1
Date Filming or Editing? Date Filming or editing? 5 th –7 th December Film just narrative 9 th January Import photos and begin to edit 10 th December (possibly stay behind) Import footage onto computer and begin editing 16 th – 17 th Last filming day (hopefully) keep feedback to refer back to 11 th /12 th Stay behind after school to edit. 21 st (possibly staying behind) Import footage and edit 17th Initial screening and gain feedback. 22 nd/23rd possibly staying behind Editing footage and photos (digipak and magazine advert) over the holiday (starts Try to rent a camera out and 28th Editing footage and photos

Editing and filming schedule

  • Upload
    lou550

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Editing and filming schedule

Date Filming or Editing? Date Filming or editing?

5th –7th December

Film just narrative 9th January Import photos and begin to edit

10th December (possibly stay behind)

Import footage onto computer and begin editing

16th – 17th Last filming day (hopefully) keep feedback to refer back to

11th/12th Stay behind after school to edit.

21st

(possibly staying behind)

Import footage and edit

17th Initial screening and gain feedback.

22nd/23rd possibly staying behind

Editing footage and photos (digipak and magazine advert)

over the holiday (starts 19th)

Try to rent a camera out and film (working a lot during hols period so might not get much done

28th Editing footage and photos (digipak and magazine advert)

7th January React to feedback 29th/30th 4th February

Editing footage and photos (digipak and magazine advert)Final editing

Thursday 8th Start shooting magazine and digipak

7th February Deadline.