERNISATION

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    41/52

    Contribution PackageFIXED ASSETS - STATION MODERNISATION

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    42/52

    Contribution PackageFIXED ASSETS - LUSAKA STATION UNDERGROUND

    Opportunity

    DEVELOPMENT

    OF THE PRIME

    BUSINESS ZONE

    The City

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    43/52

    Contribution Package

    ENGINEERING DESIGN THINK TANK

    RESEARCH

    &

    DEVELOPMENT

    INSTITUTE OF RAILWAY STUDY

    AT THE COPPERBELT UNIVERSTY

    DEISGN OF

    ROLLING STOCK,

    VEHICLES EQUIPMENT

    INFRASTRUCTURE

    &

    FIXED ASSETS

    MANUFACTURING

    OF

    ALL ENGINEERING DESIGNED PRODUCTS

    MARKET: ZR; ALL HEAVY & LIGHT INDUSTRIES; MINES; AGRICULTURE; TRANSPORT

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    44/52

    Contribution Package

    ENGINEERING DESIGN - FUTURE ROLLING STOCK

    Designed by Professor Clive Chirwa

    Contribution Package

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    45/52

    Contribution Package

    ENGINEERING DESIGN - FUTURE ROLLING STOCK

    Designed by Professor Clive Chirwa

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    46/52

    Contribution Package

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    47/52

    Contribution PackageENGINEERING DESIGN - CURRENT FREIGHT ROLLING STOCK

    Contribution Package

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    48/52

    Contribution PackageENGINEERING DESIGN - ROLLING STOCK

    OUR GOAL

    Designed by Professor Clive Chirwa

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    49/52

    Delivery Milestones

    TASKS YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5

    QUARTER 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

    PREAMBLE

    ERA

    RP

    FEIDD

    PHASE 1

    LINE 1

    LINE 2

    LINE 3

    PHASE 2

    LINE 4

    LINE 5

    LINE 9

    PHASE 3

    LINE 6

    LINE 7

    LINE 8

    LINE 10

    TRAINING

    DELIVERY TIMELINE

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    50/52

    Delivery Milestones

    TASKS YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5

    QUARTER 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

    PREAMBLE

    ERA

    RP

    FEIDD

    PHASE 1

    LINE 1

    LINE 2

    LINE 3

    PHASE 2

    LINE 4

    LINE 5

    LINE 9

    PHASE 3

    LINE 6

    LINE 7

    LINE 8

    LINE 10

    TRAINING

    DELIVERY TIMELINE

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    51/52

    New Industrial Progression

    ZR

    Rolling stock

    Manufacturing

    Think-Tank

    & Research

    Stone/Wood/

    Cement/etc..

    IT Hardware &

    Software

    Production

    Vehicle/

    Construction

    Machines

    Production

    Electricity

    Generation &

    Water

  • 7/29/2019 EIZ Zambia Railway Reconstruction - Akapelwa Lecture by Clive Chirwa

    52/52

    Thank You