    Structural Steel works Div.

    EDAT INDUSTRIAL SOLUT

  • 8/12/2019 Edat Steel Works Div.

    2/14

    EPC CONTRACTOR

    DESIGN, ENGINEERING & PROCUREMENT FABRICATION, PAINERECTIO

  • 8/12/2019 Edat Steel Works Div.

    3/14

    GENERAL INFORMATION

    EDAT has as engineering execution and technical

    expertise in the fabrication & erection of all kinds of

    Steel structures.

    EDAT undertakes the erection of piping, and structural

    work in main plant building, bunker bay and

    miscellaneous structures.

    EDAT has steel fabrication capacity and specializes in

    building steel structures for thermal power plants. The

    company takes up civil works for power plants of up to

    500 MW. EDAT undertakes manufacture, supply, and

    commissioning of super-heater Eco, reheater coils

    and equipment for thermal power stations.

  • 8/12/2019 Edat Steel Works Div.

    4/14

    DESIGN & ENGINEERING

    Recognizing the customer requirementfor a one stop solution, we offer the

    complete Design and Build package for

    steelwork. Our design capability draws

    on the expertise of structural

    steel Engineers who each have 8 years

    of experience in the trade. Couple that

    with the 10 years service of ourConstruction team.

  • 8/12/2019 Edat Steel Works Div.

    5/14

    DESIGN & ENGINEERING

    EDAT can meet, and often exceed, our clients

    requirements, utilizing the wealth of

    experience available from key personnel. We

    offer a complete service, from Design,

    Fabrication, through to Installation within the

    Structural Steel Industry. In addition to the

    structural steel service EDAT. have the in-house ability to undertake cladding design,

    supply and installation packages as required.

  • 8/12/2019 Edat Steel Works Div.

    6/14

    PROCUREMENT

    Procurement of steel material as perthe specification and standards

    mentioned.

    Procurement from certified suppliers.

    Obtain the complete test certificates

    & Mill certificates with the certificate

    of origin. The material supplied must be in

    accordance to IS 8910.

  • 8/12/2019 Edat Steel Works Div.

    7/14

    FABRICATION & PAINTING As the material is inspected and

    approved by the Quality ControlDept. and the fabrication drawingsare approved by the client, thefabrication team start its process.

    Complete fabrication is done inaccordance with the relevantstandards, the project specifications

    and approved drawings. Periodically the QC will be checking

    the fabrication works

    After the completion of the fabricationworks, the member is sent forcleaning and blasting (if required).

    After the member is clea

    from all the debris and c

    welding points are inspe

    Then the member is sen

    per the required specific

    requirement.

    Special type of paints an

    procedure is followed forstructure, Oil & Gas plan

    Plants etc

    As per the requirement t

    fire proofed by painting I

    Paints and cementitious

  • 8/12/2019 Edat Steel Works Div.

    8/14

    FABRICATION & PAINTING

  • 8/12/2019 Edat Steel Works Div.

    9/14

    ERECTION1. After the complete fabrication

    is done in the workshop, afterthe cleaning and painting isdone the members are thentransported to site on trailers.

    2. On arrival of the completemembers on site the erectionteam and the site QC inspectorcheck the material on the basisof the project specification andthe approved drawings forconstruction.

    3. Then daily erection aplaned and the erectstructure begins withcranes.

    4. Erection of a structurqualified erectors an

    5. The site engineer ansupervisor ensures a

    and all the required ttools are on site for t

    6. A site safety officer aalways present on siinspections and audi

  • 8/12/2019 Edat Steel Works Div.

    10/14

    ERECTION

  • 8/12/2019 Edat Steel Works Div.

    11/14

    ORGANIZATION CHART

    BOD

    GM DESIGN &

    DEVELOPME

    NT

    DESIGN

    ENGINEERS

    CAD

    OPERATORS/

    DRAFTMAN

    GM

    PROJECTS &

    PRODUCTION

    PROJECT

    MANAGER

    PROJECT

    ENGINEER

    PRODUCTION

    ENGINEER

    WORKSHOP

    SUPERVISOR

    FABRICATORS

    WELDERS TACK WELDERS HELPERS

    SITE ENGINEER

    SITE

    SUPERVISOR

    SITE FOREMAN

    ERRECTORSSEMI SKILLED

    HELPERS

  • 8/12/2019 Edat Steel Works Div.

    12/14

    LIST OF EQUIPMENT

    N0.T LIST OF MACHINES/EQUIPMENT N0.T LIST OF MACHINES/E

    1 BAND SAWING MACHINE KBS 1301 DG 15 AIR DRYER

    2 HYDRAULIC BENDING MACHINE 6mm THICK 16 DRILL AND END MILL GRINDING

    3 HYDRAULIC SHEARING MACHINE FOR 16mm THICK 17 UNIVERSAL IRON WORKER

    4 SIX WHEEL AUTOMATIC SHOT BLASTING MACHINE 18 RADIAL DRILL

    5 INFEED AND OUT FEED CONVEYORS FOR 18mm EACH 19 CUT OFF MACHINE

    6 9000 CFM DUST COLLECTOR FOR BLASTING MACHINE 20 PIPE BENDER WITH DIE

    7 AIRLESS SPRAY PAINTING SYSTEM 21 FORK LIFT 5 TONNER8 WELDING MACHINE 600 Amp FCAW 22 PORTABLE AUTOMATIC GAS CU

    9 WELDING MACHINE SMAW 23 PLASMA CUTTING MACHINE

    10 WELDING MACHINE 400 Amp FCAW 24 FORKLIFT 3 TONS

    11 OVERHEAD CRANE 10 MT CAPACITY

    12 SEMI GANTRY CRANE 10 MT CAPACITY

    13 AIR COMPRESSOR 7.5 HP

    14 AIR STORAGE TANK

  • 8/12/2019 Edat Steel Works Div.

    13/14

    LIST OF MANPOWERSr.n. LIST OF MAPOWER Nos.

    1 General Manager Design & Development 1

    2 General Manager Projects & Production 1

    3 Projects Managers 2

    4 Project Engineers 2

    5 Design Engineers 2

    6 Site Engineers 4

    7 CAD Operators/ Draftman 4

    8 Site Supervisors 49 Site Foremans 4

    10 Production Engineer 1

    11 Workshop Supervisors 2

    12 Fabricators 6

    13 Welders 6

    14 Tack Welders 2

    15 Errectors 15

    16 Helpers 25

  • 8/12/2019 Edat Steel Works Div.

    14/14

    HSE All the staff and workers have to comply

    with the safety rules and regulations of thecompany.

    No person is allowed on site without thePPE (Personal Protective Equipments)

    The PPE general requirement is asfollows,

    Safety shoes (i.e., with steel toe)

    Safety helmet,

    Hand gloves (normal)

    Leather hand gloves for the erection teamand welders.

    Safety Glasses.

    Dust mask.

    Work safe - live